Harrisburg City Planning Commission - 06/05/24

1:35:12EnglishTranscribed Jun 15, 2026
0:28

e

0:58

e

1:28

e

1:58

e

2:28

e

2:58

e

3:28

e

3:58

e

4:28

e

4:58

e e

5:50

like to call the Harware Planning

5:52

Commission meeting to order at

5:54

approximately

5:57

6:30 uh Commissioners you received your

6:00

minutes from May 1st

6:03

2024 are there any corrections additions

6:14

deletions is there a second second this

6:17

been moved and second for approval of

6:19

minuts as they are all those in favor

6:22

state by saying I I I opposed extensions

6:28

carried abstain one extension

6:32

sorry under old business there's

6:36

none under new

6:38

business item number one is a varant

6:42

application for 2201 North fren street

6:46

is Zone RF is by

6:50

2201 NFS

6:53

L and that's to construct a free

6:55

standing

6:57

sign taller than 4T 9 in and larger than

7:02

16.4 ft than permitted by right St uh

7:07

yes so the applicant is requesting uh

7:09

the construction of a freestanding sign

7:11

taller than permitted by W uh 4 and 3/4

7:14

feet um versus 4T and also larger than

7:17

permitted by right 16.4 sare ft uh by 8

7:21

square versus 8 square F feet uh the

7:24

property at 2201 North Front Street is

7:25

a88 acre lot with a three story 29,000

7:29

381 ft structure which was constructed

7:31

in 1924 while the project site is

7:34

comprised of six total Parcels the

7:36

subject property is the only one

7:37

relevant to the request is bounded by

7:39

2225 North Front Street to the north the

7:42

property is at

7:43

2200 uh to 228 North 2 Street to the

7:46

east Uh Wood bind Street to the South

7:49

and North Front Street to the West it's

7:50

Limestone masonry detached structure the

7:53

king mansion features elements of the

7:54

late classical Revival or neoclassical

7:56

architectural style it was originally

7:58

designed by noted architect Frank Gordon

8:00

festo Jr for horse King and his family

8:03

uh character defining features include

8:05

the Limestone masonry exterior

8:06

Mediterranean inspired architectural

8:08

features throughout the large covered

8:11

front porch and second floor balcony the

8:13

port kosher on the Northern elevation

8:15

the large covered second floor porch on

8:17

the Northern elevation The prominent

8:19

dormers on the front and side elevations

8:21

the red clay roofing tiles and the

8:23

substantial Stone chimneys new elevator

8:25

Tower and building entrance is currently

8:26

being constructed in the northeastern

8:28

Corner the main front entrance features

8:30

arched provided light double doors each

8:32

with 12 panes set within a wooden frame

8:34

which mirrors the three sets of doors

8:35

and transoms of similar design on either

8:37

side that provide access from the

8:39

interior of the building to the large

8:41

front porch there's a side entrance

8:43

accessed from Woodbine Street that

8:45

features panel double doors and a simple

8:47

wooden frame other access points to the

8:49

building feature more utilitarian

8:50

entrance designs there are windows of

8:52

varying sizes and configurations but

8:54

finestra primarily includes divided

8:56

light windows with side lights and/ or

8:58

transoms on the front first and second

9:00

floors the large third floor Dormers

9:02

feature divided light Windows set in

9:03

simple wooden frames large and small

9:05

dentals and substantial pediments topped

9:07

with red clay roofing tiles property

9:09

features a 76 space service parking lot

9:12

on the Northern portion of the site

9:13

which provides parking for tenants of

9:15

the building and an expansive front lawn

9:17

enclosed by a 4ot high metal fence with

9:19

masonry peers and Landscape screening

9:21

there's a detached garage at the rear of

9:23

the property that has the same facade

9:24

appearance and roofy materials as the

9:26

main structure the structure has

9:28

substantial historic and architecture

9:29

value and contribut significantly to the

9:31

character of the neighborhood and

9:32

streetcape along North Front Street uh

9:35

the planning Bureau recommends that the

9:36

request be approved with the following

9:38

conditions uh the applicant must submit

9:40

the requisite flood plane development

9:41

permit application for the proposed sign

9:43

and accompanying fence and wall elements

9:45

and receive approval from the flood

9:47

plane administrator uh the applicant

9:48

must ensure that the signage itself as

9:50

determined by the location of the

9:51

lettering on the sign structure is

9:53

located at least 5T from the public

9:55

right of way along North Front

9:57

Street plan buau staff recommends the

9:59

request must be approved for the

10:00

following reasons the applicant has

10:01

provided substantial statistical support

10:03

for the proposed signage based on

10:05

nationally recognized standards and with

10:07

a focus on ensuring safe access by those

10:09

traveling to the property along North

10:11

Front Street the zoning relief requests

10:13

uh NE necessary for the installation the

10:15

proposed signage are generally minimal

10:17

and non-intrusive in nature and do not

10:19

involve aspects such as internal

10:20

illumination or electronically changing

10:22

messages which might have adverse

10:24

impacts on adjacent properties to the

10:25

north propos signage is also designed in

10:28

a complimentary manner to the the

10:29

property Aesthetics and the riverfront

10:30

context and does not produce detrimental

10:32

impacts on the surrounding neighborhood

10:35

uh and the site currently features

10:37

minimal signage identifying the property

10:39

or the uses thereon the proposed sign

10:41

will be more visible to the general

10:42

public and will improve site safety and

10:44

accessibility for both visitors and

10:46

guests and passers

10:48

by thank you Jeff um could you state

10:51

your name address and relationship to

10:54

the

10:55

project absolutely chairman my name is

10:57

Ash mccom I'm an attorney with MCN won

10:59

NK 100 Pine Street Harrisburg

11:02

Pennsylvania we represent the applicant

11:04

2201 NFS LLC and with me is Mark Kowski

11:10

with the applicant he

11:13

can Mark Kowski I'm the owner uh

11:16

president CE CEO of 20201 f

11:19

LLC okay gentlemen uh heard the staff

11:23

report um are you acceptable of the

11:26

conditions we are okay did want to add

11:30

anything to the report I I always come

11:32

with a nice packet to hand out and walk

11:34

everybody through but but Jeff did a

11:36

great job covering everything so we're

11:37

happy to answer any questions the

11:39

Planning Commission might have okay

11:41

Commissioners um at this time I have no

11:44

questions um and I'll start with you if

11:47

you have any questions or concerns

11:49

commissioner

11:51

McKenzie uh no specific concerns but I

11:54

would like want to understand a little

11:55

bit more how we measuring the sign area

11:57

itself is the

11:59

if one looks at the wall that goes with

12:01

it it looks like it's maybe 150 200

12:04

square F feet in size y the sign area is

12:07

measured a rectangle around all of the

12:10

letters pursuant to the ordinance and so

12:13

that's how we came up with the 16.4 feet

12:15

where eight ft is low okay thank you

12:18

you're welcome just wanted that for the

12:21

record

12:23

commissioner yeah I think it's pretty

12:24

straightforward every time we have a

12:26

signing issue I express my feelings that

12:29

our signing restrictions are way too

12:31

restrictive anyhow so I have no problem

12:33

with

12:35

this commissioner readed I have no

12:39

questions commissioner

12:42

Jordan just one question um just for

12:45

clarification it looks like from the um

12:49

design that this is not an internally

12:51

illuminated sign correct that's okay

12:55

um how were you going to ensure that the

12:58

sign could be seen from the 230 ft at

13:01

night

13:06

soin which if we do it just probably be

13:08

a singular

13:09

Spotlight B certainly if we do provide

13:12

something like that we can provide Mr KN

13:14

cop put a metric plans to show

13:16

that requirements great thank

13:20

you um

13:22

Joe I have no questions thank you

13:26

okay is there anyone from the public

13:29

uh for against this

13:32

project I'll start with the

13:35

center to my

13:37

right okay there's no concerns there

13:40

Commissioners this is pretty

13:42

straightforward U I get a

13:45

motion

13:47

okay how are you handling the flood

13:49

plane aspect of that just curious that

13:52

professional curiosity as much as

13:54

anything sure I think that was Jeffrey

13:56

referen as one of the conditions we have

13:57

to find the permit typically what we've

14:01

done we actually include there's some

14:02

fencing reconfiguration that happens in

14:05

conjunction with this um because the

14:07

fence passed through um because we're in

14:09

such a broad space we don't have I

14:12

professionally would offer my opinion

14:13

that it's not something where I get

14:15

concerned

14:17

with plus our flood

14:20

plane location so nothing that should be

14:24

that results

14:26

in okay thank you

14:30

okay any other concerns if not could I

14:33

get a

14:35

motion motion to approve I'll second

14:39

that with with the the two conditions

14:41

listed yeah okay it's been moved a

14:44

second for approval of this project uh

14:47

with the conditions all in favor state

14:49

by saying I I oppos

14:53

extensions

14:55

motion thank you very much appr

14:59

the second item on the agenda this a

15:02

varant and special exception application

15:05

for 1849 whiteall street it's Zone

15:11

RM is followed by and he's gonna have to

15:16

help me with his

15:18

name zap zapd could you state your

15:23

name Al yeah okay thank

15:26

you with z

15:29

uh P Group

15:31

LLC is associated with the conversion of

15:34

the existing structure to a three-unit

15:36

multif family dwelling including relief

15:40

from the development standards and off

15:42

street parking requirements staff uh yes

15:45

so uh the applicant is proposing uh the

15:47

conversion of the existing structure uh

15:50

to a multif family dwelling it's really

15:51

kind of a reversion um it was multiple

15:54

units on point in the past but has

15:55

experienced about a couple decades of

15:57

vacancy um so reverts to the underlying

16:00

zoning designation uh and this includes

16:02

relief uh from the development standards

16:04

um I believe specifically the density

16:07

regulations uh and the off street

16:09

parking requirements um and uh for three

16:13

um units they'd be required to provide

16:15

four spaces and there are there's a

16:16

three- space um parking lot at the rear

16:19

of the property uh the property at 1849

16:22

whiteall street is a 09 acre lot

16:24

featuring a three-story 3144 ft

16:27

structure which was constructed circa

16:28

1900 00 property is bounded by White

16:30

