Full Transcript

·YouTLDR

Harrisburg City Planning Commission - 07/02/2025

1:22:44EnglishTranscribed Jun 15, 2026
2:37

Call the Harford Planning Commission

2:38

meeting to order at approximately 6:33.

2:42

Uh commissioners um receive your

2:46

minutes, the June 4th minutes hopefully

2:51

through the internet.

2:53

Um are there any changes, deletions,

2:56

additions?

3:02

Is there a second?

3:04

Second. It's been moved and second for

3:06

the approval of amendments as they are.

3:09

All those in favor state by stating I

3:13

oppose. Abstension.

3:18

I wasn't here. One

3:22

motion car

3:24

under old business. This is a variance

3:27

application for 1951 her street is zone

3:31

industrial and commercial neighborhood.

3:34

This file by Justin Woodward with

3:37

complete signs to install a wall sign 50

3:40

square feet larger than per right 25.

3:47

Oh yeah.

4:03

Yep. Uh so the applicant is proposing to

4:06

install an internally illuminated wall

4:08

sign uh which is 50 square feet which is

4:10

larger uh than permitted by right which

4:12

is 25 square feet in the commercial

4:15

neighborhood uh zoning district uh in

4:17

which this portion of the property is

4:19

located. Uh the property in 1951 Hurst

4:22

Street was previously comprised of two

4:23

separate tracks that total 71 acres

4:26

which were consolidated in 2023 as part

4:28

of a larger land development plan

4:29

involving the removal of a diner on site

4:31

and expansion of the gas station and

4:33

convenience store currently under

4:34

construction. The property is bounded by

4:36

Hurst Street to the north, North 20th

4:38

Street to the east, Kungl Street to the

4:40

south, and the property at 1927 Hurst

4:41

Street to the west. Given that the

4:43

property is currently under

4:44

construction, there is not much

4:45

information to provide regarding the

4:46

structures on site. Although it should

4:48

be noted the primary structure of the

4:49

convenience store will be a one-story

4:50

building characterized by varied facade

4:52

treatments including brick, metal, and

4:54

stone and large window systems. The main

4:56

entrance features full view metal double

4:58

doors flanked by sidelights and topped

5:00

with transoms. Fenistration is otherwise

5:02

limited to large storefront uh windows

5:04

on either side of the main entrance and

5:05

a small installation of clay glass

5:07

windows on the side elevation facing

5:09

Hurst Street. The remainder of the site

5:11

features gas pumps on islands underneath

5:13

a large canopy occupying the eastern

5:15

half of the property. Pur Street

5:16

corridor features little of

5:18

architectural distinction and is largely

5:19

characterized by mid-century commercial

5:21

and industrial buildings or historic

5:23

institutional structures. Thus, the

5:25

property does not contribute to the

5:26

character of the streetscape or

5:28

neighborhood. Uh the planning bureau

5:31

staff recommends the request be approved

5:33

for the following reasons. The site

5:35

features conditions that justify the

5:36

requested zoning relief, including a

5:38

complicated intersection and extensive

5:40

street furniture, including utility

5:41

poles, traffic control poles, and

5:43

signage. Uh the applicant did not have

5:45

the option of constructing the

5:46

convenience store in the IND zoned

5:48

portion of the property which would have

5:50

permitted the proposed signage by right

5:51

as the site design is necessary to allow

5:53

appropriate vehicular access and

5:54

circulation. The proposed signage

5:56

represents a minor deviation from the

5:58

zoning code to allow visibility and

6:00

legibility for drivers traveling along

6:02

Hurst Street. And finally, the proposed

6:03

signage would not be out of character

6:05

for this portion of Hurst Street. Thank

6:07

you, Jeff. Could you state your name,

6:10

address, and relationship to the

6:12

project?

6:13

My name is Dennis Boyer. I'm the owner

6:15

of Signature Sign who was hired to

6:18

install the sign. I'm not the one that

6:20

applied for the variance, but u we are

6:23

in Reading, PA 926 New Holland Road in

6:27

Reading, 19607.

6:30

Thank you.

6:34

I have no questions at this time.

6:36

Commissioners, I'll start with

6:39

Yeah, I really have no questions. seems

6:41

pretty straightforward and every time we

6:43

have a sign

6:45

for us I go on record I think our sign

6:47

restrictions are too restricted anyhow

6:49

so favor

6:53

no questions commission

6:57

no questions I think this is

6:59

straightforward

7:01

commissioner Jordan no questions

7:04

with that I'll go to the public

7:07

anyone for against this project Start to

7:11

the left

7:13

middle.

7:16

There's be no objections from the

7:19

public.

7:21

Got a motion. As everyone said, this is

7:23

pretty straightforward.

7:29

No.

7:31

Second. Been moved and second for

7:35

approval of this uh project. All those

7:37

in favor state I. I opposed abstensions.

7:42

Motion carried too much. Thank you.

7:47

Didn't even let me give me all my

7:49

arguments.

7:52

You might.

7:56

Thank you. You end up arguing against

7:57

yourself.

8:00

Okay. Under new business, this is a a

8:03

varants application for 67th Street,

8:07

which is an industrial

8:09

is filed by Ben Orin and Alira

8:14

MH 360 is to install a second vol.

8:23

Okay. Uh so the application for 600

8:26

South 17th Street involves a proposal to

8:28

install a second wall sign on site which

8:31

is 96.6 ft where only one sign wall sign

8:34

is permitted by right per section

8:35

7-325.6

8:37

the zoning code. Thus, the proposal

8:39

requires zoning hearing board approval

8:40

of a variance application. Property at

8:42

600 South 17th Street is a 5.81 acre lot

8:45

featuring a one-story 80,784t

8:48

structure which was constructed in 1960.

8:51

Property is bounded by Brookwood Street

8:52

to the north, South 17th Street to the

8:55

east, railroad tracks to the south, and

8:56

the property of 600 South 15th Street to

8:59

the west. This attached structure

9:00

features elements of a vernacular

9:02

industrial architectural style.

9:04

Character defining features include the

9:05

substantial building setback from the

9:07

street, chainlink fence topped with

9:08

barbed wire encircling the property,

9:10

painted CMU block facade, large awnings

9:13

over entrances on the eastern and

9:14

southern elevations and loading bays on

9:16

the western elevation. The main entrance

9:18

on the eastern elevation features a full

9:20

view metal door topped with a simple

9:21

glass plate glass transom and flanked by

9:23

Florida ceiling plate glass windows. Is

9:26

sheltered by a large awning with

9:27

standing seam metal roof. A secondary

9:29

access on the southern elevation

9:30

features a similar full view metal door

9:33

without transoms or sidelights which is

9:34

also sheltered by a large awning with

9:36

standing seam metal roof. Administration

9:38

otherwise is limited to small play glass

9:40

windows on the eastern and southern

9:41

elevations. Structure is topped with a

9:43

flat rubber roof. Property features

9:45

maintain landscaping along the northern

9:47

and eastern frontages with natural

9:48

vegetation bordering the railroad lines

9:51

to the south and a large surface lot

9:53

providing accessory parking accessible

9:55

from both Brookwood Street and South

9:57

17th Street occupying the remainder of

9:59

the site. Although the archite although

10:01

the architectural style differs somewhat

10:03

from the residential neighborhood

10:05

directly to the north, it is similar to

10:06

the Massian design of the industrial

10:08

properties to the east and south. As

10:10

such, the subject property contributes

10:12

minimally to the architectural character

10:13

of the community.

10:16

The planning bureau staff recommends the

10:18

request be approved for the following

10:19

reasons. The proposed signage will

10:21

better identify the businesses and

10:23

appropriately direct vehicular traffic

10:24

to the on-site parking for visitors from

10:26

the south and specifically from

10:28

Interstate 83 where the majority of

10:30

deliveries, shipments, and visitors are

10:31

anticipated. Aside from the zoning

10:33

relief required for the additional sign

10:35

beyond that permitted by right in the

10:36

IND district, the proposed signage is is

10:39

otherwise in conformance with the size,

10:40

height, and illumination regulations.

10:43

Thank you. Could you state your name,

10:45

address, and relationship to the

10:47

business? Yeah. Uh Ben Orens, um owner

10:50

of Image 360, which is at um

10:53

excuse me, uh 6395

10:56

69 to 51 sweet D, Allentown Boulevard,

11:00

Harrisburg, Pennsylvania 17112. And I'm

11:03

the owner of Image 360, which is the

11:05

sign company that is um installing the

11:08

sign on behalf of the client. Okay.

11:10

Thank you. Um again, I have no

11:14

questions. This appears to be

11:16

straightforward, but Start with

11:18

Commissioner

11:20

for any concerns or questions. I agree

11:22

with you, Joe. It's pretty

11:23

straightforward. No questions.

11:27

Commissioner Re, no questions.

11:29

Commissioner Mary,

11:33

I do have one question. I just looking

11:35

at the plans. Which street would the

11:38

signage be facing? Is it along 17th

11:40

Street? Uh, or actually on the back

11:44

side?

