4:48

at approximately

4:52

6:35 um Commissioners uh there were no U

4:57

Menace with February meetings there'll

5:00

be we'll be voting on them at the next

5:03

meeting under old business there's

5:06

none under new business this is a

5:09

special uh uh exception application for

5:12

2131 North Front Street which is Zone RF

5:17

is followed by

5:19

G

5:21

fton and chane Berger with Maple

5:24

Insurance Group this is to establish a

5:27

support a housing facility used onite

5:31

oh can you come over

5:33

here

5:42

microphone okay hi I'm neither I'm order

5:46

gz but I am here on part of both of them

5:49

if that's okay my name is Tara Davis so

5:51

I'm not the direct app okay you'll get

5:55

okay okay uh so uh the applicants are

5:58

proposing to establish a Supportive

6:00

Housing facility use uh in the

6:01

riverfront zoning District The Proposal

6:03

requires zhp approval with special

6:05

exception uh for the proposed use per

6:07

section 73057 of the zoning code

6:11

property at 2931 North Front Street is a

6:14

38 acre lot featuring a 2 and one half

6:16

story 5243 ft structure which was

6:19

constructed in

6:20

1926 property is bounded by the

6:21

property9 2933 North Front Street to the

6:24

north the property at 2944 North 2

6:26

Street to the east property at 2929

6:29

North Front Street to the South and

6:30

North Front Street to the West this

6:32

detached structure features elements of

6:33

the Tudor Revival architectural style

6:35

character defining features include the

6:37

asymmetrical facade the variegated stor

6:40

stone treatment on the first level with

6:42

half Timbers infilled with stucco on the

6:44

upper levels the variety of ornate

6:46

entrances around the building envelope

6:47

the substantial wooden brackets below

6:49

the second floor overhang the large

6:51

metal fire escape on the rear elevation

6:53

the steeply gabled roof with modillions

6:55

throughout the substantial dormers on

6:57

the side and rear roofs and the

6:58

substantial brick Chim on the front

7:00

elevation main entrance features a

7:02

Gothic arched wooden door with a small

7:03

pane set in a recessed Stone surround it

7:05

is access by a small brick path to the

7:07

Front Street sidewalk there are three

7:09

other entrances on the side and rear

7:11

elevations the two on the Northern

7:13

elevation feature 3/4 view divided light

7:15

wooden doors set beneath divided light

7:17

transoms or flanked by divided Light

7:18

Side lights one is sheltered by a

7:20

substantial awning with large brackets

7:22

and the other is recessed in a building

7:23

Al Cove penetration throughout the

7:25

property features divided light steel

7:27

casement windows first floor windows

7:29

featur Stone Sills and Soldier course

7:31

Stone headers while those on the upper

7:33

floors are set within simple wooden

7:34

frames there are five large Dormers with

7:36

simple pament in the roof above the

7:38

garage at the rear of the building

7:40

structur is topped with steep gable roof

7:42

Gable roofs which are clad in wide slate

7:44

shingles newer additions on the side and

7:46

rear feature flat rubber roofs the front

7:49

the front yard features minimal

7:50

Landscaping with a brick walkway running

7:52

through a well-maintained lawn and a

7:53

freestanding sign advertising the

7:55

existing business rear yard primarily

7:57

features a surface parking lot with a

7:58

small yard accomodating of fire pit and

8:00

decorative lighting with few minor

8:01

modifications the building retains most

8:03

of the original appearance and most if

8:04

not all of its architectural and

8:06

historic Integrity structure is a rare

8:08

example of Tor architecture in the city

8:09

and is indicative of a diversity of

8:11

older residential structures along Front

8:13

Street and throughout the neighborhood

8:14

and thus makes a significant

8:16

contribution to the architectural and

8:17

historic character of the

8:20

community the planning Bureau staff

8:23

recommends the request be denied for the

8:26

following reasons the applicants have

8:28

provided no ation or of court for the

8:30

proposal Beyond The Limited information

8:32

provided in the application and business

8:34

synopsis and specifically they have not

8:37

outlined why the existing not conforming

8:39

office use could not be continued or new

8:41

such use could not be established they

8:43

have not provided any information on the

8:44

operator of the facility their

8:45

credentials or the number of residents

8:47

that will be on site and they have not

8:49

demonstrated how the proposed use will

8:50

be compatible with the surrounding

8:51

neighborhood and the applicants have not

8:53

engaged with the surrounding Community

8:55

have not provided contact information in

8:56

their notification letters to allow the

8:58

surrounding neighbors to engage with

8:59

them regarding the project previous

9:01

proposals for similar uses in the

9:02

neighborhood were not acted upon until

9:04

there was significant Outreach to

9:06

surrounding residents thank you st could

9:09

you state your name address and

9:11

relationship to the project yes my name

9:14

is Tara Davis um I am from Maryville

9:17

Pennsylvania do you need my full

9:20

address particularly mine well you stay

9:23

from out of state so no I'm I'm a local

9:28

MR Berger is from New York and he is the

9:32

direct applicant so as his lawyer

9:34

Melissa Kelo who's not here tonight okay

9:36

I am a local representative just having

9:40

started this process with him as the

9:42

list uh the listing agent on the

9:44

property for Mr gura Salan so having met

9:49

um himim who is interested in purchasing

9:52

the building but would need this special

9:54

use

9:56

exception I've remained involved um the

9:59

local

10:00

party okay so well you heard the staff

10:04

report they have denied the I I heard

10:08

and did you state why we shouldn't deny

10:11

it I should say why you shouldn't deny

10:13

it first I wasn't aware that I was under

10:17

the impression according to the

10:18

application process that we would have

10:20

the chance to come and discuss why the

10:23

application should be or should not be

10:26

approved um so I I don't know where that

10:29

information came from who was that that

10:31

denied it no uh there was just a

10:33

recommendation for Denial in the case

10:35

report uh no decision has been made and

10:37

no decision will be made until the

10:38

zoning hearing board great okay so the

10:41

recommendation came from what office or

10:43

who uh the planning zoning board

10:45

planning board okay so that's just for

10:47

me to be able to understand and take

10:49

back um that information after this

10:51

evening the special

10:53

application um was submitted um there

10:59

are reasons for the need to be the the

11:02

use the zoning use to be changed just in

11:04

this case it's still going to be

11:05

maintained as the business use but um

11:09

with of course the difference of having

11:11

some residential stays it is a

11:14

Supportive Housing in the sense that

11:15

it's used um for patients who are coming

11:19

and staying more than short term with

11:23

staff on site so it is a staffed actual

11:27

business that would be need

11:30

um nothing in the building would be

11:31

changed as you heard the beautiful

11:33

description by the way which is probably

11:35

better than my listing description to be

11:37

honest it's gorgeous um the historic

11:40

value of all of that in that description

11:43

um nothing's going to be changed inside

11:45

there was no need for that that's hence

11:47

why the per the building and the

11:48

location was perfect for the use for Mr

11:51

Burger from New York um he does have

11:54

other established properties in Tri

11:56

County Area so Cumberland we're working

11:58

on Perry as well um the need for a

12:00

Harrisburg location was um because of

12:04

the growth factor he's housed over

12:07

266 clients um from within the Tri

12:11

County space just this year alone and

12:13

his opportunity has been growing

12:15

exponentially to house more um clients

12:19

that have come to stay after their

12:21

recovery and outpatient services have

12:24

stopped in hospital or an outpatient and

12:26

ending up they need a place to stay

12:29

right they need a place to go and start

12:31

over and get reestablished in the

12:33

community so why should it be approved I

12:36

mean I think there's multiple reasons

12:38

within the application itself I don't

12:41

hear that any one specific reason was

12:44

denied or well the reasons for denial

12:47

were essentially a lack of information

12:50

uh that was pre presented um for example

12:52