Hall Street to the north 1851 White Hall

16:32

Street to the east vagina Street to the

16:34

South and the property at 1847 White

16:36

Hall Street to the West this attached

16:38

structure features elements of the

16:39

Second Empire architectural style

16:41

character defining features include the

16:43

very facade treatments including brick

16:45

stucco and inel brick siding The

16:47

Brownstone water table the full width

16:49

porch with fluted Square columns and a

16:51

substantial cornice with pediment the

16:53

second floor Oro Windows the substantial

16:55

addition with three-story metal fire

16:57

escape on the rear elevation and the man

16:59

roof with real slate shingles and five

17:00

Dormers the main entrance features a

17:02

wooden door with a small pane flanked by

17:04

a simple s side light and topped of a

17:06

simple transom featuring the property

17:07

address is accessed by a deep wooden

17:10

porch and concrete steps there are

17:11

secondary entrances accessible via the

17:13

fire escape on the rear elevation which

17:15

appear to feature panel doors of varing

17:17

materiality ministration also includes

17:19

windows in a variety of sizes and shapes

17:21

all the windows appear to be in a one

17:22

over one configuration all the basement

17:25

windows are boarded up there are 10

17:27

windows on the front elevation 10

17:28

windows on the Eastern elevation eight

17:30

windows on the western elevation and 12

17:32

windows on the rear elevation the maner

17:34

roof features five Dormers which feature

17:36

substantial pament brackets and

17:37

decorative woodwork structure is

17:39

otherwise topped with a flat uh rubber

17:41

roof although the structure is

17:43

significantly deteriorated the

17:45

architectural style Design Elements and

17:48

building massing are reproduced in many

17:49

of the other structures along the block

17:51

as such the building reflects the

17:53

diverse nature of properties on its

17:54

block and thus contributes to the

17:55

architectural and his historic character

17:58

of the street Gap

18:00

the planning Bureau staff recommends the

18:02

request be approved with the following

18:03

conditions if granted zoning approval to

18:05

move forward with the project as

18:06

proposed the applicant shall allow the

18:08

codes Bureau to perform a comprehensive

18:10

inspection to identify all outstanding

18:12

code violations and receive approval for

18:14

all necessary city permits prior to

18:16

receiving a certificate of occupancy uh

18:18

the applicant will also coordinate with

18:19

the Department of Public Works to ensure

18:20

that the account billing is updated to

18:22

reflect the proposed change in use plan

18:25

bu staff recommends the request be

18:26

approved for the following reasons the

18:28

special exception request for the

18:30

proposed use is warranted by the history

18:31

of the property the presence of other

18:33

such converted apartment buildings in

18:34

the immediate neighborhood and the

18:36

recent zoning hearing board approval of

18:37

a similar proposal at a nearby property

18:39

with similar existing conditions the

18:42

request for relief from all street

18:43

parking is warranted by the existing

18:45

three space accessory parking lot at the

18:46

rear of the property and the on street

18:48

parking available along the front edge

18:49

of the property with whiteall Street uh

18:52

the project will result in the

18:53

rehabilitation and restoration of a

18:55

large residential property directly

18:57

across from Reservoir Park and improving

18:59

not only the condition of the block but

19:00

the overall appearance of the

19:01

neighborhood at a high visibility

19:03

site finally as opposed to other such

19:05

conversions in recent years which have

19:07

proposed the establishment of one

19:08

bedroom or Studio units the current

19:10

project will create three two-bedroom

19:12

units uh adding to the multi-bedroom

19:14

inventory in the city which is in high

19:17

demand thank you Jeff um could you state

19:20

your name and address and relationship

19:23

to the

19:25

project my address is 2858 still Avenue

19:29

New

19:30

York I am a Founder one of the partners

19:34

at the Zac P group this my

19:39

another Christopher Torres I'm one of

19:41

the founders company and your address

19:46

2155 Jefferson Street harisburg

19:48

Pennsylvania C

19:50

17110 okay

19:53

be my name is aror I'm one of the

19:56

partners I live in better place New York

20:00

New

20:01

York okay thank you um gentlemen heard

20:05

the staff report uh with the um two

20:10

conditions um are you acceptable of

20:12

those

20:13

conditions do you accept the yes the

20:17

condition uh did you want to add

20:19

anything to the report U no I was same

20:24

that Jeff told

20:25

was okay um I don't have a specific

20:29

question but looking at this uh property

20:33

it looks like you're going to have to

20:34

put a lot of money into it it's pretty

20:36

beat up yes sir and I guess you figured

20:39

that out yes sir

20:41

okay um Commissioners that's the only

20:44

thing I have to far you have any

20:47

concerns or anything and I'll start with

20:49

commissioner

20:50

McKenzie uh no concerns just commend you

20:54

for uh you know bringing building back

20:56

to life there because this is one of

20:58

those ones there's old buildings and

20:59

good old buildings and sometimes it's

21:01

hard to tell which is which so good luck

21:03

thank you

21:06

commissioner any idea when the property

21:09

was last occupied H we have no idea we

21:12

think it has been left unoccupied like

21:15

for several decades probably okay but we

21:17

are not sure when last time was yeah

21:21

judging from its appearance I'm in favor

21:22

for anything you want to do to

21:25

so best no you work kind out for your

21:27

good luck though wish you well we will

21:29

bring it back to

21:31

life commissioner re I just one question

21:34

will these be fair market properties

21:36

fair market rent will they be fair

21:38

market rent properties yes

21:41

yes Market as opposed to

21:45

low

21:47

okay commissioner

21:50

Jordan no

21:52

questions

21:55

Jo I don't have any questions thank you

21:59

is there anyone in the P from the public

22:02

were against this project I'll start in

22:06

Middle to my right so there's no one

22:10

there commissioner is there can I get a

22:13

motion I move to approve the conditions

22:16

as stated is there a

22:19

second second it's been moved a second

22:22

for approval of the project with the

22:25

conditions all in favor state by saying

22:27

I I

22:30

hios motion carried good luck like I

22:34

said hope you guys make out well thank

22:37

you than

22:56

you okay this is item number three

23:00

this is a Vance and special reception

23:02

for

23:03

1103 South Front Street which is Zone

23:07

RF uh SP Follow by Justin uh Kerman with

23:12

tunnel to Towers

23:15

Foundation uh It's associated with the

23:17

construction of a transitional housing

23:20

development reaching a 60 unit multifam

23:24

building and 20 detached Comfort homes

23:28

for

23:31

uh yes so the applicant is proposing to

23:34

construct a transitional housing

23:35

development for homeless veterans

23:36

featuring two types of housing

23:38

accommodations along with Associated

23:40

site and access improvements project

23:42

includes a mixed use building with

23:43

tenant services and Community functions

23:45

on the first floor and 60 units on the

23:47

two floors above and 20 detached Comfort

23:51

homes uh for residents Elsewhere on the

23:53

property uh the project requires only

23:55

harbard approval of a special exception

23:57

for a use not specifically prohibited in

23:58

the zoning code for section

24:01

7-33 111b of the zoning code and a

24:04

variance application for building

24:05

shorter than the 36 foot minimum height

24:08

outlined in section

24:10

73073 A of the zoning code property at

24:13

1103 South Front Street is a 15 acre lot

24:16

which is largely vacant although it

24:18

still retains some of the building

24:19

foundations and site infrastructure from

24:21

when the property accommodated a steel

24:22

mill currently it accommodates a

24:24

critical connection of the Capital Area

24:25

Green Belt but little else in the way of

24:27

development or active uses

24:28

the property is bounded by the property

24:30

at 1101 South Front Street to the north

24:32

railroad tracks to the east the property

24:34

at 1105 South Front Street to the South

24:37

and susqu and the susqu river to the

24:39

West the planning Bureau staff

24:42

recommends the request be approved with

24:44

the following conditions granted zoning

24:47

approval to move forward with the

24:48

project is proposed the applicant shall

24:50

submit a subdivision and land

24:51

development plan approval for um for

24:54

approval from the Planning Commission

24:57

and city council

24:58

uh while the applicant notes that the

25:00

Comfort homes will be capable of being

25:02

ADA Compliant uh the planning Bureau

25:04

recommends that they be constructed to

25:06

visitable standards at a minimum with

25:08

allowances for full conversion to Ada

25:10

accessibility in the future uh the

25:12

applicant should continue their

25:13

coordination with the capill areia green

25:15

belt Association regarding the retention

25:17

of the green belt across the property

25:19

this will retain a recreational amenity

25:20

for the community at large will provide

25:22

a w walking biking route for residents

25:24

to connect to the surrounding community

25:26

and the city overall um as the applicant

25:29

notes many will not own vehicles and

25:31

will maintain an ecological buffer along

25:32

the river based on the proposed site

25:34

design the planning Bureau would

25:35

recommend that the applicant incorporate

25:37

a portion of the green belt across the

25:38

southern boundary of the property

25:40

connecting the existing bridge over the

25:41

railroad tracks to the emergency access

25:43

road along the western boundary of the

25:44

property the planning bu recommends the

25:47

that the applicant install the required

25:48

bicycle parking in the ghost parking

25:50

spaces fronting the mixed use building

25:53

or near the main entrance and be

25:54

sheltered if possible residents of the

25:56

Comfort homes can store their bikes and

25:58

their units uh and finally the plan

26:00

Bureau recommends that the applicant

26:01

coordinate with the City Arborist

26:03

regarding required landscaping and trees

26:04

on site and consider installing native

26:06

plants and pollinator plants and

26:08

landscaped areas throughout the site

26:09

generally and more specifically around

26:11

the proposed storm water detention

26:13

basins planning Bureau staff recommends

26:15

the request be approved for the

26:16

following reasons the proposed project

