Harrisburg Architectural Review Board Meeting 5-5-2025
Mrs. Gripple,
Miss Rucker, Miss Bennett here, and Mr.
Henry.
Um, so we'll start with new business.
The first on the agenda is 210 Hamilton
Street.
If you would
address name is Chris, address 340
Pleasant Road, PA7.
Great. Thank you. Um, first we'll start
by Jeffrey reading a synopsis.
Uh, yes. So, the applicant is proposing
to replace the existing real slate
shingles on the third floor maner roof
and dorma roofs with Ecostar synthetic
slate shingles. Um and uh if uh you've
seen the photos in the uh case report or
um did a site visit to the property, uh
you'd note that uh the there is a pretty
minimally visible maned roof on the
third floor of the front of the
building. Um and uh they'll be replacing
the slate shingles there uh and on the
um kind of large A-frame dormer there uh
with the Ecostar uh synthetic slate
shingles. Um this is a product that uh
has been reviewed and approved by the uh
board before. Um so uh this is not
proposing a new product. Um and uh the
uh visibility of the location of work is
pretty minimal. Um and so it's a pretty
straightforward uh proposal. Um the
planning bureau staff is recommending
the request be approved with the
following conditions. Uh the applicant
should utilize a similar slate color to
the existing shingles. Uh and that's
just kind of to to maintain the overall
general appearance of the property. Uh
and then uh planning bureau staff
recommends our quest be approved for the
following reasons. The project is
similar to other approved proposals for
replacement of real estate shingles and
thus there is precedent for the
allowance of the alternative materials
and the project involves replacement of
architectural elements with minimal
visibility and a low profile along the
mansered roof.
open
the meeting up to you if you have more
comments.
No, the only thing I would not is that
we'd be using the fish scale ecoar which
would mimic exactly what's on on the
manor wall at the
time basically identif going over there.
Yeah,
would be a similar color, but
we'll match it up as well as possible. I
believe it's going to be a bedroom.
Yeah, those two. We're going to hold it
up. Double check.
Now, was that painted that slate painted
with that u
No, kind of looks like it in the photo
that it might have. Yeah, that's on
and um do you know if it was reviewed as
possible salvage?
It's beyond repair. So, fortunately,
I know sometimes we've asked the owners
to
Uh I mean I think there's been
discussion of that. Uh but I don't know
that you know the city uh manages like
an architectural salvage operation or
even a facility where this stuff could
be suh stored and then um you know
resold. Uh so I don't know, you know,
how we would maybe mandate that or track
that. Uh obviously it would be
preferable to retain whatever shingles
are possible for use, you know, on any
historic building, preferably in the
city, but um just because really there's
not a whole lot of like new slate
shingles being made uh nowadays. But I
think at the end of the day, um you
know, having a requirement like that or
a condition like that is just you know,
maybe difficult to enforce.
We do actually save when we can because
I get for other slate repairs. I do some
of that as well. So now I don't know
city would want
take them off and I can save 100 tiles.
I actually
that's what we would like to do.
Um any other comments from the board
questions?
Um I have a question for the board. Do
we want to change the condition
or say that the shall utilize a similar
slate
color
shape size and shape or texture maybe
would be a better
Yeah.
I
guess I don't know if you can get a
similar texture.
Well, I think as opposed to like it's
Yeah, the rough edge kind of
looks like a fiship.
I don't think it has a particular name
for it. I think Ecoar and Da Vinci both
come that way
naturally. Have that type edge. They
don't finish an edge of slate in one way
or the other. That makes sense.
And I guess I'll make a
motion modified condition. Second it.
I
oppos. Right. Next on the agenda is 227
M
Street.
Sorry. Absolutely.
I was going to say absolutely not. That
is not what that says.
Is that really how it's how it's
pronounced years without
Stephanie Anders.
Uh yes. So the applicant is proposing to
replace the existing panled front door.
uh and transom with a halfu fiberglass
door featuring panels along with the
transom. Uh so uh this proposal um you
know is similar to uh some other
proposals we've gotten in the past uh
for replacement uh of doors. Sometimes
people want to remove like a wood door
with a half view pane and just put
something solid in for security reasons.