11:45

It would be on

11:56

Well, South 17th Street is the main

11:57

street that runs along the building. So,

11:59

it would be on South 17th Street. That's

12:01

where the building face is facing.

12:02

That's the Okay, correct. Thank you. I

12:04

was just trying to get a little

12:05

orientation. I think the signage in and

12:07

of itself is fine. I didn't have any

12:09

questions on that. I just couldn't

12:10

visualize which side it was on. Thank

12:12

you,

12:14

Commissioner Jordan. No questions.

12:17

Go to the public again. Is there anyone

12:20

for against this project? My left

12:27

no one from the public against this

12:31

board against

12:34

commissioners. Could I get a motion?

12:38

Motion to approve.

12:40

Conditions. There's no conditions.

12:44

Second.

12:46

Second move second for approval. Uh with

12:50

no additions.

12:53

All those in favor state by saying I IOT

12:59

motion car.

13:01

I was told I had to bring a copy of the

13:03

deed of the building. Uh yeah, that'll

13:04

be for the zoning hearing board. Yeah.

13:06

Okay. You want to take it?

13:15

All set. Y thanks guys.

13:23

Okay. Item number item number two is

13:26

this a variance application for 1332

13:30

noise second zone residential medium

13:33

density is filed by Nathan Bner

13:38

with Bner Reynolds is to establish a

13:40

parking lot for structure commercial

13:42

use.

13:44

Yep. So the applica the application for

13:47

1332 North Second Street is a proposal

13:49

to establish a parking lot or structure

13:50

commercial use. Such uses are not

13:52

permitted by right in the RM district

13:55

per section 7-305.7 of the zoning code

13:57

and thus the proposal requires zoning

13:59

hearing board approval of a variance

14:01

application. The property at 1332 North

14:04

Second Street is a48 acre lot featuring

14:06

a three-story structure resulting from

14:08

the combination of three separate

14:09

buildings into a funeral home with a

14:11

total area of 8,428 square ft which was

14:15

constructed circa 1987 and a separate

14:17

storage garage of 220 ft which was which

14:20

was constructed 1957.

14:23

The property is bounded by Calder Street

14:25

to the north, North Second Street to the

14:27

east, Safeford Street to the south, and

14:29

the property at 124 Safford Street, and

14:31

a small grosser alley to the west. The

14:33

semi-et the semi- detached structure

14:36

features element of elements of an

14:37

indeterminate architectural style.

14:39

Character defining features include the

14:41

formstone facade and water table, the

14:43

multiple access points sheltered by

14:44

awnings around the building, including

14:45

the main entrance sheltered by a large

14:47

arched awning extending the full width

14:49

of the sidewalk, the regular

14:50

fenistration pattern, the upper floor

14:52

decks on the rear elevation and roof,

14:53

and the freestanding signs near the

14:55

parking lot and building entrances.

14:57

There are multiple entrances throughout

14:58

the building, although the main entrance

14:59

on the eastern elevation features panel

15:01

double doors and a full view door set in

15:03

simple frames which are sheltered by a

15:05

large awning with square post and arch

15:07

section extending to the curb along

15:09

Second Street. Other entrances on the

15:11

front and side elevations feature the

15:12

same types of doors and similar awnings.

15:14

Penistration on the front elevation

15:17

features two over two windows set in

15:19

simple formstone surrounds with soldier

15:21

course headers and sills wrapped in

15:22

aluminum. Penetration on the on the side

15:25

elevation is more irregular and features

15:27

two over two, one over one and plate

15:29

glass windows. The structure is

15:30

primarily topped with flat rubber roofs.

15:32

The other major feature of the site is a

15:33

sizable surface parking lot occupying

15:35

the southern half of the property which

15:37

is bordered by planting beds with trees

15:38

along the eastern half of the property

15:42

eastern frontage with second street and

15:44

a 4ft high chain link fence along the

15:46

southern frontage with Safford Street.

15:48

Although the architectural style differs

15:49

somewhat from near nearby buildings,

15:51

specifically with respect to the

15:52

formstone and awnings and the large

15:54

parking lot distinguishes the property

15:56

from others in the historic district,

15:57

the building height, massing, and

15:58

location along the lot lines does

16:00

generally reflect the built environment

16:01

of the surrounding community. As such,

16:04

the subject property minimally

16:06

contributes to the architectural

16:07

character of the neighborhood.

16:09

The planning bureau staff recommends the

16:11

request be approved with the following

16:13

conditions. Uh, the applicant should

16:14

provide a site plan of the proposed

16:16

surface parking lot, including aspects

16:18

such as line spaces and driveway aisles

16:20

with dimensions to confirm that the

16:22

parking lot will be in conformance with

16:23

applicable regulations. Site plan should

16:26

identify ways in which to bring the

16:27

property into conformance with the

16:28

applicable zoning regulations, such as

16:30

the inclusion of landscape screening and

16:32

possibly trees planted in the corners of

16:33

the lot. Uh the planning bureau

16:35

recommends the removal of one of the

16:37

second street curb cuts to remove a

16:39

vehicular access point if the applicant

16:41

does not intend on utilizing both access

16:43

points or possibly relocate a vehicular

16:45

access to Safford Street. The planning

16:48

bureau staffer recommends the request be

16:49

approved for the following reasons.

16:51

Proposed use does not require zoning

16:53

relief for any proposed development or

16:55

use but rather who will be using the

16:57

existing parking spaces and thus

16:59

represents a deminimous de deviation

17:01

from the zoning regulations which meets

17:03

the applicable criteria in the zoning

17:05

code. While the surface parking lots are

17:07

generally not advisable from a planning

17:09

perspective as they represent an

17:10

underutilization of valuable urban land

17:12

and create impacts such as storm mod

17:13

runoff and urban heat island effect. In

17:16

this instance, it is reasonable to

17:17

maximize the utility of spaces in in an

17:19

existing lot by leasing parking to local

17:21

residents. And finally, reuse of the

17:24

property to accommodate parking demand

17:25

created by residents and businesses of

17:27

the surrounding neighborhood can provide

17:28

benefits by reducing on street parking

17:30

near intersections and crosswalks and on

17:32

vacant lots. And the site can be

17:34

designed to incorporate elements such as

17:35

landscape screening that improve the

17:37

aesthetics of the property. Thank you.

17:39

Yeah. Could you gentlemen state your

17:42

name, address, and relationship to the

17:44

project? Yes. Uh, good evening. My name

17:46

is Jeff Clark. Um, an attorney at

17:48

Wixwinger in Widner. Address 2805 Old

17:52

Post Road, Sweet 200 in Harrisburg. And

17:54

I'm joined by Nathan Bner.

17:58

Nathan Bner with Rentals. I am the

18:03

director there as well. main office.

18:12

Um

18:14

I guess my only question was I guess I

18:17

think I know where this is in the second

18:19

street you're still active

18:23

still still active. So the the just as a

18:27

clarification because this was brought

18:28

up in the staff report and I I did want

18:31

to make this clarification. It is it it

18:33

is very minimally active. I think it

18:35

averages about one funeral per month.

18:39

But the ultimate purpose I think it

18:42

would be to a um it is listed for sale

18:45

and I think the purpose would ultimately

18:48

be completely multif family

18:50

um instead of a funeral home and multif

18:53

family and then the rest of it being um

18:56

at least for monthly permit parking too

19:00

the neighborhood.

19:02

Thank you.

19:05

I have no other questions at this time.

19:12

Yeah, just got a lot of catching up

19:14

here. Uh

19:16

Jeff, which Wanganger is no longer on

19:18

Second Street? Uh no, we actually moved

19:21

to off Linglestown Road um and sold the

19:25

building. And actually, although it's

19:27

been continued, there's there's further

19:29

down the agenda

19:31

I guess I should have write down these

19:33

is is the uh the the repurposing of our

19:36

of our building, but still serving

19:38

Harrisburg area, but now in Susana

19:40

Township and and I guess the funeral

19:45

the funeral homes in the process of

19:47

possibly going out of business on Second

19:49

Street or relocating. We have two other

19:51

locations here in Harrisburg.

19:54

Seems like

19:58

All right.

20:00

Okay. Well, I was gonna ask what are the

20:03

other ones in in the city? Funeral

20:05

homes. That is there's I really don't

20:08

think there is any might be Kimmel

20:11

Street.

20:13

Yeah.

20:14

Two locations.

20:16

Okay.

20:21

Okay.

20:22

I always like to patronize the city, but

20:25

yeah. I have another question. So, thank

20:26

you.

20:28

Good question.

20:31

Uh, Mr.

20:35

No questions.

20:37

Commissioner,

20:39

yeah, I do have a few questions. Um, is

20:42

the building currently for sale, Ben?

20:47

Okay.