26:18

will meet a critical need housing for

26:20

homeless individuals and will

26:22

specifically Target a group of veterans

26:24

who are disproportionately represented

26:25

in the homeless population will provide

26:28

quality accessible units that improve

26:30

their standard of living and we'll

26:31

introduce a housing approach that may be

26:33

a template for future

26:35

projects the project represents a

26:37

continuation of recent development

26:38

projects in this area intended to

26:41

provide accommodations and services for

26:43

those experiencing homelessness and

26:45

finally if the recommended conditions of

26:46

approval are adopted the proposed

26:48

project will result in improvements to

26:49

the site and will provide benefits to

26:51

the greater Public Welfare including

26:53

formalized access for green belt users

26:55

improved trail conditions and

26:56

maintenance of existing natural and

26:58

ecological buffers thank you Jeff could

27:02

you state your name address and

27:03

relationship to the project

27:08

certainly excuse me I'm Bruce grman

27:11

attorney for the applicant from calwell

27:13

and kurs 3631 North Front Street in

27:17

Harrisburg accompanying me is Mr state

27:25

name Luis Menendez um from from uh

27:28

tunnel Towers Foundation I am the

27:31

director of construction for the

27:32

homeless veterans program and I am uh I

27:36

reside at 70 Oakwood Avenue in upperman

27:38

Clair New

27:43

Jersey I'm Justin hul I'm the director

27:46

of government Affairs for the foundation

27:48

uh address 5488 clono Court Alexandria

27:51

Virginia um thank

27:53

you okay again gentlemen heard the staff

27:58

report um and are you acceptable of the

28:02

conditions uh first of all I want to

28:03

commend the report it's very thorough uh

28:07

and very detailed and uh with the

28:09

resources that the bureau has I'm I'm

28:11

very very pleased with the report and

28:13

grateful for it uh all of the conditions

28:16

are accepted with certain qualifications

28:19

such as uh as to the parking the bicycle

28:22

parking um they definitely will consider

28:25

bicycle parking but if they can uh

28:28

eliminate uh more impervious surface

28:31

they would like to do that rather than

28:33

putting it where parking was so uh they

28:37

will certainly uh consult with and

28:39

provide bicycle parking and storage it

28:42

may not be exactly what uh Jeff has

28:45

mentioned in his report um and as far as

28:49

uh the uh coordinating with the City

28:51

Arborist uh they are anxious to uh

28:54

install and Landscape particularly

28:56

around uh any uh storm water uh

29:00

facilities that have to be on the

29:03

property uh Jeff

29:06

any uh no um you know we'd be fine if

29:09

the applicants wanted to have uh

29:11

interior secure bike storage for example

29:14

within the mixed use building as opposed

29:16

to outdoor um racks uh so you know

29:19

that's certainly uh an aspect of the

29:21

project that uh we can coordinate on you

29:23

know prior to the submission of a land

29:24

development plan for example um and then

29:27

with to the coordination with the City

29:30

Arborist I defer to the City Arborist um

29:33

expertise on these issues and whatever

29:34

they feel um is appropriate you know we

29:37

would be supportive

29:39

of okay um are are these uh houses are

29:45

similar to the project they just uh open

29:49

up are they built in that type of way uh

29:52

no the U veterans Outreach uh of

29:56

Pennsylvania project uh now named

29:58

veterans Grove has 15 tiny homes that

30:02

have very limited cooking for instance

30:05

cooking facilities in them and they're

30:07

much smaller uh Mr Menendez can better

30:10

describe the the Comfort homes and the

30:12

intention of

30:14

them so the the our distinction is that

30:17

our homes are larger we we are at a

30:22

approximately 500 squ foot unit our

30:25

footprint is a little bit larger is more

30:27

conducive to permanent living where each

30:30

home has its own separate living room

30:34

Central kitchen area with a bathroom and

30:37

a separate private bedroom so within

30:40

that 500 foot uh footprint we're able to

30:43

accommodate a complete single unit for

30:46

uh permanent

30:48

living and my

30:50

other won't say a concern but did you uh

30:55

talk to the community in that area at

31:00

all

31:02

um yes sir uh and I just wanted to thank

31:04

the city of Harrisburg they've been very

31:06

welcome to us so far our partners and

31:08

friends over here at vopa uh we were

31:10

happy to attend their uh ribbon cutting

31:12

last week but you know part of this

31:14

process is is to integrate with this the

31:16

city of Harrisburg and make sure that

31:18

everything we do is uh is in adherence

31:21

to um what the city wishes so uh so far

31:25

we're off to a really good start and

31:26

we're excited to be here tonight and uh

31:28

hopefully we can move on the next step

31:30

thank you okay and I'm more uh stating

31:33

more specifically for shy pooke

31:38

residen um as to the shy pooke

31:41

Association we've been trying to arrange

31:43

just get our schedules together we have

31:45

reached out to them for uh an

31:47

appointment and when they can have a

31:49

group together to uh to meet with us so

31:52

we have initiated contact with them okay

31:55

because we as a commission always feel

31:57

the Community should be involved we

32:01

understand and and they are reaching out

32:03

to them and other community groups when

32:05

they can okay Commissioners those are my

32:09

two concerns so far um and I'll start

32:13

with commission K any

32:15

concerns uh the first would just be a

32:18

kind of a question uh of you uh I don't

32:21

haven't really heard of your

32:22

organization before can you give just a

32:24

brief history of how long you've been in

32:27

business where you established you I

32:29

just want to test it okay great so just

32:31

very quickly uh again thank the

32:32

commission for tonight uh we're founded

32:34

on September 11th 2001 the night of um

32:37

our founder Frank siller's youngest

32:39

brother Steven Siller was a firefighter

32:41

um he was getting off duty the night

32:42

before and he was on his way to Long

32:44

Island to play golf with his brothers um

32:46

they were supposed to meet him there uh

32:48

the first plane hit the World Trade

32:49

Center he turned his car around parked

32:51

it outside the Brooklyn BR Bry tunnel

32:53

ran to the tunnel to the towers where he

32:56

perished that day hence our foundation

32:58

tunnel to Towers um since then uh we've

33:01

been building uh homes and real estate

33:03

for catastrophically injured veterans

33:05

and their families throughout the

33:06

country actually have a lot of uh work

33:09

we've done in the Commonwealth of

33:10

Pennsylvania so far got a one pager on

33:12

that I can leave with you but um bring

33:14

us to present day about two years ago

33:16

the you know homeless veteran crisis in

33:18

our country continues to rise there's

33:20

around 33,000 in our country now we

33:22

wanted to attack that headon we're

33:24

building real estate um apartment

33:26

buildings throughout the country

33:27

affordable housing to tackle this issue

33:30

that's why we're here tonight and we're

33:31

excited and um again want to answer all

33:34

your questions and concerns thank you

33:36

okay thank you that that's good

33:38

information the uh the second question

33:41

is what how will the two types of uh

33:44

housing work separately or work together

33:47

what's in the tower versus is one more

33:49

of a the 64 units is that more of a

33:53

um I don't know call compenent or

33:56

nursing or care type facilities is or is

33:59

it this the multi-story building yeah

34:02

it's just a multi-story building the

34:03

units are a little bit smaller they

34:05

they're roughly 400 square fet 390

34:08

thereabouts they are permanent residents

34:11

as well okay uh the difference between

34:15

the units in the building and the

34:17

Comfort home is that the Comfort homes

34:20

are offered to Veterans senior veterans

34:24

veterans that are 55 and over who for

34:27

some reason or other have spent most of

34:29

their lives in some sort of transitional

34:33

uh homelessness condition and so we

34:37

afford them these homes so that they can

34:39

live in dignity uh and spend the rest of

34:42

their lives there so these are uh

34:44

awarded to specific veterans so they're

34:46

a permanent type they can live there the

34:49

rest of their lives so these are more

34:51

geared towards the older veteran where

34:54

the veteran that's going to reside in

34:55

the multi-story building you can stay as

34:58

long as you have to you can be here

35:00

permanently if you want to uh but our

35:03

goal is to have them transition out of

35:05

there at some point after they've been

35:08

in this environment they've made a

35:10

commitment to better themselves they've

35:12

made a commitment to reintegrate into

35:14

society and our hope is that they're

35:16

able to move on into a more permanent uh

35:19

accommodations on their own okay well

35:22

that helps make sense of what's going on

35:24

there uh last question would be is uh

35:27

are are you in association with any

35:29

local based groups or state-based groups

35:33

uh for providing you know support

35:35

services and things like that or is that

35:37

something that you operate yourselves I

35:40

mean well our ground floor as far as

35:42

service you said uh face-based uh groups

35:46

um we do when we do go into a community

35:48

we do Outreach to the local community

35:50

churches different organizations that

35:53

want to participate for example one of

35:55

our projects in uh uh in Houston the

35:58

local community took us in in the sense

36:00

that they wanted to participate in some

36:02

of our local uh programs that they have

36:06

during during the holidays where they

36:07

would want it to come in and serve the

36:10

veterans right the residents give them a

36:12

meal help them out during the holiday

36:15

season um that's something that we

36:17

welcome and so we do have opportunities

36:21

like with VOA we are this is something

36:23

that's very important to us to

36:24

collaborate with their organization they

36:27

are a more of a transitional uh program

36:30

where once those veterans get themselves

36:32

under feet we're there to receive them

36:34

at a more permanent

36:35

basis okay no other

36:39

questions U commissioner

36:42

Reed I'm sorry

36:45

two Jeffrey this is in the flood zone

36:48

correct um so portions of the uh western

36:52

part of the property along the river are

36:54

in but like uh I don't believe it uh the

36:57

the boundary extends past the emergency

36:59

access road that's there now okay um and

37:02

there's a small portion um along the

37:04

east side of the property as well that I

37:06