And other times we get proposals uh like
this where it's replacing a solid panel
door um with uh half pain. Um, and when
reviewing a project of this of this
nature, you know, you kind of look to
the historic district design guidelines,
uh, which generally discourage the
replacement of, uh, panled wooden doors
with, um, fiberglass or modern
materials, uh, because the profile of
the of the panels and the recessed areas
isn't quite the same. And in this case,
we're adding a um, uh, halfview pane as
well. Um I think when I uh went out and
did a site visit um you know I noted
that uh in addition to like this
proposal and this aspect is not um
relevant maybe necessarily to this
particular project and it's not
certainly the applicant's responsibility
but it appears that a previous owner uh
replaced some of the u windows on the
property uh took two over two windows
out and put in one over one windows. Uh
there were some other aspects uh like uh
mini split system put in um and some
other changes to the building that uh
you know didn't go through uh the harb
approval or as far as I can tell get
city uh permits. Um and so you know when
looking at this I'm looking at it almost
as a continuation of that where the um
historic nature of this building has um
kind of slowly been uh degraded uh and
erased. And so I think this uh proposal
would be kind of a step in that similar
direction. Um, and you know, there are
um existing products out there like
wooden doors, wooden panel doors
especially, uh, that could be used to
replace this. Um, you know, I think
it's, you know, evident as wood door
when you go up to it. You can kind of
see some peeling paint. Um, but the, uh,
proposed door would be a pretty
significant change, uh, from the current
appearance. And again, because it's
right up against the sidewalk and is not
set back like underneath a porch or
something like that, it's even more
conspicuous than it might otherwise be.
Um so for that reason um the uh plan
bureau is recommending the request be
denied um uh because the proposal to
replace a paneled wooden door with a
fiberglass door with a half view pane is
not an appropriate or necessary
alteration to an existing historically
appropriate feature. Uh because the
building does not have a front porch to
obscure the proposed change and the
location of work is in the touch zone.
The alteration will be conspicuous and
visible from the public right ofway. And
the applicant has the option of
installing a new wooden or wood
composite panel door if the existing
door requires replacement for either
security or energy efficiency reasons.
There
anything if I may. So um the homeowners
actually
Okay. With replacing the door and
currently it would have glass and just
go back to the six panel door as you
have with regards to the the previous
steps that previous owner have
done something
she
did. Uh the only thing that I would like
to bring
up safety
and obviously contacted us for the
purpose of getting this done because
safety not to say anything we know about
that block or that part of the city but
things can happen and being a single
homeowner that is so we have to go in
full battle just the way it appears I
believe
that we are all to do
Um, I noticed that there's three doors.
Yes, two of them would be on the side.
So, it would not
have an
effect any type of
appearance. The front were actually
instead of Six panel solid.
Is there some reason why given that you
wouldn't be doing the door you had in
mind, you couldn't just keep the
original door or the existing
It
is obviously from
shifting by
and a new door would have equal
preference. Yes.
So the six panel that you're talking
so it is fiberglass but the the outside
would be of what would be a composite.
So if we
have the necessity for
that office
again right
measure. We actually uh had one of our
measures come out
city
door. So we are in all all steps.
We are
meeting
thoughts they go with this fiberglass
with the positive exterior.
Yeah. Uh you know I saw that in the um
in the case documentation that I think
there's like fiber core and then a
fiberglass outside of uh the um on the
exterior of the door. Uh I know the the
the board has approved fiberglass doors
in the past. Um I think in some cases
the conditions are a little or the
circumstances of the property are a
little bit different. Maybe you have a
you know existing vinyl door or existing
fiberglass door or something like that.
um or it's a particular size uh and it
needs to um have that you know ideally
it would be um you know wood door but I
think if there's a compromise to be made
and it sounds like the applicants are
you know willing to compromise on the
design of it I think um there's some
justification for um you know an
allowance of the material I I think in
the past
um I don't know whether it's uh this um
manufacturer or installer or it was
another one but They said that the
fiberglass was paintable. Um, so I don't
know if if yours is or not. So it is
paintable, which I know is one of the,
you know, long-standing
um, you know, issues of of every review
that the board does is the paintability
of of the product. And if the product's
paintable, um, I think there's, um, you
know, that certainly helps, uh, in
support of the applicant's position.
Does Anderson do a wood composite door?
What we have is what we are proposing
here that not a full the door itself.
It's not a posit.
Can you make it?
Currently we are not offer
approved in several areas of the city.
So that's exactly what you're what
you're looking at here. That's what we
would evidence. That's what he has.
Best framing to
those. The door be the
six. Hi
Thank you. Thank you.
Next on the agenda is 308.