20:49

Um, are you planning on modifying the

20:54

current parking lot? I didn't see any

20:57

hands of the parking lot itself. So I I

21:01

think um there the ordinance does have

21:03

requirements for an off street parking

21:05

lot which we would have to um create a

21:09

plan for. We didn't we haven't created a

21:12

plan I guess and and actually that was

21:14

one point of clarification I had for the

21:16

town for the staff is do we need that

21:18

plan for the zoning hearing board or is

21:21

that if we're granted the variance we

21:23

would need the plan when when applying

21:25

for the for the permit? Um, well, I

21:28

would say so long as the uh aspects of

21:32

the property like the size of the

21:34

parking spaces and stuff were in

21:35

conformance with the zoning code, that

21:37

wouldn't need to, um, be there before

21:40

the zoning hearing board. Um, if there

21:42

were going to be any deviations um, uh,

21:46

we would probably want to see it there

21:48

because those might need to be discussed

21:49

before the zoning hearing board. But, I

21:50

mean, currently the existing property is

21:53

fully paved. um it has been operating as

21:56

a parking lot of of sorts for the

21:58

business. So um you know it could

22:01

certainly be relined. Um but uh uh you

22:04

know so long as that can be done in

22:05

conformance with the zoning code I don't

22:06

think that need is an imminent need.

22:08

Okay. So I I guess in answer in further

22:11

answer to your question I think our

22:12

intent would be to be in compliance with

22:15

the zoning co code as to the

22:17

requirements for a parking lot. Uh it

22:20

does it is used as a parking lot. It

22:22

already has lines, but right, especially

22:25

if one of the if if a condition is

22:28

imposed about closing one, there's two

22:30

entrances on Second Street. I think if

22:32

that if one of them is closed, I think

22:34

it would have to be reconfigured.

22:37

And so, um, we ultimately would have to

22:40

have a a plan, but we would I think the

22:44

goal would be to have it in compliance.

22:46

And and the reason I uh noted the

22:48

recommendation on the relocation is

22:51

because I noticed one of the driveways

22:53

was chained off. So um I didn't know if

22:55

there was a long-term plan to relocate

22:57

an access point or something. Maybe you

22:59

could answer that. No, we we keep it

23:01

chained off just because

23:04

there have been times people

23:08

so we kind of chained it off but we have

23:11

funerals.

23:16

Okay. I I think that clarifies that. I

23:19

that's the line that I was thinking Jeff

23:21

about the zoning code and just the

23:24

parking requirements. And I mean

23:26

ultimately probably getting ahead of

23:27

myself. If you were to sell the building

23:28

and then that owner were to change the

23:31

building and convert to more

23:32

multifamilies, then they would have to

23:34

provide parking. Correct. For those

23:37

units, but that would not fall upon

23:40

their shoulders. Well, so uh there are

23:42

there are actually I think five units in

23:44

the in the building now. Um so it's got

23:47

a unusual configuration of funeral home,

23:49

first floor, apartments above. Um, and I

23:53

would anticipate that uh for any new

23:56

owner, they would have to be providing

23:57

parking for the residents of the

23:59

building. And currently the tenants of

24:01

the of the apartments do park in that

24:04

parking lot. And so, you know, I think

24:07

it would be assumed that any any

24:09

additional tenants would get those park

24:11

would get parking spaces to comply with

24:14

that and then the remainder would be per

24:16

monthly permitted. Yeah. I mean, I I

24:20

definitely um support the need for

24:23

additional parking in that neighborhood.

24:26

Um it can be a challenge, especially on

24:28

street cleaning days. Uh in this area,

24:32

it's not in the parking standard

24:36

parking. Correct. I saw on your case

24:39

report. So, it's abuing it. It is. It

24:41

runs down Second Street. Um and then I

24:44

think west along um Verbbeck. Okay. So

24:48

they're just outside, correct? Where

24:50

they're not competing. There's no issue

24:52

there. Okay.

24:59

That's it. I don't have any other

25:00

questions.

25:03

Commissioner Jordan. Yeah, just just one

25:06

question. So you're saying on average

25:08

now you're currently having about one

25:10

funeral a month, correct? Correct. So

25:12

when that does occur with the current

25:15

tenants that you have there or um are

25:17

you experiencing any type of I guess

25:19

logistics issue as far as parking and

25:22

running a service?

25:26

I think it's generally coordinated with

25:28

the tenants and they're sort of warned

25:30

and

25:32

uh but there are 40 spaces so I think it

25:35

uh tends to be plenty.

25:42

Um,

25:44

is there anyone in the public getting

25:47

less and less against this project?

25:50

Start with the center, right?

25:54

If not, commissioners, can I get a

25:55

motion?

25:58

Motion to approve with conditions. Is

26:00

there a second?

26:03

Moved a second for approval with the

26:05

conditions. All those in favor state by

26:06

saying I. I. I. opposed.

26:12

Thank you very much.

26:30

The next one is the item number three.

26:32

This is a variance and special exception

26:34

application for 2001.

26:37

Atlantic Street

26:41

residential medium densities followed by

26:44

RA construction and to convert the

26:46

existing single family dwelling to a two

26:49

unit multi family.

26:53

Uh yes. So, the uh proposal for 2001

26:57

Lennox Street uh represents the

26:58

conversion of the existing structure to

27:00

a two-unit multif family dwelling, which

27:02

requires only hearing board approval of

27:03

a special exception for the proposed use

27:05

and relief from the off- streetet

27:06

parking requirements per section 7-305.7

27:09

and 7-3 27.6 of the zoning code,

27:12

respectively, and a variance for relief

27:14

from the density regulations in section

27:16

7-307.3

27:18

of the zoning code. Property at 2001

27:20

Lennux Street is a 04 acre lot featuring

27:22

a 2 and 1/2 story 2400 square foot

27:24

structure which was constructed in 1920.

27:27

Property is bounded by Lennux Street to

27:28

the north. The property at 2003 Lennux

27:30

Street to the east, chalky alley to the

27:32

south, and South 20th Street to the

27:34

west. The semi- detached structure

27:36

features elements of vernacular

27:38

architectural style. Character defining

27:40

features include the painted brick

27:42

facade, the large deck fronting the

27:43

enclosed former front porch, the

27:45

two-story deck on the rear elevation

27:47

with a wide wooden fire escape, the

27:49

gabled roof, clad and standing seam

27:52

metal roof, and the detached garage with

27:55

wooden swing outdoors. The main entrance

27:57

features a wooden door fronted by a

27:59

threequarter view storm door is accessed

28:01

by a wooden porch and concrete steps.

28:04

There are secondary entrances accessible

28:05

via the rear porch and fire escape.

28:08

Penetration also includes 21 wooden

28:10

windows in a variety of pane

28:11

configurations and settings. The first

28:13

floor features divided light windows

28:14

primarily in 2 over2 and 6 over6

28:17

configurations while the upper floors

28:18

feature primarily one over one windows.

28:20

Structure is topped with a clipped

28:22

gamrell roof clad and standing seam

28:24

metal. There is a detached hip brick

28:26

garage at the rear of the property with

28:28

wooden sidehinged garage doors with a

28:30

hip roof clad and asphalt shingles. As a

28:33

semi- detached structure, the building

28:34

mirrors architectural features of its

28:36

pair to the east. Although there are

28:37

differentiations in some aspects such as

28:39

the porch and rear elevation and

28:41

generally reflects the massing of other

28:43

properties in the surrounding

28:44

neighborhood. As such, the building does

28:46

contribute to the architectural and

28:47

historic character of the streetscape

28:49

and neighborhood.

28:51

The planning bureau staff recommends the

28:53

request be approved with the following

28:55

conditions. If granted zoning approval

28:57

to move forward with the project as

28:58

proposed, the applicant shall allow the

28:59

codes bureau to perform a comprehensive

29:01

inspection to identify any outstanding

29:03

code violations and will receive

29:05

approval for all for all necessary city

29:07

permits prior to receiving their a

29:08

certificate of occupancy. And I note

29:10

that I believe the applicants have been

29:11

in coordination with the city's codes

29:13

bureau on inspection of the property.

29:15

And the applicant must remove the fence

29:17

between the driveway and Chalky Alley,

29:19

which is currently blocking the public

29:20

right ofway, and require tenants to

29:22

either park in the garage or on the

29:23

street to ensure that an ADA compliant

29:25

sidewalk is maintained along South 20th

29:28

Street. Planning Bureau Staff recommends

29:29

the request be approved for the

29:30

following reasons. The zoning relief

29:32

request for the proposed use are

29:33

warranted by the history of the property

29:35

which has operated in the past as two

29:37

units as well as the configuration of

29:38

the property in which existing features

29:40

such as the rear fire escape to the

29:42

second floor provides a building code

29:44

required secondary egress. Um the

29:47

property the project will address the

29:49

primary concern of the public regarding

29:50

such conversions specifically the impact

29:53

of on parking available to existing

29:55

residents through the provision of the

29:56

required parking in the detached garage

29:58

at the rear of the property and due to

29:59

the availability of ample on street

30:01

parking along the frontage of the

30:02

property with South 20th Street and

30:04

Lennox Street.

30:06

Thank you. Could you state your name,

30:09

address, and relationship to the

30:11

project?

30:16

My name is Sambu Alar. I'm owner of

30:19

2001.

30:21

My address is 6431,

30:25

Pennsylvania.

30:28

My name is Gerald Bradzik, general

30:30

contractor. My address is 4908 Sunset

30:33

Drive, Harrisburg.