believe is largely uh over the footprint

37:09

of the uh new storm water management

37:11

Basin that's being created along the

37:12

access road that's been created there as

37:15

well as the access road itself so um

37:17

looking at the um flood plane overlay

37:20

with the at least tenative uh building

37:22

Footprints here uh I didn't see that any

37:24

of the development would be in the flood

37:26

plane maybe some of the fence around the

37:28

border of the property but that's a

37:29

relatively uh straightforward um review

37:33

if necessary all right that's a good

37:35

thing then uh what other projects do you

37:38

have in Pennsylvania right now um this

37:41

is our first project in Pennsylvania so

37:44

uh this is our prototype that we've been

37:46

developing for the last three years two

37:48

three years and so it's being rolled out

37:51

not only in in Harrisburg but we've got

37:53

a similar project in brington Florida

37:56

where we were just needed we were deed a

37:58

few uh 8 acres to develop a similar uh

38:03

development so we call them veteran

38:04

Villages all right um it's it's the main

38:08

piece is the multistory building like I

38:10

said with our services on the ground

38:11

floor to support the village so with the

38:14

main building the multi-story and the

38:16

housing around it creates The Village so

38:19

we've got projects in uh brington

38:21

Florida just started development in

38:23

projects in Bayville New Jersey we are

38:26

out in Buffalo New York

38:28

uh and soon to be and uh we've got a

38:31

different type of project in Memphis

38:33

which is our other component or

38:35

development uh component which is

38:38

acquiring uh not nonfunctioning

38:41

properties similar to a Windom hotel

38:44

or or such where we renovate and convert

38:48

into a similar multi-story building so

38:50

those are two different types of project

38:52

either we grow or uh from Full

38:54

development or we do a renovation

38:57

uh but this particular model is

38:59

something that is special in the sense

39:01

that we're creating that Village uh that

39:04

we that we're we're so uh we're seeking

39:07

to create for the for the tenants but

39:09

that is not the only contact that the

39:11

foundation has with the Town

39:14

Pennsylvania Mr H can explain more yes

39:18

um over the past 20 years it looks like

39:20

we built um nine homes for fallen First

39:23

Responders four for gold star families

39:25

and we' built three smart homes for C

39:27

catastrophically injured veterans right

39:29

now we support through our national case

39:31

management Network 118 pennsylvanians um

39:35

you know separate from the from our

39:37

veterans Village that we're about to

39:38

produce and I'd be happy to leave you

39:40

one of these sir yeah and just to

39:41

clarify this is just one specific

39:43

program what uh Jason J is talking about

39:47

is other programs that we have within

39:49

the overall TTT

39:51

organization and no further

39:54

questions uh commissioner re Comm Comm

39:57

mckisic asked most of my questions but

39:59

one thing I wasn't clear on that's okay

40:01

you had three of them um what

40:04

transitional uh services do do you

40:06

provide what services do you provide

40:08

social services or well as far as

40:10

services are concerned um anything that

40:14

they need to get themselves right get

40:17

themselves back

40:18

into the position where they can begin

40:21

to rehabilitate themselves we deal with

40:24

PTSD to a certain extent we deal with

40:26

substance abuse to a certain extent and

40:28

I mean by a certain extent that if the

40:30

cases are beyond our capabilities to

40:32

deal in this environment we do not want

40:35

to have a stable stable environment and

40:38

then bring in someone who may need

40:40

additional help we will help those

40:42

individuals transition into a program

40:45

that better fits their needs we also

40:47

provide Workforce training we provide

40:49

services for them to learn how the

40:51

veteran to learn how to write a resume

40:53

how to

40:54

interview uh we provide help with them

40:57

to access their uh contacts at VA we do

41:02

have case management uh resources on

41:04

site and they are become part of the

41:07

overall community in that step to

41:10

rehabilitate yourself and there are

41:11

whole host of other that perhaps we can

41:13

elaborate further if you like on some of

41:15

the other programs is fine thank you

41:18

that's

41:19

it commissioner Jordan yes um would you

41:22

be able to show on your diagram how this

41:25

um project um ties into the green belt

41:28

connection like how it's

41:30

retained um not presently because that's

41:35

still very actively being negotiated

41:37

there are actually at least two other

41:40

property owners involved um the dolphin

41:43

County General Authority on the North

41:46

obviously and uh the owner of the

41:49

remaining property on the south and um

41:53

uh you know the access road goes across

41:56

all of those property so um it's a

41:59

multi-party negotiation we've been

42:01

negotiating in good faith with do M and

42:04

uh we'll continue to see if we can get a

42:07

resolution um you have to remember that

42:11

this is has always been private property

42:15

and the green Bel has been fortunate to

42:17

be able to use it um so we want to see

42:21

if we can continue that uh compatible

42:24

with the needs of the private property

42:26

owners now you're hearing about a an

42:29

altruistic uh project that's going to be

42:33

uh giving our veterans digity and

42:36

security and uh we have to uh deal with

42:39

those issues also so it's a complex

42:42

issue but we're continuing to work in

42:44

good P I understand and one other

42:47

question um it says in a report well

42:50

actually let me just ask this as a

42:52

question is there um a particular reason

42:54

that the um units aren't starting out

42:56

initially 888

42:58

compliant um they are they are man they

43:01

are designed their prototype uh uh are

43:05

ADA Compliant or convertible let's just

43:08

say uh one of and as well one of the one

43:11

of the issues that we took into

43:13

consideration in designing the Prototype

43:16

uh and we found out through conversation

43:17

with our veterans is one of their major

43:19

concerns is how is someone going to

43:21

visit me if they are either in the same

43:25

condition that I am or if they are in

43:27

worse condition than I am how are they

43:29

going to come over uh so we've created

43:32

the model where uh you do have steps

43:35

there are steps to the unit if you can

43:36

use them and each unit has a ramp so

43:40

it's an ADA Compliant ramp that reaches

43:42

the sidewalk or the grade at the proper

43:45

slope that they're able to access the

43:47

interior of the Comfort home if you're

43:49

visiting the units in the main building

43:52

as well they are ADA Compliant if a

43:55

veteran comes in and our kitchens and

43:57

are designed as such where if they need

43:59

to have on a wheelchair and they need to

44:01

have the approach to that kitchen uh the

44:05

cabinets can be retrofit in other words

44:09

cabinet can come out a panel can go in

44:11

so that you still have the approach

44:13

clearances and accessibility to all the

44:16

uh uh Cabinetry and the kitchen as well

44:19

as the bathroom are accessible door the

44:21

doorways are accessible each bathroom

44:23

has clearance 36 in clearance minimum uh

44:26

to get themselves in we do not have a

44:28

swing door in the bathrooms we provided

44:31

uh we're designing uh what we call the

44:34

uh sliding door so that we're able to

44:37

get in and out so there is no

44:39

opportunity if something happens inside

44:41

the bathroom we can't get in the

44:43

bathroom we still have a sliding door on

44:46

the outside it's a barn door that's what

44:48

they're called go thank you very

44:51

much

44:54

Joe uh the the two questions I have I

44:58

think commissioner Jordan just covered

45:01

um and so maybe I'll I'll just uh I'll

45:04

just leave with those so thank you for

45:05

your responses for those mine were

45:07

related toward to the green belt and to

45:09

um the uh ADA compliance but you

45:11

answered them thank

45:13

you um before I go to the public um Jeff

45:18

I think they partially answered what I

45:21

was going concern I know there's

45:23

Property Owners down that way and other

45:27

owners and how are they are how are you

45:31

dealing with that so uh for the most

45:34

part I think um the at least uh the

45:37

applicants I know are working directly

45:39

with the green belt Association um and I

45:42

um believe that uh other uh

45:45

representatives for um the prospective

45:48

property owner to the South between this

45:50

site and the VAS site uh and the I guess

45:53

current property owner because the

45:54

applicants are contract purchasers as I

45:56

understand it um are all in negotiations

45:58

about where exactly um you know the

46:01

footprint of uh of the green belt may go

46:04

um you know our recommendation in the in

46:06

the case report was based on the fact

46:08

that when you look at the uh site plan

46:11

provided with the application um the

46:13

fence that encloses the site is on the

46:15

east side of the access road uh that

46:17

runs that connects both to the Dolphin

46:19

County General Authority property of the

46:21

North and then uh the vula property down

46:23

in the South so there isn't a uh fence

46:26

caim off access there so it's still I

46:29

guess in theory um open um for public

46:33

access and therefore kind of makes a

46:34

good um connection point and it would

46:37

require I guess the least amount of

46:39

easement um between the bridge and uh

46:41

that site uh that being said you know I

46:44

think we would be uh happy to you know

46:48

coordinate with uh both the applicants

46:50

and the green B Association on whatever

46:53

solution they come up with whether it

46:54

goes across the Northern end of the site

46:56

or the southern end of the site or

46:58

wherever it needs to go but um you know

47:01

as the planning Commissioners know uh

47:02

you know we brought this up at the at

47:04

the last uh development for the vopa

47:06

site um that it be included and it was

47:09

not included in the found design and uh

47:11

it was our concern that this would be

47:12

cut off uh into the future and not just

47:15

for the general public but for um

47:17

residents of both the existing VOA

47:20

facility this proposed facility and the

47:22

potential future facility um between

47:24

these two um as the applicants note in

47:26

their application uh most of their ten

47:29

of their residents aren't going to have

47:31

um Vehicles so uh you know we expect

47:35

that they will want to go out and um

47:37

engage with the community go out and

47:39

visit around Harrisburg and if they're

47:41