Your name and address.
by
26 car.
Uh yes. So the applicant is proposing to
replace the five existing wooden windows
on the front elevation uh with fibrics
with fibbrric windows. Uh and uh the
request should I guess be modified to
note that only the first floor window uh
would be packed out um by one inch on
either side. Uh as noted in the applic
as noted in the application uh the
existing the other four windows on the
second and third floors I think would
just uh be matching existing profile of
the window. Um so in looking at
something like this I know um
the board has generally discouraged uh
packing out uh it changes the appearance
and the kind of the profile of the
window. Um in this case I think we were
balancing a couple things. So, one of
the things uh was that the applicants
noted their only this is they couldn't
make a product that was the same size as
the existing uh window frame. Um so that
would mean that the alternative would be
doing like a play glass window. Um so I
have something similar in my front um
the front window on my first floor uh
where replaced a big double hung with a
a picture window. Um and maybe you could
put you know a fake check rail in the
middle of that. um to replicate the
appearance of a double hung window.
Um or the alternative would be, you
know, allowing the applicant to uh
install the window as proposed. And I
noted that in looking at the window, the
check rail is actually somewhat
offcentered uh on the overall window
frame. And the proposed window uh also
has that offset to the check rails. So
uh you know, this is kind of um one that
I think could go either way. Um and when
considering it, I really thought that um
maybe the
greater contributo element I guess uh
would be the offset check rail as
opposed to the overall you know profile
sides of the window. Uh and so the
question came down to well we recommend
denial or a condition with approval with
a different type of window. What would
that be? Um, and again, it couldn't be a
fiber window um or a wood composite
window of the exact same size. It would
have to be a picture window with like a
a simulated uh check rail in it. Uh or
it could be what the applicants are
proposing. And so, uh while I know that
I know the board's position on uh
packing out windows, um it seemed in
this case like it may be the lesser of
two evils uh when it comes to the uh
replacement of these windows. And
obviously as they're replacing the
windows on the upper floors too, you
kind of want a continual appearance um
between all the windows on the property.
So it'd be one where I don't know that
it would necessarily be the best idea to
say, well, we'll approve the four
windows on the second and third floor
and not the first floor window. I think
that would be even more conspicuous than
um you know what some of the other
options would be. Um so uh with that
being said uh the planning bureau
recommended uh the request be approved
um for uh the following reasons. Uh the
proposed window material is
administratively approvable per the
historic district design guidelines. And
although the project represents an
alteration which is discouraged by the
board due to the visible impact on the
architectural feature, the alternative
of a picture window would be a more
conspicuous change. Um, aside from the
proposed f first floor replacement
window, the project can otherwise be
administratively approved as presented.
Uh, and finally, the project will
replicate the off-centered check rail
between the top and bottom sashes of the
existing window. Um, so again, I think,
you know, this could have really gone
either way and I'm sure there may be,
you know, some indecision on behalf of
the board members on which way to go in
this case, but um, the planning bureau
felt that this was a pre more preferable
option to the alternative of a picture
window with the simulated check rail.
Um, we can make a picture window the
correct size. What we were trying to do
was match the double hung on the house
that's attached to it, like within
inches of that window. There's another
one on the next home. So, the homeowner,
we wanted to try to keep that. We
figured that was going to be an easier
approval process than going to a picture
window. So the the it's the overall
United that window that's giving us an
issue. It's the same thing when we did
the window at your home. We're talking
about a thumbs width on each side. Um
and on a 50inch wide window that's going
to be harder to pick up on than if we
make a picture window with like a
simulated check rail. I think that that
will look worse than like sash, you
know, because it's just a piece of glass
at that point.
where the sashes aren't offset and that.
So, the double home's going to look much
better as you're driving by, then you
won't you would have a really hard time
noticing one inch on each side of that
window
with it.
Can you explain the one inch uh
so I can make No, I can make it would be
on the width. So, I can make the width,
but then I can't get the height. I can
make the height, but then I can't quite
get the width. So, we're like two inches
too big on the the overall size of that
opening. So, it was going to look better
uh because we can slope the sills on our
double hungs to match the slope sills of
the original windows, it was going to
look better to lose the inch on the
sides than at the top and
bottom. We can nicer that way. And then
on the interior, it has the existing
original wood stops. They almost cover
most of that packing and we're just
going to have a little bit on the the
inside to touch up on. So, but it'll
look much better with the double hung
being out front. So, you're there's
brick walls around.
