Harrisburg City Council - Work Session 1/20/2026
All right, good evening everyone. Again,
thank you. Um, Harrisburg City Council
hosted an at an executive session,
excuse me, prior to the start of our
work session this evening. Um, so I'd
like to call our work session to order
at 5:42
p.m.
Mr. Humphrey, could you please call the
role?
>> Miss Davis,
>> present.
Miss Green,
>> present.
>> Mr. Jones,
>> here.
>> Mr. Lawson,
>> here.
>> Miss RWS,
>> present.
>> Mr. Rodriguez,
>> present.
>> Miss Hill,
>> present. Thank you. We have a
semi-lengthy agenda, but I'd like to get
started and hopefully we can make up for
some time. We will begin with the budget
and finance committee. I will defer to
our budget and finance committee chair,
vice president Jones, to lead
discussion.
>> Thank you, President Hill. Um, we have
from budget and finance. Um, Mr.
Humphrey, can you please read resolution
63 of 2026 into the record, please?
Resolution 3, 2026. A resolution
approving the first proposed 2026 budget
reallocation in order to authorize the
roll forward of certain 2025 budget year
encumbered commitments and to reaffirm
certain 2025 capital project and program
appropriations.
>> Thank you. Uh gentlemen, can you please
state your names for the record and
please give us a overview of resolution
3 of 2026?
Sure.
Bob Kenny, finance director.
Gotta get used to the new mic. Uh good
evening everyone. Uh thank you,
President Hill. Uh Vice President Jones.
Um what uh Brian McCussen from the U
accounting um the accounting manager
here, budget and finance. Um you have uh
before you the resolution for this
evening and it's also displayed in Excel
format. Uh thank you Jared and Cedric
for doing this. It it makes it easier on
the eyes.
Um so this is I don't want to say
routine but it's the typical first
budget reallocation adjustment that
occurs at the start of the new year. uh
namely we have uh various encumbrances
which include either purchase orders or
or contract they're they're called
contract encumbrances in munis um I
tried to simplify this um in column um E
we have the original adopted budget for
the new year and the proposed budget
amendment for each line just reflects
what the open encumbrances were at the
end of 2025
still in need still is is a commitment
and now they're rolling forward into
2026.
Um the general fund of course is the
biggest piece of this and uh if not all
practically nearly all budget units are
affected by this uh proposed budget
amendment.
Um if uh Cedric if you scroll down
please to
um the bottom of the general fund which
I think it I think it bleeds over into
the second page.
So right there uh it's 19.7
mil uh.7 million is the roll forward for
the general fund and that is so
extremely high the the predominant
factor there is there is the broad
street market uh expenditure line within
a facilities
maintenance and of the 19.7 million 16.5
is Broad Street and that's that's
approximately 84% of the total request.
Uh just for comparison, if we would
factor that out, that would leave us
with a roll forward of approximately
uh 3.2 million, which is more along the
lines that you typically see in in
previous years.
So that is the general fund and um
somewhat uh favorable news here too.
part of the way to fund this budget
adjustment. Uh last year for 2025, you
may recall there was a delay of course
in the state budget process to achieve
the capital fire protection allocation
for the city. Uh originally the budget
amount for 25 was 5 million. Uh the
commonwealth increased that up to seven.
And the good news here is this uh the
payment or the check payment just
arrived last week.
uh within the treasurer's office. So,
it's been received and deposited and
booked, but it is in effect 2026
revenue.
>> That's for fire. Correct.
>> I'm I'm sorry.
>> Fire capital fire protection.
>> So, uh we have budgeted for this year uh
just the 7 million which we anticipate
to receive uh later on this year when
the state moves on the uh the new fiscal
year budget. But with this 7 million
that that transacted now the the the
request the reasonable request here is
to increase our revenue line up to 14
million to take that into consideration.
Um so the rest of this funding relates
to additional draw on cash fund balance.
Um now the one thing to remember uh
about the city's budget we we always
have budget or open encumbrances at the
end of the year. In other words, not
still a commitment but not spent. And
the thing about Broad Street Market,
16.5 million is is out there in in roll
forward, but of course the anticipation
is we will not be spending that much
>> before the end of the current year. It
will uh uh spill over into 2027 uh no
doubt. So, but we still have to reflect
what what the numbers say and and uh
budget accordingly.
Uh that's the general fund and moving on
down uh all nearly uh all of the main
funds of the city of course are are
affected. State liquid fuels fund is
there. Uh the big roll forward piece is
uh capital outlay for streets and roads
uh projects. Um
moving down to the host fund. Uh again
this is Broad Street related. There was
a $500,000 commitment last year. Uh
that's encumbered at the end of 25 in in
its entirety. So that's rolling into 26
for for budget adjustment.
Uh the next major fund, of course,
neighborhood services. Um and it's
predominantly made up of two main two
main budget units, the public works
piece and parks maintenance. You can see
the lines there as they go down the
list. Um, and uh, Cedric, if you go
ahead further down, we'll get to a total
for neighborhood services,
which is a little over 500,000.
And again, the way to adjust for this
accordingly is to utilize beginning
ofear cash position or or cash carry
forward, cash carryover. Uh there are
some encumbrances that involve the three
burrows of course smaller much smaller
amounts but they still have uh
encumbrance commitments.
So that includes uh the line detail for
neighborhood services. The next fund is
the senator's fund. Um not quite $1
million is still open at the end of 25.
And this of course relates to the FNB
stadium upgrade project which is very
near completion but I I checked with
facilities maintenance on this and that
they anticipate that this will be needed
for for 26 uh the various vendors
contractor type vendors involved will be
submitting
I believe their final invoices. So it
still is it still is a significant
commitment out there for the senator's
fund.
And there is funding support needed to
to do that based on what the cash
balance is in in the senator's fund
which includes a transfer from the
general fund uh to bolster that up.
Uh that's the senator's fund and the
next three funds are smaller in nature.
There there are three of the special
funds including the blight fund, police
protection fund and parks and wreck.
the smaller amounts uh but but still
they're they have commitments uh still
in effect
those three
uh moving down to the final fund on on
this exhibit A is the capital projects
fund uh and again streets and roads I
mentioned there's streets and roads and
liquid fuels there's a sharing of
expense there but the bulk of the
projects are housed in the capital
projects fund so there are uh um various
uh incumbrances and and need to be
rolled uh for roll forward. And again,
the general fund needs to uh supplement
the the um resource uh the asset
resources in that fund to get it to
where it needs to be. That's the general
fund transfer piece.
Uh I can stop and take a breath right
there. That's that's the the roll
forward schedule exhibit A. if there's
any comments or questions.
>> Uh just for me, um I pretty much
understand what's happening, but just to
summarize for uh the public, what's
happening here is that money that was
previously budgeted in 2025. Um the
remaining of those funds still need to
be utilized in 2026 uh for contracts,
budget, I mean, um projects that weren't
paid for that still need to come out.
So, is that correct?
>> Yes. Yeah, that that that's the
understanding given that uh most
departments prepare their budget
uh needs ahead of the the old year
ending. So, they're looking forward and
we of course we necessarily don't know
what is going to be paid by the end of
the year when we're working on the
budget in November uh with with those
final couple of check runs that happen
in in December.
>> Okay. Um, I just wanted to do that from
myself and uh edification for our
residents and I can open the floor if
you guys um if anyone has any questions.
I'll open the floor up and I'll start to
my immediate uh right with uh
Councilwoman Green.
>> Good evening, gentlemen. Thank you for
being here tonight as always. Uh I don't
have any questions for you. It's a
pretty standard thing that we do every
year. So, thank you for being here.
Thank you,
>> Councilman Lawson.
Thank you. I I do not have any
questions. Thank you for a very thorough
presentation. Definitely appreciate it.
>> Certainly.
>> Councilwoman Davis.
>> Thank you, Vice President Jones. Good
evening, gentlemen. I don't have any
questions. Thank you for being here.
>> Councilman Rodriguez.
>> Thank you. Uh good evening. Thank you
for your presentation thus far. Uh my
question um is kind of around the
remaining funds from the trash relief uh
fund. Is that a part of the rollover
from the 1.4 or the estimated cash
carryover from public works? There was
still a small balance left from the
trash relief funds. It was around that.
That's why I asked um you actually could
still see it too, Mr. Brian.
>> I I think I'm on to what you're
referring to, but when when you say the
1.4
>> right there, I was just guessing that
that would be the line the cash
carryover because it was generally
around that ballpark, the 1.14. Oh,
okay. Uh
>> or or does that money get rolled over?
>> Well, it just just to clarify because
what we're looking at right there,
what's what's highlighted really is the
capital projects fund, which is not the
the the 2 million relief, right, that
came into neighborhood services
as income, as revenue to
>> uh that that fund, you know, before the
end of last year. So it it it created
the ending of course u it it
strengthened up the cash balance at at
the end of 25 but the roll forward
request for neighborhood services is a
little over 500,000.
>> Okay.
>> For for the new year.
>> All right. Thank you.
>> Sure.
>> Councilwoman Ross.
>> Thank you Vice President Jones. And
thank you both for being here tonight.
Um this is a standard procedure so I
don't have any questions. Thank you.
President Hill,
>> good evening. Thank you. I don't have
any questions around exhibit A.
>> Thank you. You may proceed.
>> Okay. Uh just one one additional exhibit
uh exhibit B and uh the presentation
here is just a formal reminder to to
council to be aware of the they're
they're entitled budget reappropriation
uh items and they mainly represent
capital uh type expenditures in nature
and and more so grant uh expenses that
are funded by the grant funds. Uh the
first one up here relates to the
$500,000 to move to the fire protection
fund. It's all aimed at bolstering that
fund in anticipation of the need uh for
the uh new apparatus uh fire truck uh
equipment uh that is materializing in
the new year.
So that that's to uh prepare that fund
or or or move the funds from the general
fund. Uh the next section and these are
all footnoted of course you can see on
the left there um this uh item B
footnote B um and it relates to the Dock
Street Dam where the city is uh in the
mindset of the um the permanent boy
installation project which um there is
this is sort of very preliminary or very
very early stages but but But the
strategy here is that to be aware of a
uh uh reimbursement agreement through
the Commonwealth, which would uh work
toward what what what this project
entails right now, the the the $2
million for that particular line. That's
all contained within the state grants
fund. The city hasn't uh incurred uh as
of yet any expense related to this
project.
Uh the next in in the midsection here,
footnotes C through I all pertain to
what originally was uh achieved through
the American Rescue Plan Act, but of
course uh everybody has heard me say it
where those funds for the most part were
were transferred to the general fund as
revenue replacement. Uh accordingly, the
general fund has funded these particular
initiatives.