30:38

Both of you heard the conditions. Are

30:40

you acceptable of those conditions? Yes.

30:45

So everything that conditions has

30:48

already been planned

30:52

except the removable fence which

30:59

I don't have any questions at this

31:01

moment. Um so commissioners I'll go to

31:04

you with the questions or concerns.

31:17

Yes.

31:22

Yeah.

31:23

And just to clarify, this is similar to

31:25

the property for 3100 North Third Street

31:27

where at one point it operated as two

31:29

units. The um commissioners may remember

31:32

that it had a three unit three space

31:34

garage at the rear of it. Uh but it

31:36

hadn't been um occupied as two units for

31:38

like 20ome years. So per the zoning code

31:41

uh the uh former non-conforming aspect

31:44

uh rever um was vacated and it reverted

31:46

to the underlying zoning. So just to

31:48

clarify that aspect

31:56

no questions.

32:02

No I don't think I have any questions.

32:03

It looks like the variance requirement

32:05

actually goes away because they have the

32:09

square footage uh for the specific

32:11

criteria, not for the density. Oh, okay.

32:15

Okay.

32:17

But beyond that, uh it looks like they

32:21

could potentially provide

32:24

at least two off street parking spaces

32:26

if they fix the garage or there are two

32:30

spaces right outside the garage.

32:32

Concrete But you

32:35

I thought those infringe on the right of

32:37

what public right? Yeah. So those aren't

32:39

technically spaces because they'd be

32:40

blocking the sidewalk and and I know

32:42

that there's there wasn't a sidewalk uh

32:44

at the property of the south 2008 Paxton

32:47

Street, which was a car dealership for a

32:48

long time, but when they reconstructed

32:50

it, we had them put in uh sidewalks in

32:52

the public rightway. So now there is

32:54

like a path across Chalky Alley there.

32:56

So yeah. So, I mean, if you're able to

32:59

repair that garage or even just remove

33:01

the doors, you would have two parking

33:03

spaces that could be utilized

33:07

the approval then definitely I have a

33:09

plan to

33:12

I don't have any other questions.

33:16

Commissioner Jordan, no. No further

33:18

questions.

33:20

Okay, I'll go to the public. Uh, no one

33:23

on my left, no one in the center. And to

33:27

my right.

33:30

Okay.

33:32

Microphone state your name and address.

33:36

Can you see my tenant on top floor now?

33:39

Yes. Um I'm Telicia Chisum. I live at

33:42

201 Linux Street. Um we're on floor two

33:47

is we have six um occupants in on the

33:51

second floor and um

33:56

it's It's a lot of us there, but I'm

33:59

nervous about the the construction

34:02

because the foundation isn't

34:06

doesn't look even like and it's we're

34:09

already occupying. So, it just looks

34:13

like it's it's going to disturb. I have

34:15

two disabled children and it looks like

34:18

it's going to like um a disturbance for

34:20

us and um

34:24

I The only way to get down to the front

34:29

um is

34:32

like to go out front is through the

34:34

regular way to come downstairs and you

34:37

got to go through the apartment the the

34:39

the unit that he's making downstairs. We

34:42

have to go through that to access the

34:44

front door right now. And I guess that's

34:46

what he's trying to, you know, construct

34:49

into

34:50

just the one, you know, like so both

34:53

units could access the front. But it's

34:56

it's concerning because we're there

34:59

already and the structure like it just

35:02

when you go up the stairs, it it's

35:04

already kind of leaning, which makes me

35:07

nervous for my family. Um, and I just I

35:12

did want to come and say that to you

35:14

guys because it's not just myself, but I

35:17

have children. I have a fiance. I fell

35:20

down the back stairs already. Um,

35:24

because when we moved in, I didn't know

35:27

it was Mossy. I didn't know anything

35:28

about any loss, but I fell down and

35:31

fractured my tailbone um already in the

35:34

back. and I had um city code came out um

35:38

because of that. Um

35:42

and then it's like a lot of u different

35:46

things going on in the unit and we we

35:50

already spoke on it and the landlord

35:52

about um you know like he had he he's

35:55

trying to fix things. I'm I'm not going

35:57

to say he's not. Um but I just wish they

36:01

were already fixed before we got there.

36:03

But I didn't know all this stuff was

36:04

going to take place um right at that

36:07

time, you know, when we were moving in

36:09

because we our lease was up where we

36:10

were moving from. So, I was just trying

36:12

to find somewhere for me and my four

36:15

children, you know, me and my family.

36:17

So, um we we moved in and it's a lot of

36:23

things going on in in the unit. Um like

36:27

we have electrical problems, we have um

36:32

like

36:34

pest, we have rats,

36:38

um roaches,

36:40

and

36:43

I'm

36:44

I'm here because I just I need I need to

36:47

know what's going on with our home. We

36:51

have to live in this house. We're here.

36:55

So, I I I do I I have a voice and I

36:59

wanted to use it today because I feel

37:01

like it's hard right now. We don't know

37:05

what to do.

37:07

And he and when we moved in, it's also a

37:11

uh we don't have a living room. We don't

37:13

have a dining room. We only have four

37:16

bedrooms and a kitchen.

37:19

Okay. Thank you. Thank you. I'm going to

37:23

let you respond.

37:25

Let me explain.

37:30

I bought this property.

37:35

Could you could you speak?

37:39

It it it has a different condition. I

37:43

improve a lot because they have a two

37:48

electrical panel is old old panel and I

37:52

changed the new panel board.

37:54

already there and some of the electrical

37:59

uh uh w the lines were not you know uh

38:06

working fine and yesterday I always

38:09

taking care as soon as they complain

38:11

about anything I went there and bring

38:14

some people to fix it immediately

38:16

because we haven't started the

38:18

construction at so uh uh whatever the

38:23

problem they have, we fixed it. Like uh

38:26

the electrical panel already we put the

38:29

new panel board over there, two panel

38:31

board and uh all the uh the paste

38:37

control because we tried to uh you know

38:42

do the treatment but it's not work. She

38:46

also did, I did, we tried and we I

38:49

contracted the pest control first pest

38:52

control company and yesterday they did

38:55

all the treatment for whole house and

38:59

they are doing again

39:02

next two weeks also they do for the uh

39:07

in and out

39:10

because whenever we rented the property

39:15

She checked and uh she she satisfied say

39:20

husband and wife is hug each other said

39:22

like very much and I didn't enforce them

39:26

to rent the property and they rented and

39:30

anyway whatever the problem they have I

39:33

always do the you know treatment and the

39:36

pest control I already contracted for

39:38

the uh the exist

39:43

I open Both the side the uh kitchen side

39:47

they have a wooden porch and other side

39:50

because we are we are trying to put a

39:53

hallway

39:55

down side to exit both the unit they can

39:58

exit to to exit and now temporarily I

40:03

allowed them to okay use whatever you

40:06

want they exit and when the construction

40:09

would begin then some uh interruption

40:13

would be there but it's not mean you

40:16

know all uh we we do construction in the

40:19

night or early in the morning but

40:22

daytime definitely we do construction

40:24

and he said he will complete by 3 weeks

40:28

thank you and and

40:32

well heard concerns with with the

40:34

structure um I don't know if there's any

40:37

pictures of the basement but somebody

40:39

has done a massive job of shing up that

40:42

property

40:43

When I I talked several times message

40:47

when I had the rental inspector out, we

40:51

took them in the basement. They were

40:52

like, "Oh, who did this?" You know, it's

40:55

it's all restructured in the basement.

40:58

No, yes, the building sagged. We can't

41:00

take the sag out of the threetory

41:02

building, but they restructured the

41:04

whole building, so there's no problem

41:05

with this. Okay. Um, as far as concerns

41:08

with the with the uh the construction

41:11

going while she's there. The way I

41:13

understood it is her lease said that

41:16

there's going to be construction as soon

41:18

as it was approved and that she would

41:21

have a hallway eventually that goes out

41:23

the front door only. I mentioned this

41:26

was supposed to be explained to her when

41:28

when her lease was written. I wasn't

41:30

there for that, but we went over that. I

41:33

said, "Make sure they know that they use

41:36

the downstairs for now when when you get

41:38

the approvals." He needed to get some

41:40

money coming in on his

41:43

that when you get the approvals, we're

41:44

going to make the stairs go straight

41:46

down and out the front door and then

41:48

she'll be only on the second and third

41:50

floor. So, that's where where we're at

41:53

with that. We're good with that. Yes, it

41:55

has pest control problems, but it's a

41:58

joint. So you can kill yours but you

42:02

can't kill your neighbors because it's a

42:04

joint house and and pest people also

42:06

said it take little time because other

42:08

house also adjoining and both side we're

42:12

going to treat because I cannot ask

42:14

other you know uh landlord to okay you

42:17

treat your house it affect my right we

42:19

can only treat our side

42:23

yes it's it's a basically what I call a

42:25

half a double

42:33

No, it's like an upstairs and

42:34

downstairs.