Um, again, that's all staying original.
So, the homeowner, he travels a lot for
work. He knows that he needs there's
some uh wood work that needs to be done
and like the box sills and whatnot. He's
going to paint that to match because our
color is pretty close and he's going to
paint the wood trim around to match the
window once he gets the wood repair
done.
And then what is the full exposure of
the sash?
I don't know. The size of the width of
the sash
the overall unit is going to be The
overall unit width is 48 in wide is what
we can make. You go into that opening. I
would say 3 in from there to start the
glass. I don't know. The sash
is 2 in wide the whole way around. It's
very accurate. So, so like original wood
windows. Okay. But so it look like two
inches on the top, three inches on the
sides, two inch. Oh, is it you're
talking about the border around the
window. I don't think you're because
there's box sills below it. So, that's
going to blend in nicer. Um, and then at
the top there's more than likely
decorative trim um around that window.
So I don't think if you're are you
talking about like the
profile around the window where we
finish off
to that we'll
be our window is 3 in from frame to
glass and then we're going to have about
an inch on each side. So you'll have
um probably
only two inches of like finishing
material from our window over to the
existing trim and then the rest will be
window sash like sashes
operating that what you were looking for
each side or I guess I'm confused on
what your question was that two inch on
each side or one inch each it's one inch
on each side but then the finishing
covers support our window frame. So,
that's where I got, you know, you're
going to we're going to use what we
typically use in Harrisburg is um called
Ftrim or Ltrim and it's made out of the
fiber material. Um you'll probably have
about a 2 inch wide piece of that
running around, but it's covering up a
portion of our frame. It's covering up
the whole window frame. It snaps into
that. You want to see some pictures of
like of like before and afters or
I don't have them of that house, but I
have
Is this material?
Yeah, it's we've been using
it in Harrisy here
for 10 years, I think. Yeah, I was going
to say I think the first couple
instances we had were maybe like 2014,
2015, and I think there had been
administrative approval starting like
2016, 2017 or something. I think was
when the board took a vote to grant
administrative approval to it.
I understand the description.
Thank you.
Um I you know I I think to um you know
the applicant's uh point because it's
not just a simple brick mold frame all
the way around uh and kind of to your
point of like well it would be two
inches on the top then and three inches
on the side because you have those like
chunkier headers and sills. Uh the
additional width on the sides is going
to be less noticeable because of those
bigger blocks on the on the top and
bottom of the window. If it were just,
you know, brick mold all the way around
and you just like put a window in there,
which we have those windows in in the
city, um I think it would probably the
change would be more evident. Um but I
think due to the nature of the um
existing uh conditions, I think it'll be
less visible and and I think like I
said, at the end of the day, it seems to
me that the more you know, unique aspect
is the offset check rail in this window.
Um, and
so a replacement that can replicate that
is probably preferable over something
that's just again a picture.
Find an image that you share with I have
a a few um you want to bring it up.
So this is cornal but like same age,
right? But we did bottom two windows,
top three are still original.
And this is packed out with the one.
These didn't necessarily need to be
packed out, but there's not a whole lot
of difference. And these are much
smaller windows. So on a 50-inch wide
window, that's that's the issue. We're
talking about a thumb on each side. And
you there's going to width difference
between this window and this window just
because you're setting inside the
existing framing that's already
there right side windows
original left side replacements
So there's like some slight profile
differences, but driving past and seeing
that is going to be much harder to see
than if we put
the a 2 in wider picture window
in cuz the homeowner was trying to match
the window that's like 2 feet over in
the neighbor's home.
Yeah.
It's very very close.
[Music]
Thoughts, concerns?
I like the idea of keeping an operable
window operable.
I would
suggest
that at least from my perspective I
would be okay with approving this but
not having it set the precedent that
this would be a one time only approval
for this
particular alteration
that month from now someone says well
they did
view each one of
and I and I do always um you know inform
everybody that uh that board decisions
are not presidential. They're based on
the circumstances of each particular
property and each particular project. Um
and therefore approval of a particular
material or product for one property is
not necessarily going to be given for
another. again, if you're have a door
right up to the sidewalk or step back on
a in a in a porch. Um, so I do make a
note of that, but including it in the
actual uh resolution is, you know,
probably helpful to anybody that may
want to read that for the future.
[Music]
Motion. I make a motion to approve
with
Connie's recommend with the addition.
Okay. Second.
I have a
motion.