Um, and I I I believe you're familiar
with with with most if not all of these
uh the the various initiatives including
affordable housing, um the home repairs,
the senior program, uh the uh demolition
uh efforts. Actually, that one is nearly
uh all but exhausted. There's only um in
in in column E, these amounts really
reflect what's still available in
project budget.
And the two bottom lines then pertain to
the Hall manor pool project which is
broken up into two phases. Phase one has
had some activity uh because it was it
was it was the original amount for phase
one was 2 million.
So phase one is being uh is what has
been active at this point.
Again this is all contained within the
state grants fund. So we can track uh
the activity uh through uh grant project
identifiers or project strings in in
Munis.
So that that's that piece. The bottom
piece um
um is and if Cedric if you could please
scroll down to the next section which is
coming out of the federal grants fund.
That's fund 14. Um,
this relates to the multi- parks and
playgrounds improvement project that uh
is being funded by that significantly
large uh 13 plus million dollar grant
that's that's HUD source and is being uh
passed through from uh from DCED.
And again, these these remaining amounts
show the project budget that is still
been that has been available. There's in
in recent months there's been heavy
activity uh on the projects which you
know on those footnotes identify the
locations as you can see there including
the sports field uh reservoir park and
Wilson playground.
So much expending has occurred and then
the on on the flip side of this this is
a reimbursement grant. So there is
significant already the uh through the
grants department they've been putting a
lot of effort into realizing those funds
to turn it around to reimburse the city
which has uh has been occurring in
recent weeks.
>> So that that uh covers those sections. I
can stop right there for any comments or
questions.
>> Thank you. Um I really don't have no qu
any questions. Um I do, but I think uh
um parks and reccks coming up, so I'll
save that for them. Um I have no
questions. And again, I'll open the
floor this time. I'll go to uh my far
left and start with Councilwoman Davis.
>> Thank you. I do have a question about
your last point. Um, you mentioned the
federal grant is $13 million that comes
down from the government and then the
various departments have to reimburse
the city. Is that correct?
Well, maybe I didn't say it clearly
enough, but it's it the the city pays
out uh ma mainly to the the vendors that
were that are involved in these various
pieces and then that um payment
information, proof of payment gets
submitted to uh the department of
community and economic development. And
there's also a uh a conjunction with HUD
too. HUD HUD system has to be involved
and and the two pieces come together but
and then but DCEED reimbures the city.
Um it's just there. It's one department
at at the state level.
But uh as um as as Vice President Jones
mentioned, this this is all under the
oversight and uh uh workflow process
through the uh the parks and recreation
>> department of the city. Thank you.
>> And facilities maintenance, they they
they play a role, too. I'd be remiss if
I didn't say that. Okay.
>> Uh, Councilman Rodriguez.
>> Thank you, Vice President Jones. Um, and
I don't mean to sound redundant, Mr.
McCutchen. Um, if the rollover or the
encumbered commitment from the uh trash
relief program is not recognized through
line C through I, where would I be able
to find that balance?
What's left from the program? Because
that was an encumbered commitment from
25,
>> right? Uh, but you um
>> there was roughly still a million
dollars left from the trash relief
program. So, I'm just trying my best to
follow those funds so we know um what's
left, how many more families we could
assist, etc.
>> Oh, okay. Um
>> we don't call it ARPA funding no more
because it of course. So, correct. I'm
trying to not say that but to identify
it, it was through the ARPA program
which became the trash relief program.
So, if that's not identified through C
through I, where could we get a grasp on
where or how much left is in that
program?
and um through the business
administrator's office. I I wasn't
involved in the detailed tracking of of
of what you're saying about which which
refugees disposal accounts in thei in
the system in the main frame are being
adjusted accordingly. uh there there is
there was a developed list for that on
on on the financial side why we're not
seeing up here
in that midsection I mentioned ARPA the
the $2 million in full was completely
transa uh transferred in in 2025 meaning
that had it not been transferred we
would still see it up here but uh it
happened late last year it was moved
from the state grants fund where where
it's being tracked and allocated and it
was transferred into neighborhood
services the the full 2 million those
are the financial dollars along those
lines um I circle back to what I what I
commented about the uh the business
administrators department about uh
working off of a um of a listing of
accounts that were to benefit. So I I I
can't I can't detail that for you.
believe Antonio is here. Would he mind
giving us um maybe an update about that
if possible? Like I said, I don't want
to sound redundant, but I just want to
make sure we're keeping a track of that.
And you know, because if there are more
dollars that could assist families and
local businesses, that's something we
definitely want to project and get out.
>> I understand what you're saying. Y
>> it actually did. They allocated money to
churches.
Church is a nonprofit business.
Hello, council. Hello, special assistant
in the business administrator's office.
Uh, so yeah, just to give an update on
the trash bill forgiveness program. Uh,
we did launch uh phase three. So that
went out to 578 residents. Uh, so they
have uh 10 days from the time that the
letter was mailed to get it back to us.
Um, so that timing is still ongoing. Uh
basically they have effectively until
like the beginning of next week to get
it back to us.
>> Perfect.
>> Um so we're we're getting that ongoing.
Phase one was also residents and then
yeah phase two was was churches that we
we gave back. Uh we did the list for
churches was
>> that went through hardship during the co
pandmic.
>> Right. And it was basically everyone
that went through hardship during that
time and still had a a delinquent
account. Absolutely. Um we didn't you
know there was no extra parameters on
that one.
>> Right. Right. Right. Right. Right. No.
And I I was clear. I actually spoke with
um your office about that uh early on.
So I was aware of it. I've also stated
that on the record. Um completely aware
that some churches that went through
financial hardship due to the COVID 19
pandemic did receive relief. No no uh
fighting against that. Just more more in
the sense trying to keep a track of
those dollars and how we could, you
know, stretch it as far as possible to
assist more residents in the city. That
was all.
>> Absolutely.
>> No malice behind it at all.
>> No, no, no, no. Yeah, you're good. I
just wanted to be clear that there is.
Yeah. Um Yeah. And if depending on how
many residents return it in phase three,
we could get as close as about uh $250
$300,000 remaining, but that would be
with a near perfect return rate. So uh
obviously we don't expect that. So uh
there will likely be some extra funds
left over and we'll have to figure out
>> and you guys will just keep getting it
out there trying to
>> we'll have to figure out what the next
steps are.
>> Perfect. Thank you so much for that
answer. Nothing further. Thank you.
>> Thank you.
>> Um Councilwoman Ross.
Uh, thank you, Vice President Jones. I
don't have any questions.
>> President Hill,
>> thank you. Um, I have two questions. Um,
one regarding the
the pool improvements you mentioned
phase one
um is completed, has been completed or
is near completion. Can you speak more
to that or should I wait for parks and
wreck to provide an update there? Uh
that yeah that's that's probably a
better bet. But it
>> I just wanted to
>> it's but actually it's just been a minor
chipping away because if you recall it
was 2 million for phase one. Yes. But
there's still uh a little over 1.9
million available.
>> Okay. Well, I'll follow up with them.
>> Sure. Certainly.
>> Thank you. And while you're here,
Antonio, I have additional questions
regarding the um trash bill relief if
you don't mind. Um, you mentioned
so I think let me back up. The last time
you were before us was in December and
at that time I think phase the end of
phase one was nearing at that point. So
how many people um received the relief
from phase one that allowed you to move
to phase two with churches and then how
many churches? So how many people were
impacted in phase one and received the
relief?
>> Okay. So I don't remember the exact
numbers but round like rough ballpark
numbers it was about 550 were sent in
phase one approximately 265
roughly uh returned. So that's how many
people would have received the
forgiveness the first time.
>> Okay.
>> Um churches it would have been around 25
were sent out and about 20 returned. So
20 of them received uh the forgiveness
and this time we sent out 578. So, we'll
have to see how many return by the end
of the phase. Uh, I think so far we're
at around 70 have returned.
>> Okay. And when is this phase over?
>> Uh, the beginning of next week. So, they
have till till then to return it to us
either via mail or in person.
>> Okay.
Thank you for clarifying. I don't have
any other questions.
>> Councilwoman Gray,
>> thank you very much. I don't have any
questions regarding this. I think the
questions I have have been asked and
answered. Councilwoman,
I mean, excuse me, Councilman Loss.
>> No problem. Thank you very much. Um, uh,
Vice President, and I don't have any
questions. Just a a a statement, uh,
based on, uh, things that I've heard
from from people questioning, um, if we
were going to keep up with the ARPA
funds once we put them into the general
fund. So, I appreciate,
you know, detailing that we're still
following the plan that we had laid out
um for the ARPA funds before we we
transferred to the general fund so that
the public is aware that no, it did not
just go to pay the city's bills. We are
making the improvements that um we
determined uh previously. So, thank you
very much for that.
>> All right. If anyone has any more
questions or comments, um, thank you
guys for your presentation and I would
ask that resolution three of 2026 be
moved to our next legislative session
for vote and I would ask my colleagues
to support. Thank you.
>> Yeah. And um, Vice President Jones, just
one quick followup if
>> No, your time is expired. Now I'm
messing with you. Go ahead.
>> Clock is um the clock is out. Um, no.
back on uh the 15th when we were working
through the final phases of the budget
process, I gave an overview about the
general fund. Since it's such, you know,
significant roll forward, I I back at
that time, I I I said our cash position
should be I was estimating uh between uh
21.5 and 22 million. And of course, now
that the the old year has been closed
and we're underway with the new year,
the general fund's cash position at the
end of 2025 is 14.4 4 million. So had
the capital fire protection
materialized, that would have been
another 7 million. It would have brought
it up to kind of what we were expecting
uh for year end. But I I just thought
that would be a nice uh tiein to what we
proposed this evening for, you know,
increasing that revenue.
>> That's weird. That number is the same as
for the broad street market that
>> 14.4 exact number, isn't it?
>> Oh, it's uh it's close. that budget
adjustment that was done in in the prior
year.
>> Yeah. All right. Thank you, guys.
>> Very good.
>> Yep.
>> Thank you,
>> President Hill.
>> Thank you, Vice President Jones. Next,
we have the business of the Community
and Economic Development Committee. I
will defer to our community and economic
development committee chair, Councilman
Lawson, to lead discussion.
>> Thank you very much, President Hill. Um
u Mr. Humphrey, could you please read uh
resolution for 2026 into the record?
>> Yes. Resolution 4 of 2026, a resolution
approving the preliminary/final land
development plan for 1332 North Second
Street, submitted by Adam Brenamman of
Brenamman Properties LLC to expand the
existing non-conforming multif family
dwelling use on site by converting space
occupied by the former funeral home
funeral home and associated site and
access improvements.
>> Thank you. And um Mr. tonight if you
could uh expound on uh what we have here
in this resolution so that we have
information for council.
