Harrisburg Architectural Review Board Meeting 4-7-2025
All
right. Well, welcome everyone to the
April 7th historic architectural review
board. Um, our first order of business
is uh roll Mrs. Grible here, Miss
Rucker, Miss Bennett, Mr. Henry, and
Miss Ziggler.
Great. Next on the agenda is a review of
our minutes from the March 3rd, 2025
meeting. Have a chance to this
afternoon. Motion a second. All those in
favor say I. I opposed. No abstensions.
No abstensions. Motion
carries. All right. Uh we have no
applications to review today. So the
only item on the agenda is under other
business uh for a preview of some of the
work that uh will become come in a later
application for the Broad Street
Market. Um
so typical procedure is just State your
name and address for the record. You
would state your name and address.
Okay. And um usually we have a re of an
application a summary to go through but
I guess in this case we don't. So should
we just open up the floor or would you
like to stay state a few things
initially here Jeffrey? Uh yeah. So um
tonight's meeting is uh just a
preliminary presentation uh to the board
uh to um provide some uh information and
background about uh details on the
reconstruction of the brick building.
Um, and this is uh to solicit um
questions or comments from the board
members ahead of a formal presentation
at next month's meeting on uh May 5th uh
in which uh a more full uh presentation
uh and documentation uh would be
provided uh to the board. Um but they
did want to get uh again they did want
to get that feedback from the board um
in as far in advance as possible uh for
um that final uh formal uh submission.
Uh and you know we felt that because
there was no uh applications on
tonight's agenda that this would be a
good time um to uh have the board review
this uh as opposed to maybe just sending
this out via email and soliciting
feedback. Um and uh so with that being
said, we haven't provided a a formal um
case report or review of the project
because there's really not a final
formal uh proposal or review. Um and uh
with that, I guess I'll just uh turn uh
the mic over to the applicants so that
they can uh provide a little bit of
background on uh the Broad Street Market
brick building reconstruction. Sure. And
just one item, Rebecca and Peter, you
both represent Murphy Denton Hayer
Architects, right? And working for the
city on the
project. All right. Yeah. If you want to
walk us through your um PowerPoint
presentation, that would be fine. Unless
you have some intro words of wisdom for
us.
We'll we'll just dive right in. Okay. Um
Jeffrey was saying this this
presentation is focused solely on the
brick building.
scope of the project. So um we will
probably be back again at a later date
to talk about other um parts but but
right now it's just the
coping. So Pete and I have been and our
team have been doing a lot of research
um and trying to find as many historic
images as we possibly can of the brick
building um in order to be accurate to
the uh different components of the
building.
So, we've been to the state archives.
We've been to the um you know, we've
we've had some help from historic
Harrisburg. Um we've been to the
Pennsylvania State Library forum and um
gathered as many historic images as we
can. So, some of those
images. Would you mind going back to the
second page for a moment and just orient
us to what this
is showing sorry on
the the right which of those are the
exist existing buildings. So the the the
building to the right the building to
the left is the wood structure that was
uh was previously on the plaza um and
that was taken down part of the project.
So this this street is no longer
Okay, thank you. Sorry. Continue. That
that picture really is more relevant as
we develop the rest of the the big
picture stuff, but
um we did find some some good images of
the interior and exterior.
This really is the the key image that we
found and we're going to come back to it
later in the presentation because um
this is the earliest image that we could
find and we were able to get a high
resolution uh version of it. So, we've
really been studying
this side. Yes, that's the side that
So, we started uh first by looking at uh
the masonry. We have a consultant sheep
restoration that focuses on building
restoration
and things of that nature. So um see
these images here um the image to the
left is showing
that wall is two widths thick with
roughly a one inch air gap space in
between. It's a very slender wall. It's
tall. Um, so we're comfortable, um, that
we're going to be able to stabilize the
wall and use it in our new. Um, some of
the we're proposing is to have 8
in metal stud on the back side of it to
help support it and stabilize the actual
wall. We're also proposing to
uh, grout basically air to
stabilize. Um, One other thing to note
from the brick um the photo to the right
is every
seven. So these are various um images of
the grout um I mean the mortar mortar
and grout uh and there's very different
uh iterations throughout. Um we did do a
in-depth mortar uh analysis and we were
not able to
um throughout the building. Um but we
were able to understand what's currently
on the building and we're
currently finding the right permits um
for the existing brick soft softer brick
and you can tell from the bottom bright.
These are other images of other masonry