Second.
I motion carries. Thank you very much.
other
business continue what was discussed
last
month of the project.
your name and address.
Yeah, I gave you I gave you the
PowerPoint, the print out. I actually
have um the specifics on the paint and
the masonry I think from last meeting
too, just in case you had follow
questions about that. But the PowerPoint
that you have is the one um that they
had provided for this meeting. I think
photographs in there because it was too
low resolution.
Peter from 6608 North place
Rebecca
McCormick
West Market Street.
Um, you know, not much additional beyond
uh last month's discussion. Um, we did
have a a follow-up meeting where we
discussed some of the feedback that the
board provided at last month's meeting.
um and some maybe additional uh
information that the consultant team may
want to provide uh for this particular
uh presentation. And if you'll note on I
guess the seventh page of the um
PowerPoint uh they have a kind of
comparison chart of the um materials uh
that are involved in this uh
reconstruction. some of the major
materials that are involved in the
reconstruction. Um, you know, roof,
walls, windows, uh, doors, and it kind
of has a breakdown of what it was
originally, if known. Um, what might
have happened or what happened in the
1970s when there was a reconstruction
project and then in the '9s during that
reconstruction project, which we
discussed at the last meeting, and then
finally this current proposal. So, I
think it it's designed to uh help the
public and the board understand and kind
of track like what's being changed. Is
this a change from the original or is
this a change from the most recent
reconstruction of the of the property?
And therefore, it might be different
from what we are used to seeing as
residents of the city. Uh but that's not
necessarily means it's any less historic
or less appropriate uh than what was
there previously. Uh so that's what that
charter is designed to do. Um and I
think uh the consultant team will um
probably expand a little bit upon that
and um maybe address some of the other
uh questions or issues that were brought
up by the board at the last meeting.
I just want to make one clarification. I
didn't say I just said it was the Broad
Street Market, but focus is the brick
building today. There might be comments
on other
discussion. So,
um guess go through your PowerPoint with
us.
Um so, I'll start with uh page two. Um
it's some of the photos that were
previously presented at the last
meeting. Um again, these are the photos
we've been in our research um using as
um items or checkpoints to go back into
try to tell the story of what was
previously there and how the building
time
um some historical photos. The one note
on the right is the is the structure
that was previously in the plaza and
building
um the
dark is also some more um images. Um
really focused
on the image on um we did reach out to
um for some more as
well that he sent back to us. Um did
learn this image is from 1890.
So like Jeffrey was just saying we did
compile a chart to uh sort of explain
the evolution of various elements of the
building and what we're proposing and in
a lot of the cases we are going back to
the what is the original um because in
the 70s they they made some some very
drastic changes um and then again in the
'9s Some of those changes went back to
the original and others did not. So we
are trying to reference the 1890s image
with all
modifications
windows. We'll get to the roof as well
because there's some changes
from the next
much has changed since the last uh the
last
meeting existing walls are two widths um
with space in between. Um and usually uh
bricks every seven to kind of help tie
it together. Um but it needs some
stabilization to graph of the center
void um and point to an exterior size
wall and also metal stuff on the
interior side um to stabilize the wall
as well.
It's some other
um issues that we discovered some of the
bricks are very
soft
to place the select bricks if they're
really bad shape ways to possibly
It
stands a water
issue
of that
We didn't find out what the um issue
was. So they weren't able to actually
scope the the down spout. So we're going
to actually part of the project we're
going to replace all the down spouts and
underground basically. So that was one
of the problems where we um we are
trying to get more information from the
geo with the water table. water tables
roughly 10 ft low rate which should be
below us but there's still concerns
possibly we have a a wet season that it
might rise up for for small periods of
time so we're still looking at
waterproofing the existing
we are I think we talked about this last
time we're removing the slab inside so
we can get to the foundations for
repairs from the inside and Basically
all of the sidewalk along the north and
south side will be coming out for
replacement of infrastructure and
utilities and
um a foundation drain will also help
drainage so if it does rise can drain
doesn't get absorbed.
No we're fill the cavity. So, we're
going to put a
mebring section. That's the section
that's out.
as well. We're all on the same page.
So, it's
it's on the following slide.
interior elevation showing
some
construction last
Next slide is our
photo is an example of um the door
replacement and
transmosing as we did last month to take
the trans up to
height
larger. Next slide.
They were solid panel.