42:36

Yeah. Which already had the kitchens

42:38

existing with a stairway between the two

42:41

floors. Yeah. Which never made sense to

42:43

me. And and to some of the uh questions

42:46

brought up by Miss Chisum, um you know,

42:50

that's why we put in the uh as a

42:52

condition that there be a thorough

42:53

compre uh comprehensive codes bureau

42:55

inspection because there may be

42:57

electrical work that was done previously

42:59

that may not be up to current code um

43:01

issues with the sagging. It sounds like,

43:03

you know, I know that sometimes happens

43:05

in old houses, but it sounds like

43:06

there's some shoring up. But if that's

43:08

not shored up appropriately, our codes

43:10

bureau will note that and they'll give

43:11

them the appropriate uh treatments to

43:13

ensure that because they're not going to

43:15

sign off on somebody living in a home

43:17

that could potentially, you know,

43:19

collapse or something. So, uh that

43:21

thorough codes inspection is uh designed

43:23

to ensure that not only the proposed uh

43:26

unit is going to be habitable and safe,

43:29

but that the existing unit is as well.

43:31

Right. When we started this project,

43:33

first thing I did was call the codes

43:36

department and have the rental codes guy

43:38

come out and look at the property. And

43:41

he two of them came out and they thought

43:44

it was a great problem. They thought it

43:46

was great. Just needed this hallway to

43:48

to divide the two units.

43:51

It's been sort of inspected by by the

43:54

city.

43:55

That's my question was the codes you're

43:58

requiring the codes to check on it.

44:01

Right. And I believe that as I said I

44:03

believe there's been some preliminary

44:04

things but being that they didn't have

44:06

approval to create the second unit yet.

44:09

I'm sure some of the more thorough

44:11

things that you would go through when

44:12

creating that um were having to wait

44:14

until they get approval from the zoning

44:16

hearing board. Yeah. Yeah. The codes

44:18

inspector. We probably spent the the

44:20

three of us probably spent an hour hour

44:22

and a half on at the property. We went

44:24

from this from the third floor to the

44:27

basement. Every unit, every closet,

44:29

bathroom, they looked looked it over

44:32

fair, right? Yeah, they're showing us.

44:34

Yes. I'm not I'm not debating. I'm just

44:36

saying that it has been looked at. I

44:38

wouldn't have started this project

44:40

without getting codes out there just

44:42

because it's a different situation.

44:47

What was on the first floor? It's a It's

44:50

a It is a unit.

44:52

Third first floor has a kitchen, a

44:54

living room, and a a dining room, and

44:58

then a front porch. Okay. And there's no

45:02

bedrooms. No, it's it's like a one.

45:04

We're going to make a bedroom in the

45:06

plan. So, it's a single family. Yes. Who

45:07

is it? And then upstairs has a kitchen,

45:10

four bedrooms, a bathroom, a half. I

45:14

mean, one and half bathroom. Yeah. It's

45:15

a It's a whole another apartment. I

45:18

think I think it's it's always tough to

45:19

tell with these when you know there were

45:21

two units in the 90s for example again

45:23

and then somebody buys it and they live

45:25

in it by themselves and uh for 20 25

45:29

years as the case may be in this in this

45:31

particular property. So um yeah I mean

45:34

sometimes they have weird configurations

45:36

sometimes they bring in maybe like their

45:38

in-laws and they just give them a a

45:40

kitchen somewhere to to you know make

45:42

them happy and give them their own

45:43

space. So, uh, you know, that's why we

45:46

want to make sure that they're going

45:48

through the appropriate zoning approvals

45:50

to get approvals for these and also that

45:52

the codes bureau is doing their

45:53

inspections to make sure this stuff is

45:55

up to code.

45:57

And that's what we're doing. Go back to

45:58

the electrical box. He paid $74,000

46:01

to change the panels on my word because

46:04

they were Federal Pacific panels. And I

46:05

don't know if you know what Federal

46:07

Pacific mean they're junk. Insurance

46:09

companies would insurance because those

46:12

panels scare is they don't breakers

46:14

don't turn off. So, he had the panels

46:18

changed and he's been finding problems a

46:20

little bit here and there and he's been

46:21

fixing it.

46:24

Also want to note that one of the

46:27

conditions in here state by Jeff is that

46:30

um to allow you guys to allow the code

46:35

bureau to perform another comprehensive.

46:39

So you agree to

46:44

any other concerns?

46:49

So then are at this point are you

46:52

blocking that front egress? No. From

46:56

them being able to they can use it right

46:58

now. The only time they're not going to

47:00

be able to use it is when I have to

47:03

reconfigure the stairs and that'll be a

47:06

week or so. We'll have to

47:10

That's a codes if they don't have two.

47:13

There needs to be property. But that's

47:14

what we're creating is their second. I

47:18

understand. I know. It's a

47:21

they're going to be there.

47:24

But I have to tear out stairs, right?

47:27

Reconfigure them so they come out in the

47:29

hallway rather than come out in the

47:30

living room of the first floor.

47:35

It's just

47:44

Is there anyone else on this side?

47:50

Your hands up.

48:02

My name is Antoine Washington. I also

48:04

live at 2001

48:06

street and my question is when they do

48:10

the constructions

48:13

again

48:17

that's just my questions

48:21

also more dangerous when it's raining

48:25

it's not

48:29

just like

48:31

I mean he said more dangerous maybe

48:33

And I don't he's not he's not fix

48:40

but I'm still concerned about the like

48:43

how

48:45

he told us not to

48:48

check the mail in the front like so it's

48:51

like those type of things are my

48:53

question

48:59

initially initially I I proposed them to

49:03

use that as a as an emergency and do the

49:06

front one the regular but they feel not

49:10

comfortable then I allowed them to use

49:13

both side even downside is open for all

49:18

the floor and the room and I asked them

49:20

to okay use use the

49:24

other side also so I allowed them

49:27

because I until I knew the problem then

49:30

I don't but if I knew the problem that I

49:33

allow. I never stopped them to use it.

49:37

Just a quick question. He's he was

49:39

concerned about safety on the stairway.

49:41

Is there anything? They're they're

49:43

pressuret treated stairs and they're

49:45

kind of shaded by a big tree get

49:48

pressure treated. It gets slimy. I

49:51

already did the power wash everything.

49:55

We could probably put some non-skid

49:58

material on the treads. I'm going to I'm

50:01

going to paint it. I'm going to paint it

50:04

in in this weekend.

50:08

Yes. No, no, that also I I

50:22

say to the res

50:24

to also let him let your landlord know

50:28

some concerns. It seems like you're

50:31

doing everything to fix this up right

50:33

now. So if you had other concerns, I

50:36

would say, you know, talk to you. Seem

50:38

like you're acceptable things that might

50:42

be your concern.

50:46

For the future, you might want to think

50:48

about that. The only other thought I

50:51

heard

50:52

with I know you might not be able to

50:55

control it, but maybe the test control

50:59

like

51:00

Because I know office buildings and

51:02

everything else they always have some

51:05

pest guy come out whatever that I

51:08

already contacted sir I already

51:09

contacted they already started they

51:11

already they already they were out

51:14

yesterday contract one other company I

51:16

contacted but they didn't schedule so I

51:19

found another company and do it right

51:33

Yes. So, so in reference to the back

51:36

stairs,

51:38

I don't know if this a question for

51:42

um is there a possibility to

51:46

like you're saying like putting on like

51:48

the adhesive like Um, kind of like the

51:51

the grit. I would I'd rather use

51:54

non-skid paint. The adhesive glues on

51:57

paint stays longer. I mean, I I think if

52:02

he I mean, he's probably has a lot of

52:04

experience in the construction industry.

52:07

Yeah. I guess I guess my concern is not

52:11

only just for the construction, but

52:13

maybe just going forward. Um, because

52:15

just incidentally, just personally, my

52:18

deck is the same way. It gets slimy.

52:21

So, you know, not only for not only for

52:24

any construction, but just going forward

52:26

if there could be some type of

52:28

installation of the paint would actually

52:30

seal the wood and stop that slime. Okay.

52:35

Would it would it prevent um

52:40

preventing the slime? Yes. But would it

52:43

be a safety concern just just in general

52:45

from it just raining? No, because it's

52:47

non-skid. It's It's paint with sand.

52:50

Okay, that that's

53:00

commissioners. Any other concerns?

53:03

I get a motion.

53:12

Is there a second?

53:18

I'll second

53:20

for approval with the condition. All

53:22

those in favor state I I opposed.

53:28

Motion carried. So you know what you

53:31

heard tonight. We just continue with

53:34

Jeff. Yeah. And I would make sure you

53:37

work with your tenants there just to

53:38

make sure that they're safe. Definitely.

53:43

All right. Thank you very much. Let's

53:45

go. Thank you.

54:02

Item number four, this is a variance

54:05

application for 315 North Second. It's

54:09

zon commercial neighborhood called Adam

54:14

Redmond with Redmond Properties LLC

54:18

is to convert the existing office

54:20

building into a 10 unit multi.