issues that we're running into. We have
um there's a water
source building. Um there's some to
attend to
um the worst area um in the nonburn
section. This is an image of the image
to the left is the interior side and the
image to the right is the exterior and
it would be the southwest corner of the
building. Um we're proposing to actually
um take down the wall roughly where the
down spout is on the leftand side and
then um right hand side of the window in
between the window and the door um
because it's not stable. It's containing
water.
for many years. You can see from the
interior side that there was like a
patch job um to try to help to help the
issue. However, it is not really helping
the issue. See on the exterior of how
it's kind of going out that condition.
Um so we really think we got to take
down that portion.
Exactly.
Um these are just some of the elevations
um working on documents outlining
work that is needed to
get
back. Um, we're also looking at the wood
accents
and document.
So, we did paint analysis on the
building as well. Um, we took along with
our consultant um, we took about 23
different paint samples for different
locations both inter exterior building.
Um, from those samples, really only
about six were usable samples because on
the building, um, there was very little
paint remaining in certain areas where
we were really hoping to get paint.
But the what the samples told us is that
um the building was a lot more colorful
than it is than it was right before the
fire where all of the accents the
windows um and all of the wood
ornamentation were paint out white. What
we found was that um really they they
were different colors and the colors
changed over the years. Um and we
started to look at the um the uh
Harrisburg train station which is of the
same era in a similar type of building
um which used a lot of these same
historic colors. So we think that's a
really good reference. Um and we are
still working through what we think
should be but we are going to suggest
some colors that aren't just white some
of the wood
This is just an example of a project
that was on in the past. Um a project in
Gettysburg historic project where again
all of the ornamentation windows um and
trim were painted out white. Um but
after paint analysis uh we learned that
really details were um few different
colors and we got everyone on board with
painting um back the original
colors that analysis told us they were
and um I think the
result
striking. We also did get three good
samples from building um again working
on what what we're going to recommend as
the paint colors, but
um we might be looking at a the exposed
deck on the interior. may suggest
painting that out a slightly darker
shade than some of the structure on the
interior.
So going back to this original
photo, some of the things we notated
in would be some of heights, the type
of built.
This is a
screenshot
right here.
are a lot taller
than we're proposing
to
to the doors back to the original
size. We did have reach out
to window
manufacturers and actually
helps us as
well. So this is just an
example. So it's a six
panel double door. This is the
center. Um so roughly previously around
prior to the
fire and the doors on the north and
south
elevations
center in the
center that
was prior to
so really it's only
short east ends where the doors
were
entry doors along the long
or
short. So, we know that windows are of
contention in a lot of cases, but um we
are again really studying and counting
bricks based off of the 197 image. And
um if you take a look at the image at
the far left, that's the historic image
in the middle. The the res the
restoration work was in the I believe
90s we really didn't keep the
proportions we would like to go
back the
grid portions that were there in 197
image we are proposing um
aluminum
interior exterior aluminum
Um, I really um think that the the
aluminum clad will preserve the
longevity of the windows and really
help, you know, alleviate some
maintenance that the city would would
otherwise have
to every five
years. All of
these and we are working um we've
reached out to a number of manufacturers
and Marvin is our preferred um
manufacturer. They
have a lot of good custom options for
matching the styles and rails and the
mountain profiles to the historic house.
Um and we are um upgrading the building
with um modern HAC system so we do meet
modern energy requirements. So that
means that we have to have insulated
windows. Um, and we are proposing
simulated lights.
I know there's been a concern in the
with the public about what simulated
divided light means. Um, and just for
clarification, um, my understanding is
there's still a wood member or an
aluminum. You're propos we'll talk about
aluminum clad in a little bit, but
there's a raised mutton bar
um on the exterior face of the two the
two panes of glass. Something on the
exterior face and on the interior face.
And then in between the two panes of
glass, there's also a divider that so
you won't see light between the exterior
and an interior piece. So I think some
people were thinking it's just an
interior piece between two panes of
glass. So you'd always get the glossy
look over the mutton pieces. Um that's
not the case with these. A simulated
divided light is to look like a true
divided light window.
We would
start on the interior and
exterior like in the bottom bottom row