There was there's glass inserts current
like prior to our project. This is the
'9s replacement doors which were not
authentic. Didn't look like it did. So
we're going back. We're going to go back
to the solid
on the
exterior east and west elevations.
There's a six that was used in photo and
then on the the east I mean north and
south
elevation lower eleing
to have the interior set of the
doors that way. Um the other thing too
is originally the doors were out.
Um you can kind of see that door slide
that I referenced. There's kind of a
recess for the doors that we're going to
have that as well. That's more
and west entrances will have 88 push
buttons. So,
thank you.
The next slide on slide 17 is
just it's the
photo. So this slide that has
various images is just showing it's just
illustrating the changes that were made.
So in the 70s they actually broke the
transoms into two separate pieces. The
lower piece of the transom was operable.
The upper piece was fixed and they
actually recessed the lower transm with
the door. Um and then in the 90s
renovation they they tried to go back
to historically but I still think they
didn't
quite make it match. Um so You can just
see the evolution rightosing what we
feel is the closest match how it
wasn't getting to windows.
Um we are looking at the bigger windows
and also taking
those back historically. So in this
photo um the
199 we're working with to do um a
different
size middle windows because we think
originally they probably didn't they
weren't able to manufacture or install
the
window because it is so large. So the
middle mountain will be a wider
profile to mimic the original
today because we do want to continue the
conversation of the aluminum windows. We
also brought a sample of a composite
window. Um we have learned from that
they cannot manufacture the first
extruded like you
can. So this obviously exact window
we're proposing but we wanted to show
materiality we talked a bit about the
simulated divided lakes. Um so this is
what this is
78 for the
month and the the divider piece will
be doesn't
light this one shows that metal finish
and you can see it more because it
reflects light but these are the
composite windows and you can see the
the lines are just not as crisp and
clean.
We have some details in the next sheets
that show we've been studying all of the
we don't have any original
windows but we
are windows there which
presumably to the original windows but
also just the proportions and the
We
check which
is the way to go with you know be
finished with the
[Music]
That's the reason behind it.
I am
here nowing a fully operable double
double hung windows. Um so Marvin has a
hardware that they can lock the
So it can only be operated with key
which means it can still be operated but
somebody could just
you need to ventilation that's
well the building will be climate
controlled though that's the thing like
you probably we probably don't want
people opening the windows um when the
AC's on or the heat's
on they make the air go they
And well, in the
event and open the
windows, we're
noting
any screens. It really would interfere
with the appearance.
So the operation would only would be
very
limited not by people in the market but
only by
and that's the first one or the story as
well.
So um these details we're still
developing these details but have
met the manufacturer to discuss and
um discuss how the windows are going to
integrate into the existing building.
We're not modifying any of the
um talked about last time we are
replacing all of the sills which had
been replaced in the 90s. They don't
quite fit the openings.
So, we're proposing a
pre-cast.
Um, you know,
there were more closely, but we did all
the
details. We pulled a couple
of projects that were approved by the
register of historic places. So um the
um 1887 American
brewy similar
era7 that range a little bit earlier
but they were all custom made by
also and that was
projects on the
national station. So very similar era
um aluminum custom wood windows by were
approved for this project also in the
national like these are two that are
very close
to those
Uh yeah, we do right before the um
dimensions.
But
um I mean we did find this on
um on the National Park Service
rehabilitation guidelines uh
did state that for example C types of
large buildings particularly highrises
um which is not but um building room
windows may be suitable for historic
wood are not practical and the design
dete
Then question about
windows. We'll move on to the paint
analysis. I think we talked about last
time we did um take 23 samples from
various locations building for paint
analysis. There were only really three
on the exterior that were usable paint
samples um because there was so much
charring on the paint that a lot of it
was not usable. Um but these these are
the three colors that we did find
through paint
and some
images. We also talked a little bit last
time about um the
historic image for the pink colors going
away from just all white trim to
palette.
Next building is a another project we
did in historic
Gettysburg. We presented several
different
options palettes using a lot of the same
colors from the analysis. We presented
it to the the market board and the small
group that
we everyone read the option list which
is what we're showing
[Music]
here in a solid color whereas the doors
will be used by public would have a
two-tone palette where the base panels
are a lighter color the styles and rails
are probably darker
And just for clarity, where's the red
going? Is that on the bracket?
So
also, so we're trying to tone versus
two more
detail. I know there was some comments
you're
proposing going
back
to last year.
series 1300 series.