there's no information provided on the

12:54

number of residents that would be um on

12:56

site at any one time uh there was no

12:59

provided about uh who the operator even

13:02

is much less their background um and uh

13:06

any certifications or licenses they may

13:08

have at the uh federal state or uh

13:11

county level okay so I do have business

13:13

information with me um happy to provide

13:16

and send as much more of that as

13:18

requested I didn't know until this

13:19

moment that that was a request or a need

13:22

um that's not stated clearly in

13:23

pre-application or application so

13:25

knowing that I can send a lot of that

13:27

information in if needed um for the

13:29

zoning hearing board I would say that

13:32

this clinically managed low intensity

13:34

type of program in the area is important

13:37

because of an obvious case of growing

13:39

Mental Health crisis in the area and

13:41

obviously how many people we've been

13:42

able to house in this area so far now

13:45

that being said this is a well

13:46

established company that has been doing

13:48

this um again in Tri County for years

13:52

happy to send that additional

13:53

information um it does have a software

13:57

backed program involved where

13:59

it's highly um uh the the patients are

14:03

locked in the clients are locked into

14:05

having check-ins having lots of coming

14:08

and goinging rules house rules uh

14:10

regular meetings the staff has certain

14:12

check-ins with them daily weekly um you

14:16

know it's it's not a house it's it's a

14:20

place where they have a regular commune

14:22

of organized efforts put in place to uh

14:27

maintain a structured

14:30

business for their mental well-being as

14:32

they move forward in their in their

14:35

outpatient growth right so happy to

14:39

provide more information I'm not sure

14:41

what exactly you might want okay usually

14:44

if you have to provide the information

14:46

that should go to Jeff and when you come

14:50

here we're not going to look at that we

14:53

need to send that to him Jeffrey right

14:56

my one concern is

14:59

SP you have

15:01

not contact anyone in the community or

15:04

the neighbors we did I have the

15:06

certified letters that were sent out two

15:07

months ago

15:09

actually no they I mean they said that

15:12

they that they did provide the

15:13

notification letters but they explicitly

15:15

noted in their application that they had

15:16

not done any engagement with the

15:17

community outside of those letters and I

15:19

know that when this uh a similar type of

15:22

use not um the same uh resident group uh

15:27

was reviewed at a recent meeting uh the

15:29

Planning Commission continued the case

15:31

until the following month's meeting so

15:32

that they could engage with the

15:34

surrounding uh Community to discuss any

15:37

um you know questions they might have

15:38

concerns they might have uh regarding

15:41

the proposed

15:42

use so these letters that went out

15:45

certified there was there was an uh is

15:49

there supposed to be an additional

15:51

Community engagement that's required in

15:53

order to get through to the zoning Board

15:55

hearing so in the what would you

15:56

recommend so in the applic in the

15:59

special exception variance special

16:00

exception application uh the

16:01

introductory Pages it does explicitly

16:04

say that um applicant should engage the

16:07

community because it will assist in

16:11

going through this process it will help

16:13

uh the community know what's being uh

16:15

proposed uh because we do uh post these

16:18

things both on the property itself as

16:20

well as uh on the city's website and in

16:22

the local newspaper um and it um

16:25

basically allows the community to have

16:29

an opportunity uh to ask questions

16:31

before this meeting so that uh this

16:33

meeting is not the first time um uh

16:35

surrounding neighbors may be hearing

16:37

about a particular use um or finding out

16:39

about a particular project okay so just

16:42

to be clear the letters that were sent

16:44

out on January 3D was ample enough

16:47

except for the fact that we would have

16:49

wanted to do like walkabouts postings on

16:51

doors like what well I believe that I

16:53

believe the um letters also have the

16:56

wrong dates because they have the

16:57

February dates and not the March dates

17:00

um they I I think maybe the letters were

17:02

sent out anticipating that the

17:04

submission would have been made um in

17:06

time for the February meetings but it

17:07

was not uh so it

17:09

didn't uh get into the planning Bureau

17:12

um until the February deadline for the

17:14

March meeting right I think there was a

17:16

little bit of a there was some email

17:19

communication back and forth that I did

17:21

see that there was some delays between

17:23

offices and Gathering and capturing some

17:25

of the application process and submitted

17:28

documents right so I think there was

17:31

definitely some some like hey we we

17:33

thought we were going to make that

17:34

February 3rd meeting and

17:36

then we're told that we couldn't

17:38

something was wrong with the application

17:40

or something right I'm gonna stop okay

17:43

this should be care of before we're not

17:47

doing this now yeah I was under the

17:49

impression that everything had been

17:50

taken care of clearly this is what we

17:53

were under the impression we needed to

17:54

do in order to get

17:56

here okay basically what I'm looking at

18:00

right now is I'm going to to deny it and

18:03

also recommend to continue this when you

18:07

have all the papers here okay can I have

18:10

a clear concise amount of information

18:14

needed to come back you have this you

18:16

have to contact I think that's half the

18:19

B right that's actually right in the

18:21

application instructions I actually

18:23

revised them recently to be much more

18:25

clear and and comprehensive about what

18:27

is necessary because we do get questions

18:30

about what type of documentation would

18:32

help and so I wanted that to be clear

18:34

upfront to applicants so that is in the

18:36

application doc I'll make sure Melissa

18:38

Kelo understands that yeah I want you to

18:41

contact him not continue this with us

18:44

right sure so I'm just saying as the

18:46

commissioner I'm gonna that's my

18:48

recommendation but I'm going to hear

18:49

from the other Commissioners uh

18:52

commissioner

18:55

K I could support a continuance for more

18:58

information or an outright denial but I

19:00

don't think we can vote

19:03

tonight commission no I I agree we

19:06

either deny it or continue it seems to

19:08

be U the application seems to be

19:11

inadequate commissioner re and I agree

19:13

as well same

19:15

reasons commissioner m y also an

19:19

agreement okay commissioner Jordan an

19:24

agreement okay um is there anyone from

19:27

the public for against this project I go

19:31

my the

19:32

left

19:34

midle and to my right okay if you do

19:38

come to the microphone and state your

19:40

name and your

19:48

address I no you you can stay there you

19:51

can stay

19:56

there thank you uh for the opportunity

19:58

my name name is uh Eric Bal Bei

20:02

ttel I live around the corner uh 125

20:06

Manor

20:07

Street and I own a home there with my

20:11

with my wife uh we didn't receive any

20:14

notification

20:16

whatsoever uh and uh I'm really puzzled

20:21

and questioned what type of facility

20:23

this is uh mental health was mentioned I

20:27

believe in one of the letter

20:29

substance abuse was mentioned I don't

20:31

know if it's for both one or the other

20:34

um there are similar facilities I think

20:38

they're similar uh in the area that have

20:41

a lot of outdoor activity which I think

20:44

would be detrimental to the values of

20:46

the homes uh around so i' be greatly

20:50

concerned about that but thank you for

20:53

the opportunity okay thank

20:57

you evening thank you for the

20:59

opportunity to address this board uh my

21:02

name is Dave shankweiler I live at 2921

21:05

North Front Street we are two doors away

21:07

from this this structure and I'm here

21:11

you know I don't want to be the guy that

21:13

says not in my

21:14

backyard uh but um I don't think this is

21:19

compatible with the neighborhood this

21:21

neighborhood has

21:23

um The Neighbors in this neighborhood

21:26

have invested well over a million

21:29

dollars in the structures in that

21:31

neighborhood most of the homes in the

21:32

neighborhood average a 100 years of age

21:36

or or between 80 and 100 years of age um

21:40

it's a very good neighborhood it's a

21:42

tight neighborhood and um I just don't

21:46

think it's compatible as Eric said we've