>> Uh sure. As uh Cedric noted, uh this is
a proposal uh to expand an existing uh
multif family dwelling at 1332 North
Second Street. Uh the property is or was
uh the New Meire Funeral Home. Uh so it
was a funeral home on the first floor
and there were five apartments above it.
Um and the current proposal uh involves
um establishing uh eight units in uh the
first floor and uh which is a bit more
of a sprawling than the upper floors of
the of the building uh for a total of I
believe uh 12 or sorry 13 overall um
apartment units in the building. Um the
uh I believe the new meer funeral home
uh exited the uh property sometime in
the middle of last year. So, the
property has been vacant for a little
bit. Um, and uh the applicants came
through uh for both the zoning relief
necessary to expand the non-conforming
use of the multif family uh dwelling.
Um, and uh I believe that was the only
zoning relief they needed. Um, there is
a large accessory surface parking lot on
site uh that's just to the uh south of
the property that has I think in the
neighborhood of 35 spaces. so they have
enough off- streetet parking uh for uh
any tenants or their guests of the
property. Uh and um overall uh this is a
fairly straightforward proposal for
reuse of the funeral home. Um you know
they've uh there are it seems to be the
uh most reasonable uh reuse for this
space as opposed to something else like
I don't know convenience store,
restaurant or something like that. And
as council knows, you know, the
provision of um housing helps put a
downward pressure on uh the housing
costs in the city here. So, more housing
units on our inventory are always
helpful uh to help address that. So, uh
with that being said, the planning
commission uh recommended that city
council approved the request with the
following conditions. Uh any exterior
alterations to the property must be
submitted for review by the city's
historic preservation specialist and may
require har approval of of a certificate
of appropriateness application. Um and
the applicant must coordinate with the
department of public works regarding the
size, location, and screening of any
required refuge containers. Uh planning
bureau recommends the applicant consider
eventually consolidating all refuge
storage and access in the existing
carport along the CER street frontage of
the building. I know during the planning
commission meeting they had indicated
that they uh may be looking at some
other alternatives and um I think uh in
their coordination with the department
of public works they may in fact tell
them that they need a dumpster to be
placed in the um in the on-site parking
lot. So uh we leave it up to the
applicant to work with um department of
public works to find the best solution
uh in that case. Uh the planning
commission recommends city council
approved the request for the following
reasons. The adapter for use of a vacant
and underutilized funeral home into
apartments represents a sensible
expansion of the existing multif family
dwelling use on site and the project can
adequately address the primary concern
regarding such proposals specific
specifically the provision of off
streetet parking for tenants and their
guests. Uh other conversions of former
commercial spaces elsewhere in the city
have demonstrated such projects do not
adversely impact the neighborhoods in
which they are located and often help
catalyze other improvements in those
communities. And finally, the proposed
redevelopment will add new residents to
the neighborhood to activate the street
on nights and weekends and grow customer
base to support local businesses and
will provide additional units to the
Midtown housing inventory. Uh, and with
that, um, I'll let the applicant
introduce themselves.
>> Council, my name is Michael White, um,
director of acquisitions and development
for Brenamman Group. Happy to be here.
Thank you for hearing our proposal.
Um, I could Would you like me to to
continue with the description of the
project or
>> Yes, please.
>> Okay. Um, so some of the facts, uh, Jeff
already noted, but it's an existing uh,
8,500 square foot building. Um, there is
a 5,000 square foot commercial space.
Um, if I could I could clarify, it's
being it's in light use right now. the
the current operator of the New Meire
Funeral Home is is doing sparse services
there and is is planning to to uh to
cease operations. Um above it there are
five existing apartment units. Um and
then in addition to the building there
is uh 35 parking spaces. So has a really
sizable uh parking lot and a larger lot
um in general almost a half acre. Um,
you know, with the sale, there is an
additional surface parking lot, uh, 122
Calder Street. Um, everything that, um,
you know, Jeff mentioned in terms of,
uh, of proposals for improvements that
we are, we are open to. The one the one
question that we did have in terms of
refu we're open to working with public
works to find, you know, the best
solution to consolidate trash in a way
that that doesn't um, you know, expose
residents or the, you know, the public
in a way that's that's unsettling. Um we
have uh uh we're proposing or we're
approved for eight units in the existing
funeral home space. Um we have uh a
great team. We're working with with CDA
Dawson Architects uh on the project. Uh
we're working with Inen Co. for the
construction uh Midtown Property
Management to to manage once it's
stabilized. Um we have a proposed
loan construction closing date. um
probably the middle of March, but our um
you know our final uh deadline for that
or what our goal would be would be by
the end of March. Um we can commence uh
construction after you know permit
feedback um probably about 35 to 45 days
after that. And uh we hope that we have
a very conservative timeline just given
our prior experience of of an
eight-month uh construction period. Um
and then thereafter a two to to four
month stabilization and lease. Um we're
we're really excited about the project.
Um we think that it's a it's a unique
building. It's a unique site. We hope to
make it a, you know, a wonderful
addition to the community and, you know,
add housing units. Um, and, you know,
looking forward to questions and
prepared to to help fill in any details.
Thank you.
>> Thank you very much, Mr. White. Um,
thank you. You answered one of my
questions was just making sure that you
had the uh the financing in place
because we see many people that come
before us
>> and we approve the the deal and then
things just don't happen. So, love that
you you already have that duck in a row.
Um, one question I would have for you is
uh you're using Inch and Co. as your
your general contractor. Do you have any
say um if you're as if you are able to
work with any of our um uh diverse uh
minority businesses in in the area in
the construction of this this project or
is that completely in the hand of your
general contractor?
>> Uh it's something that I'd be I'd be
happy to talk. We have an upcoming
development meeting here on Thursday. Um
and we're going to learn more about um
the subcontractor base and and the
people that the third parties that I
inch wants to work with. So um if I
could loop in with you, I'd be happy to
to receive a list of referrals. If you
have um contractors in mind, we
definitely um would be open to talking
to an about that and and seeing, you
know, how that can work with their with
their project scope and the workflow. So
absolutely open to that.
>> Okay, great. That's um
one question. One last question I have
and and this is just for my own
information.
>> I'm sorry if I could just add that that
that we do hope to be able to to GC uh
projects in the future and have more
flexibility. That's something that we're
that we're building up to um and we can
have a little bit more autonomy over the
over that process and then that would
you know empower us even more to to
consider um uh contractors independent
from you know GC controller
consideration. So sorry to interrupt.
No, no, that's fine. And and the reason
I bring that up, uh looking for like
more the the minority and womenowned
contractors, it it's basically to help
um improve uh the life of many of our
citizens. Um, basically when we uh are
intentional on on hiring these people,
we're we're getting people that will one
a be able to to move into your your
project because they have a a great
paying job and and then also we're um
hiring we're we're hiring companies that
are going to hire people that um other
companies may not look to hire because
they they don't understand necessarily
that person's background or that
person's um uh lifestyle where you have
of a more diverse um contractor group,
you'll you'll get more people that will
hire uh people that
uh others may look at and and not think
that they're uh appropriate for a job.
So, just keeping a an open mind on on
that when you do uh work as the general
contra um as your as your uh as the
general, that would be that would be
great. Um and and then the the last
question that I have is just is there
any type of environmental mitigation
that has to come when you're um
converting uh a funeral home to a a
residential unit because I'm not certain
of different chemicals that may be
present in in the process. Yeah, that
was a big um when we were assessing the
site and and and working with the the
seller and the funeral, that was a big
question that that I had and and he's
going through
um the appropriate process with I'm not
ex, you know, totally familiar with the
regulatory bodies that would supervise
the the dissolution of the of the
funeral home. Um and that's actually
part of the
>> the um the sale and the escrow and that
what the Mr. Bitner the seller that he's
going through and we're giving him time
to to do that appropriately. So that's
that's his um under his control and his
objective and and we you know we've
talked to him about that a lot just from
the standpoint that we allow a window
for that to happen appropriately. So
that's um but in terms of um the
building itself and the conversion
>> um you know we have already mapped the
sewer system. Um we've had a laser scan
of the building. Um we've had our
subcontractors in and to assess any
environmental hazards in terms of like
the disturbance of you know um demoing
the building and the existing layout as
part of the conversion. So that's
something that that that we have our eye
on and there's been prior renovations to
the building. So we think that it's it's
in it's in great shape to to be to be
converted again, I would say. And um
we're we're satisfied, you know, from a
safety standpoint.
>> Okay, great. Thank you very much. That's
everything that I have as as far as a
question. I'm going to just go to my
immediate left here and um Councilwoman
Green, do you have any questions?
>> Thank you very much. Thank you,
gentlemen, for being here tonight. Uh I
think it was a pretty thorough
presentation, so I don't have any
questions. Thank you,
>> Vice President Jones. Any questions?
>> Yes. Thank you. Thank you, uh for being
here and your presentation and being
willing to do a project in our beautiful
city of Harrisburg.
>> Many more to come. Yeah. Uh, I'll just
reiterate what, uh, Councilman Ross, I
mean, Lawson has said. Um, for me, I
won't go into too many things, but I'll
just ask two questions. And something
that I'm very passionate about is is
ensuring that, um, local people in the
city of Harrisburg, I won't use
diversity, equity, and inclusion. I'll
just say, you know, contractors here in
the city of Harrisburg have an
opportunity. And I know this is a small
project, so I'm not looking to get 50%.
You know, this is just a ask. It's not a
requirement. It's a ask. Um, this is
just something that I'm very passionate
about ensuring that, uh, the locals have
an opportunity to be included in the
economic growth of our city. Um, how
many jobs you think will this create?
>> I think, uh, 15. um in terms of the
primarily just via the the um the
subcontractor
uh skilled labor base.
>> Okay.
>> Um and I also that um we we do have um
projects that that are coming up too
that like I said that so when I say that
you know we we venture to to to GC that
we we do have projects coming up that
we're going to have uh specifically that
we have site control that are you know
very likely to happen. Um, so I I would
hope that this could be a, you know,
continued conversation about absolutely
who we employ and and how thoughtful
that process is. So,
>> well, absolutely. I'm just speaking for
uh the residents again, um, being my my
uh my lifetime here in the city, you
know, I've witnessed a lot of uh
construction and development happening
where um, a lot of us were cut out and
um, I'm just being that voice. Second
thing, um, safety wise, I see in here
that you guys won't be changing any of
the lighting. How efficient is that
lighting in that area to make to ensure
that the residents in that uh area can
have some some good lighting? I see some
of the historical things that you may
have to go through, but do you believe
the lighting is efficient in that area?