What's the difference in the cost? We're
still working on the cost. Um but we
think on the loan it'll it'll work
itself out. I think on
the we did we did have a meeting today
actually um that it would probably be
around double the cost um cost of it
mainting
color the details but we're trying to
find the smallest standing seam profile
updated session last
time. Um so the the red lines on
the minimally changing the pitch um we
need to get ination
um to
minimize we
understand but there's
ways piece that's that goes against the
brick better system we think there's
of those up to minimize the impact
of the facial
growing ground.
have one question. Um, in a meeting
recently, someone asked about the
brick there.
Were you able to manufacture?
We were actually taking they're removing
bricks. This green
different bricks. So the bricks are
different sizes exterior for the three
different pieces and
inter same.
All
right, I'm impressed.
Um, yeah, I guess if you wanted to go
through your last slide there of the
site, Ariel,
no, it was just if there was any
comments that we needed to talk about
the site, we just included,
what is the scope of work on the site
for the brick building? said you were
talking about taking off the concrete
floors to get downations but people
should expect
and for interior of
the building I understand the systems
want to kind of
disguise itself
at separate. No, that's that's starting
to evolve right now. Right. So there is
not what's being proposed right now is
there's not a central plan.
We're proposing um to put a chiller pack
system which would be in the parking
lot parking lot
here and then find a way to shall
We're exploring it now and then the
chillers will be fed below the
street and as well
we're never going to be
able to find a house for
now on the
same basically left very little.
down into upper
area. It'll be space,
but you won't need
any building.
You're saying
wall side that kind of splits it. We're
on the east
side or it' be on the first story.
There's a high window.
There's like a higher window that's
not members of the public
here. wanted to bring up to your
attention and we're looking
at specifically today. I can understand
that to be the first phase
of
future to this
project. Do you have comments you wanted
to
this procedure is name address for the
record?
I serve on the task
force. They meet every other Tuesday
with the architects and I'm very
impressed. I just want to say that for
the record. The way in which the
architects have approached this project
both with respect to being diligent with
historic photography, paint colors and
other attributes of the project. I just
wanted to mention that from my
standpoint speaking on behalf of
historic from my standpoint very
impressed. The only other question uh is
state historic preservation office is
also I think in the process of reviewing
these plans and whether or not there's
been any feedback from them and that is
requirement based on the federal
undertaking some grant funds involved
here that does kick in that state. So I
don't know Jeffrey can you comment on
that? Uh I don't believe I've received
anything yet. I don't know if the
project team has
So we we did get a preliminary uh review
better and it was only based off of our
schematic design submission. So they
haven't seen the development of the
design. So we need to have that
conversation with them but um they did
make the same comment that you guys did
um that their preference was for a metal
just we've made that change. um a couple
of interior
uh comments comments on the interior
building,
but I don't think it were really any
different than what we had discussed
with you guys last
month. Just in support of your metal
roof, which I'm really glad that you've
made that change.
I did a little research too trying to
find um some information and could not
find anything on this building in
historic newspapers, but there were
building they were building another new
market in 1872 on Market Street and they
were using a metal on that
But again, it would appear that the
state preservation office is in the
process of
What's the maintenance on a metal roof?
I
don't
expect color so it'll have a high
reflectivity and less prone to fading
than a darker color.
That's what
I they do paint.
So, do they them over paint?
You can't paint over
that for
the is 35 years for the finish. Oh, for
the finish. Okay.
I think there'll be some date. I
mean, but
Thank you very
much. Josh Kesler, city
res. I think these guys have done a
fantastic job. I came
tonight
exior but I went through the plan I
support you know all of it was very
thought on the windows very historically
appropriate
maintenance metal
roof touch
necessary so you know it's a little more
upfront cost first but longevity
you know
is full support of proposals any other
changes maneuvers or other things that
might come
up here.
Julia James 1327
Street about indoors as someone who's
not quite tall enough to reach the glass
that was
indoors by those
doors coming
out for people to see each other coming
in and out a good idea.
What are the steps now?
So I think so the um um uh formal COA
application is not being filed um as
part of this project. Uh uh which is why
this was introduced under other
business. Um that was um a
recommendation of the of the S's law
bureau. Um so uh from here I guess uh
the board if you have any last comments
that you would like to make.
um any statements in one way or another
uh to um you know express the board's
feelings about the particular project
but I believe um you know there wouldn't
be a formal COA uh resolution to go to
the to city council although city
council will of course be um getting uh
this documentation they would be voting
on various aspects of I'm sure contracts
and stuff like that uh so this will be
going to city council in something.