54:25

Okay. The uh variance application for

54:26

315 North Second Street uh is a proposal

54:29

to convert the existing office building

54:31

into a 10-unit multif family dwelling

54:32

which requires only hearing board

54:34

approval of a variance from the density

54:35

regulations outlined in section 7-307.3A

54:40

of the zoning code. The buildings on

54:42

site will be converted into 1 and

54:43

twobedroom units ranging in size from

54:45

486 ft to,290 ft. Property at 315 North

54:50

Second Street is a.1 acre lot featuring

54:52

three attached buildings, a 2 and 1/2

54:55

story 2332t

54:57

structure, a three-story 2700 ft

55:00

structure, and a three-story 4938t

55:03

structure. All of which were constructed

55:05

circa 1900. Property is bounded by

55:07

Barber Street to the north. The property

55:09

at 210 Pine Street to the east and south

55:11

and North Second Street to the west.

55:13

These attached varying structures which

55:15

are or will be internally connected

55:17

feature elements of varying

55:18

architectural styles. The southernmost

55:20

of the three buildings features elements

55:21

of the federal architectural style.

55:24

Character defining features include the

55:25

painted brick facade, the arched

55:27

entryway and awning and access ramp at

55:29

the rear entrance and the regular

55:30

fenestration pattern. The main entrance

55:32

is recessed behind an arched entryway

55:34

featuring wide pillisters, a keystone

55:36

and a decorative sconce and features a

55:38

panel door flanked by divided light

55:39

sidelights and topped with a sunburst

55:41

transom featuring the property address.

55:43

Fenistration on the front elevation

55:45

includes five 12 over 12 windows with

55:47

wooden sills and decorative brick

55:48

headers which all feature painted wooden

55:51

shutters. There are additional five

55:53

divided light windows on the side and

55:55

rear elevations. The structure is topped

55:57

with a gable roof clad and asphalt

55:58

shingles. The middle building features

56:00

elements of the Italian8 architectural

56:02

style. Character defining features

56:03

include the painted brick facade and

56:05

water table, the decorative metal grates

56:07

over the basement windows, the former

56:09

entryway converted into a Juliet

56:10

balcony, the consistent fenestration

56:12

pattern, the three-story bay window, and

56:14

the decorative stepped brick cornness.

56:16

The main entrance is is no longer

56:18

accessible from the street as the stairs

56:19

were removed prior to October 2008 and

56:22

replaced with a decorative metal

56:24

railing, but features a wooden panel

56:25

door set in a simple frame and topped

56:27

with a sconce. The entryway previously

56:29

featured an arch brick surround, which

56:31

has since been infilled with brick.

56:32

Fenistration on the front elevation

56:34

includes 17 divided light wooden windows

56:37

set in simple wooden frames. Those on

56:39

the first and second floors include

56:40

storm windows. There are an additional

56:42

five divided light wooden windows on the

56:44

rear elevation which also include storm

56:46

windows. Structures topped with a flat

56:48

rubber roof. The northernmost of the

56:49

three buildings features elements of the

56:51

classical revival architectural style.

56:53

Character defining features include the

56:54

painted brick facade, the double-sided

56:56

access stairs, the regular fenestration

56:59

pattern, the substantial brick corners

57:00

featuring brick, the substantial corners

57:03

featuring brick pillisters, decorative

57:04

brick and wooden elements, and a central

57:05

embattlement with narrow windows and a

57:08

large three-story decorative brick

57:09

chimney on the side elevation. Main

57:11

entrance features a paneled wooden door

57:13

set in a simple panled frame flanked by

57:15

sconces and topped with a trans divided

57:17

light transom. It is accessed by

57:18

birectional brick steps with a simple

57:20

metal railing. Adenistration on the

57:22

front elevation includes five 9 over9

57:24

windows with brick sills and headers

57:26

which all feature painted wooden

57:28

shutters. There are an additional 11

57:30

divided light windows on the side

57:32

elevation and two dormers topped with

57:33

substantial pediments on the side roof

57:35

flanking the rear chimney. The structure

57:37

is topped with a gable roof clad real

57:39

slate shingles. The buildings retain a

57:41

significant amount of their

57:42

architectural and historic integrity and

57:43

exhibit a unique configuration of three

57:45

conjoined structures of differing

57:46

architectural styles. And although they

57:48

differ significantly from other

57:50

properties on the block, particularly

57:51

those to the north and south, they

57:53

reflect many of the same architectural

57:54

features as other historic properties

57:56

throughout the downtown historic

57:57

district. As such, the structures

57:59

contribute significantly to the eclectic

58:00

and diverse architectural and historic

58:02

character of the streetscape and

58:04

neighborhood.

58:05

The planning bureau staff recommends a

58:07

request be approved with the following

58:08

conditions. If the applicant receives

58:10

approval of the requisite zoning relief

58:12

requests, they must secure city council

58:13

approval of a land development plan for

58:15

the proposed conversion. Any exterior

58:17

alterations to the building will receive

58:19

approval from the historic preservation

58:21

uh from the historic preservation

58:23

specialist or if necessary receive harve

58:26

application. Planning bureau recommends

58:27

the applicant consider differentiating

58:29

the facades of the three buildings to

58:30

reestablish their original identities.

58:32

If the referenced parking spaces are not

58:34

on the subject property, the applicant

58:36

should provide a signed lease agreement

58:37

to allow parking at those spaces. And

58:40

just to clarify, I think the applicants

58:41

in their um application indicated that

58:44

there were eight spaces at the back of

58:46

the property, but when looking at the

58:48

property on the city's zoning map and

58:50

the county's tax parcel viewer, it

58:51

appears that that rear property is part

58:53

of the 210 Pine Street um property. So

58:56

there might be u an issue with the

58:59

county's records, but from my reading of

59:01

it, it looked like those are on a

59:03

different property. They may have an

59:04

existing lease for those um because of

59:07

the existing office building that's on

59:09

site, but I just wanted to clarify that

59:13

the Verizon, it's now Verizon. Yes. Uh

59:16

and then finally the applicant will

59:18

coordinate with the department of public

59:19

works to ensure that the account billing

59:20

reflects the establishment of the

59:22

proposed uses on site and to identify

59:23

the appropriate refuge storage and

59:25

collection needs. Plane bureau staff

59:27

recommends the request be approved for

59:28

the following reasons. The internal

59:30

configuration of three attached

59:31

buildings specifically the locations of

59:32

aspects such as walls, stairs and doors,

59:35

windows compels the reorganization of

59:37

space into more units than would be

59:38

permitted by right and the components

59:40

necessary for the establishment of the

59:41

byite multif family use such as

59:43

additional kitchens and bathrooms.

59:45

requires investment that is compensated

59:46

for through the addition of additional

59:48

units.

59:50

The proposed reuse will add new new

59:53

residents to the neighborhood to

59:54

activate the street on nights and

59:55

weekends and grow a customer base to

59:57

support local businesses and will

59:58

provide additional units to the downtown

1:00:00

housing inventory. The range of unit

1:00:02

sizes and the mix of one and two-bedroom

1:00:03

units will accommodate a variety of

1:00:05

household sizes and needs, helping to

1:00:07

further diversify the downtown housing

1:00:08

inventory. And finally, other

1:00:10

conversions of former office buildings

1:00:11

in the surrounding neighborhood have

1:00:13

demonstrated the proposed use will not

1:00:14

adversely impact the character of the

1:00:16

neighborhood.

1:00:18

Thank you, Jeff. Could you state your

1:00:20

names, address, and relationship?

1:00:23

Good evening, everyone. Thanks for

1:00:24

having us here tonight. My name is Phil

1:00:26

Patrina Mcnes Wallace and uh 100 Pine

1:00:30

Street on behalf of the applicant

1:00:32

Brenamman Properties LLC, uh who's also

1:00:35

here tonight. Yeah, appreciate everyone

1:00:37

having us. Adam Brenamman, owner of

1:00:39

Brenamman Properties LLC, uh 3423 Canyon

1:00:43

Creek, Mechanicsburg, Pennsylvania.

1:00:45

Thank you. You both heard the uh staff

1:00:48

report with the conditions. Are you

1:00:50

acceptable of this condition? Yes. And

1:00:53

we just have a a short presentation here

1:00:56

tonight. Um I will pass out some

1:00:58

exhibits just to make sure we're all

1:01:01

looking at the the same thing here. But

1:01:03

recognizing that we're

1:01:08

and holiday.

1:01:23

Thanks.

1:01:30

So, as Mr. tonight uh so eloquently laid

1:01:34

out. Uh we we generally concur with the

1:01:37

comments made in the staff report. Um

1:01:40

applicant um is looking to um is under

1:01:45

an agreement of sale for the property uh

1:01:48

with the Pennsylvania Healthcare

1:01:49

Association there. It's been their

1:01:52

existing use uh since 1996.