>> Um we're we're continuing to assess. I
think that that we want it to be a um a
much improved site in general. Um, and
we're we're still working um with some
of our subcontractors to figure out with
the facade and like what what the best
way for the building to present uh you
know as safe uh and attractive for the
community. So I don't I don't have a
specific answer right now other than to
say that it's for me personally it's
something that I'm I'm very focused on
even from a from a marketing standpoint
you know just uh in terms of the
profitability of the project that you
know we want um the site to be
transformed. Yeah. And we want people to
feel, you know, we want people to feel
good uh and safe about where they live
and we want the neighbors to feel good
and and and safe about what is is put in
their community or how buildings are
changed in their community. So whether
you know uh lighting um to the degree
that that we're allowed to um and then
uh safety in terms of safe access to the
building. Um
>> yeah, I see you have maybe three
different interestes to this property.
>> Yep. So, that's something that we're,
you know, we're working on with our
subcontractors and that we're at a
really critical point right now. We're
going to get a lot more detail here in
our in our coming meetings, but it's
it's a focus of mine. I can say that.
>> I appreciate it and I hope we can get an
update on that on those safety measures.
So, that would be great. And that's all
my questions. Thank you.
>> All right. And, uh, President Hill,
>> thank you. Good evening. My questions
are around affordability.
So, I wanted to know if uh this project
will be participating in the affordable
housing 20% relief.
>> Uh it will not. Um but when I when I
came before about 3:15 North Second I
think we we heard that feedback and and
we did um rework our you know our
performing our project and we were
working with the affordable housing
trust fund to try to take two of those
units um of the 10 and and make them
affordable. So we're it's something that
we're working on. Um we have other
actually our next two projects that we
hope to complete are going to be 100%
affordable um 28 units total um as
proposed right now. So, it's something
that we're, you know, going back to a
prior project to try to institute um and
that in our future projects that um when
and you know, we look at a lot of
different things, but these are very
present and future projects that that
are going to be 100% affordable. So, for
this one, it is not going to be, but
that we it's something that we're
passionate about and focused on and that
we're putting a lot of resources into
now and I think um over the next year
and a half that we're going to be able
to add a lot of affordable housing to
the and these are all projects in the
city. So,
>> Okay, great. Um for this project, it
would have only been approximately three
of the 13 units, but I'm glad to hear
that you are revisiting with the other
project. Um, it's just it's something
that I'm passionate about because it's
great to have um
rehabbed
um properties or even new units
available to our residents, but if
nobody can afford them, they're going to
remain vacant, right? Um, so I think I'm
glad to hear that you heard what I said
and that I'm going to continue to ask
because it's important, right? Um, one
developer once said, "Oh, it's going to
be a beautiful building." I'm like,
"That's nice. It's going to be beautiful
and empty because nobody can afford it."
So I just want to ensure that um I guess
not this project but your future
projects you are um taking the city
proper median income into consideration.
>> Yes.
>> I don't have any other questions. Thank
you.
>> Thank you. Um Councilwoman Ross.
>> Thank you very much um Councilman um
Lawson.
Um I just just to piggyback off of um
President Hill, I was wondering um if
there not going to be any affordable
apartments, how much are how much is the
rent going to be uh for the apartments?
I think it's one bedroom and two
bedrooms.
>> Yes. Yes. Um the the rents range from uh
1,000 per month to 1,800 per month and
the average is uh just over 13.
>> Okay. So, the 10,000 would be for the
one bedroom and
>> that's for a studio actually.
>> Oh, that's a studio. Okay.
>> Oh, wow.
Okay. Um, and then I just had a couple
more questions. Um, one of my questions
and it it actually wasn't until you were
speaking about that there were
apartments currently in the funeral home
and then you're converting um the bottom
level into I think eight more
apartments. There's five at the top. So,
I was thinking, are is there anybody
living currently in the five apartments
at the top? And okay. And so, I was just
thinking about them like, are you going
to be rehabbing their apartments? If so,
how are they going to be displaced? And
if you're not, then how are they going
to be displaced? If you're while you're
doing the bottom level. Um, so I guess
my question is just around like how are
you working with those residents? And is
there going to are they going to be
displaced at all? What kind of
provisions are you putting in place to
make sure that they're okay?
>> We do not have any plans to displace
those residents. Um
>> they are in terms of the current
occupation, I would need to when we went
under contract, it was uh 100% occupied.
So all five of the apartments were
occupied.
>> Okay.
>> Um we do not have any
>> we would like to from a maintenance
standpoint, the units are very nice
right now, but we would like from a
maintenance standpoint to improve them,
but we don't have any plans. It's not in
our budget to totally renovate them and
give the residents notice. So, our plan
is is to is to keep the residents in
place.
>> Okay. And you're and since you're not
going to re be redoing their apartments,
is their rent going to be raised?
>> The we don't have any plans to to to
raise rent on those residents right now.
Um we haven't had any communication with
the residents. Um I uh you know, and I
actually need to get more updates on
exactly the status of the occupancy. Um,
okay.
>> And, uh, but as of right now, we just
want to keep things as they are.
>> Okay. I mean, I know, um, per se it
doesn't really have anything to do with
the a vote on this property. It's not
part of the land development, but they
are a concern for me, the residents that
are in there, and just making sure, you
know, they're okay. The rent's not going
to be raised just because you are
rehabbing the bottom level, but you're
not going to be re renovating their
apartments. But if would would you be
able just to let us know how many um
residents are currently just living
there just for our
>> Yeah, I can get an update from the from
the seller and then as we kind of get
closer to our our actual settlement date
which is related to the construction
loan closing that I can get exact
information.
>> Okay, thank you. I appreciate that. Um
and then I just had um and just correct
me if I'm wrong. I just wanted residents
to know about the parking because
parking is a huge issue in the city. I
just wanted to make sure they knew that
um from the understanding you're going
to be providing 16 spaces for this um
multifamily dwelling that which is the
recommended amount and there could be
more spaces because there's a I think I
think uh you said across the street
there was a possibility or you could use
extra space. the the second street lot
actually has 36 spaces. Um and so
actually the you know separate from the
16 there's an additional 20
>> um that will be
>> um
>> there for flexibility. Okay. Um and so
there's that one of the uniqueness
things about this site is that there's
plenty of parking. So um and that right
now that parking will not be leased to
the public. Um okay because we do not
have permission to do that. Um,
>> so from the current resident standpoint,
um, that there's going to be plenty of
parking.
>> Okay. And will the parking be free for
them and the current residents that are
living in this dwelling?
>> Uh, right now for the the current
residents, it is free and we don't have
a plan to change that, but for the for
the new units, we're we're working on
our proform. There might be a fee for
parking. Um, and that's part of
assistance to to finance the project.
>> Okay. And how much are you looking for
to possibly charge the new residents of
the eight newly constructed apartments
or renovated apartments for parking?
>> My awareness of um the the rates is that
we we're either going to put it into
rent and it'll be part of the rental
consideration. We need to talk to our
property management company about where
that would be, but my awareness of the
market is between um 50 and and $75 per
month. Um but we have to, you know, once
we get um greater clarity on cost, we
have to decide exactly what we're going
to do with that. Um but um right now
it's up in the air. I need more info
from the property management company
about what they think would be the best
thing to do.
>> Okay. Thank you so much for answering my
questions. That's all for me.
>> Thank you, Councilman Rodriguez.
>> Thank you, Chair Lawson. U Thank you
both for joining us this evening and
providing this presentation. I don't
really have questions, just some
sentiments for it. Um, I'm appreciative
that you'll be overhauling the amenities
for the current residents that are
there. Um, just to kind of match up if
there is I I guess if there isn't a
chance to upgrade, um, how would you go
about that or you just work like a
normal maintenance kind of let them
know, give them a heads up, make the
corrections, and kind of keep them in
the apartment?
>> Yeah, I think we take a lot of pride in
in in maintenance and our
responsiveness. Um, so I think that it's
a little bit of a of a balance to not be
disturbing, but wanting to improve the
quality. Um, so I think that our normal
process would be to reach out to all
those residents, you know, uh, how has
maintenance been? Do you have any
problems? What would you like to see
improved? You know, what are your plans
long term, you know, for for residing
here? And then, um, I think the basis
would just be super responsive to
maintenance and immediately take care of
of any problems, especially as they
relate to habitability. So, um I think
it would just be some communication and
kind of understand, you know, many that
they may say, "Hey, my unit's great. I
like my privacy." They may say, "Hey,
this these issues have been ongoing and
we need you to take care of them." And
and we are well resourced to do that and
we take tremendous pride in, you know,
all of our properties um that that's the
case that they're they're well taken
care of.
>> Thank you for that. And um I do
understand there has to be a bottom line
when you're doing any kind of
development so you can make the project
work. But uh 1,300 for a studio and like
upwards to 1,800 I think you mentioned
>> thousand for the studio, 13 average.
Yeah.
>> Okay. Okay. Okay. That kind of just
screamed, you know, not so affordable
for the area. Um and just kind of the
question of what kind of tenant are we
looking for? or is it just business
people coming into the city to work
downtown, which we definitely need some
more life pumped into the Midtown
downtown area? But we definitely need
some affordability for maybe, you know,
single parents or, you know, something
something afford along the lines of
that. So, that just kind of screams out
to me right away. Um, but I do
understand there's, you know, a bottom
line that you have to, you know, even to
make the project work, something has to,
you know, give weight. But I am
appreciative of uh the consideration of
your previous you know developments and
going into the affordability with those
units and I just look forward to future
developments and how we can make that
work for the families in the area. But
um the current parking lot you did
mention you would retain that as well
though, right? Um the the one that's
connected to the Okay.
>> Yes, that's part of the
>> And just for my own curiosity, is there
a crematory like in the building right
now like in the facility? Uh yes,
>> there is.
>> There is.
>> Yeah, I believe there's Well, I'm not
totally I don't I don't believe so
actually. I don't think that there is
cremation proceedings.
>> That's what I was I was curious about
that.
>> No, I don't I don't I don't think so. I
have not I have not seen that. It has
not been disclosed and I think that
their process is is different from that
on that on that site.
>> I didn't want to be on Ghost Hunters or
anything.
>> Yeah. No, this is Yeah, this is
>> But people are going to be living here
now.
>> Yeah. Yeah, absolutely. And what I just
was curious because I know sometimes a
lot of fuel lines would have to be
connected to those furnaces. So that
could just be a lot of more work on your
end, but I was just curious more than
anything. It's not very frequent we get
these kind of developments, you know, um
restructuring old, you know, uh morg or
funeral home or crematory. So I I am
appreciative for you gentlemen being
here this evening. And that's all I
have. Thank you.
>> Thank you. Yep. Thank you. And then
Councilwoman Davis.
>> Thank you, Councilman Lawson. Good
evening, Mr. Knight and Mr. White. Um,
most of my questions were answered, but
I still have a few, well, two and then
one statement. What drives what what is
driving you to consider uh your next
project of 28 units and all of those to
be affordable?