second column left and then the spacer
in between so you can't
see we are
styles and um that needs to be the
proportions. It's it's challenging
because we're only using photograph. Um
we know that the windows that still
exist are not original.
So, we're working on that.
If you're done with windows, um could I
ask were the
um the um clear story windows were they
operable?
They were originally operable.
But again, since we are
um we're now going to um be introducing
HVAC into the building, um we are
proposing um fixed double window. So,
they reticable, but they not be operable
because um for one, I don't think
there's anyone at the city who's going
to be going out to opening them, but um
there's also not
long. Yeah, they work. I've been going
here since I was a child.
things to open up
this we are the manufacturers make
operable double windows but we
don't see
and and I do think it's probably
important to note that they had to open
them at that point to allow like air
flow through and the is going to be air
conditioned. There won't be that need
for that um type of you know operation
of
ceiling fans.
Uh no I don't think any
the roofing component um
1907 photo um where we don't we don't
feel that there was a metal roof um used
or slate. Um so we feel the most
appropriate is going back to the asphalt
prior to the fire um going to an
architectural typical asphalt.
And because we do have to bring the um
envelope of the building up to current
we are proposing to add
insulation of the decking.
So we what the way that we're proposing
it is to
um you're required to have continuous
insulation along the building and um so
where the roof stops at the walls where
there's an overhang we can taper the
insulation
down achieved insulation up to the wall
edge and then we can taper it down um so
that we have the same
um that existed. So from the short side
elevations
um we'll be tapering it towards the
front and the long side.
So when you're looking at it from the
endlight
and we feel that's more fitting just so
of the market having exposed decking
And then uh for gutters and down spouts.
So originally we thought before we had
the high res photo of this we thought it
was uh box gutters.
Um um but from this photo we were able
to see that it's just half
gutters. Would they have an aluminum or
copper?
I
think we also think it's hard to tell
from the image, but it looks like they
were painting. Um, and we're paint.
No, just talking here. This edge
that's pretty
You were talking about the
roof and um tapering it where it has the
overhang which makes a lot of sense
except on the end condition when you
have that facial board
still. Will you extend it upward to
compensate or
Oh, even the lower roof. Well, both I
guess the the higher peak
is more out of the view, but you still
have It looks like there's still a
facial board and some brackets, right?
So,
um compensating. Well, how how many
inches different is it?
Still working on that. Yeah, we're still
working on it, but we're trying to get a
an assembly as we
can.
So that's
insulation. We're thinking once we get
down
right on the sides on the long lengths,
but I'm talking about at the peak
there's still board there as well.
Decorative board with brackets, right?
So the roof
overhead spaces as well. So we'll we'll
be able to taper it at that
edge. So so
that good question and I guess all of
the imagery that's included in the
packet and that I've seen don't really
have an a bird's eye view. Uh So we
don't know what kind of roof was there
and if asphalt was there
last
as I'm not sure we
can make demands another type but what
do you given the age of the
building material
certainly wouldn't
I don't I don't
Yeah, I think I'd like to see some more
um typical that same age, what kind of
roofs they might have had.
Um, a metal roof to me sounds right, but
the other building that was
fair was
like
metal.
Right. The wood the wood
building a little bit.
Exit sessions
It doesn't. You can't really tell
either. We have photos from
easier to see because
it's also thought that they were
different enough that it wouldn't
necessarily matter. The other thing that
we might come up against is that if we
we do have a quite a low slope um on the
lower roof. I'm not sure that a modern
standing seam manu
Sure. Barely making jingles
there. It's you'd have to be across the
street like really like we we did some
studies actually standing if you'd be on
like the sidewalk roughly at where the
red one there's no way. Even we're
building up that you even be able to see
where it tapers
like you say.
They do make low slope metal
standings. You might want to look into
that. They don't
always there are criteria, right?
The the stone building.
That's what we were just talking about.
Um, we don't know what was on each roof
and we're just trying to find something
period appropriate
originally. That's what we're trying to
determine.
So that's that's one item of discussion.
Um,
that would be worth investigating
further for our next
gathering. Um, and then let's talk more
about the aluminum clad windows. And I
kind of see the metal roof idea helping
to justify some aluminum clad windows
eventually, but period of the building
wouldn't have had
cladding unless you can tell me
otherwise. But I don't think the age of
the building would have had aluminum and
As a board, we're typically looking at