21:48

already got two of these facilities in

21:49

our neighborhood we have one on the

21:51

corner of green and Division and then we

21:53

have one in the 2800 block of north of

21:56

North Front Street um both of those

22:00

facilities as Eric said have a lot of

22:02

outdoor activity early in the morning

22:04

till late at night um I happen to know

22:07

the one on on uh North Front in the 2800

22:10

block my son actually rented the

22:13

property next to them uh and it it was

22:15

not a good situation with the outdoor

22:18

activity with the smoking and other

22:21

activities that happened so it's it's

22:23

not a good track record I think having

22:25

two in our neighborhood is plenty and we

22:27

shouldn't go further the other piece of

22:29

it is two doors away from this facility

22:32

is the Alex Grass Center for Jewish life

22:36

on the former uh academic center they

22:39

have a lot of children's activities

22:40

there they have a lot of outdoor

22:42

activities uh a lot of senior citizen

22:44

activities uh I don't think this is

22:47

conducive if you look at this property

22:50

um with the clients they would be

22:52

serving I would think they need uh

22:56

amenities we're not close to a bus route

22:59

we're not close to um shopping areas and

23:03

any of that type of thing so it it's

23:06

it's just not a a a good neighbor to

23:08

Neighborhood to put that our properties

23:11

are wellmaintained in the neighborhood

23:13

uh we've spent a lot of money to upgrade

23:15

those I know my wife and I uh we took a

23:18

property that was going to be condemned

23:20

and put it back together again and and

23:23

uh that's the same story for a number of

23:25

those properties in our area I'm

23:27

familiar with the exterior and interior

23:30

of this property it's not wellmaintained

23:32

by the current owner uh for me to hear

23:36

that uh I've been inside the property

23:38

for me to hear that there's going to be

23:40

no changes to the interior how how do

23:43

you do that it was a It was a commercial

23:46

property before uh before the current

23:48

owners it's now a commercial property

23:50

how do you put residential inside with

23:53

without major uh work to be done as far

23:57

as bathroom facility shower facilities

23:59

and bedrooms um but that being said it's

24:03

it's we're trying to take a a

24:06

neighborhood and put it back to

24:08

residential and we're trying to keep it

24:10

a neighborhood a community and I don't

24:13

think this is compatible to that so

24:15

thank you for your time I appreciate the

24:17

opportunity to speak to it okay thank

24:19

you can I ask a quick question um just

24:22

on the regard of the ins no no no no no

24:27

okay You Had Your Shot

24:29

well he mentioned the inside condition

24:31

and I don't think that was fair I just

24:32

wanted to make sure that we okay

24:36

okay um this is why we always ask for

24:40

Community involvement absolutely this is

24:43

why we want the neighborhood to be aware

24:46

and then maybe you could get together

24:49

and make some you know decisions on that

24:51

but to come here and not you know talk

24:54

to any that's just not what we look for

25:00

absolutely

25:04

understood I'm going to go for the

25:08

motion okay uh Commissioners can I get a

25:12

motion on

25:13

this uh I I would like to move to deny

25:17

this application um primarily on the

25:20

basis that the information that was

25:22

submitted is not following the

25:24

instructions that were provided with the

25:26

application process um it's lacking a

25:29

lot of pertinent and important

25:31

information for us the planning Bureau

25:33

to make any sort of good faith decision

25:36

on this um it also appears that the

25:39

actual applicants

25:42

named uh are not present and also

25:45

apparently did not participate in the

25:47

preparation of this application they did

25:49

not provide information and also because

25:52

there has been zero community outreach

25:54

of the

25:55

neighbors is there a second

25:59

second he's been moved in second to deny

26:01

this application all those in favor

26:04

state by saying I

26:07

I opposed exstension motion carried so

26:12

what am I to tell Melissa Kelo to do

26:14

next contact you I yeah I will follow up

26:16

with her okay that'd be great she she'll

26:19

want to hear that thank you thanks

26:40

um the next item on the agenda is the

26:44

preliminary final land development plan

26:47

application for 555 South 25th Street

26:51

this is Zone ins institutional it's

26:54

followed by James Skinner with the

26:56

Commonwealth Charter Academy charter

26:58

school is to demolish a portion of the

27:02

existing building on site and

27:04

Redevelopment the property as a school

27:07

with a larger build-in footprint and

27:10

expand expand its sight and excess

27:13

improvements yeah uh so the applicant is

27:16

proposing to demolish a port a portion

27:18

of the existing School building on site

27:20

and redevelop the property as a school

27:23

with larger building footprint expanded

27:25

site and uh and access improvements I

27:28

would note that I did dis have a

27:29

discussion with one of the applicants um

27:32

prior to the meeting here and it seems

27:34

that there's like a bit of a

27:36

miscommunication about what is actually

27:37

being proposed for the site uh it is a

27:41

school but it's not like a school um uh

27:45

there won't be school children there so

27:47

I think that uh speaks to um I think our

27:50

recommendation of the continuance but

27:51

I'll get to that uh in just a second I

27:53

just wanted to clarify that while we had

27:55

said it was a school uh in followup

27:57

conversations appears that that's not

27:59

kind of the case um so um but I think

28:02

the applicants will maybe be able to

28:03

discuss that a little bit

28:05

more the property at 555 South 25th

28:07

Street is a 9.55 acre lot featuring a

28:10

twostory

28:13

32437 foot structure which was

28:14

constructed in

28:15

1959 the property is bounded by the

28:18

property at 2933 North Front Street to

28:19

the north the property at 2944 North

28:21

Second Street to the east property oh

28:24

that was actually wrong so sorry about

28:27

that that's what you caught Jamie

28:28

apologies uh this detached structure

28:30

features elements of the international

28:31

architectural style uh character

28:33

defining features include the

28:35

significant building setback from the

28:36

Main Street the asymmetrical layout the

28:39

brick facade the expansive entrance

28:41

Portico the decorative murals and

28:43

religious iconography around the

28:44

building envelope and the large

28:45

congregation hall near the front

28:47

entrance there are three main entrances

28:49

along the front elevation the primary

28:51

entrance Fe beneath uh the Portico

28:53

features three full view metal doors

28:55

within a yellow metal surround flanked

28:57

by decorative sidelights and topped with

28:59

a pentagonal transom it is accessed by a

29:01

wide concrete walkway there's a second

29:03

set of full view metal doors flanked by

29:05

S side lights and topped with transoms

29:06

and a similar set of full view metal

29:08

doors flanked by large side lights

29:09

providing access to an assembly area at

29:12

the southern end of the building

29:13

penetration is varied throughout the

29:14

building it primarily features narrow

29:16

casement windows on the front elevation

29:19

with plate glass and double hung windows

29:21

on the side elevations the main

29:23

structure is topped with a flat rubber

29:25

roof while the Assembly Hall is topped

29:27

with the gabled roof featuring asphalt

29:28

shingles the grounds largely feature a

29:31

maintained grass lawn with rows of

29:32

mature trees on the northern and

29:33

southern boundaries and a cops of mature

29:36

trees in the front between the access

29:38

drives there is a metal back stop in the

29:40

Northwestern corner of the site

29:42

indicating the former presence of a

29:43

Ballfield at this location property

29:45

appears to retain most of its original

29:46

appearance and Architectural Integrity

29:48

it differs significantly from the

29:49

residential neighborhood to the west and

29:51

south and more closely resembles the

29:52

large commercial and institutional

29:54

properties to the east thus it makes

29:56

little contribution to the architectural

29:57

char character of the

29:59

community uh plan Bureau staff uh

30:02

recommends that the request be continued

30:05

uh for the following reasons um while

30:07

the bureau is generally supportive of

30:08

the overall project there are some

30:10

aspects that require further review and