So I'm not sure that it it doesn't but
that city council is going to ultimately
get this right. So essentially if you
guys did it your step one right city
council it always essentially goes
there. So, we're just making sure that
you guys have any questions, comments,
that was the presation. That's what that
was
for. I guess it's turning on now. Um,
but essentially, again, as Mr. Knight
said, if you guys have any questions,
comments that you would like that
record, obviously, let Jeff know. It'll
get to city council. Um, but something
magnitude, right?
essentially that city
council
sitt first. So there's going to be
federal
funding which is why he was talking
about chip which means there's a section
106 process that you're going through
and so there should be
consultation and I'm wondering if it's
to have a member of the of AARB on the
as a consulting party there's nothing
nothing actually to
likeational front so there's nothing for
it to actually like action
I think your your comment was a little
different right your comment was in the
national review scope because they're
using federal funds, they have to do
what's called section 106 review, which
requires you to have consulting parties,
people who are interested parties to
attend and talk about the project. And
I'm wondering if shouldn't there be
someone from ARB on as a
consultant? So,
How is this going to happen?
Yeah. I'm wondering whether that city
question. It's interested parties. It's
it's not the city doesn't get to decide
that necessarily. We would disagree with
you. Yeah.
That's fine. We own the building. We own
the property. We owe the money. We have
the insurance files. We have the
applications. The city will have
everything to say about it. Oh. Oh, no.
I'm not saying the city doesn't have
anything to say about it. saying that a
consulting party isn't just a by the
city. I got that part. I'm saying but
but how it goes forward there's there's
many many parts to this thing but we
have we have an insurance company to
answer to at the end of the day federal
money what's here will be a minuscule
part of the entire thing which phase
it's in will be an issue that's still
not resolved. minuscule or not, if you
have federal funding, you have to go
through this consulting party
process. I would I would just suggest
that if it comes if there's an
opportunity that maybe president of this
board should be consulting part and we
haven't gotten to that step yet. Yeah,
exactly.
But when it when Shipo is starting that
read, then that's when start to come up
with that's when I think Trina
should
well position rather than the name.
Yeah. No.
Um, so are there comments that we want
to move
forward? The only thing that I see
as material
Yeah question last month you g a short
synopsis shingle and you had something
about the insulation build up now that
it's metal clad that's what I was trying
to trying to change the
profile but it's still the six
insulation is still going
because current energy
code installation.
So, we've got wood
doors. Made comment
about swing of the doors.
Now, just traffic. Hopefully, it will
again,
excuse me. Are there still two sets of
doors at each entrance?
There's
like some back of house for just
specific.
Any other concerns?
appreciate all
the use to the city
If there's no other
business to adjourn
Thank
More transcripts
Explore other videos transcribed with YouTLDR.

Los maestros del dinero, Historia de la reserva federal - Documental completo
Geeki Jazzy · English

Hakikat Ilmu Kimia • Part 1: Hakikat dan Peran Ilmu Kimia dalam Kehidupan
Jendela Sains · Indonesian

LOMBA DEBAT SMAN 1 JAKARTA
SMA NEGERI 1 JAKARTA OFFICIAL · Indonesian

ECOSYSTEM - The Dr. Binocs Show | Best Learning Videos For Kids | Peekaboo Kidz
Peekaboo Kidz · English

BAB 1 Sistem Koordinasi Manusia (Sistem Saraf, Indra, dan Hormon) IPA Kelas 9 Kurikulum Merdeka 2026
Funscience · Indonesian

Maria Khoreva - ballet Paquita, var.#1
Maria Khoreva (ballet dancer public) · English

Michelin presented airless tires for production cars
Innovative Techs · English

Program Arduino TIMER DIGITAL DOT MATRIX LED & BUZZER || Simulator WOKWI! 🔔🔴
Alfian Center · Indonesian

Universitas Terbaik di Indonesia yang Mengubah Masa Depan! Kampus Terbaik Indonesia
NafiGasi · Indonesian

Rota 66 Português - Mateus 21 | Luiz Sayão | IBNU
Com IBNU · English

Cycle de l'oxygène
Editions Larousse · English

🚨 LA PATTERN HISTORIQUE se répète : BTC et XRP foncent vers CETTE zone !!
Preda Crypto · English
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.