not going to have vehicles how will they

47:42

do that walking and biking presumably

47:44

maybe a shuttle bus or something as well

47:47

um but uh you know if that is the case

47:51

um they have a readymade connection

47:53

right now and so we want to make sure

47:56

because of didn't end up in that last

47:57

project that it does end up in this

48:00

project um and not and we don't get to

48:03

the to the next project which will be

48:05

the last one of this property and it

48:07

doesn't happen there either and then all

48:08

of a sudden we've lost our connection so

48:10

we plan Bureau feels very strongly that

48:13

um you know that this really needs to be

48:17

included uh in a PL design however that

48:20

may happen and again we recognize that

48:23

this is private property as the

48:24

applicant said um but at the same time

48:26

it's also you know a critical 100y old

48:29

more than 100y old portion of um the

48:32

city's infrastructure and uh you know uh

48:36

we would we just want to make sure that

48:39

that connection is maintained however

48:40

that happens and in a way that uh

48:42

benefits not just the general public but

48:44

the residents um of each of these

48:47

developments that's going to be down

48:48

here in South harisburg

48:52

yeah if I may follow on U what is

48:55

currently happening is there a Gap in

48:57

the green bound at the present time or

48:59

how is that being rerooted I have not

49:00

been down there since the project was

49:02

completed Opa yeah currently um the uh

49:06

Bridge of the railroad tracks uh was uh

49:09

temporarily um uh closed for uh

49:12

construction and utility work to connect

49:14

the vopa site uh to I guess whatever

49:17

utility stubs were on the Dolph County

49:19

General Authority site um and the

49:22

alternate route uh goes over Sycamore

49:25

Street um to C Street and then down

49:27

Cameron Street to connect to uh the

49:30

green Bel about at Elliot Street I think

49:32

or just north of that uh where there's a

49:35

truck entryway down to the green belt um

49:38

but if you've been down there that's not

49:41

really a safe place to ride frankly for

49:43

anybody U much less for a child or a

49:46

senior or something the grade of the

49:48

bridge is really high there's very

49:49

limited visibility the sidewalk is

49:51

almost non-existent um and so you know

49:54

from the Plenty bear perspective that is

49:56

not a long-term solution and being that

49:58

there's only one other crossing of the

49:59

railroad tracks down here in South

50:01

Harrisburg you know we feel that it's

50:03

really imperative that the connection be

50:05

maintained right so I mean and I think

50:07

that kind of my concern we don't want to

50:10

turn the green belt into a permanent

50:11

green

50:12

strip with roundabouts at either end

50:15

yeah you know it has been there for

50:17

hundred years and again we're being

50:19

asked to provide a special exception

50:20

here so it is kind of the time to talk

50:23

for a Tit for Tat um you know what can

50:26

we get

50:27

in return for the public in return for

50:29

waving this regul this item and I would

50:31

like to see that in the discussion and

50:34

and I don't think that and again I don't

50:35

think that needs to be necessarily

50:38

decided on today uh there will be a

50:40

follow-up Land Development plan uh that

50:43

Planning Commission city council will

50:44

review uh but at the same time we'd like

50:47

to not leave that hanging to the last

50:50

moment and the sooner it can be hashed

50:52

out what again whatever the solution is

50:55

uh the better I think right I guess

50:57

that's the question is once we approve

50:58

this tonight we've kind of lost our

51:01

leverage uh By the time Land Development

51:04

plan comes in with special exception

51:06

already approved there's really not much

51:07

we can do and I think the evidence of

51:09

what happened recently great project by

51:11

the way but

51:13

um is indicative we let it off that it

51:16

would be developed and it would be

51:17

talked about and it didn't

51:19

happen um so that's a concern I

51:23

have um just one more thing Jeff um I'm

51:27

not sure exactly what this location is

51:30

but will the um High new highway coming

51:33

through will that affected at all I'm

51:35

not the highway but yeah the it

51:38

shouldn't um the the highway is north of

51:41

the general author Dolphin County

51:42

General Authority property so um you

51:45

know aside from maybe more noise I don't

51:48

think there will be any physical impacts

51:51

uh from the the structure of the highway

51:53

or anything like that

51:58

uh yeah it is yeah but there will be I

52:01

think widening uh at the very least off

52:04

ramps um to the south of where the

52:06

bridge is now the bridge

52:09

for um I'll go to the public now if

52:12

you're for against this project I stand

52:15

and state your name and I I'll start in

52:25

midle good good evening uh my name is

52:27

Doug Hill I live at 709 Green Street

52:29

here in Harrisburg and I am currently

52:32

president of the Capal area Green Belt

52:34

Association it's a pleasure to be with

52:35

you tonight I and I do appreciate the

52:37

commentary you've had thus far I just

52:39

wanted to add a few things to it a

52:41

little bit additional perspective uh and

52:44

I'll start by saying we are very much

52:46

supportive of the tunnel to Towers

52:47

project it's something that's critically

52:49

needed here in the city and they're

52:50

certainly serving a a a a population

52:53

with a distinct need in a unique way a

52:56

unique and uh important way and so we do

52:59

hope the project is going to be able to

53:00

go through uh from the perspective of

53:03

the green belt association association

53:05

it's well the green belt's been around

53:06

for a 100 years the association's been

53:08

around for about 30 and we've been

53:10

maintaining the trail uh for the

53:12

entirety of the trail over that period

53:14

of time including here in the South

53:16

Harrisburg Area uh in the South

53:18

Harrisburg Area uh we've done a

53:21

significant amount of grading

53:22

maintenance other improvements over that

53:24

period of time as well as as ongoing

53:26

maintenance um excuse me I will I will

53:31

acknowledge uh that we are doing it by

53:33

written permission uh but that is the

53:36

extent of it it is not a license it is

53:39

not an easement it is not a RightWay so

53:41

it is just by courtesy of the current

53:43

owners that we occupy that but it has

53:45

been a

53:50

relationship theou I'd like to

54:03

the couple points I'd like to make first

54:06

is that both the comp plan talks about

54:08

the green belt as an important asset of

54:11

the city and its maintenance as a part

54:13

of the character of the city and

54:15

availability of the residents and then

54:17

zoning ordinance itself as a part of its

54:19

objectives uh talks about completing the

54:22

green belt and this is one of the last

54:24

couple privately owned properties where

54:27

we don't have a clear license or or

54:29

easement agreement and so uh as you

54:32

pointed out this is the time uh to get

54:34

this resolved uh with some permanence uh

54:37

it is accurate uh that we have been

54:39

engaged in good faith discussions uh on

54:42

multiple occasions uh in person uh email

54:45

and otherwise and we've exchange

54:47

sketches and so on uh we are confident

54:50

that we can continue on that route and

54:53

hopefully find something that's going to

54:55

work

54:56

uh I with your permission Mr chairman we

54:59

have a sketch that we did based on the

55:03

uh sketch plan that was submitted to you

55:05

if we could distribute that to you if

55:06

that would be

55:07

helpful I have a couple other folks from

55:10

our board who are here that'll do that

55:12

while I talk I don't want to take too

55:14

much time but uh on on that plan uh we

55:18

have shown you in red the historic Route

55:22

of the green belt and when you get it

55:25

you will see that it does go diagonally

55:28

right across the property and obviously

55:30

uh can't continue to exist in its

55:32

current

55:33

configuration and so then what we've

55:35

shown as an alternative is uh in green

55:39

and that is to continue as the uh City

55:42

described in their analysis to continue

55:45

along the emergency access route and

55:47

then go along the southern boundary of

55:50

the tunnel to Towers property and

55:52

connect again up with the railro bridge

55:54

you also see the little stub by the

55:55

railroad bridge which is what Mr Gman

55:57

referred to the third property owner

56:00

would also have to be involved

56:01

ultimately in in that rerouting uh but

56:04

we are we're pleased to submit that to

56:07

you because it acknowledges that the

56:09

plan the sketch plan that they've done

56:12

including its configuration and the

56:14

configuration of the fencing uh would be

56:17

able to accommodate the green belt uh in

56:19

this kind of a configuration would be

56:22

able to maintain it in a way that has

56:24

the uh best ecological

56:26

perspective as well as the best

56:29

continuity and the least public danger

56:32

compared to for example The Detour that

56:34

we have right now out on Sycamore Street

56:37

uh the other couple benefits uh that uh

56:40

have been mentioned in the report and

56:42

will emphasize to are that it does

56:44

provide pedestrian access for the

56:47

residents of tunnel Towers but also uh

56:50

the emergency access road extends the

56:52

whole way down uh to Veterans Grove and

56:56

and so can also provide pedestrian

56:58

access for them as well as the

56:59

intervening property when that becomes

57:01

developed right now uh the veterans

57:04

growth does not have uh specific

57:07

dedicated Public Access other than

57:08

walking on the on the new roadway uh it

57:11

also uh we would argue has therapeutic

57:14

value to have a recreational opportunity

57:17

right outside your gate is something

57:19

that we think would be beneficial to the

57:22

residents of tunnel to Towers uh and um

57:26

it also as I mentioned provides access

57:29

for Eden and for uh VOA for their

57:32

residents to uh well the the intervening

57:36

property to have access up to City

57:37

amities including the bus stop up at the

57:39

pendot building as well as uh to the

57:42

City

57:42

generally

57:44

um I I in that respect then I think I

57:49

would say we have we support the

57:51

recommendations as they are made in the

57:54

uh conditions uh expressing the city

57:57

report uh for uh T TOS to continue their

58:00

discussion with us and to arrive at a

58:03

solution comparable to what's described

58:05

uh in the city report thank

58:10

you thank

58:12

you if there are anyone else in the

58:15

center or

58:18

against if not I'll go to my right

58:21

anyone for against the project

58:25

[Music]