30:12

consideration including a traffic impact

30:14

study will likely be will likely be

30:16

required as the project will exceed the

30:17

city's threshold of 40 trips per peak

30:19

hour uh the applicant should consider

30:21

relocating the proposed two-way

30:23

vehicular access point into a single

30:25

two-way entrance and exit located at the

30:26

intersection with Barry Hill Street to

30:28

simplify traffic flow clarify vehicular

30:30

and pedestrian movements and improve

30:32

safety for all users and um I just

30:35

wanted to note that uh did get the city

30:38

Engineers um review today and that was

30:41

provided uh to the planning

30:42

Commissioners um at your El turns there

30:44

um and that has notes and that has notes

30:46

on the uh proposed site plan uh to the

30:49

effect of consolidating uh the um

30:52

driveway uh access points

30:58

uh the applicant uh must install an ada8

31:00

compliant sidewalk on the entire South

31:02

25th Street Frontage of the property

31:04

connecting with the existing sidewalk at

31:05

the southern end of the site

31:07

additionally there do not appear to be

31:08

any pedestrian infrastructure into the

31:10

site from the public RightWay implying

31:12

that anyone arriving on foot will need

31:14

to share Drive aisles with vehicles and

31:16

tractor trailers uh the applicant will

31:18

not be permitted to install 8ot high

31:20

fences as such fences are not permitted

31:22

by right in the ins District per section

31:24

7-37 point9 e of the zoning code uh um

31:28

there do not appear to be any outdoor

31:29

players for school children although

31:31

again per our follow-up discussion um it

31:34

does not appear that there will be any

31:35

on site um the applicant is not

31:37

indicated where the required bike

31:38

parking will be located on site and the

31:41

planning Bureau has engaged the city

31:42

arur on Project reviews that landscape

31:44

and tree retention best practices can be

31:46

incorporated into the new design and to

31:48

ensure that native plants and pollinator

31:49

plants are being incorporated into the

31:51

project as outlined in the city's

31:52

comprehensive plan and then finally the

31:54

planning Bureau recommends the applicant

31:56

engage the surrounding Community to

31:57

identify changes that would help the

31:58

site better integrate into the community

32:00

identify opportunities to enhance the

32:02

utility of the site and ensure that its

32:03

future use does not retain the same

32:05

concerns and problems of the current

32:06

configuration um and again some of that

32:09

was based on uh the presumption that

32:11

there would be school children here on

32:12

site um obviously that does not sound

32:15

like that's going to be the case um but

32:17

again the applicants I think will

32:18

probably provide a little bit more

32:19

background um to that uh but um as with

32:24

any project um and especially in this

32:25

particular context of this neighborhood

32:28

we feel that um public engagement may be

32:31

necessary uh the property is kind of

32:33

located on one of the few dead end

32:34

streets here in the city so uh traffic

32:37

circulation is not quite the same as it

32:39

would be with the regular Street grid

32:41

and especially with the introduction of

32:42

tractor trailer traffic um we thought it

32:45

might be necessary to um engage the

32:48

community to understand how that might

32:51

impact um uh traffic circulation um

32:54

safety of all users and maybe just um um

32:58

you know noise uh or congestion issues

33:01

that the community may may have about

33:04

the project so with that being said our

33:06

recommendation is uh a continuance so

33:09

that we can further meet with the

33:10

applicants uh and especially with the

33:12

city engineer uh to discuss some of the

33:15

um access issues surrounding the

33:18

proposal thank you Jeff could you state

33:21

your names and relationship and

33:25

address uh my name is Jim

33:28

I'm the director of facilities for

33:30

Commonwealth Charter Academy I live in

33:33

lingal

33:36

toown

33:43

jar the civil

33:45

engineers okay and Could you um speak

33:47

into the

33:51

microphone just just to make sure we're

33:53

picking it

33:54

up need

33:57

yeah Jared hackenberry at arm group at

34:01

the 4600 Lena Drive in Mechanicsburg and

34:04

I'm the civil engineer for the

34:08

P I'm Robert Rulo I'm with Sigma 7

34:11

Design Group We're The Architects and

34:13

Engineers for

34:15

the tech services part of the building

34:17

the north part of the building

34:21

um East Street Street New York

34:28

I'm Dina Snider with strata architecture

34:31

I am the architect on the

34:33

ex I am located at 611 William pen Place

34:38

Pittsburgh okay um you gentlemen and one

34:43

lady U heard the report

34:47

and and the items for the

34:50

continuation so um maybe you want to

34:53

fill us in a little more on the project

34:56

sure I can do that um as was mentioned

35:00

um we're a we are a cyber F School uh

35:04

which explains the fact that there won't

35:07

be

35:09

students arriving on buses like that at

35:12

the at the building um we're currently

35:15

at one Innovation Way uh right at the

35:19

hack entrance uh is where our our main

35:22

building is now uh just to give you a

35:25

little bit of background that building

35:26

is full

35:28

um we've grown uh since Co and which has

35:34

uh basically as we've added students

35:37

we've added teachers uh we require our

35:40

teachers and staff to come into a

35:42

building kind of look

35:44

like um when this property became

35:47

available as a as a school were

35:50

considered a school psylvia public

35:52

school um the

35:56

location was great

35:58

the zoning is great us as a schol and

36:02

saw it as an opportunity

36:08

able so some of the things that were

36:12

mentioned you know

36:15

sidewalks with those with the

36:18

suggestions there we're happy to

36:22

accommodate we won't see students

36:28

to the building but we can we can

36:33

certainly we're happy to do those kinds

36:35

of

36:37

things but it will it will really look

36:40

like adults driving

36:42

in work stay for the

36:47

day in a general

36:53

stay again scho buses

37:00

okay

37:01

um the same question I had for the last

37:04

one did you contact the community about

37:08

your project we we did not no we we

37:12

again maybe assumed in correctly um

37:15

because we're a school and it was a

37:17

school um we assume that would be okay

37:21

to go into that area if we need to talk

37:23

to the local people we can certainly yes

37:28

I would highly recommend it you never

37:31

know they don't know what kind of school

37:33

it is they you know they should be aware

37:36

of exactly what you're putting in there

37:38

so you know it could have been a school

37:40

that you know had all kinds of people

37:44

there so um I highly recommend you do

37:48

that we can do

37:50

that uh Commissioners that's my only

37:52

question I had so at this time and if

37:55

you have any concerns or questions and

37:57

I'll start with commissioner old sorry

38:01

inic uh do I understand this is a

38:04

complete relocation of what you have at

38:06

the farm show or is this an augmentation

38:08

no we're we're hoping to move a couple

38:10

different departments uh that we just

38:13

ran run out of space because this seemed

38:15

like it was a downsizing that's why it

38:17

was no from what you had up there yeah

38:20

we'll be able to hire more people this

38:22

way okay no neon no glowing stuff along

38:25

the top of it that neighborhood no

38:28

uh how many how many teachers a in cyber

38:31

settings when we've done them you know

38:33

it could be 150 square foot per teacher

38:37

relatively small setting so you could

38:38

have a lot of people in there um I think

38:41

right now because of the Departments

38:43

that we're moving there it will be a lot

38:46

of our it people and it will be some of

38:50

the the

38:51

media U side of the school so not really

38:54

the instruction not there will be some

38:56

instructors there but the vast majority

38:59

know I mean I think our uh parking

39:03

footprint um might have been in the 70

39:08

but we think maybe there might only be

39:10

50 people in the building at the

39:12

most okay no other

39:15

question

39:18

commission commissioner re no questions

39:22

commissioner M yeah um I'm very familiar

39:26

with the in common troter Academy

39:29

location I that to tore it back when it

39:31

opened um so I understand conceptually

39:34

like this the way you function in the

39:36

setup and everything for so I'm

39:39

following what this site would be set up

39:43