1:01:55

Um we did want to clarify before I get

1:01:58

to my exhibits here. wanted to clarify

1:02:01

the parking um that the parking was

1:02:04

included in the agreement of sale um for

1:02:07

the for the property, the eight parking

1:02:09

spaces um behind the building. Um so

1:02:13

during the due diligence period of this

1:02:15

agreement of sale, which is um you know

1:02:18

due to close at the end of July, um

1:02:23

our impression is that the county tax

1:02:27

mapper may have been incorrect. Um but

1:02:30

during the due diligence process uh we

1:02:33

believe that the parking situation will

1:02:35

be clarified uh as they were part of the

1:02:38

contract. Um so they will um you know

1:02:42

either either at at the end of the the

1:02:44

due diligence be owned by the applicant

1:02:46

uh or um will be be deed to the

1:02:50

applicant um by the end of of closing uh

1:02:53

to the extent there are any

1:02:55

discrepancies. Um, so just to orient the

1:02:59

commission to where this property is

1:03:01

located, if you turn to exhibit A1,

1:03:05

um, that I passed out, that's a that's a

1:03:08

large, um, aerial image overview of the

1:03:11

property on at 315 North Second Street.

1:03:15

Um, if you're looking to the north,

1:03:18

that's the continuation of the Verizon

1:03:20

building. Um, looking just west is the

1:03:23

former Bridges Social Club. um which is

1:03:26

now um just a vacant um restaurant

1:03:30

property. Um to the south of 315 North

1:03:34

Second would be the Harmony Towers uh

1:03:37

and a few restaurants and convenience

1:03:39

stores. And then further to the east of

1:03:42

the property is um the the large brick

1:03:46

Verizon building along Second Street.

1:03:49

This property is located in the

1:03:50

commercial neighborhood district uh and

1:03:53

is one of the historic buildings along

1:03:56

uh North Second Street that applicant

1:03:58

intends uh and and and will preserve uh

1:04:02

as much of the history of this building

1:04:04

as possible as part of the conversion

1:04:07

from office to residential. It was one

1:04:09

of the big um driving points of of this

1:04:13

property here. Um

1:04:16

turning to exhibit A2. Um these are the

1:04:19

Google Street View images of the of the

1:04:22

property. Um just so that everyone is is

1:04:25

familiar with um what the you know

1:04:28

exterior facade looks like. Um you have

1:04:31

Barber Street that runs along um the

1:04:35

western side of the of the property

1:04:38

looking at it from the street. And then

1:04:40

the third aerial, I mean the third

1:04:42

Google Street image is that back parking

1:04:45

lot um again which was included as part

1:04:48

of the agreement of sale. The applicant

1:04:51

is under contract to purchase and close

1:04:53

on by the end of July. Um so now turning

1:04:58

to exhibit A3 is the floor plan. And so

1:05:02

we'll just talk a little bit about what

1:05:04

applicant plans to do here. But this is

1:05:07

intended to be a, as shown on the floor

1:05:10

plans, a 10- unit apartment multifamily

1:05:13

conversion, which is permitted by right

1:05:16

in the CN uh commercial neighborhood

1:05:18

district. Um the the parking is uh

1:05:22

pursuant to the zoning ordinance in the

1:05:24

commercial neighborhood district and in

1:05:27

um the downtown center district is uh

1:05:30

exempt from the parking requirements.

1:05:32

However, applicant is providing those

1:05:34

eight additional spaces. Um, so we saw

1:05:38

that as as an added benefit of this

1:05:40

property and again was one of the major

1:05:42

selling points um of the of the

1:05:45

transaction. Um, the 10 dwelling units

1:05:48

in the building. There will be a a unit

1:05:50

mix of six one-bedroom units and four

1:05:54

twobedroom units. The approximate um

1:05:58

average square footage of those units

1:06:00

collectively is 719 718.7

1:06:05

square feet. Um and it the units will be

1:06:08

spanned across uh two floors of the

1:06:12

building. And so tonight, um, we are

1:06:16

here to request a recommended approval,

1:06:20

uh, of our variance request in the

1:06:22

application from the density requirement

1:06:24

of section 7-307 of the zoning

1:06:28

ordinance, um, to permit 10 dwelling

1:06:31

units at this property. Um the applicant

1:06:34

is here tonight to answer any questions

1:06:36

that the commission might have. Um but

1:06:40

is very excited and and anxious about

1:06:42

this project uh with the opportunity to

1:06:44

redevelop uh a really awesome building

1:06:47

along North Second Street uh in in a

1:06:50

much needed area for additional housing

1:06:52

and hopefully more foot traffic for the

1:06:54

businesses and restaurants uh in the in

1:06:57

the commercial neighborhood district and

1:06:59

also that downtown center district right

1:07:00

next to it. Um, so with that, we will

1:07:03

request uh a recommended approval and

1:07:06

concur with with uh Mr. Knight's uh

1:07:08

report and then I will yield to the

1:07:10

commission for questions.

1:07:14

as far as the parking concern right now

1:07:17

based on what you've said there any

1:07:21

still any concerns about who owns it or

1:07:24

uh no I would you know like I said it I

1:07:27

would guess that those are on the

1:07:29

adjacent property but my guess is that

1:07:31

they've had a long-standing lease for

1:07:32

those and that's why they're discussing

1:07:34

them as like deed with the pro with that

1:07:36

property they've you know probably been

1:07:38

leasing them to the to the business

1:07:39

that's operating on in in the property I

1:07:41

mean they've presumably been parking

1:07:43

there. Um, so I would guess that's how

1:07:46

it works out. But regardless of whether

1:07:48

they own it or they're leasing it, like

1:07:50

long-term leasing, in my opinion, that's

1:07:52

the same thing. It's about the provision

1:07:53

of the parking and and it seems like

1:07:55

they have that in hand.

1:08:00

And as far as parking again, I know you

1:08:03

you have the eight spaces. Um,

1:08:07

would sort of nice if you were providing

1:08:12

for the tennis like recent spaces in the

1:08:16

parking places downtown.

1:08:19

Just something

1:08:22

to the extent possible. I think that you

1:08:24

know we will evaluate that and if if

1:08:25

possible to add additional spaces uh in

1:08:28

compliance obviously with the with the

1:08:29

zoning ordinance and the you know the

1:08:32

dimensional requirements of the parking

1:08:34

um that that's certainly something that

1:08:36

we will evaluate and take into

1:08:38

consideration here.

1:08:42

commissioners. Right now, that's my only

1:08:44

question, but we'll come back to that.

1:08:47

Um, Commissioner, do you have any

1:08:49

concerns or questions? Uh, no. Uh, well,

1:08:52

not really. Uh, we're seeing a lot of

1:08:54

this right now, conversion from uh

1:08:56

commercial office spaces to residential.

1:08:59

That's a good thing. We're all behind

1:09:00

that. Um, and when it happens, the only

1:09:02

issue we have is density. And Jeffrey,

1:09:04

you're you have no I mean, you have pro

1:09:07

no problem with that. Um, yeah. Hey, you

1:09:09

know, as I noted, um, they I think the

1:09:12

probably unique interior of the building

1:09:14

being that it's three connected

1:09:15

buildings and like where those stairs

1:09:17

are, where those features are. And I

1:09:19

think as in the way they've laid laid

1:09:20

out the uh different apartments where

1:09:22

they're not just, you know, all the same

1:09:25

square footage, you know, tiny little

1:09:27

apartments, scene, as many as they can

1:09:28

cram into the nooks and crannies there.

1:09:30

They have a diversity of uh sizes and

1:09:32

styles of their apartments. You know, I

1:09:34

think they're it's clear they're not

1:09:35

just trying to maximize the number of

1:09:37

units in there. I think and so I think

1:09:39

it's always tough to say you know what

1:09:40

is the minimum number of units to make a

1:09:44

project financially viable. I think like

1:09:47

I think it's not a surprise that

1:09:48

everything's more expensive right now.

1:09:50

You know uh the numbers have to be kind

1:09:54

of increased a little bit to make

1:09:55

projects work and and I think that the

1:09:58

uh uh layout of the interior um is you

1:10:01

know reasonable from that perspective.

1:10:05

All right.

1:10:06

And Mr. Mr. Brenman, it appears that

1:10:08

Ryan Herur is not a partner of yours in

1:10:10

this. He He has the opportunity to be if

1:10:12

he wants to. Then I can't vote for you.

1:10:16

Yeah. Yeah. You have

1:10:23

commission.

1:10:25

This is a followup to the previous

1:10:27

question and this is for staff as well.

1:10:29

In in your comments here, you

1:10:34

you indicated that you more information

1:10:36

is necessary to justify why 10 units are

1:10:39

necessary rather than eight for example.