wood or composite windows.
Um, it's very
well,
my memory doesn't I don't have many
cases in my memory of when we've
approved aluminum flat windows unless
they were
recent building. Yeah, there there have
been a couple um aluminum clad uh
windows. I think one uh that comes to
mind uh is 1718 Green Street. Uh they I
think they use the elevate uh window um
which might have been Marvin I think
does that line. Um so you know the board
now
in that case I believe that was like a
side elevation and maybe even like an
upper floor. So there might have been
the justification touch zone, not on a
primary facade. And obviously, a
building like the Broad Street Market
has many more frontages on the public
rightway. And there's also a higher
priority than a row home uh in the
middle of, you know, some block in in
old uptown. Um and and you know, this
was I did warn the project team. I said,
you know, the windows and the
materiality will probably be one of the
biggest things. Um but uh you know, I
think given the number of windows that
they have up there. And I know in in
some cases when we're talking about a
composite, a wood composite window, uh
that we've heard from several property
owners that you get to a certain size
and and the manufacturers just aren't
making those and maybe you can go
special order these. But um I think we
also in the consideration of everything
that's being proposed as part of this
reconstruction is, you know, what's it
going to cost? Because this is not a
simple this is not a single home. This
is like a really large building and you
know I don't know I don't know myself
where necessarily all the money is
coming from whether this is from the
insurance payout and therefore you know
it's somewhat limited in terms of what
resources we have available um but uh
you know making sure that I think first
and foremost that the building becomes
uh gets back up and running and is
brought code compliant. I know this is
another uh topic of uh issue that the
board has discussed of you know what is
permissible as far as a new alternative
material if the greater interest in the
retention of the building, the longevity
of the building. Um you know making sure
that the property is something that
people are going to want to buy and
invest in and live in in the future is a
consideration
uh for um for the board. Um and you know
I think this in many cases these issues
that might have been uh you know
secondary or even tertiary in some cases
um in other reviews really come to the
four in a in a project like this given
its visibility given its importance you
know um and so yeah I think there is
certainly those questions of well was
that a metal roof do we want to allow
aluminum clad windows Um, and you know,
it's definitely something uh that again
I know the project team has spent a lot
of time investigating and researching
on. Um, and you know, their point about
the the maintenance of it is a good
point because again there's a lot of
windows in these buildings and um if if
it's there have to be wood windows and
we're having to have you know the
facilities uh department go out there
and paint every other year, every third
year. Um, you know, do we have the
capacity to be able to do that? Do we
have the resources to be able to fund
those things on
kind
of
retreated kind of
I would think that we should at least
see some comparison moneywise
to size.
Um and
um kind
of I think what you're
saying yes essential
everything this is our big
show and I'm not sure
this complies on a whole list
material and I do think
it's research
on
some windows to see
if
material and at least be able to show us
due
and I I'm sure um
national secretary of interior standards
will come into play as well. We we
strive to follow. Um so when it talks
about windows there we
may also because of the high
profile situation for this building we
may want I I'm wondering about positive
that's even appropriate. I do understand
the new growth wood is not what the old
growth would lipan right
so yeah windows are always a
complication so we'll have to do some
due diligence reading through the
secretary of interior
standards and don't know if there are
restrictions funding
sources also bring
We
are
certainly but I I'm not
sure and we do have a cost comparison of
what
However, I think it's worth questions
extremely
expensive. I personally I would not
If you
were able to
match this in the
comments and they would all be
Now, going back to the doors, they are
wood doors that you're looking at or are
they plaid? Also,
we're looking to use wood on the
exterior side doing a similar vest
on your interior doors. Okay. We don't
have perview of
but we want to have the true on the
exterior but we have to keep the
envelope. So we're keeping
Okay. So, I think we've reviewed
everything. Um, question.
Yes. Thank you. I was just there on
brick.
Yeah, we're gonna try to
read. There's a whole brick stud we're
doing too. Each brick actually sections
are all different and they're also all
different
brick same way.
First of all, thank you for the word
because I've been a preservation
professional for
almost
that
photo. I'm wondering if you could
They did try.
Yeah, they could try
add one of the things.
Well, all the trains and doors were able
to get in right
Will you go with a traditional limestone
mortar or you going to go with a
type
softer the