as to um curious though if you could

39:46

just clarify and explain more um the the

39:50

intent of having two separate entrances

39:53

one being for trucks and the mention of

39:56

uh tractor Trail trucks being at this

39:58

site so what's going on there why would

40:00

we need a separate truck entrance so you

40:03

we won't be seeing tractor trailers

40:06

there part of the section of the

40:09

building obviously heavy

40:14

Tech's there's going to be some servers

40:18

and which will

40:22

arrive um and then you know obviously we

40:26

expect UPS

40:28

F xon to go back well they're on my

40:31

street too

40:32

y so but we want to make we wanted to

40:34

make sure we had the the the correct

40:38

curvature and and ability to get back in

40:41

and out of their or a

40:44

life but we won't be

40:50

like

40:51

okay so the possibility of um you know

40:56

based on the City Engineers comments and

40:59

and planning comments the possibility of

41:01

adjusting how the current Ingress egress

41:04

configuration is and everything are you

41:07

amenable to adjusting that that's what

41:09

it takes revising everything it seems

41:12

like the traffic study condition would

41:15

go away given the change of now

41:18

understanding the use better I I would

41:20

imagine so I'm not sure what their

41:22

shifts are like but you know when we

41:24

were operating under the assumption this

41:26

was a school and and it looks like a

41:27

school I think when you look at it and

41:29

because it previously been a school I

41:31

think you imagine 40 50 teachers getting

41:34

there at 6:30 in the morning 7 o'clock

41:36

in the morning um so I would imagine

41:39

that the um traffic is much more spread

41:42

out over a day for something like this

41:44

and they probably do not trigger that

41:46

threshold we do we Flex We

41:50

Flex okay um I don't have any other

41:54

questions

41:55

thanks Commission

41:58

no further questions commissioner

42:00

address that okay is there anyone from

42:03

the public who against this project I'm

42:05

I start with my left and center and

42:10

there's no one in my

42:12

right uh commissioner is

42:15

um I get a motion on

42:21

this okay

42:24

yeah I don't have an issue with your con

42:27

to there but I just I think the one

42:29

thing that would be nice is to get some

42:33

income tax real estate tax paying

42:35

Partners I assume you guys are nonprofit

42:38

based on your thing with the state so

42:41

from the city

42:42

standpoint it's not development that

42:44

creates anything for us so we do have a

42:47

pilot program with the city already we

42:50

do have payment taxes you do okay would

42:53

that be extended to this site it

42:55

certainly could be I want to say it's in

42:58

the neighborhood of

43:00

775,000 a year that we P to the city

43:06

okay what triggers that or what

43:09

triggered that was that an offer made or

43:11

it we do that um in we're we're all over

43:15

the state we know we're

43:17

using Emergency

43:19

Services that's where I'm coming from

43:22

yeah yeah absolutely we know that we

43:25

need to come

43:30

do that in

43:37

s commissioner I gu

43:39

some my questions for you is I also have

43:43

a follow question oh I'm sorry um this

43:45

is primarily for Jeff the um outdoor

43:48

play area for children would also

43:50

disappear well unless their staff want

43:53

to use that climbing walls and whatnot

43:56

in some of these plac

44:01

so before we vot uh again I think with

44:05

the circumstances being as they are do

44:08

we want to go for continuous or do we

44:11

are we okay with

44:14

uh with the changes with the changes

44:18

from the

44:20

people that's big question yeah I think

44:23

we answered probably the technical

44:25

questions relative to traffic which

44:27

would be a noo if we didn't have that

44:29

information that we had generation

44:30

because we have to have a consistent

44:33

approach to all um I guess the key

44:37

question is looking at the nature of

44:39

that neighborhood the distance of the

44:41

building what's directly surrounding it

44:43

I guess the Salvation Army is behind

44:46

diagonally up I guess um it is a one-way

44:50

street so there's not L of traffic but I

44:52

know the thrust that some of the

44:54

Commissioners have had to try and make

44:55

sure that there's been more of an

44:57

Outreach to the community and we've you

45:00

just listened to that on the last one

45:02

you know the that we've tried to

45:05

do that's the other thing can we add the

45:09

conditions of meeting with

45:12

the if we pass it meet with the

45:20

community know what they really are

45:23

there for how would we structure that

45:25

Chad um not really sure I mean with uh

45:29

with respect uh to whatever action uh

45:32

the commission may take you know I think

45:35

um frankly I would like to almost have

45:37

an opportunity to re-review it too in

45:39

light of the different uh operation of

45:43

the property I mean it may maybe this is

45:46

an office use it's not even a school I

45:48

kind of want to go back and look and see

45:49

what how we reviewed uh their proposed

45:53

uh the property at one Innovation Way I

45:55

believe that wasbe 15 or so around there

45:59

so that would have been reviewed under

46:00

our current zoning code and would like

46:01

to see that because that may dictate how

46:04

much parking is necessary or or um you

46:07

know just the specifics of it I think

46:10

could

46:11

uh you know having that be reviewed I

46:15

think would be a benefit to the overall

46:18

project as opposed to kind of approving

46:21

it and putting it out there and just

46:22

saying okay we'll do some stuff before

46:24

you get to City Council I think having

46:26

it be a a cleaner package that goes to

46:29

city council will ultimately benefit um

46:32

you know the applicants as well as uh

46:34

the

46:37

community with that could I get a motion

46:40

from

46:49

Commissioners motion to

46:52

continue is there a second on the motion

46:58

moved in second to continue this project

47:01

continuation all those in favor stay by

47:04

saying I I

47:09

oppostion motion

47:12

carried

47:14

continuation I will say you guys have

47:16

quite aable designer so looking forward

47:19

to seeing how this will turn

47:21

out quality

47:26

thank

47:37

you yeah that

47:42

would okay item number three this is

47:46

um uh preliminary final land development

47:49

plan application for the Harrisburg

47:52

parks and recreation

47:54

facility for the properties at uh 10:7

47:58

and 1021 North Cameron Street and 1105

48:02

her street and 1105 her street rear and

48:06

102 North 12th Street which is Zone indd

48:10

industrial it's followed by Richard far

48:13

with SS original Transportation

48:16

agency is is to consolidate the subject

48:19

properties and construct a new city

48:22

parks maintenance facility on site yeah

48:26

uh yeah yes so uh the applicant is

48:28

proposing to consolidate the subject

48:30

properties and construct a new city

48:31

parks maintenance facility on site um

48:34

and that includes the properties at 1,2

48:36

nor 12th Street 1105 H Street 17 and

48:40

1021 North Cameron Street and an

48:43

unaddressed parcel in the middle of the

48:44

block um the existing nearby facility at

48:49

901 North 2 Street um which is kind of

48:52

at the back right at the base of the

48:53

Hill below the Harrisburg Cemetery uh

48:56

will be demolished as part of a larger

48:57

project redeveloping the Susana Regional

48:59

Transportation authorities operations

49:01

and maintenance facility at 901 North

49:03

Cameron Street which will include the

49:05

vacation of public rights of way and

49:07

consolidation of lots in the block to

49:08

the South uh project site is comprised

49:10

of five Parcels 1,2 North 12th Street

49:13

which is 2.01 Acres 1105 H Street which

49:16

is6 Acres 17 North Cameron Street 34

49:20

Acres 1021 North Cameron Street 0.25

49:23

acres and and an undressed parcel of 07

49:26

Acres totaling 3.27 Acres which features

49:29

two buildings and a canopy from a former

49:31

gas station the largest paral the

49:33

largest parcel features a one-story

49:36

18244 ft industrial structure

49:39

constructed in

49:40

1960 uh the property has a limited

49:42

history of mertile permits but appears

49:44

to have primarily accommodated Auto

49:45

oriented uses on site the second largest

49:48

parcel uh 1105 her street features a

49:50

1story 2976 ft structure constructed in

49:54

1960 property has operated primarily as

49:56

a since at least 1990 first as less and

49:59

Tiny cocktail then as Ros and later as

50:01

four aces Barn Grill Parcels fronting

50:03

Cameron Street previously accommodated