1:10:43

I mean I think that's you know uh

1:10:45

working on the margins a little bit of

1:10:46

like I know it can be difficult uh for

1:10:50

developers to provide proformas um

1:10:53

numbers are changing stuff like that. I

1:10:55

know a lot of times developers

1:10:58

um don't often want that out there

1:10:59

because that might be their proprietary

1:11:01

information for how they uh do projects

1:11:03

and they don't want their competitors to

1:11:05

have. Um so uh it would be I think kind

1:11:08

of um helpful if they were able to

1:11:10

provide you know more to clarify that

1:11:14

difference. But that all being said I

1:11:16

like I said looking at the layout of the

1:11:17

structure um and the way they've got uh

1:11:20

their units laid out I mean it seems

1:11:22

rational. Um okay

1:11:27

I would just respond to that comment and

1:11:29

saying that um an analysis was done uh

1:11:33

and and numbers run by engineers to

1:11:35

determine what would be the you know the

1:11:37

maximum number of units that would

1:11:40

comfortably fit in this um property um

1:11:44

while also still being uh financially

1:11:47

feasible for the developer. uh and and

1:11:50

that that number um is is what was

1:11:54

reached at 10 dwelling units. Um you

1:11:57

know the the the full analysis of that

1:11:59

um

1:12:01

we can produce evidence of of how we

1:12:04

arrived at that number um at the zoning

1:12:07

hearing board. That's that was the

1:12:09

rationale and a lot of intentionality

1:12:12

and thought went behind how we arrived

1:12:15

at that number and you know throughout

1:12:17

the planning process um before we got it

1:12:19

to this point that number did change a

1:12:22

few times um you know just reflecting

1:12:24

the thought that Mr. Brenamman had had

1:12:27

put into it and and how we can optimize

1:12:30

this space. Yeah, I'll add too something

1:12:34

that was important to me was, you know,

1:12:36

from a um development standpoint, this

1:12:39

building could feasibly hold a lot more

1:12:41

than 10 units, but I wanted to make sure

1:12:43

that our this building and the units

1:12:45

were good size that we had a range, as

1:12:47

as Mr. nice set of of two-bedroom units

1:12:51

and we we have a unit over a thousand

1:12:53

square feet units that are good size and

1:12:56

that mix of one bedrooms and two

1:12:57

bedrooms u which I I think is very very

1:12:59

feasible and be great for the

1:13:01

neighborhood

1:13:06

commissioner

1:13:10

I really just echo um my other

1:13:13

commissioner's comments about the number

1:13:15

of units and providing justification for

1:13:19

that need for to meet the variance

1:13:21

requirements. And ultimately, you know,

1:13:24

that's going to come down to zoning.

1:13:26

We'll make that decision. Um, but I had

1:13:29

the same question about whether 10 units

1:13:32

is necessary and is it justified. Um,

1:13:36

beyond that, I mean, I am in favor of

1:13:39

converting this type of property back to

1:13:42

probably its more intended use, which

1:13:44

would be residential, you know, living

1:13:48

um, in the location. And I'm sure if the

1:13:52

parking is part of the sale agreement,

1:13:55

that will get reflected in the deed and

1:13:57

probably land develop you'll need to

1:13:59

submit a land development plan. So,

1:14:00

we'll see that reflected in there.

1:14:07

Commission,

1:14:08

the only question I had is um have you

1:14:11

guys started to consider what your

1:14:13

proposed rental rate range might be for

1:14:15

these units?

1:14:18

Yeah, we have um started to to run the

1:14:21

numbers on it. Um these were as of this

1:14:25

time um market rate units and um you

1:14:29

know as as you know the the rates change

1:14:32

and based on you know the time of year

1:14:35

and when we go to market we would hope

1:14:37

that that we are leasing these units up

1:14:39

in 2026 at some point middle of 2026 um

1:14:43

at that market rate.

1:14:45

Thank you.

1:14:54

Is there anyone from the public on my

1:14:57

right

1:14:59

against this project?

1:15:01

Okay. Um, as my commission said, I think

1:15:05

it's a good project.

1:15:08

We all like to see the downtown filled

1:15:11

up with people again, and this seems to

1:15:14

be one of those projects that will help

1:15:17

out. And

1:15:21

the other is there anything in there

1:15:24

like office buildings presently or

1:15:26

anybody in that those buildings?

1:15:30

I'm sorry. Could you repeat that? I'm

1:15:31

sorry. Are there any occupants in those

1:15:33

buildings at the present time like

1:15:35

office or right now? No. Uh it it's the

1:15:39

Pennsylvania Healthcare Association and

1:15:40

they're actually if they haven't already

1:15:43

moved out, they they're in the process

1:15:45

of moving out. Um just because they they

1:15:48

don't need the office space anymore. So,

1:15:50

they they listed it for sale uh and Mr.

1:15:54

Brenamman was able to to enter into a

1:15:56

contract with them to purchase it um

1:15:59

because they are downsizing an office

1:16:01

space. So, there there won't be any

1:16:04

occupants of it um by closing.

1:16:07

Okay. Just wonder commissioners. Can I

1:16:11

get a motion on this program?

1:16:16

Is there a second?

1:16:19

Second. It's been moved and second

1:16:22

approval of this project. All those in

1:16:24

favor say I.

1:16:30

Good luck. Thank you.

1:16:34

Have a good holiday everybody.

1:16:39

Okay,

1:16:40

moving right along. Item number five.

1:16:44

This was a application for 508 and 510

1:16:49

North Second Street Merchant

1:16:50

Neighborhood by David Futcher with WCI

1:16:55

Partners LP. It was to convert the

1:16:58

existing office building

1:17:01

with a total of 11 units. It appears

1:17:04

that the applicant has requested

1:17:07

to August 6c.

1:17:16

So moved. Second. Second.

1:17:19

Second to continue. All those in favor

1:17:23

say by saying I oppose and

1:17:28

uh six land development plan application

1:17:31

for 508 510 North Second Street Zone

1:17:34

commercial neighborhood followed by

1:17:36

David Butcher with WC partners LP 11

1:17:39

total units between the two buildings.

1:17:42

Applicant has requested to

1:17:47

Is there a motion?

1:17:50

So moved. Is there a second? Second.

1:17:54

Move a second for continuousation of the

1:17:57

land development plan to the August 6

1:18:00

meeting. All those in favor say by

1:18:02

saying I I opposed and abstension.

1:18:05

Motion carries. Item number seven, land

1:18:09

development plan application for 1081

1:18:12

Elliot Street

1:18:14

Indust. is followed by Charlotte Kum

1:18:18

lawyer with capital region water

1:18:21

construction industrial building

1:18:23

associated site and excess improvements

1:18:27

request continues to the August 6 HPC.

1:18:32

Can I get a motion?

1:18:36

Is there a second? Second

1:18:40

for approval or to have the

1:18:42

continuation. All those in favor state I

1:18:46

opposed and carried.

1:18:50

Okay. Other business. Uh you mentioned a

1:18:53

new member maybe. Uh yes. So uh I

1:18:56

believe uh there was a nomination for a

1:19:00

member uh who was heard last night.

1:19:02

Correct. Yes. Uh last night's city

1:19:04

council meeting for uh Basier Vincent.

1:19:07

Um so I think he'll probably be getting

1:19:09

a final vote at the July 8th meeting.

1:19:12

So, I would imagine he would be in

1:19:14

attendance at the August 6 meeting,

1:19:16

presuming he's approved.

1:19:18

What's his background? Um, uh, I didn't

1:19:22

look too much through his resume. Yep.

1:19:25

He he was running for city council. Um,

1:19:28

Mr. Vincent was, uh, pretty involved in

1:19:30

the comprehensive plan process,

1:19:32

especially towards the end of, uh, the

1:19:34

process. So, he is familiar, you know,

1:19:37

with planning in the city and more

1:19:39

specifically with the comprehensive

1:19:40

plan. Um I you know his uh run for a

1:19:45

city council I think demonstrates a a

1:19:47

passion and a commitment to the city of

1:19:49

Harrisburg. So um you know all of those

1:19:52

things I think make would make him a

1:19:54

good candidate for uh for the seventh

1:19:56

seat.

1:20:14

Yes.

1:20:23

Yeah. I did I did meet with him at one

1:20:24

point I think maybe in 2019 or 2020 kind

1:20:27

of towards the end of the process. So um

1:20:29

and again I I could tell you he was

1:20:31

passionate about uh the city and about

1:20:33

making you know sure that uh uh we are

1:20:37

following our planning documents in the

1:20:40

projects that

1:20:43

I missed in the city council race.

1:20:47

Uh anything for the good of the order

1:20:51

commissioners?

1:21:04

Well, it's

1:21:08

leaving coming in. I mean, that's the

1:21:09

nature of cities, a constant evolution.

1:21:16

Well, the uh the residents hopefully

1:21:19

with these projects. So,

1:21:32

I'm not a millennial.

1:21:34

I don't know.

1:21:38

But seemed like the entertainment is

1:21:40

moving to

1:21:44

State Street.

1:21:48

Well, you guys did

1:21:51

guys did approve those music venues for

1:21:54

uh for Second Street here and and

1:21:56

hopefully uh you know, I think there's a

1:21:59

it's kind of a chicken or an egg

1:22:01

sometimes, I think. And if there's a lot

1:22:02

of people, they're going to be

1:22:03

demanding, you know, moving downtown,

1:22:05

they're going to be demanding things.

1:22:06

whether it's restaurants, music venues,

1:22:08

retail. So hopefully that follows um our

1:22:12

coming.

1:22:29

Could I get a motion for

1:22:32

Is there a second? Second.

1:22:37

Okay. All those in favor state by saying

1:22:39

I I

More transcripts

Explore other videos transcribed with YouTLDR.

Get the TLDR of any YouTube video

Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.

Try YouTLDR Free