58:30

hi I'm John Hickey I live at 3901 Pam

58:32

Drive in Mechanicsburg I'm on the board

58:34

of veterans Outreach of Pennsylvania I'm

58:36

here with h our chair Tom and uh another

58:38

of our board members and we did want to

58:41

express our support for the project um

58:43

our project is really more driven as a

58:45

therapeutic model so we're going to take

58:47

people more almost like a in intensive

58:51

therapy and it will be really good for

58:54

us to have a place for them to sort of

58:56

graduate to a phase two um right next

58:58

door um a lot of the things that we'll

59:00

be doing we've already been talking with

59:02

tunnel the towers quite a bit about how

59:04

we might coordinate and collaborate in

59:06

the future so we think this is a really

59:08

good opportunity for us um to extend

59:11

what we're doing and make Harrisburg um

59:13

recognized nationally again you look

59:15

look at the other cities that we're

59:16

talking about Atlanta Houston these are

59:18

you know Harrisburg being on that list I

59:20

think is a a feather in the cap so we

59:22

did want to express our support

59:26

okay thank

59:27

you this there's no one else from the

59:30

public now come back to the

59:31

Commissioners um before I get to the

59:35

Commissioners I want everyone to know

59:38

that we are not opposed to it I think we

59:42

all for and matter of fact I'm a veteran

59:46

myself so I think a great project but we

59:49

have to do this to make sure you work

59:51

with the community and know all the

59:54

other people involved so that's why

59:56

we're ask this question commissioner

1:00:01

other yeah one question Joffrey um the

1:00:05

is this being subdivided from the larger

1:00:07

property or is it a different owner than

1:00:10

the one previously that U they had dealt

1:00:12

with on the bopa project it will uh the

1:00:15

existing property um as noted is 15

1:00:17

Acres but uh eventually as part of the

1:00:20

land development plan they will'll have

1:00:21

a subdivision component they will be I

1:00:23

think purchasing 8 and a half acres of

1:00:25

the 15 property leaving 6 and a half

1:00:27

between the two developments for um a

1:00:30

future project but was this originally a

1:00:33

portion of the other property was this

1:00:34

one larger it was at 1 Point 20 acres um

1:00:38

everything south of um the Dolph County

1:00:40

General okay and if I may it was

1:00:44

originally all one parcel including the

1:00:46

pendot property right it was put

1:00:49

together by the people named Alex grass

1:00:51

and Ali Ro back in the day yeah never

1:00:53

heard of them never heard of them

1:00:57

so yeah that's I guess that's the the

1:00:58

one question I'm just trying to

1:01:00

understand the role of that property

1:01:02

owner on the remaining piece within all

1:01:04

of this I mean she was uh willing to let

1:01:07

them use it all the years but now that

1:01:09

we're into either I don't know whether

1:01:11

there's a profit to be made on any of

1:01:12

this sale truly at the end of the day uh

1:01:15

by their estate or or or that side or

1:01:18

it's simply a uh you trying to move the

1:01:20

property in a more beneficial use that

1:01:22

it's not really our her view here to be

1:01:25

to be worried about about that um but I

1:01:28

guess the U uh the question then it

1:01:31

comes back to what

1:01:34

are the tough points is it

1:01:38

Insurance uh to establishing a root

1:01:42

whether it's something like what's being

1:01:44

shown on on the um sketch that we were

1:01:47

handed um what would make it difficult

1:01:50

in your mind to establish this route and

1:01:52

allow it to be a RightWay easement on

1:01:54

your property for this to

1:01:58

work well what'll be your property once

1:02:00

you purchase

1:02:01

it there's been extensive discussions

1:02:04

with um the uh Dolphin County General

1:02:08

Authority and uh the state that leases

1:02:11

the land from the uh uh General

1:02:14

Authority whether they need all of that

1:02:19

parking lot for instance and if it could

1:02:22

be along their the edge of their parking

1:02:25

lot

1:02:26

that's already semi public use if you

1:02:29

will rather than on private property um

1:02:33

and the state has not my understanding

1:02:36

through Mr beno's response was that the

1:02:40

state was not

1:02:42

cooperating so um there's there's some

1:02:46

big players here that uh they're all

1:02:48

digging in their

1:02:50

heels but again I'm trying to understand

1:02:53

the the the downside of of an easan or

1:02:55

right away for a bicycle path I mean

1:02:58

there are a lot of Rails to Trails that

1:03:00

are created all over the country uh I

1:03:02

don't see this as being terribly

1:03:03

different from that um I'm just trying

1:03:07

to understand there's obviously

1:03:09

something that I'm not aware of and and

1:03:12

maybe the Commissioners have better idea

1:03:14

uh that why this can't be negotiated out

1:03:17

relatively easily even to the point that

1:03:19

it could have been a solution tonight

1:03:21

knowing the phenomenal work you brought

1:03:23

in and so on so forth

1:03:26

there are a multitude of of issues

1:03:29

really when um and um

1:03:32

security is a is a major factor when you

1:03:35

have uh residential communities of um

1:03:40

significantly less able people these

1:03:43

These are fragile people um and vula uh

1:03:47

has the uh benefit of being further away

1:03:50

from it

1:03:52

intentionally um and um

1:03:55

we have to be frank there's always been

1:03:57

evidence for instance of of drug usage

1:04:00

uh on this uh portion of the green belt

1:04:03

down by the river and so forth and that

1:04:06

that's a potential problem and it has to

1:04:09

be addressed one way or the other um so

1:04:13

uh security uh is is a a vital issue I

1:04:17

wouldn't say it's the only

1:04:19

issue but it's a vital vision

1:04:27

all right thank you Mr chairman just

1:04:29

just the reality of the difficulty is

1:04:31

that it's multiple private land owners

1:04:34

this board can't impose a condition on a

1:04:37

property next door even though the green

1:04:39

belts crossed multiple properties that's

1:04:42

the reality of it so this only gets

1:04:44

resolved in two ways get resolved by an

1:04:46

agreement gets resolved by a government

1:04:48

taking those are the two ways to resolve

1:04:50

this problem and every everybody is

1:04:52

looking for an agreement on a government

1:04:54

taking sure

1:04:56

so uh help me out draw draw for another

1:04:59

thing on the the U pendot building there

1:05:03

is that this point they have revoked the

1:05:06

right of passage across that state

1:05:08

property no that's what I'm I think

1:05:11

you're saying this our solicitor

1:05:13

suggesting no there's still the um

1:05:16

access along the riverfront portion of

1:05:19

that property where the current Green

1:05:20

Belt runs now and then connects to what

1:05:23

is essentially the emergency access road

1:05:25

here um and I have not been in any

1:05:29

conversations with either the county or

1:05:30

the state on this but from what I

1:05:32

understand they're not necessarily

1:05:33

looking to kind of to the applicants

1:05:35

point they're not looking to expand the

1:05:37

footprint uh the public access footprint

1:05:40

Beyond what's there

1:05:42

now so what we have is we have a public

1:05:45

parcel that we're allowing Public Access

1:05:47

across to the north correct okay and so

1:05:51

we're now talking about a private entity

1:05:54

that's developing and and they're asking

1:05:56

for special treatment uh good again a

1:05:59

very good cause special treatment in in

1:06:01

the processing of a special

1:06:03

exception um and there doesn't seem to

1:06:07

be any uh reciprocity you know to the

1:06:10

city to the community's request

1:06:12

here yeah again you know I think the the

1:06:16

planning Commissioners know where the

1:06:18

planning Bureau stands on this we feel

1:06:20

that you know that this again green belt

1:06:24

is one of the city's best jewels that we

1:06:27

have here um and this point is a

1:06:30

critical connection and so however that

1:06:32

needs to be maintained we will strongly

1:06:35

support that again you know that could

1:06:38

be running across the parking lot as the

1:06:41

applicant said it doesn't sound like

1:06:43

maybe uh the state's uh open to that um

1:06:46

but I think to the to your point um it

1:06:50

seems like this is a relatively

1:06:53

straightforward um a relatively

1:06:56

straightforward kind of thing about

1:06:57

having an easement to have a short

1:06:59

stretch of this I think to the

1:07:01

applicant's point about uh drug use and

1:07:04

I don't know I can't speak to the

1:07:05

veracity of that statement but I think

1:07:08

for whatever that was there or whatever

1:07:10

other concerns were there were largely

1:07:12

due to the um undeveloped nature of this

1:07:15

property and between the existing

1:07:17

veterans growth property this proposed

1:07:19

property and then whatever is coming

1:07:21

down the road for the property of the

1:07:22

South much of whatever created adverse

1:07:26

conditions there will go away because

1:07:27

all of the property will be not only

1:07:30

occupied and developed but largely gated

1:07:32

too um and so it won't be an issue of

1:07:35

there's you know large swas of UNS

1:07:38

surveilled area where maybe you know

1:07:42

stuff happened in the past and so I

1:07:45

think you know again it's our hope that

1:07:48

to to Mr Grover's point that uh this is

1:07:52

um negotiated out amicably between all

1:07:54

the parties that um at the end of the

1:07:57

day um we maintain this

1:07:59

connection okay so as a commission we we

1:08:03

could strengthen the language that's

1:08:04

been suggested in the

1:08:06

report

1:08:09

and please I did see a should before the

1:08:12

continued coordination I think we're all

1:08:14

extremely hopeful about the continued

1:08:16

coordination could change that to I mean

1:08:19

it's still just coordination but a shall

1:08:20

or something like that is that what you

1:08:22

mean I'm I'm looking for some way to

1:08:24

encourage

1:08:26

and if you know that that happened

1:08:28

before a land development plan comes

1:08:29

back and again does what happened

1:08:31

previously and uh all I know is living

1:08:34

downtown the drug use on River alley

1:08:36

behind my home and location the drug use

1:08:39

in South Street the shootings on on

1:08:42

Chestnut in second at 2:30 in the

1:08:44

morning I would venture that it's

1:08:46

probably safer down there than it is in

1:08:47

downtown Harrisburg after living there

1:08:49

for 30 years it's sad to be making that

1:08:51

statement so um I'm having a tougher per

1:08:56

time um accepting that as the only

1:08:59

reason that this can't

1:09:05

happen well I think the condition what I

1:09:07

would I mean I could certainly support

1:09:09

it if we could make some modifications

1:09:11

to the the recommended condition which

1:09:13

was wherever I put it

1:09:15

here yes sir

1:09:49

yeah no and I think it's two tough

1:09:51

situations that are running into one

1:09:52

another and we just want to see that it

1:09:54

really happens that there's an you know

1:09:57

amicable situation I mean we've sat here

1:10:00

for I've been on the commission for 27

1:10:02

years and how many times we've been

1:10:03

promised that people will provide

1:10:05

parking by entering into agreement with

1:10:07

the city parking authority um which I

1:10:10

also chair so I know a little bit about

1:10:11

that um and only to find that it didn't

1:10:14

happen how many other the things we've

1:10:16

asked for because we don't have the

1:10:18

administrative depth and resources to

1:10:21

follow up on things and uh I'd like to