50:05

gas station as evidenced by the

50:06

remaining canopy though there are no

50:08

records of multiply permits for the

50:09

properties and Google streets view

50:11

confirms there was no business operating

50:13

on site as of September 2007 uh project

50:16

site is bounded by H Street to the north

50:17

North 12 Street to the east the property

50:20

at 901 North Cameron Street to the South

50:22

and Cameron Street to the West

50:27

um and to provide a little actual

50:29

background because Commissioners may be

50:31

wondering why um Serta is building a

50:35

facility for uh uh the city um so as

50:39

noted this is a and the applicant will

50:40

be able to provide a little bit more

50:41

background but uh this is a multiphase

50:44

uh project in really the block bounded

50:46

by the cemetery hear Street Cameron

50:48

Street and State Street um and it's um

50:51

you know multiphase and it requires uh

50:54

kind of stepped uh development of

50:56

demolition and then construction then

50:57

Demolition and construction um so

51:00

they're going to be I think they're

51:02

taking the lead on this because they're

51:03

overall the developer for the whole

51:05

block um and they'll be building the

51:08

proposed parks and wreck facility that's

51:10

being discussed today uh so that they

51:12

can then demo uh the other Parks and Rec

51:15

the existing Parks and Rec facility

51:16

which is just south of sunshine Park uh

51:19

and then um all of the buildings that

51:20

are part of that Goodwill campus uh

51:23

right there and then there'll be uh

51:25

vacating rights away consol ating those

51:27

blocks and then constructing a new

51:28

operations and maintenance facility

51:30

before then demol the demol demolishing

51:33

the existing um uh bus garage uh that uh

51:38

Serta has been operating I think since

51:40

like the 1930s or something some

51:41

capacity Char yeah uh so um so that's

51:46

why you know they're uh be taking the

51:48

lead on this because the first stage of

51:50

this bigger larger multi-year uh uh

51:53

project um and so when we're reviewing

51:57

this we're just reviewing uh the um

52:00

current proposal for the uh new uh

52:03

buildings on site but it would be

52:05

helpful to keep that whole thing in mind

52:06

that this is going to be step one of a

52:08

three or four phase project uh with that

52:11

being said uh the planning Bureau staff

52:14

is recommending the request be approved

52:15

with the following conditions uh the

52:17

applicant uh must secure approval of a

52:20

letter of map provision from FEMA so

52:22

that the development can proceed as

52:23

proposed and must eventually receive

52:25

approval for both the structural

52:26

demolitions on site as well as the

52:28

proposed new construction uh and the

52:30

project team um has submitted uh the ler

52:33

to uh FEMA and is um I've recently seen

52:37

some back and forth with FEMA requesting

52:38

some additional um information I believe

52:41

uh and so I'm assuming they'll be uh

52:43

working with them to clarify uh that

52:45

additional information needs and and

52:47

provide any additional documentation uh

52:49

but they are in the midst of that

52:50

process uh currently um but they do need

52:54

FEMA approval for that before uh they

52:56

can go forward as

52:58

proposed uh the applicant should

53:00

coordinate with the city arborus to

53:01

increase the ecological impact and treat

53:03

canopy on site by incorporating native

53:05

tree species and pollinator plants

53:06

particularly on the western edge of the

53:08

site around the storm water detention

53:10

infrastructure which can also address

53:11

localized air pollution created by

53:13

Cameron Street and her street

53:14

infrastructure um so you know having a

53:17

buffer of trees um you know would help

53:19

address some of again the local uh air

53:22

quality issues as well as uh kind of

53:24

beautify the site uh for anybody travel

53:27

um on those on H Street or Cameron

53:29

Street and then finally uh if possible

53:31

the plane bu recommends removing the

53:33

southernmost vehicular access point onto

53:34

the site to remove a vehicular

53:36

pedestrian conflict point which is

53:37

especially important given the proximity

53:39

to Sunshine P Sunshine Park And to

53:41

clarify uh vehicular circulation I think

53:44

we've had some discussions about this uh

53:46

in the past in some of our meetings

53:47

regarding this project uh it may be the

53:49

case that they need to have two separate

53:51

ones just for uh the types of vehicles

53:54

for staff and visitor access then for

53:57

city um vehicle access but being that

53:59

it's directly across from Sunshine Park

54:01

which will remain as part of um the

54:03

future iteration uh of this block um

54:06

we're trying to look to reduce vehicular

54:08

um vehicular pedestrian conflict points

54:11

where possible although I should note

54:13

overall um there will be a reduction in

54:15

that uh because they will be removing

54:17

two uh curb Cuts onto HST stre uh as

54:19

part of this project and reconstructing

54:21

the sidewalk along there so um you know

54:24

they're it's already consolidating some

54:26

of the uh uh vehicular access points um

54:30

but if possible to simplify that into

54:32

one would be preferable uh but we would

54:34

understand certainly if there are

54:35

operational reasons why that cannot

54:37

occur uh the plan Bureau staff

54:39

recommends the request be approved for

54:40

the following reasons uh the project

54:42

will uh expand and modernize the city's

54:45

Parks maintenance infrastructure

54:47

improving the ability of the Parks and

54:48

Recreation Department to provide

54:49

services to Residence and a facility

54:51

that creates better working conditions

54:52

for staff uh the project site is a

54:54

conspicuous location at the intersection

54:56

of two State routes and the removal of

54:58

dilapidated and underutilized buildings

55:00

and replacement of larger of large

55:01

expanses of impervious surface with

55:03

vegetation and a modern city building

55:05

will bring aesthetic improvements not

55:06

only for passers by but local residents

55:09

and workers as well thank you Jeff could

55:12

you state your name address and

55:14

relationship to the project sure good

55:17

evening uh my name is Bill schnor I I

55:20

work with Stant Tech Consulting U here

55:23

representing SRTA as the applicant this

55:27

project I'm out of the Mechanicsburg

55:30

office

55:33

um I believe that's

55:36

okay uh you heard the staff report and

55:40

are you acceptable of the conditions yes

55:43

I read through it I'm I'm in agreement

55:45

and I uh we

55:48

are acceptable of the conditions of the

55:50

recommended

55:52

approval hope everybody is like that

55:56

I have no questions at this time except

55:59

uh this one in the future of um future

56:04

plans are they going to uh demolish the

56:08

U Goodwill the

56:11

cilities yes one of the challenges with

56:14

a facility like the SRTA is that they

56:19

need to remain operational during

56:22

construction and so once they start to

56:24

build the main facility it's prob like a

56:26

two and a half year construction cycle

56:29

so they have to remain operational so

56:33

that's why they uh the main facility is

56:35

really going to be in the area of the

56:37

Goodwill

56:38

buildings and uh while the existing

56:42

facility remains

56:44

operational

56:45

okay that's the only question I had so

56:48

far um commissioner McKenzie any

56:50

questions or

56:52

concerns yeah first of all I'm pleased

56:54

to see something happening on that site

56:56

because knowing the flood plane

56:58

elevation we did the building across the

57:00

street cap of you many years ago and

57:02

spent a great deal of time trying to

57:03

figure out how to work with reverse

57:05

flooding and seven or eight foot above

57:08

street level there was the was the flood

57:11

level and you've got to be that high

57:13

it's got to be that higher higher for

57:14

you I assume this is going to be flood

57:16

resistant as opposed to flood proof uh

57:20

it is going the first floor elevation of

57:22

uh all structures on site are going to

57:25

be uh a foot and a half above the uh so

57:28

I didn't see any Contours on here I was

57:30

trying to figure out how high that yeah

57:32

above the base flood elevation yeah now

57:34

like Mr Knight mentioned the uh there

57:38

are current studies in process and uh

57:42

That Base flood elevation is going to be

57:45

uh modified and so our low Mark that we

57:49

have submitted received our first set of

57:51

comments is to uh uh

57:56

be able to design to that base flat

58:00