>> Two separate projects um for 14 each.
Um,
I think it's really important. Um, you
know, I, uh, I didn't grow up directly
in the city of Harrisburg, but I spent
my entire life in, in the area. Um, and,
uh, I think that I'm very interested in
in learning um, and and participating in
more opportunities for affordable
housing. I think that they're and I just
look as a company, we want to be
balanced. You know, if we're going to do
market rate projects, I want to do
affordable projects, too. So we have
>> um you know two market rate projects
that you've heard about. We've gone back
and and made an adjustment to one and
then we have two affordable projects um
coming up. And then part of that was
actually just a process of you know
we've you know been educated by uh other
people on um you know what the
opportunities could be for the city um
and for us. So now
>> that's why you know the next couple you
know we're we're working hard for
affordable projects. So, it's balance.
Um, it's a it's a love for the for the
city of Harrisburg and and and wanting
there to be, I would say, a beautiful
building that is also affordable,
wanting to do great structures that are
accessible to a broader part of the
population in the market. And then from
a just wanting to be balanced and and
and help all the city's residents as
opposed to like a target population that
can afford rent that that might not be
accessible to to others.
>> Thank you. I appreciate that. And are
any of your units um developed for or
will they be developed for uh handicap
persons?
>> Well, on 1332, one of the interesting
things about the building is it has many
ground level access points. So, the
entire all of the units um and
the I think per code actually there's
going to be accessibility all the way
around the building just because of the
nature of the the units being on the
ground floor. So,
>> right.
>> So, I would say that a big part of, you
know, the the work around the building
is making sure that we have the
appropriate ramps and access all all
across the building and that's a big
part of what we're working on right now.
So, for 1332 and then
>> um for 315, yes, um too, we do have um
accessible units and then for our
upcoming projects um they're going to be
a little bit more challenging. um 2100
North Third, it's going to be a little
bit more challenging just because of the
historical nature of the building and
we're going to have to create that
access. Um but yeah, the general answer
would be yes. And sometimes it's
dependent on the site and the project
and we take advantage of that when we
can and sometimes we need to work to to
make sure that's the case.
>> And some of the other handicap features
would include like the bars in the
bathrooms to help persons too
>> that are handicapped.
>> Yep. I think openings, thresholds,
>> right?
>> Um access to the building and then um I
would just say in general just from
humanto human standpoint that um
>> we are open to we want to make units
available to everybody from the leasing
st you know standpoint and if somebody
came to me that needed accommodations um
like you know um accessibility bars and
bathrooms that I would be happy to to to
accommodate that. Um so thank you for
asking.
>> Thank you. And then
would you send out a letter to the
residents in the neighborhood um making
them aware that there's going to be
construction and maybe heavy equipment
there. Um, often times, uh, companies
come into the neighborhoods and they may
start working at 7:00 in the morning,
8:00 in the morning, and they're making
all this noise and nobody in the
neighborhood is aware that this uh, I
just think it's a, you know, nice uh,
touch and shows the respect for the
community as well as your tenants on the
second floor in that property.
>> Yeah. What? Absolutely. Um, and I know
that there's already been notice as part
of the standard process for our our
zoning hearing and and planning
commission. So, we we have had public
circulation of the, you know, of the
project approval process. And then I
think given the gap in time that it
would be appropriate to give an
additional notice when we have a a firm
construction day so everybody's aware.
That's
>> Thank you, Mr. White. That's it for me,
Mr. Councilman Lawson.
>> Thank you. And then, uh, Vice President
Jones said he had a follow-up. Yeah,
just one quick question um that I meant
to ask you. Uh far as the do you have an
estimate of what kind of taxes this
project would bring into the city
>> um
in terms of uh property tax revenue?
>> Yes, sir. Um I apologize. Yes.
>> Is it uh
>> just off the top of my head? I mean the
current um assessment um is around
20,000 uh a year and then
>> the improved at the common level ratio
there would be uh a significant increase
but I wouldn't know exactly until the
the the appraisal and I work with we
work with Van Allen and they're really
helpful on the tax side. So I don't know
exactly but there's definitely going to
be a massive improvement um you know to
the building and um
>> so you have to reassess.
>> Yeah, but we might I want to be that
that we might also pursue abatement
though too. So long term um it's going
to be a much improved building that is
much more valuable and um has a much
higher assessed value.
>> And so when you're looking at abatement
what what time I mean like five 10
>> there's a I think for it was just it was
just um or it's in the process of being
approved or it was just approved again
for 2026 and this would be the the 100%
residential tenure.
>> Okay. Thank you. No further questions.
>> Thank you. And then I had just one
followup just because there were a
question about the uh the rent range. Uh
what is the the unit mix as as far as
like types of bedrooms? Uh what are we
looking at there?
>> Uh primarily one-bedroom units, uh a
two-bedroom unit, and a studio. in terms
of the units created and then the
existing I think that there's there's
two threes
uh two twos and a one or a two and two
once I haven't really we don't um just
with respect to the residents and like
the current owner we haven't had the
most access to the to the occupied units
because that's disturbing and so um but
that's my that some of those units are
actually bigger
>> great thank you very much
um council would anyone have any
follow-up questions
>> not a follow-up question. Just want to
say within the perimeter of that
facility, of course you have Morris
laundry mat, you have Stillies, you have
the Grilled and Juice Bar. So just that
development alone or rejuvenate just
that small corridor right there, Second
Street. So you know, we get into the
habit of creating more developments like
this, we could really pump some more
life into Harrisburg. So
>> yeah, we're very we're very excited. I
appreciate you mentioning that. It's a
really cool corridor and part of the
city and we're hoping to contribute to
that.
>> Absolutely. Thank you. Thank you, Chair
Lawson.
>> Thank you. Thank you gentlemen very
much. Um I would uh like to uh move uh
resol resolution 4 2026 to our next uh
legislative um session. And I'm going to
uh encourage my uh fellow council
members to support this as we do need uh
more development in our in our in our
city and bringing it to that area would
be a great asset to the city. So,
thank you very much.
>> Thank you.
>> And I believe Mr. Knight, you're going
to stay right where you're at. Um,
Mr. Humphre, could you read please uh
resolution 52026 into the record?
>> Yes. Resolution 5 of 2026, a resolution
approving the preliminary/final land
development plan for 2601 North 3rd
Street, building 1, submitted by Gregory
Hawquist of Penmark Harrisburg Holdings
LLC to convert the vacant hospital
building into a mixeduse building and
associated site and access improvements.
>> Thank you. And once again, we have Mr.
Knight. And this time, I'll remember to
ask um who are you sitting with?
>> Sorry. Go ahead. council.
Uh my name is Greg Hulquist and I'm with
Penmark.
>> Okay. Thank you very much, Mr. Hulquist.
And uh it looks as if we have a uh
presentation if you could please.
>> Yeah, I'll do a little introduction and
I'll hand it off to Mr. Hawquist to go
through the PowerPoint. Um uh so as
Cedric noted, uh this uh proposal is
actually the um second phase of the uh
poly clinic hospital campus
revitalization.
um council may remember I think last
year uh reviewing uh building number
three which is phase one uh which is at
the northern end of this site um and was
the former nurses quarters uh so that
was a bit more of a I think easy
conversion to apartments this is going
to be a conversion of the main hospital
building uh at the southern end of the
site uh so much bigger um institutional
space um so uh the proposal is um
significantly different in terms of both
the number of units and the types of
uses that will on site. Um they're
proposing to convert the vacant hospital
into a mixeduse building featuring 130
residential units, associated amenity
space for tenants and both space
reserved for retail store uses and space
set aside for future development
proposals. Um so that will allow the
project to I think evolve over time um
as uh some of these units come on board
and as I think they probably further
their engagement with the neighborhood
uh the surrounding neighborhood. They've
been um h having a lot of meetings as
you may recall from the first phase of
this project. Uh the project proposes
units in a variety of configurations and
sizes from studios to three-bedroom
apartments and from 544 ft to 1144 or
sorry 1143 ft. Um again this is uh the
second phase here. Uh the um applicants
have a uh significant amount of parking
associated with that. You can see in the
upper right hand corner of that uh uh of
the um PowerPoint slide there, the
parking garage. I think it's somewhere
in the neighborhood of like 400 parking
spaces, 440 parking spaces in that
garage. And then there's also a
significant amount of on-site surface
parking um to the west of the main
buildings there. Um and uh as noted, uh
there will be it's going to be a
mixeduse building, so there is space um
along the fourth street frontage for um
some outward facing commercial uses and
then some kind of flex space for the
future on all of the floors. Uh so that
would be I think a really unique aspect
of having some sort of a commercial or
community focused space on upper floor.
So it's not necessarily just entrance
right in at the ground level. Um but uh
overall, you know, this uh is a very
unique and challenging um footprint of a
building and floor plan of a building.
Uh so we're excited to have somebody uh
that is um on site and uh working
through the process to hopefully bring
this property uh back into productive
use for the city. Both contributing to
uh the tax base as we've heard before
here and then also providing um new
housing units for um potentially current
residents of the neighborhood as well as
future residents. and then some um
neighborhood focused um commercial and
community uh amenity space. Uh with that
all being said, uh the planning
commission recommend that city council
approved the request with the following
conditions. Uh the applicant must
reconstruct portions of the fourth
street sidewalk to be ADA compliant and
specifically the loading dock in the
middle of the block. Uh the bureau
recommends that other points with
vehicular crossings utilize driveway
designs with consistent raised safe
raised sidewalks across them for safer
uh vehicular pedestrian conflict points.
And uh that first point was if you uh
are familiar with the process, there's
like uh two loading docks off of Fourth
Street that trucks would back into right
off the street. So it kind of cuts up
the sidewalk right there. So, we're just
recommending that that be, you know,
reconstructed and hopefully to have a a
raised crosswalk design across some of
the two vehicular access points um into
the site on Fourth Street. Uh the
applicant must coordinate with the
Department of Public Works regarding the
size, location, and screening of any
required refuge containers. Uh the
planning bureau recommends the applicant
consider eventually consolidating all
refuge storage and access in the
existing vehicular access areas along
the Fourth Street frontage. And again,
there are two kind of little pocket um
parking areas, loading areas off of
Fourth Street uh for the former hospital
there um that would perhaps make a good
location for uh trash trucks to be able
to get into and also to keep uh the
refues uh off of the public rightway uh
frontage. Um the applicant must ensure
that any proposed signage for the
businesses on site is in conformance
with the applicable regulations or they
must secure the necessary zoning relief.
And finally, the planning bureau
recommends that sheltered bike parking
be provided at the main entrances to
both the residential and commercial
components of the property with secured
bike storage potentially located in one
of the proposed amenity areas on the
first floor as shown in the floor plans.