1:10:24

just see more teeth in this

1:10:26

you know and again don't want to stop

1:10:27

the project um

1:10:31

but it right here thank

1:10:34

you uh let's see

1:10:36

um continue coordination I would say

1:10:39

change that to sh coordinate with a

1:10:41

green belt take those three words out

1:10:43

and the whole thing probably works

1:10:45

speaking of the green belt there was a

1:10:46

gentleman with his hand up oh I'm

1:10:48

sorry would you recognize him I would

1:10:51

seed

1:10:52

my okay okay yes

1:11:03

hi right Doug Hill again and uh thank

1:11:05

you for letting me uh respond to a

1:11:08

couple points that were made first uh

1:11:10

I'm troubled by the representation that

1:11:12

there's drug use as a rampant thing on

1:11:15

the Green Belt uh I think your point was

1:11:18

well made we aren't going to be po Anish

1:11:20

and say there isn't anything happening

1:11:22

anywhere along the green belt but we do

1:11:24

know statistics Ally from our monitoring

1:11:27

over the years that we have very very

1:11:29

few incidents documented incidents

1:11:31

anywhere in use of the green Bel belt it

1:11:33

is used by our public as a recreational

1:11:36

facility it's family use it's people

1:11:38

getting to work it's act every bit of

1:11:41

active Transportation so I think it's

1:11:43

unfair to characterize that area or any

1:11:46

area as a drug use area number one

1:11:48

number two uh the plan we haven't seen

1:11:51

the fence specifically as proposed but

1:11:54

it is in on a plan of six foot aluminum

1:11:56

fence so I presume that it's certainly a

1:11:59

physical barrier and possibly even Vis

1:12:02

visibility barrier and so I think that

1:12:04

uh resolves some of the issues uh third

1:12:08

uh one of the proposals that we had

1:12:10

previously discussed was to go along the

1:12:12

northern border through the pendot lot

1:12:14

and then across the eastern border of

1:12:17

the tunnel of towers property so we

1:12:20

would still have been traversing two

1:12:22

boundaries we're proposing the Western

1:12:24

and Sou rather than the northern and the

1:12:27

Eastern uh last and this is an important

1:12:29

point for you uh as we've been

1:12:32

progressing through these discussions uh

1:12:34

we did do our due diligence and took the

1:12:36

proposal to the dolin County General

1:12:39

Authority asking for uh their view of us

1:12:43

uh coming through the parking lot and uh

1:12:46

going going in that direction there

1:12:47

there are some engineering issues with

1:12:49

that we'll set that aside but uh they

1:12:51

very flatly as a board action said that

1:12:54

we would not be given permission to go

1:12:56

anywhere else on their property other

1:12:58

than the quarter that we already have

1:13:00

under license agreement and that's the

1:13:02

piece that goes uh from the Phoenix Park

1:13:05

along the Riverside of the building and

1:13:07

connects to the property line for tunnel

1:13:09

of the

1:13:11

towers thank

1:13:15

you Jeff did you add the the

1:13:20

change I was I had made have made a note

1:13:22

of it but I was waiting on a vote from

1:13:24

the Planning Commission you did get that

1:13:27

I I did make a note of it yes could I

1:13:30

add on to that a little bit sorry um and

1:13:34

I'm I'm throwing this out for discussion

1:13:36

so on point number three if it was

1:13:38

changed to the applicant will coordinate

1:13:41

with the Capital Area Green Belt

1:13:43

Association regarding the retention of

1:13:45

the green belt across the property um to

1:13:49

retain a recreational amenity for the

1:13:50

community at large some and so forth

1:13:53

with that language

1:14:00

did we just restate that again sure um

1:14:03

the applicant will coordinate with the

1:14:05

Capital Area Green Belt Association

1:14:07

regarding the retention of the green

1:14:09

belt across the property to retaining a

1:14:12

recreational amenity for the community

1:14:14

at large and then the rest of the

1:14:16

sentence as it's already

1:14:18

written that sound good okay thank you

1:14:21

Mr chairman I okay I want any other

1:14:25

comments from the

1:14:27

Commissioners

1:14:28

okay

1:14:31

um I would ask your solicitor what what

1:14:34

that

1:14:36

means what is the obligation of the

1:14:38

applicant pursuant to that

1:14:43

language I don't know so that that's the

1:14:47

with all due respect

1:14:48

I I say that not to

1:14:51

frustrate the uh commission but shall uh

1:14:56

coordinate ver uh versus continue to

1:15:00

coordinate

1:15:02

um it's in the condition we're going to

1:15:04

do it and as Council I'm just worried

1:15:08

about who's to judge that and who's to

1:15:11

say we didn't do it you understand my

1:15:14

frustration

1:15:18

commissioner to continue negotiations

1:15:20

certainly we accept I guess I would

1:15:23

probably I could that language to

1:15:25

strengthen that then the applicant shall

1:15:27

coordinate with them to

1:15:30

retain that's real simple I think that's

1:15:33

the intent that we're trying for I I

1:15:35

would suggest that that would be

1:15:37

imposing a government taking on them

1:15:40

that the city of pass have to pay for

1:15:43

okay that's what you're talking about

1:15:44

that's becomes a taking at that moment

1:15:47

so the alternative if that's not

1:15:49

workable would be just to deny this

1:15:50

tonight that's an alternative and that's

1:15:52

what's and they can come back after they

1:15:54

have sorted that out

1:15:55

well again this is a very special

1:15:57

exception it still goes on to zoning

1:15:58

it's up to that you're make your

1:15:59

recommendation to zoning is that I have

1:16:02

no idea what their solicitor will see

1:16:03

this as I mean that's frankly you know I

1:16:05

just don't know how they're going to

1:16:06

look at it

1:16:09

so okay um there's no way we can address

1:16:13

it in the land development plan

1:16:15

no I mean I think it's not too late to

1:16:19

address it in the land development plan

1:16:21

right now it doesn't show up here now

1:16:23

anyway if the same project special

1:16:25

exceptions given they don't have to do

1:16:28

it unless it's shown as part of the

1:16:31

applic of the intent

1:16:41

here even if we have the language in

1:16:45

there to this

1:16:47

listen they still have to go to the

1:16:50

zoning right that's what I'm saying the

1:16:52

zoning ultim this is a recommendation to

1:16:53

zoning what I'm saying if the city of

1:16:56

Harrisburg and and remember you're

1:16:58

you're an advisory committee to the city

1:16:59

of Harrisburg and to the council and if

1:17:03

the city is putting a shell in front of

1:17:06

something that actually has a tooth to

1:17:08

it about your land we've now impaired

1:17:11

your rights to your land and and

1:17:13

ultimately there can be an application

1:17:16

for having to pay for that that that's

1:17:19

the simple reality of it um the uh what

1:17:23

this project needs is an excellent

1:17:25

mediator that's what it needs you know I

1:17:28

think a lot of people have tried in this

1:17:30

effort I think everyone involed can ATT

1:17:32

test to there's been people trying to

1:17:33

come to a solution and it is a challenge

1:17:37

I can't tell you why it's a challenge

1:17:39

other than you get you get hear you hear

1:17:41

no a lot that's what you hear right and

1:17:44

I guess just to to go on that end what

1:17:47

the exposure that the city would have

1:17:50

would be based upon the impacted uh

1:17:52

piece of land relative to the purchase

1:17:54

price price right I would say so whether

1:17:57

you know whether whether it's a $500,000

1:17:59

piece of property and 5% of it's

1:18:01

impacted that's $225,000 impact I mean

1:18:04

that real numbers that's that's

1:18:06

someone's decision I don't know who

1:18:08

they're having it might be a court or

1:18:09

something but yeah yeah so but that's I

1:18:12

think way way way way down the road and

1:18:14

there's lots of land between here and

1:18:15

there uh I'm just telling you that's

1:18:17

that's that's the difficulty of it right

1:18:19

I mean I I think you should know that I

1:18:22

think the zoning board should know that

1:18:24

the council may say let's do exactly

1:18:26

that right but I'm just saying the green

1:18:29

belt uh is 100 years old mhm I don't

1:18:32

know what its roots were for a 100 years

1:18:35

but it really matters what it what its

1:18:37

roote was and how long this has been

1:18:39

that route um uh I don't know if I know

1:18:43

the parties have their views of what the

1:18:44

people's rights are uh those owners

1:18:48

changed over time uh it doesn't mean

1:18:51

anyone lost a right if everyone ever had

1:18:53

one if the one had one 80 years ago or

1:18:55

70 years ago I just don't don't think

1:18:57

anyone wants to go down that path

1:18:59

legally but that's the kind of stuff

1:19:01

they litigated for Marcela shell right

1:19:04

like what who what land rights existed

1:19:06

back then because they don't just go

1:19:08

away if they're not properly transferred

1:19:10

so uh you know I know Bruce has dug in

1:19:13

deep into these documents and uh so it's

1:19:16

a long history so I believe you'll get

1:19:18

to an agreement I just don't know it'll

1:19:20

be probably one everyone hates you know

1:19:22

that that'll be how you you know

1:19:25

everyone got their interest taken care

1:19:26

of

1:19:28

so but if we pass this through even in

1:19:32

as you cause maybe a taking not no no

1:19:35

not but I mean it's not going to be your

1:19:37

vote that does that type of that it

1:19:39

takes this issue forward to zoning tells

1:19:41

them what we think yes I think and then

1:19:43

this ultimately we may be setting the

1:19:45

stage for Council to take some of the

1:19:47

$12 million and leftover error money or

1:19:50

whatever the case is to solve the green

1:19:52

belts issue once and for all

1:19:55

and if we just approve this tonight that

1:19:57

doesn't get that hearing and pushed

1:20:02

forward I I can't say either way that

1:20:05

you know because the same arguments are

1:20:06

going to be made at zoning I think by

1:20:09

everybody so I just don't know how

1:20:11

they're going to treat it that that's

1:20:13

that's going to be the

1:20:16

issue we should keep your

1:20:19

word and as I said it's going to go to

1:20:22

zoning so they can argue that they can

1:20:24

argue with there and we'll listen our

1:20:27

suggestion that that's my thoughts keep

1:20:30

the

1:20:31

change so just to be clear um you want

1:20:35

me to use the language that um

1:20:37

commissioner Jordan referenced uh I

1:20:40

think it needs like I said I think they

1:20:42

pointed out maybe that we needed to

1:20:44

strengthen that language a little bit

1:20:45

more to shall coordinate and take out

1:20:49

the other words that are in that

1:20:51

beginning of the sentence okay the abant

1:20:53

shall coordinate with the the green Bel

1:20:56

Association as a condition of this

1:20:59

special exception approval commissioner

1:21:01

with all the respect

1:21:04

um that's just not going to get you any

1:21:07

further than continue to coordinate I I

1:21:12

know no difference

1:21:14

sir well I beg to differ but that's my

1:21:17

motion yeah that's that's your priv

1:21:20

that's up to the Commissioners now you

1:21:22

heard you say

1:21:25

any other comments from the

1:21:27

commission

1:21:29

joh okay and then we're ready for a vote

1:21:34

on this

1:21:36

project so uh just to be clear that's my

1:21:39

motion motion I made the motion yeah you

1:21:43

can blame it on

1:21:44

me broad shoulders made to approve this

1:21:49

project with the

1:21:52

conditions who seconded as amended I'll

1:21:54

second it you second it yeah been moved

1:21:58

to Second for approval of the project

1:22:01

with the conditions all those in favor