elevation and then we will be you know

58:02

what that elevation is I'm just curious

58:05

38.9 okay and uh so yeah we the first

58:10

floor elevations will be a foot and a

58:12

half above okay is that what is that was

58:14

it 18 inches or 30 inches we used to

58:16

require uh our our freeboard requirement

58:19

is 18 inches yeah okay okay call there

58:23

um other than I can't conceive of

58:24

anything I've watched that site for 30

58:26

years and it's never looked any good so

58:31

um

58:32

yeah

58:34

commission no really questions I I agree

58:37

with Vern I've looked at that site for

58:38

years it's been so unproductive and glad

58:40

to

58:41

see see that change and always glad to

58:43

see something come to that Corridor so

58:45

definitely in favor of

58:47

this commissioner re no questions

58:50

commissioner m i echo my commissioner's

58:54

comments and any questions I had were

58:56

already answered just through the

58:57

additional information you guys provided

58:59

so thank you commissioner Jordan no

59:03

questions is there anyone from the

59:05

public for against this project let

59:08

start with my

59:09

left no one in the middle no one my

59:12

right

59:14

so Commissioners um this is almost

59:17

straightforward um can I get a motion

59:21

I'll make a motion to approve and I'm

59:23

turn to see if we had we do have a few

59:25

conditions listed one two and

59:28

three I'll second been move to Second

59:31

for approval with the conditions all

59:33

those in favor state by saying I I

59:37

opposed extensions motion Carri good

59:40

luck you thank

59:42

you you'll see me

59:44

again for the rest of

59:48

it correct

59:59

this is um item number four this is a

1:00:03

zoning map Amendment uh application

1:00:07

for 320 rally Street 1511 north3 Street

1:00:12

and 1530 North four Street which is Zone

1:00:15

inss

1:00:17

institutional is filed by Midtown campus

1:00:20

LP and Harris Logan LP this is the

1:00:24

change of parel zoning destination to

1:00:27

the commercial neighborhood

1:00:30

Zone uh yes so the applicant is seeking

1:00:32

an amendment to the official zoning map

1:00:34

in order to change the parcels uh change

1:00:36

the parcel zoning designations from the

1:00:38

institutional Zone to the commercial

1:00:39

neighborhood Zone uh the request um

1:00:43

footprint uh is comprised of three

1:00:45

blocks uh the project site um at 320

1:00:49

Riley Street uh is comprised of a single

1:00:51

parcel that was Consolidated from 22

1:00:52

separate parcels and a small RightWay

1:00:55

totaling approximately 1.01 Acres the

1:00:57

small RightWay the Grocer's alley was

1:00:59

vacated in October 2020 uh this site is

1:01:02

currently in approximately 117 space

1:01:04

accessory parking lot with minor

1:01:05

Landscaping improvements along the east

1:01:07

south and west boundaries although the

1:01:09

planning Bureau notes that the lot

1:01:10

appears to be sparsely used o to the

1:01:12

fact that spaces are reserved um or I

1:01:15

guess were reserved for students and

1:01:16

facil and faculty of the pack Midtown

1:01:19

campus as footprint has shrunk

1:01:21

dramatically in the past few years

1:01:23

resulting in less use uh the northern

1:01:25

boundary of the lot also features some

1:01:26

landscaping and improvements related to

1:01:28

the boy Street Urban Meadow project site

1:01:30

is bounded by the Boyd Street Urban

1:01:31

Meadow to the north North Fourth Street

1:01:33

to the east Riley Street to the South

1:01:35

and Logan Street to the West uh the

1:01:38

loock uh the property at 1511 North thir

1:01:40

Street uh is comprised of a single

1:01:43

parcel totaling 0 57 acres in size the

1:01:47

site is currently occupied by an

1:01:48

accessory parking lot with minor

1:01:50

Landscaping improvements along the north

1:01:52

and south property boundaries the site

1:01:54

is accessed by curb Cuts along Riley

1:01:55

Street North thir Street the site is

1:01:57

bounded by the bo Street Urban Meadow

1:02:00

and 1519 North thirr Street to the North

1:02:02

Logan Street to the east Riley Street

1:02:04

and 300 to 310 Riley Street to the South

1:02:06

and North Third Street to the west and

1:02:08

finally uh the block at 1530 nor Fourth

1:02:11

Street is comprised of 12 different

1:02:13

parcels and near rights of way uh

1:02:16

totally approximately one acre although

1:02:17

that was also Consolidated uh the site

1:02:19

is currently occupied by an

1:02:21

approximately 50 space accessory parking

1:02:23

lot bordering an unimproved gravel lot

1:02:25

that is is utilized as informal parking

1:02:27

and currently as a construction staging

1:02:29

area uh for infrastructure along North

1:02:32

Fourth Street this site is bounded by

1:02:34

Harris Street to the north North Forth

1:02:35

Street to the east the boy Street Urban

1:02:37

Meadow to the South and Logan Street to

1:02:39

the

1:02:40

West the planning buau staff recommends

1:02:43

the request be approved for the

1:02:44

following reasons uh the proposals

1:02:46

appear to have been given the current

1:02:48

institutional designation uh by previous

1:02:50

City staff and furtherance of planning

1:02:52

projects at the time most notably the

1:02:54

Harrisburg Midtown campus master plan

1:02:56

which was completed in April 2007 uh

1:02:59

which proposed the establishment of a

1:03:00

hack Midtown campus a project that never

1:03:02

completely materialized as such it is

1:03:04

reasonable to evaluate the current do

1:03:06

zoning designation and consider amending

1:03:08

it and consider whether amending it will

1:03:11

help promote current development and

1:03:12

longrange planning goals uh the current

1:03:14

ins zoning designation has adversely

1:03:17

impacted the cityan community as it

1:03:18

relied on a singular and outdated

1:03:20

development model which failed to

1:03:22

materialize leaving large vacancies in

1:03:24

the urban Fabric and stying potential

1:03:26

Redevelopment of the underutilized sites

1:03:27

along the corridor and finally the

1:03:30

subject properties are bracketed by CN

1:03:32

Zone corridors to the east at North 6th

1:03:34

Street and West North Third Street as

1:03:37

well as further to the South uh at along

1:03:39

verbeck Street and thus the uses and

1:03:41

development permitted by the CN district

1:03:43

will not be contrary to the character of

1:03:44

the neighborhood and in fact will

1:03:46

reflect the mixed use the mixed use

1:03:48

nature of the surrounding

1:03:50

Community thank you Jeff could you state

1:03:53

your names and address in relationship

1:03:55

to

1:03:57

project David shy I'm uh an attorney

1:04:01

with chman pepper lock and we represent

1:04:03

the

1:04:04

applicant and I'm Doug ntic I'm with

1:04:07

Greenworks development we are the

1:04:08

applicant uh at 1500 North Third in

1:04:13

harrisb um I have no questions at this

1:04:17

time

1:04:18

Commissioners and could start with

1:04:20

commission any concerns or

1:04:22

question sure I'm surprised it took you

1:04:25

that long to get here to make this move

1:04:28

I mean unfortunately I think Joe and I

1:04:30

were here when we went through the

1:04:32

resoning to try and get hacked downtown

1:04:36

and there was a lot of potentiality

1:04:37

there I'm kind of disappointed that

1:04:39

didn't happen but that did appear in our

1:04:42

comprehensive plan is something that

1:04:43

needed to be addressed so I'm not

1:04:46

surprised to see to see that coming back

1:04:49

and it also gives us an opportunity to

1:04:50

put property on the tax

1:04:52

rols um because we move from an to to a

1:04:56

commercial type use assuming whatever is

1:04:58

developed I see you had a couple of

1:05:00

renderings from a couple years ago that

1:05:02

Alexander did yep is that what's

1:05:04

proposed or just an example of what

1:05:06

could happen updated the the initial

1:05:07

rendering I think you saw the one that

1:05:09

had the incline solar on the roof we've

1:05:11

updated from there to go to more of a

1:05:13

flat roof and kind of change the

1:05:15

envelope a little bit but it's basically

1:05:17

a center

1:05:19

Courtyard and are you looking at market

1:05:22

rate on that I'm

1:05:24

assuming a little bit of

1:05:26

commercial like a Podium building kind

1:05:28

of like the kind of like a Podium

1:05:30

building lower stories are commercial

1:05:34

andare feet of retail Riley is all we're

1:05:37

going to do about 2500 square feet okay

1:05:39

okay neighborhood support yep kind of

1:05:42

things okay hopefully a restaurant that

1:05:44

service the residents as well as the

1:05:47

community okay no nothing more okay

1:05:51

commission yeah the only worse in

1:05:53

surface parking lot is underutilized