bricks and we're doing additional
testing?
Sorry. It's tough to get
foundation. You can see that
moisture almost.
I would think any weak holes are covered
by the concrete sidewalk as well.
So, um, if you're furring out the
interior with stud, I imagine that will
be some sort of plaster drywall to
represent and some insulation. So, are
you putting a big barrier in? Are you
doing spray insulation or you
which is the vapor barrier.
So there's there's two processes right
now investigating. So one of them is you
see the down there. So we're thinking
there might be compromise in the line
once it
gets at the
bottom. Um the other thing we're
studying is the the water level. Um
basically
So we're getting
pricing on
it doesn't make sense to go through this
whole restoration.
Um to my point about the vapor barrier,
old buildings would breathe, right? So
now we're adding this vapor barrier um
to air conditioning as part of the HVAC.
Um so that makes me
think obviously we need a vapor barrier
so that we don't destroy the
brick cause other issues but um HVAC
is something that we don't always get to
see before it's applied to a building.
So, where and how are you planning
to where are you putting the equipment?
Where are you putting the
chiller rooftop units or whatever?
We're still
working. Um, we have a central central
plaz
that both stone building
you don't have any boiler
mechanical room in this this building or
in the stone building. Correct.
So you'd have some sort of access way in
the plaza. Yes.
Bricks or whatever happens, right?
There's also in your picture some
electrical equipment. Looks like that's
nice to clean up some of inevitable
spaghetti. So I like the underground
approach for that as well. If we can
create some sort of confident
Are you doing anything? Um, are any of
those exterior 1990s tables around the
perimeter of the brick
building? I know they're in front of the
stone. They are.
Do you have any plans for those?
stone on the outside of around the
perimeter. Um, pretty much at the curb
line of the sidewalk, there's uh some
posts with tables that were intended to
give you, you know, the the thing that
happened inevitably was in the in the I
think so in the plaza people have set
set up um tents and tables but those
were intended to be able to be pulled
out and used without bringing your own
table
I've never I've never seen them in Yeah.
I don't know that it's a feature.
Although I'm curious to find out what my
my guess is that I've always thought
about this too is my guess is it was
probably supposed to replicate when
there were wooden extensions on the
outside of the building. Um and there
were stands I think in the almost like a
modern equivalent of of that was
obviously uncovered and you know
unencloed but it was kind of intended to
replicate the activity that would occur
on the sides of the boat.
last major renovation.
So next month you'll also talk more
about the second phase and third
potential phase.
Um, so what can you talk to us about a a
little bit about how you're approaching
the construction of the project?
You're doing just the brick
building initially, right?
In May, I think we were still only
focused on the brick building because
that's piece that everyone wants to see
expedited and completed. Um,
We're still knocking out what
exactly are you
I think we would probably pick one of
those,
but we were only
able colors.
When you go with the insulated glass
windows, it looks like in this picture
there
At first,
sorry,
but you're not because you have
insulated glass, you won't need any
storms.
DC
heat in the winter.
[Music]
lockable.
Yeah, I don't there there are several
double hungs on the ground.
So when they are fixed double hung do
they have the offset?
Yes, they basically just
like they
just so I really don't think
it's made. It's really more
functionality
issue. If
particular vendor that's near a window
goes and opens it and then the AC's
running there's going to
be
there that's not
This is David Baker. He's our facilities
manager.
Seems like
so for
ventilation and air change. Do you need
any lers?
Well, we don't know where the equipment
is yet, so you don't know if you're
going to need loopers. But if you
propose putting one of making one of
these openings into a looper, I think we
would want to know that
Well, I can't speak for everyone, but I
appreciate the attention to detail on
this landmark building for us in
Harrisburg. And I'm really happy to be
here tonight and to see movement on the
project as
well.
Been eagerly
waiting. I think you heard from some of
team testimony. There's a lot of
research that
way analyzing samples. Um this was not I
think show up and say okay we're going
to do this this and this. It's like
understand the building to
understand life and
building doesn't seem to me that uh from
my conversation our discussions I can
see notions about how this was supposed
to be
done analysis of the actual building. I
think a lot of what you heard here is a
response to what they found
investigator.
Should I open the floor? Comments from
the public? David, anybody?
You're both David. So,
all right. Well, then I guess I have to
take a motion for adjournment. I'll make
a motion to adjurnn. Second. All those
in favor say I. I. Motion carries. Thank
you for your time. Thank you.
More transcripts
Explore other videos transcribed with YouTLDR.