1:22:03

state by saying

1:22:04

I I oppos

1:22:09

abens motion

1:22:13

car again I I do hope you can work

1:22:15

something out because it's a great

1:22:17

project and the alignment is

1:22:22

phenomenal okay we're on item number

1:22:26

four this is a subdivision application

1:22:29

for

1:22:31

1529 13th

1:22:33

Street The Zone uh residential medium

1:22:38

density is sped by Gan and Jim spago

1:22:43

hello to separate the existing Parcels

1:22:46

into three individual lots for each of

1:22:48

the three resid on

1:22:51

site I'll wait till they get up here

1:22:56

Jeff are they here yeah are they here

1:22:58

yeah they're just waiting to get up here

1:23:11

yeah that was the big

1:23:13

one so they weren't here for the

1:23:15

subdivision

1:23:35

okay uh so for our final case here um uh

1:23:40

the subdivision for 1529 South 13 Street

1:23:43

um the applicants are proposing uh to

1:23:45

subdivide uh or to separate the existing

1:23:47

parcel into three individual Lots uh for

1:23:50

each of the three residences on site uh

1:23:54

the property 1529 South 13 street is a12

1:23:57

acre parcel featuring three separate

1:23:59

structures 1523 and 1525 South 13th

1:24:02

Street are 1, 192t structures

1:24:05

constructed

1:24:06

1957 whereas 1529 South 13th Street is a

1:24:11

1395 ft structure constructed in

1:24:14

1964 the subject property is bounded by

1:24:16

South 13 Street to the north the Cameron

1:24:18

Parkway portion of the Capital Area

1:24:20

Green Belt to the east and south and the

1:24:22

property at 1531 South 13 Street to the

1:24:24

West structure 1523 South 13 street is a

1:24:27

two-story detached structure featuring

1:24:29

elements of a Cape Cod architectural

1:24:31

style character definining features

1:24:32

include the very facade treatment

1:24:34

treatments including vinyl siding and

1:24:36

brick the large divided light window and

1:24:38

the mirror Dormers in the gable roof the

1:24:41

main entrance features a solid panel

1:24:42

door with two small panes fronted by a

1:24:44

3/4 view storm door it is accessed by a

1:24:47

concrete pathway and steps penetration

1:24:49

also includes a large divided light

1:24:51

orial window and side by side one over

1:24:53

one window flanking the main entrance on

1:24:55

the front elevation the side uh Eastern

1:24:58

elevation features five Windows two

1:25:00

Dormers are clad in vinyl sighing and

1:25:02

appear to feature six over six windows

1:25:04

The Roof is clad in asphalt shingles the

1:25:07

property primarily features a maintained

1:25:10

grass lawn with a mature Pine Tree in

1:25:11

the sidey yard a short driveway accesses

1:25:14

a small parking pad on site 152 the

1:25:17

structure 1525 South 13th Street is a

1:25:19

two-story detached structure featuring

1:25:21

elements of a mid-century vernacular

1:25:22

architectural style here Define features

1:25:25

include the split level configuration

1:25:26

with basement garage the varied facade

1:25:28

treatment including vinyl siding and

1:25:30

brick and the asymmetric window pattern

1:25:33

the main entrance features a solid door

1:25:34

with three small horizontal panes

1:25:36

fronted by a 3/4 view storm door is

1:25:38

accessed by a concrete pathway and steps

1:25:40

to both the sidewalk and driveway Rod

1:25:42

features a wooden roll down door with

1:25:44

with a row of Windows ministration also

1:25:46

includes a plate glass window flanked by

1:25:48

divided light double hung windows and

1:25:50

several other windows on the front

1:25:51

elevation the gable roof is clad in

1:25:53

Asphalt shingles property primarily

1:25:55

features a small yard enclosed with a

1:25:57

short HED r with several mature pine

1:25:59

trees a short driveway accesses the

1:26:01

basement garage Bay finally the

1:26:03

structure at 1529 South 13 street is a

1:26:05

two-story detached structure featuring

1:26:07

elements of a mid-century vernacular

1:26:08

architectural style character to

1:26:10

defining features include the split

1:26:11

level configuration with basement garage

1:26:14

the varied facade treatment including

1:26:15

vinyl Sidi and brick and the asymmetric

1:26:17

window pattern the main entrance

1:26:19

features a solid panel door fronted by a

1:26:21

3/4 view storm door is accessed by a

1:26:24

concrete pathway and steps to the

1:26:25

sidewalk garage features a wooden roll

1:26:28

down door with with a row of Windows

1:26:30

penetration also includes a PL glass

1:26:32

window flanked by divided light double

1:26:34

hung windows and three other one over

1:26:36

one windows on the front elevation there

1:26:38

are total five there are five total

1:26:40

sliding windows on the two side

1:26:42

elevations the gable roof is clad in

1:26:45

asphalt shingles the property primarily

1:26:47

features a maintained grass lawn with

1:26:49

two mature pine trees in the front yard

1:26:51

taken together the structures have

1:26:52

limited architectural and historic value

1:26:54

and they differ significantly from the

1:26:55

attached row home and semi- detached

1:26:57

structures to the north thus they do not

1:26:59

contribute to the architectural

1:27:00

character of the streetscape and

1:27:02

neighborhood the planning Bureau staff

1:27:04

recommends the request be approved for

1:27:05

the following reasons the proposed

1:27:07

subdivision will create individual Lots

1:27:08

which are all in conformance with the

1:27:10

applicable zoning regulations regarding

1:27:12

use development standards and off street

1:27:13

parking and the proposal will advance in

1:27:16

a minor manner the goals of the city's

1:27:18

comprehensive plan through the creation

1:27:19

of individual residential lots which are

1:27:21

more viable as home ownership

1:27:23

opportunities than the current lot

1:27:25

configuration um thank you Jeff um could

1:27:28

you state your name address and

1:27:30

relationship to the project sure my name

1:27:33

is Alison Hannah from penon Associates

1:27:35

we are the surveyor and engineer that

1:27:37

prepared the plans for you um and the

1:27:39

address of penon is 5070 Ritter Road

1:27:42

Mechanicsburg and the applicants are to

1:27:45

my left

1:27:49

[Music]

1:27:59

one Jim Spagnola 1806 BR Creek Lane

1:28:02

Middletown Sun

1:28:05

okay um you everyone heard the staff

1:28:08

report um actually there's no uh no

1:28:13

conditions no conditions so I guess

1:28:14

you're acceptable to those uh did you

1:28:17

want to add anything to the uh report no

1:28:20

nothing to

1:28:22

add um

1:28:25

question I had when I looked at the

1:28:28

picture

1:28:30

um it looks like

1:28:33

one house not separated is that or is

1:28:38

there two houses there's a total of

1:28:41

three homes my grandfather had purchased

1:28:46

two homes on the right the two brick

1:28:48

structures and then at some point I

1:28:50

don't remember when 60s they my grand

1:28:54

father gave my mother and father the lot

1:28:55

to the left of the Yellow Cap Cod is so

1:28:59

you have the yellow cave Cod I think on

1:29:00

its own separate parcel technically the

1:29:02

other Tom two homes on the right when my

1:29:04

grandfather purchased it he purchased it

1:29:06

from the Builder and those two lots were

1:29:09

on one de for some reason never

1:29:12

subdivided but the actual structure they

1:29:16

have separate three separate single

1:29:18

family homes correct CU looking on here

1:29:21

it looks like it's just one house

1:29:23

there's three separate single family H

1:29:26

okay uh Commissioners that's all I have

1:29:28

for this um and if you have any concerns

1:29:31

or questions andway commission McKenzie

1:29:34

no I was just trying to figure out you

1:29:36

explained it how it ended up as three

1:29:39

houses on one piece of

1:29:42

land

1:29:44

UHD yeah like like ver I my my question

1:29:47

was how did this ever happen and I guess

1:29:49

the had these houses never been sold in

1:29:51

the past but now now I get it

1:29:54

something something happened when was in

1:29:57

the mid 80s where the city for they were

1:30:00

three separate paral numbers somehow in

1:30:03

the mid 80s City combined one par so

1:30:08

it's a little

1:30:09

confusing we we'll correct that tonight

1:30:24

because they

1:30:39

will there was technically two B's I

1:30:43

believe one for the Cape Cod on the left

1:30:45

and then one D for the two Bri single

1:30:48

family structure and those are the

1:30:51

ones trying to subdivide out and just

1:30:53

get it straighten that at this point

1:30:56

yeah yeah I think I think what uh Mr

1:30:59

Grover is referencing is um the county

1:31:03

reflects both law consolidations and

1:31:05

deed consolidations in in the same

1:31:07

manner which is a problem I've had with

1:31:09

them and express to them many many many

1:31:12

times uh because it causes confusion

1:31:15

like this and uh they have not addressed

1:31:19

it

1:31:24

commissioner Reed no questions

1:31:26

commissioner Jan no questions Joe no

1:31:30

questions or

1:31:31

concerns is there anyone from the public

1:31:34

for against this I guess no one's

1:31:38

here um yeah this is pretty

1:31:40

straightforward I just wanted to clear

1:31:43

that up because I was thinking this is

1:31:45

one house are you gonna tear the wall

1:31:48

down yeah like anyways um Commissioners

1:31:54

can I get a

1:31:57

motion motion to approve second second

1:32:00

it's been moved and second for approval

1:32:03

of this project all those in favor state

1:32:05

by saying I I opposed ABS

1:32:10

motion did you second that thank you did

1:32:12

you second that thank you who seconded

1:32:14

that okay knew it came up from over

1:32:16

there glad this a lot easier

1:32:25

[Laughter]

1:32:28

tangentially related

1:32:38

Yesa way part of the green belt over by

1:32:42

Paxton Street is that part of the green

1:32:44

belt uh it's a reference to Spagnola way

1:32:47

over by like Paxton Street the green

1:32:49

belt that crosses off is that part of

1:32:50

the same green belt yeah there's the

1:32:52

paxtang parkway that's north of Paxon

1:32:54

Street and connects up to Market Street

1:32:56

and then there's a small section by the

1:32:59

five census Garden to the South maybe

1:33:00

that's Spagnola way just south of that

1:33:02

uh that's I think like an eastern part

1:33:04

of the uh Cameron Parkway this is

1:33:06

labeled as the Cameron Parkway on our

1:33:08

Maps yeah okay thank you all you're

1:33:11

welcome thank you Jeff do you have

1:33:14

anything uh nope uh that's it from uh

1:33:18

from my perspective I'd like to um I

1:33:22

guess I just like to thank the plan

1:33:23

Commissioners on the on the Green Belt

1:33:26

aspect again this is I know it's big

1:33:28

project I know it's not going to get

1:33:30

resolved here one way or the other what

1:33:32

happens um but uh you know I can see

1:33:37

this getting kicked down to the to the

1:33:39

last project and then the last developer

1:33:41

is not going to want to do it and say

1:33:43

why do I have to do it and not them I

1:33:44

think to the commissioner uh the point

1:33:48

like it frankly shouldn't be as

1:33:50

complicated as it is um

1:33:53

element outside the room

1:33:56

right right

1:34:00

but but that being said yeah that being

1:34:04

said in my in my conversations with kaga

1:34:08

uh they have I think Express more

1:34:10

optimism that they're closer to getting

1:34:12

a solution uh than they maybe were six

1:34:16

months ago

1:34:51

she get there

1:34:54

yeah anything for the good of the water

1:34:58

Commissioners not could I get a motion

1:35:00

for

1:35:03

adjournment is there a second second

1:35:06

stand all right thanks guys

More transcripts

Explore other videos transcribed with YouTLDR.

Get the TLDR of any YouTube video

Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.

Try YouTLDR Free