1:05:55

surface Park parking lot so I'm all in

1:05:57

favor of

1:05:58

this commissioner re no questions

1:06:03

commission uh yeah I would Echo both

1:06:07

Commissioners um very astute statements

1:06:10

commissioner Al

1:06:13

tool and I mean I remember when you

1:06:17

presented some plant I think they needed

1:06:21

a zoning uh variance and special

1:06:23

exception this was a few years ago

1:06:26

and what was the outcome of that

1:06:28

decision the the history of that was in

1:06:32

was 2019

1:06:41

yeah in

1:06:45

202 came back and

1:06:52

Zoning oh interesting did they Deni the

1:06:55

special for the parking the relief from

1:06:56

the off street parking the off street

1:06:58

parking relief was denied so a portion

1:07:00

of the project then reversed course yeah

1:07:04

so made the project impossible yeah at

1:07:07

this scale sure sure understandable um

1:07:11

yeah this this makes sense to me and um

1:07:14

certainly a good way to start to

1:07:16

revitalize this portion of the Midtown

1:07:19

neighborhood which we've been trying to

1:07:20

do bring in more connect yeah connect

1:07:22

Revitalize bring in more tax base bring

1:07:24

in more people bring more use so all

1:07:26

that this Project's going to be great

1:07:27

Fort great for the city yeah thank

1:07:31

you commissioner Jordan no questions

1:07:34

just more or less EO fellow

1:07:37

Commissioners they'll be nice to see

1:07:39

something anything there because it's

1:07:42

just wide

1:07:44

open so anyone from the public were

1:07:48

against this project not stke to my

1:07:51

left okay you come microphone

1:08:00

and state your name and your address uh

1:08:03

my name is Matt Coleman 1932 North Third

1:08:06

Street I guess my question is like the

1:08:08

area around there being zoned for

1:08:11

commercial how far out is that going to

1:08:14

expand in say beginning project so how

1:08:18

far out I guess that uh commercial Zone

1:08:22

will end up going from a peri time I

1:08:25

guess currently now what what are the

1:08:28

borders for the current zoning is it

1:08:31

just those that 21 whatever acre or is

1:08:36

it is it

1:08:37

going does changing the zoning expand

1:08:45

out one of you

1:09:11

these

1:09:14

two know

1:09:25

I know C

1:09:43

C thank you for the

1:09:47

question you

1:09:49

have and there's no one in the middle

1:09:51

and no one to the right the commissioner

1:09:53

is the

1:09:56

oh yeah just I just want to build on

1:09:59

your last comment there and I'm not sure

1:10:01

it's clear to everybody is that you're

1:10:04

still maintaining Evangelical press as

1:10:07

institutional zoning the uh old um

1:10:11

Hudson building or not was Hudson I

1:10:12

forget what it was

1:10:15

the right right that's that's being

1:10:18

maintained in as it is and then the the

1:10:22

I think it was a Hudson building where

1:10:23

they used to hack used are they still

1:10:24

using that

1:10:26

P still using the mid what they call the

1:10:28

Midtown one building yeah yeah that's

1:10:30

still being used so there's

1:10:32

still there's that was the one I think

1:10:35

Hudson's one I'm thinking was in the

1:10:36

back

1:10:37

corner like right here of the parcel I

1:10:41

don't have the right name for it but it

1:10:43

had been an auto they had the ramp and

1:10:46

all all the goodies in it as I recall so

1:10:49

um so you you're not stripping out by

1:10:52

this move completely you know

1:10:55

institutional uses or educational

1:10:57

potentialities just reflecting the

1:10:59

reality and quite honestly having

1:11:01

housing there could and the highest and

1:11:04

best use for those couple of lots is

1:11:06

what we're trying to do

1:11:08

yeah okay

1:11:10

thanks just let you know that wasn't the

1:11:14

Hudson building I was Hudson

1:11:19

building I think that's like um TWA or

1:11:24

some kind of

1:11:26

before all this firsts right a that's

1:11:30

what yeah that's

1:11:34

what with that Commissioners could I get

1:11:37

a

1:11:43

motion no conditions there's no

1:11:49

conditions moving to second for approval

1:11:53

with no condition all those state by

1:11:57

saying I oppose OB car good luck thank

1:12:02

you thank

1:12:08

you Jeff any

1:12:11

other um

1:12:14

nothing that I can think of off the top

1:12:16

of my head um so uh I think you'll try

1:12:22

to think there are a few cases for next

1:12:24

month but um because this month's

1:12:26

meetings were kind of a little earlier

1:12:28

in the month I should be able to

1:12:29

hopefully get the uh meeting minutes

1:12:31

done for you guys so you'll be able to

1:12:32

be caught up uh at the April meeting uh

1:12:35

with all the minutes and everything any

1:12:37

update on the

1:12:38

market uh so I don't know if um anybody

1:12:42

saw or attended there was a meeting I

1:12:45

want to say last Thursday Thursday um

1:12:49

and yeah there was uh I think it was an

1:12:51

hour hour and a half or so uh at the

1:12:53

historic harrisb Association

1:12:56

uh uh building um it's they I think

1:13:00

outlined a bit more of the uh public

1:13:04

engagement process that will be going

1:13:06

forward um provided some uh dates uh

1:13:11

that had occurred over the last month

1:13:13

year and a half uh at which you know

1:13:15

some mile Point uh posts where um they

1:13:18

were getting a project team selected and

1:13:21

uh some initial uh engagement with the

1:13:23

vendors for example so so um I believe

1:13:27

in that uh uh meeting the mayor did uh

1:13:30

you know outline that uh the priority is

1:13:34

first and foremost the brick building uh

1:13:36

and getting that reconstructed um on

1:13:39

effectively the same footprint um and

1:13:41

effectively the same way I don't know if

1:13:43

they know exactly what all the details

1:13:45

of the building will be but it'll

1:13:46

essentially have the same uh

1:13:48

fenestration pattern the same types of

1:13:50

Windows it'll be brick um and then it'll

1:13:52

have obviously some Modern uh um system

1:13:55

me upgrades um Ada stuff like that a

1:13:59

little bit more seating in it then the

1:14:01

second phase I believe will be the stone

1:14:03

building and modernizing that um

1:14:05

bringing again the MEP uh mechanical

1:14:07

electrical Plumbing uh up to up to code

1:14:10

and uh Ada and then finally um a new

1:14:15

life for the plaza um whatever that is

1:14:18

and the goal I believe is to have all

1:14:19

the systems below the plaza um and so uh

1:14:23

that might be a part of you know

1:14:24

whatever new structure sits on top of it

1:14:27

that's clearly uh years and many

1:14:30

millions of dollars you know down the

1:14:32

road so I think there's a lot a lot less

1:14:35

um certainty about what that looks like

1:14:36

and when that happens but the priority

1:14:38

is reconstructing the brick building and

1:14:40

then bringing the uh Stone building up

1:14:42

to

1:14:44

Cod okay anything for the good of the

1:14:47

order Commissioners if not a motion to J

1:14:57

um you're thinking the the most recent

1:14:59

one where they had the um youth aging

1:15:02

out of uh foster care uh that is not the

1:15:05

same group

1:15:06

no

1:15:11

yeah that I

1:15:16

yeah I I I kind of feel like maybe they

1:15:19

pulled her out of the bullpen and she

1:15:20

wasn't warmed up you know

1:15:25

um

1:15:27

but

1:15:30

yeah no I I think I think she's either

1:15:33

the realtor for

1:15:39

the I I mean I would imagine at this

1:15:43

meeting yes because it's recommendatory

1:15:45

but they probably not at the zoning

1:15:46

hearing board meeting

1:15:57

I I updated it specifically for that

1:15:59

reason because yeah so and I mean it's

1:16:02

pretty it's pretty laid out and you know

1:16:04

to include your contact information in

1:16:07

the letter that people can reach out to

1:16:08

you which were not included in the

1:16:11

letters um so uh you know we'll we'll

1:16:14

see what uh what they come back with or

1:16:18

maybe what uh further communication

1:16:20

results um but uh you know yeah I it was

1:16:24

was definitely a bit of a a short on

1:16:32

details yeah I was GNA say making it

1:16:35

nice I

1:16:36

know yeah yeah I was trying to give her

1:16:39

all the chances I was like she do even

1:16:41

know what she's she don't know what

1:16:43

she's talking about

1:16:48

so yeah could you tell me that what it

1:16:52

is again I'll move move to a Jour I know

1:16:55

is there a

1:16:56

second I heard a second somewhere who

1:16:59

who seconded who was that someone to

1:17:02

claim

1:17:23

it e

More transcripts

Explore other videos transcribed with YouTLDR.

Get the TLDR of any YouTube video

Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.

Try YouTLDR Free