MATERI GENETIKA: BIOLOGI KELAS 12 SMA
SIGMA SMART STUDY · English

Howard Marks Warning: if you invest like this, you're about to lose everything
My First Million · English

Here's Why All Sermons Should Be Christ Centered - Tim Keller
The Gospel Coalition · English

تفسير القرطبي | سورة الواقعة (3) للشيخ عبد الكريم عبد الله الخضير
تدارس القرآن ٤ · English

好吃又实惠的街头酸菜鱼泡面 #路边摊美味 #街头美食的诱惑力有多大#小吃 #food #noodles #delicious #cooking #streetfood
Ayu速食 · English

رئيس الوزراء المصري: المدن الجديدة في مصر نجحت في توفير 5 ملايين فرصة عمل
AlQahera News - القاهرة الإخبارية · Arabic

اكتشف هذا القانون الكوني لتحقيق كل ما تريد !
Safia Tahar - صفية طاهر · English

it's time to start disowning Bambulab printers.
Once in a Six Side · English

كيف تغير حياتك و تنجح في اصعب الظروف - العادة الأولى - دوباميكافين
دوباميكافين Dupamicaffeine · English

A MÁFIA DOS NECROTÉRIOS | CORTES DO MAU - ACHISMOS
Maurício Meirelles · English

Tokyo diaries | ִֶ눈오는 날 여자놀이 🤍₊˚ ❆ grwm,짱 귀여운 타르트 가게🍰,소금빵🤤🤤
아린 wested_arin · English

الجملة التوضيحية المحدثة من آكسس كونشيسنس! (AR) @accessmultilingual
Multilingual Tools of Access Consciousness · English
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.