Uh planning commission recommends that
Harrisburg City Council approve the
request for the following reasons. The
adaptive reuse of a large vacant and
underutilized institutional building
into a mixeduse building with lower
level retail store spaces and apartments
above represents a unique and
challenging project in the city and will
support redevelopment of the remaining
buildings that comprise the former
hospital campus. Additionally, the
applicant is retaining flexibility in
the project by reserving portions of the
building for future development
proposals which will help the project
grow more organically to support the
needs of existing residents of the
neighborhood and future residents of the
development. A successful redevelopment
of this institutional site may help
catalyze redevelopment and reactivation
of other institutional sites to the
north, including the former William Penn
High School and the Zebo Shrine. Other
conversions of former commercial or
institutional buildings elsewhere in the
city have generally de demonstrated such
projects do not adversely impact the
neighborhoods in which they are located
and often help generate other
improvements in the in those
communities. And finally, the proposed
redevelopment will add new residents to
the neighborhood to activate the street
on nights and weekends and grow customer
base to support local businesses while
providing a new neighborhood focused
space and will provide additional units
to the uptown housing inventory.
>> Mr. Hus, please.
>> So, I put a little presentation
together. to see everybody again. Uh,
council,
um, is it okay if I give a quick update
on building three, what you guys
approved in November, just to sort of
update you on what's happening?
>> Um, next slide, please.
>> So, this is an overall progress schedule
of building three. Um,
yeah, it started out with city council
approving the zoning. We went in for
land development approval.
Uh, we submitted that in August, so you
all approved it. I think it was July 7th
and then we submitted on August 1st. We
went in front of uh planning commission
on 93
and they recommended it for approval and
then we uh went in front of you on 113
and then 1110 you voted it into
into action there and so we from that
point we went into detail design.
The detailed design is basically at the
point now of going out for bid. Um the
reason I highlight that uh is about the
questions around minority participation,
you know, which is something I'm sorry
I'm a little sick. So, uh something that
I um talked about every time I've been
in front of council is something that's
important to us. And um so
hopefully all those the subcontractors
will be seeing those drawings. Uh we got
our demo permit on 9:30 and we started
demolition as soon as council approved
in November. Um we started demolition
and we actually had to stop because we
ran into some structural questions. This
is an old building. It's 100-y old
building or at least portions of it are.
It's um actually was built over four
different time periods. So all these
different structures and questions came
up. So, we had to stop, pause, get
questions answered, and then we're back
under construction again with the
demolition.
And our construction will really get
started in earnest as soon as that demo
is far enough along. We did get our
building permit. Um,
I guess uh yeah, January 13th. So, we're
ready to start and we'll steam ahead as
soon as our demo is far enough along.
Next slide, please.
I wanted to give a quick update on the
um historic tax credit process. It is
very involved and
um it's important that I talk about it
because we have told the neighbors and
told council that we're going to
preserve the building and I just thought
it would be important to let you guys
know where we are with that. Next slide.
So this is kind of the layout of the
overall program. When you submit for
historic tax credits, you have to go in
with the whole campus all at one shot.
So that's building three, building one,
and building two. Our main focus right
now is building three, but we are
working on the tax credits for buildings
three and building one at the same time.
I circled that building three because
the next slide,
uh, please, next slide.
This is the the schedule for building
three only. And every one of those lines
is a lot of work. So we have a
fourperson team working about halfime
for the last five or six months on
getting the historic tax credit. So it's
just sort of a no one can read any of
that I know but uh
next slide please. Uh a little uh sense
of the progress. We are very fortunate
to have an excellent uh demolition
contractor
who's really doing a great job and um
this is kind of some before uh we really
started on the first first the fourth
floor, excuse me. Uh and are working our
way down. And next slide. And this is
what that looks like after about four
weeks. I mean the I want to say the
hardest part of the fourth floor looks
like this. and you could eat your dinner
off the floor. I mean, it's insane how
clean and and thorough and good a job
that's a local contractor.
There are ample
folks here. We just have to find them.
And um this is an example of that. So,
next slide.
We talked a little bit about
um the last time we got in front of you
guys about site logistics and that was
important and we it is locked down just
like this. Hopefully if any of you have
driven by you see that we really try to
make sure that the site is tight
um that there's not loose anything
anywhere. It's like we've got a really
good construction manager, a really good
demolition contractor,
and we're doing our best to follow the
the rules. We have a couple more um
meetings with the neighbors coming up.
Um those are going to go on the city
website out of the gate this time
instead of the last time. We found out
the hard way that we were getting a poor
showing because we weren't advertising
it the right way. And uh so we'll just
do that right out of the gate. This will
be our sixth and seventh
u meeting with the neighbors and we'll
give them an update uh as well and talk
about building one because right now all
eyes are on building three but building
one's more the same. So we want to make
sure everybody's
u connected with what's going on.
Building one would follow building three
by about two or three months. Three
months say
u so it had to do with financing why we
split it up that way.
couldn't go to a bank and have them
finance 230 units all at one shot.
Um, next slide.
Um, so a little bit uh more about uh
building one which is phase two. So land
development on building three is done.
This is about building one. Next slide.
Uh this is where it sits on the site. I
think most folks are aware of it. You
all have seen I think all of this
before.
um in the zoning uh the resoning
application and again with the land
development application that we just
submitted
and these are just some 3D views of it's
all in a model so I asked the architect
you know sent me some pretty pictures
whatever and that's what he sent me so
next slide
um so this is an aerial from the fourth
street side and the uh reason I wanted
to show that is one. It kind of shows
the mass of this. I get lost every time
I go in this building. It's five
stories, including the lowest level.
It's 205,000 square feet roughly.
We can't use all the square footage with
the zoning uh limit that we have with
230 units. This campus really could
support more like 300 units. Um
we just we can't use it all. Um, next
slide.
And the these are some street views. Um,
the main entrance, that's the
picturesque entrance that everybody
sees, but honestly, the street views on
the right and on the bottom is really
what everybody sees. And that's the old
on the right is the old emergency um
entrance,
which lends itself to a grocery store.
Um,
pardon me.
So, we are talking to someone right now.
It's not Whole Foods.
It's a local
It's a local uh merchant who has two
facilities in the city now. And this
would be about 6,000 square feet. We We
could do like 10 or 12, honestly. And
for a
medium-sized grocery store, you want
like 10 to 12. Uh,
but they want about six. And we think it
would be great uh to be able to have a
local
merchant, you know, provide that kind of
resource for the neighbors. Uh, we will
make no money here. We know that. It's
not for that. It's really to try to
though
we're going to try to work something out
with them. Hopefully we can. Um they
were going to be here tonight but their
daughter is sick. So um so that's
you know a use there. That would be
great. And that's on that corner on the
bottom. But what you see when you go
down four street and I know it's quiet
and we've heard the neighbors loud and
clear. We understand their concerns. We
think now not like we live there and we
don't proclaim to act like we know
exactly but I've had developments come
in my neighborhood and where I lived in
outside of Philadelphia and I'd like to
think I understand that
uh we need to listen to them. But right
now it's a blight like it's an eyesore
and it's getting worse. And one of the
nice things about the historic tax
credits is it gives us some funding to
clean the brick up. Um, and that's a lot
of brick in that building.
Hundreds of thousands of square feet of
brick. It's crazy.
But anyway, so next slide.
This is the first floor. It gives you an
idea of the apartment layout. This was
in your should have been in your packet.
You all you all got a packet right from
Yeah. Okay.
Um and you see on the upper right there
that we left
an area um conveniently for future that
was it would be easy to develop later
because it's vertical. So you can
imagine running sanitary stacks with
apartments up on below you. So we we
kind of left a wing.
Right now, our zoning limits us to
really apartments um in terms of use,
but we're capped out in terms of
capacity. So, we're
whatever we do, we're going to have to
go in for zoning relief
um and get approval and go through
zoning hearing board and go through
planning, go through city council. And
obviously, that's a very heavy neighbor
community concern. So, we'll have to do
our homework and make sure we get the
word out and solicit uh feedback from
the neighbors and make sure we hear
them. So, so that's one possible use.
Another would be a small hotel that
would require zoning use relief.
We're not allowed to do that right now
with CN zoning. So, again, we'd have to
go in front of the neighbors.
Whether or not that's even in the cards
or not is to be determined. you know,
we'd have first have to attract someone
to go in front of zoning, you know, so
we're somewhat limited. It's a big
building. Um, and then the next slide.
Oh, I'm sorry. I'm go back to So, the
building itself is 203,000 square ft.
Uh, it's five stories. We are utilizing
124 of residential and retail is 15,000.
So, it's about 139 of the 203. So that
gives you an idea. There's still 63,000
square feet which in itself is a whole
project.
Um and then building two is another 27.
So it's
90,000 square feet. That
it's a lot. Um next slide. And this is
an important slide because this is the
first floor which is massive. It's all
the back of house for the hospital and
you are somewhat limited to what you can
do down there. I mean there is window on
the four street side.
Um so we could do residential units
there but I mean even we have a lot of
amenity uh carved out here. You still
have a lot of future. So,
um, but the retail along Fourth Street
is really what we're we're excited about
trying to make, um, as much of that
happen as possible. And so, the grocery
would go in the corner right now, and I
just got plans back from
from that merchant, uh, on Saturday, and
we're going to meet on Friday
and start to work the numbers and see if
we can come to a an agreement there. And
then the middle section is what we had
called out as a possible restaurant. It
is also too big for a restaurant.
Um, so it could be two or three
restaurants. Honestly, it's big enough.
Um, if anybody's interested in some old
boiler room steel,
we're we're taking inquiries. I mean,
that thing is loaded with boiler room
steel. But
um and then the the far left is was the
old wash room and we had that pegged as
a gym.
It's too big for a gym,
but I mean certainly a portion of it and
there's a good amount of amenity here
that we could we could make use of and
more retail if if there's an interest.
But the the retail is somewhat
fragmented. It's not like a strip mall
because there's space in between. So,
it's sort of isolated, but it still will
generate some foot traffic. Next slide,
please.
Um
I This is a slide I presented last time.
There's at least $30 million in
construction, about uh 50 full-time
equivalent
conservatively
uh phase three jobs and 70 I think the
last applicant said 15 and this is more
than three times the size. So I think
that's conservative 50 but um
and uh they this building would be 90.
So, it's a lot of jobs. And our our goal
is to try to
we're going to try to split this
building up so that more folks that are
local can participate and get their beak
wet, so to speak. Um there's plenty of
work to go around.
There's really too much for anyone
contractor here in any trade. So,
we expect there will be two or three
drywall and framing contractors. uh two
or three demo contractors,
two or three electricians, you know, or
more, whatever it needs to be. Um but
that it's it's a good opportunity for
that.
Um next slide.
Uh we talked about uh not to beat a dead
horse, but we have meetings six and
seven coming up on 23 and 210,
and we'll go through uh the city website
for that. I talked to Jared today about
who to do that with and he sent me the
information. So, we'll set that up. Uh,
I want to touch on I know the questions
will be asked, so I'm going to touch on
it anyhow. The past neighbor meetings,
the questions were around parking.
We talked about parking last time that
we have more than enough parking and
that a lot of the parking like right now
there's no one in these buildings. like
we're not taking up any parking in the
neighborhood. It's not what it's not us
that's doing it. It's still a concern
that we do not add to that. Um
it's really UPMC is is the issue. We've
offered spaces to residents if we have
the garage and anybody that wants one
and we'll continue to offer that at the
public meetings.
Um traffic was a concern as a an office
building. We So we we hired for building
three, we hired a firm to do a tripgen
letter and that was at the city
engineers request and we met with the
city engineer.
They asked us to do a campuswide letter
or a tripgen letter which we did. We met
with the city engineer. So I'll show you
what that showed in one second. Um
security and safety was a concern. you
know, will this bring crime into the
neighborhood? We explained that studies
would show that it does the opposite. It
brings
population that otherwise it's a it's a
vacant lot. Like we've found squatters,
you know, there's it's hard to keep up
with with that. There's not a fence, you
know, like a barbed wire fence around
this property. So it would bring light
and you know not overly done but it
would bring
attention and focus to the to the area
uh as far as security and safety go.
And then they had the neighbors had
construction related questions. When
would it start? What time would it
start? Things like that. We think we've
hopefully we've ironed that out with
building three. Um, in terms of we
haven't had complaints. Uh, we did have
one call a neighbor explained that there
was a strobing light going off in our
building. So, that's good. It was an
false alarm, but
that was good. I think it was a power
outage or something in the area. Next
slide, please.
We showed you the parking plan last
time, and that's the garage that Jeffrey
was referring to in the upper right
there.
And so it's not nothing's changed as far
as that goes. We have
actually
we have more more than enough parking
because the parking the more than enough
parking was based on a certain maxed out
situation which we're not even going to
exceed with phases one and two. So
next slide.
So there it is. Uh that's the capacity.
Next slide.
Um, this you didn't see. Uh, this was
the trip. This was the, uh, campuswide
tripgen. The most recent use of this was
as office and we went over this with the
city engineer building one, which is the
ones that are circled.
We just lost that lease like a year and
some months ago. Um,
so it'll go from 252 peak in the AM to
66 as an apartment building
at 240 to 266 and on the weekend 179 to
63. So it's a redu a significant
reduction from an office use to a
apartment building use and
multi-residential use
uh mixed use. Next slide.
That's it.
>> All right. Thank you very much. That was
a a great presentation. Um I personally
have uh a stake in this project just
because I live not too terribly far away
and hopefully um the retail is going to
be something that we can enjoy. I love
the idea of bringing a grocery store a
little closer to home that I can walk to
and and and take items back. And also as
a hotel, excuse me, not a hotel. Very
wishful thinking there. But as a uh
as a hospital, this is where I I learned
my grandmother was human. So getting
Yeah. Actually, she she became sick. And
before that, you know, you you just look
at your your your parents, your
grandparents is they're they're super
human. But right there is so it's a it's
a it's a piece of of Harrisburg history
that does mean a lot to me. And I and I
appreciate you um touching base on some
of the questions that I would I would
have had for you is definitely want to
see minority uh and and diverse business
um uh
access to this to this project as well
as a lot of our our local residents
because again we want to keep as much of
that money in the city limits as
possible um so that we're we're
providing good jobs for for our
residents. Um, and it it may have been
in there just of curiosity from uh from
our last discussion. What what is like
the the mix of apartments? Are we
looking at one bedrooms, two bedrooms?
>> So, it's uh studios to two beds. We may
in building three have some three beds.
Um, we're going to continue to look at,
you know, what the market says. It's
really saying studios ones, twos, but we
we have enough room to have some threes.
Um, so we'll I think we'll have some
threes. The rents are
uh they were a tad higher, they're a tad
lower now. Uh we start in the mid 900s
for studio
and uh we're right now we're we're not
at subsidized
you know low-inccome h tax tax credit
housing levels of affordability
but we are at market rate 80% AMI for
many of our units. um the financing that
we have just won't allow for u
the lower level of affordability like
30% AMI.
>> Um but like the last applicant, we're
actually
we're meeting with Brian Hudson, we're
we're exploring
really being able to do affordable with
the right financing.
um Allah
Tar Castile and Leseawn McCoy and Aaron
Donald like those guys got his
low-inccome housing tax credits which is
what you need for that level of
affordability whether you do four or 9%
deter you know it's whether or not
you're at 30 or
50 or 60% we're at 80 but that's what
the private market would require but
that's where our levels are so it's that
mix and about that that uh price around
u 13 to450 for a one bed and uh 1,600
for a two bed.
>> Okay. Thank you very much.
>> Yeah,
>> that's that's everything I had as far as
questions. So, I will uh come to my left
here with uh Councilwoman Green if you
have any questions.
>> Thank you very much. Thank you,
gentlemen, for being here tonight. Um, I
don't really have many questions. We've
discussed this project a few times over.
So, glad to see it it progressing and
moving forward. Also glad to see that
you're using some some local companies
uh in the construction uh which is
something that you discussed, but a lot
of times we never hear the followup
whether people actually use them or not.
Everyone says they're going to, but not
many actually do. So, thank you for
following through with that. So, thank
you.
>> Thank you, Vice President Jones.
>> Thank you. Thank you for uh coming in uh
this evening and giving us an update.
But I will just share that I I have been
to this site several times and um you
are correct, Councilwoman Green, that um
I I've actually seen locals working
there and and and I thank you. Um she's
correct. A lot of people come in and say
that they're going to do these things.
Not that we have any compliance around
that. And hopefully it's okay that I
stop by because I don't want to seem
like I'm the compliance officer.
>> You're all welcome.
I I did go there and I seen it and um
>> just stop telling our contractors what
to do. But
>> no uh but I really appreciate that
because um that that is something that's
very near and dear to my heart. Not that
my uh opinion or you know uh weighs on
this project. But I I really am glad to
see that that that's happening. And um
to hear the future um I agree with
Councilman um Lawson um grocery stores.
We know we're in a food desert. that's
something that's really needed in the
city and I think um again being in that
walkable area it would definitely help
the residents and the last thing that I
would say is um please keep me updated
because I did um come to a few of the
first community meetings that you had um
and just giving that update I just I
would love to hear what some of the
residents in that area have to say about
the potential of the things that you're
looking to do and where they're at with
that. So and I can also share that with
my colleagues. So again, I just want to
thank you uh for bringing this project
to our city and uh keep up the good
work.
>> 700,000
>> taxes.
Well, I'll say thank you, Vice President
Jones, and I'm going to say thank you
for that 700,000 as as well, President
Hill.
>> Thank you. Good evening. Um many I think
many of my questions um were answered
through your presentation, but I'm
excited we're moving to phase two. Um
also excited that the grocery store
you'reing a local merchant, so that's
really exciting. I hope their daughter
feels better. Um a restaurant or
restaurant. Um the gym, maybe downsizing
the gym. Um, and then some of the
concerns of the neighbors. I'm glad to
hear that you're continuing to
communicate. That was going to be one of
my questions. Um, but the two meetings
on February the 3rd and February 10th,
I'm hopeful that you'll have good
attendance there. Um, also happy to hear
that you're re-evaluating the rent
range. Um, I'm sure you knew that was
going to be a question of mine
>> somehow.
>> Not so much. Not so much. um
the low income. I'm trying to capture
the median. So, those that fall in the
middle that sometimes um don't have an
option for affordable housing. So, um
that would be in your discussions
um moving forward. Just remember that
catchall in the middle that sometimes um
is not eligible right for the low income
um
set aides and then
it they don't make enough for the um
higher rent range. So just keeping that
communication open around the rent I
think will be helpful for me. But um I
don't have any other questions. Thank
you for your updates.
Thank you. Um, Councilwoman Green or
Green,
>> don't worry. I I messed yours up
earlier, so you got me. I
>> um No. Um, I was just also going to uh
just the same sentiments as um President
Hill with the median income because
there are those those slight people in
the middle. I always say I've been one
of those who just um I don't get
approved for lower income, but I really
don't make enough for what they want me
to pay. So, just that little middle
person. So, just thank you again for
think rethinking those prices. Um and I
also wanted to say I I applaud you for
trying to find retail businesses, local
ones to come in. Um I think the grocery
store idea is great. We are in a food
desert as um Vice President Jones said.
So having that grocery store right there
helps a lot of um individuals, a lot of
people get to food and people who aren't
living in that building, people around
the neighborhood. So I think that's just
going to pump up our local businesses
and really help our residents. I know
you guys were looking for more ideas. So
I was over here thinking to definitely a
hairdresser. If you find one, just say
it helps. Um, but even with the gym, I
know you said that space was really
huge. So, if you can put an indoor track
within that gym, I think I know a lot of
people say, you know, there's isn't one
really. I mean, there is a talion lake
near there in a way. You can walk on
Front Street, but if you can't go
outside, I feel like an indoor track is
helpful. And then it also helps people
in the neighborhood to come in and use
those facilities, too, as you all let
them. So, I just wanted to throw out
some ideas and say thank you.
>> Can I touch on that?
>> Yeah, sure.
>> So,
regarding the grosser, you know, we also
don't want to be the the developer that
brings a grosser in from outside. That's
going to that's just going to fail
>> because they're not connected with the
community. They're too big. The the the
quality is not there. The prices are too
high. Like so this grosser we're excited
is that they have two locations. One is
about 3,000 square feet, one's about
2,000. So the combined of those two is
5,000. Like
>> this would probably be cheaper rent.
>> Right.
>> Honestly, and we're we're looking to try
to make it work. Like
>> Right. And like you said, they're local,
so people know them. They're connected
to the community. They know those needs.
So um that was really that's really
important. So, I think that's a great
idea.
>> So, I'm glad you all you I can see that.
So, thank you because it's a like you
said, it's a huge vacant building and to
leave it the way it is will bring more
crime. That's a fact. There's statistics
on that. More blighted buildings, more
crime. So, um
>> with the school, middle school,
>> right? The pendant. Yeah.
>> The old um v high school and then a
vocational school. So, I I just think
that um this is needed. So, just thank
you. Um, but that's it for me,
Councilman Lawson.
>> Thank you, Councilwoman Ross.
>> All right, Councilman Rodriguez.
>> Thank you, Chair Lawson. Um, it's
refreshing when developers come in front
of us and they listen. I'm not saying we
know all or have the recipe, but uh you
know, if you add up all the years that
you know, we've been residents in
Harrisburg, it's a pretty heavy weight,
you know, on this uh day, and it's just
it's refreshing that you take the ideas
and even if you can't, you try to work
them in. Um everything from the progress
chart to the community outreach update.
It's refreshing. A lot of times we ask
for this feedback. We ask for, you know,
have you done community outreach? You've
came with a whole table, right? And
showed how it goes on. Um, it's very
appreciative and it seems like to me
you're building an ecosystem where
families can work, eat, live, learn,
play all in one setting. Don't have to
travel too far. From the kind of setting
that you're putting together in the
team, you won't even need a car, you
know, really. You you'll be
selfestablished right where you are. And
and and that that's just pie in the sky.
That's amazing. Um, I know we previously
previously spoke about a jazz club. Is
that like out out the window?
I mean, honestly, the the Well,
>> I'm a I'm a huge jazz person myself. Um,
>> but I'm not going to sit here and shine
you on like
>> the neighbors are concerned about noise.
Now, if we can design it in like to a
restaurant where we I we I can't sit up
here and do something different than I
told the neighbors.
>> Absolutely.
Uh but if we can design it in like back
off the street and it's not going to be
a problem for the neighbors.
>> Yeah,
>> absolutely.
>> All day long.
>> And it's not like you said like a a
hip-hop forum where they'll be, you
know, artists coming and doing big
shows. Jazz is really kind of, you know,
sedated, lowkey. Um but it is up to
those residents in that area and their,
you know, uh thoughts and suggestions
nonetheless. But even the flex space
community rooms on each floor, you know,
where you're giving families the
opportunity to maybe celebrate birthdays
or have meeting spaces, you know,
community spaces, that that's huge. So,
um, thank you. And also, I'm very
appreciative that you kept your word
with the parking and allowing the
residents to park in the ample spaces,
you know, for anyone that needed help.
Um, one thing I did want to touch on and
I had a question for was the refues. I
know, um, trash was something that we
weren't too sure of where to keep units.
Um, has an inside incinerator ever been
thought of where families can just kind
of come in the hallway, pull the bin
down, throw the trash?
>> We have We have a trash shoot.
>> Oh, there is a shoot. Okay. Because I
know previously it was up in the air.
Wasn't really too sure where we keep the
bins and the black cans. And so the
chute is like the way we
>> It's in the design.
>> Oh, that' be amazing. I think that would
be amazing and the best way to go.
>> The only way to go. You can't rely on
anybody, you know, somebody. So, I have
partners that
tried to talk me out of it. Like,
>> they they're not apartment people. They
don't know. They just they're trying to
save a buck. Like, it's not going to
work cuz it's tight. This is a tight
project
>> and it's huge. And it's huge. And I know
growing up in um project facilities.
We've always had that floor to floor in
New Jersey. There's like 15 floors and
each floor you got that shoot, you throw
the trash down, done deal.
>> You have to make it and then you still
have to clean up. You still have to
>> and you can't get mad.
>> Yep.
>> Like you just got to do it.
>> Yep. No, I think that's a great idea and
and a great compromise and resolve
>> trash and track trash compactor
>> and that'll go straight down to like the
basement area.
>> It goes into the first floor where
there's a compactor and then that gets
picked up. What we have to work out is
whether or not it's a compactor with uh
public services, but
>> Gotcha.
>> There will be um trash shoot for sure.
100%.
>> Awesome. Well,
>> and 99 this is so building 3 is 99. This
is 131. So it adds to 230. Okay.
>> Um,
yeah, there'll probably be two in
building one.
>> That'd be amazing. That'd be amazing and
easier for maybe our seniors that may be
in there that can't go all the way
downstairs, dispose their trash, go all
the way back up. That'd be so
convenient. So, thank you for uh
listening and taking what we say and,
you know, and just kind of being
proactive with it all. So, thank you for
your presentation and thank you, Mr.
Jeff. That's all I have.
>> Thank you. And Councilwoman Davis.
>> Thank you, Councilman Lawson. And good
evening um again, Mr. Halquist. Good to
see you.
>> Good to see you.
>> I want to just make a statement in
regards to the grocery store. I used to
live in that neighborhood and I would
drive either to Camp Hill to Giant, to
Linglestown to Giant or out on 29th
Street to Giant to go to to get decent
food. Um, I remember the grocery store
that was there. There was a lot of
processed food, a lot of lowquality
food. And unfortunately, I don't think
everybody could go to the other grocery
stores. So, I would just um encourage
you to keep that in mind and I'm sure
you will just to have whole fresh foods
there for the for the neighborhood and
affordable hopefully also too. So you
said whole foods and you said whole
fresh foods.
>> Whole fresh foods.
>> Okay,
>> that's
Yeah, but that's all.
>> No, we will we'll we'll talk a little
bit more about that.
>> Okay. Thank you, Councilman Lawson.
That's it for me.
>> Thank you. Um, I'm going to uh like to
uh move resolution uh 5 uh 2026 to our
next le leg legislative session. And uh
this will and actually well I got a lot
of positive feedback, but I'm going to
ask my council members to support this
as well as as we look to move that to
the next legislative meeting and then
that would conclude the business for uh
economic development.
Thank you very much.
Our next committee business lies with
the public safety committee. I will
defer to our public safety committee
chair, Councilwoman Green, to lead
discussion.
>> Thank you very much. Uh the public
safety committee is going to discuss
resolution 1 of 2026. Mr. Humphre, if
you wouldn't mind reading the resolution
into the record.
Resolution 1 of 2026, a resolution
authorizing the city of Harrisburg to
negotiate and enter into a professional
services agreement with WCA public
safety assessments for the purpose of
providing psychological testing and
assessment for the city's Bureau of
Police.
>> Thank you very much. If you wouldn't
mind introducing yourselves and then um
you can move forward with your
presentation and we'll open up for
questions afterwards. Don't try to dodge
the mic now.
>> I never dodged anything. He's not shy.
I'm not shy at all. Hello, city council
members. Welcome back to 2026 and uh I'm
Commissioner Thomas Carter and to my um
right is uh Deputy Chief Kenneth Young.
>> Good evening and thank you for having us
again. I'm Deputy Chief Young. Uh this
resolution is actually is an annual one
that we did last year. Actually, for the
last two years, if you remember before
that, for the ones that have been here
for a little bit, we used uh Dr. Laguna.
Um Dr. Laguna is no longer in business.
So, which is unfortunate and then to try
to find somebody that provides these
services in this area is rather
challenging. Um, so this is a resolution
to enter into uh to professional
services agreement with uh WCA uh public
safety assessment and what they are
offering or what we need from them would
be psychological services. I guess the
best way to explain what those services
are is if you look at exhibit A. Um it
gets into agreement and on the back side
it tells you what the what exactly these
services are for. So it would be uh for
post uh conditional offers of
psychological evaluation. So as part of
that hiring process they uh to get them
into the academy and to be certified
through the commonwealth we need to get
them a psychological evaluation on them.
So that's part of that service. Uh we
don't use the promotional evaluation but
that's something that that
we're going to begin to explore. I think
that's a valid option to see what uh to
see where they're at as far as that
goes. Fitness for duty evaluations,
wellness visits, the uh post-traumatic
stress uh disorder evaluations. Um and
then you got the specialized
evaluations. The ones that we use
typically the most would be the u uh
postcond conditional psychological
evaluations for any new hires, fitness
for duty, wellness, and then the uh PTSD
after critical events uh an evaluation
that uh that we're required to have. Uh
if we look at uh the rates from 25 into
uh this year, uh the fitness for duty
went up by $50 from 250 in 2025 to 300.
wellness went up um for uh from 200 to
250 and then the the the u the traumatic
um traumatic post-traumatic uh
evaluations went from 500 to 525 minor
increases um that uh that I mean there
it's standard when you get to to this
stuff.
>> Thank you very much. Um I don't have
many questions. Thank you for noting the
price increases. That was one thing that
I was going to note. Um, and just I
guess kind of a question, this is not
just used for police, it's used for fire
as well, correct? These services al also
used by the fire department.
>> This is just for the police department.
>> Okay. Because it says police, fire,
dispatch, postcond conditional
psychological evaluation.
>> Yeah, I think that's how he groups it
together.
>> Okay.
>> So, he he provides services. The WCA
specializes in in public safety. So, I
think that's just how he's outlining it
on the exhibit A, but we would just use
it for this would be just for police.
I'm not sure who the fire department
uses.
>> Okay. I'll have to follow up on that
because I know last year in the fire
department's um quarterly reports in
quarter 1, two, and three, they um note
the consultation fee by the same company
for their psychological evaluation. So,
I'll just follow up with them because I
think they do use the same company and
it's the same fee structure there.
>> Yeah, they're hard. There's if you look,
there's really not a whole lot of people
around that do this any longer. when we
lost our local connection with uh with
Dr. Lagona, this was the nearest place
that we could get. And they're fortunate
because a lot of the testing, we can
actually bring them here. We don't have
to send people to their to their office.
So, they're doing the prehire prehire
valuations. They do all that stuff here
for us.
>> Okay. Thank you. I don't have any other
questions regarding this resolution. I'm
going to open it up to my colleagues.
I'll start to my immediate right with
Councilman Lawson. Do you have any
questions for uh Deputy Chief Young or
Commissioner Carter?
>> I I do not have any any questions at
this time. Thank you.
>> Thank you. Um Vice President Jones, any
questions?
>> Thank you, Councilwoman Green. No
questions.
>> President Hill, any questions?
>> I don't have any questions. Thank you.
>> Thank you, Councilwoman Ross. Any
questions?
>> Good evening to you both. I just had a
really quick question just for
clarification. Um the pricing is it is
per officer per visit or just per
officer.
Um and it's just how many visits they go
for the
>> depends. Yep. Sorry. It depends on what
it is. Some of it's per hour.
>> You get into a fitness for duty
evaluation that's a couple hour test or
a uh a post-traumatic stress incident
that's a couple hours. So there's a
>> their hourly rate uh is what is what
they're is what's listed.
>> All right. Thank I just want that
clarification because we can hear
prices. No, no, you didn't do anything
wrong. But I think not just I but
public, you know, people who are
listening are here just wondering how
does is that like that's hourly, but not
knowing if it was like per officer
that's the one fee or
>> some of those take an hour. So really
that's what the fee is per hour. Some of
them are a little more in depth
depending on the circumstances of the
person being evaluated,
>> right? No, it's needed. I think that
this um is a service that we need just,
you know. So, thank you. That's it for
me.
>> Thank you, Council Member Rodriguez. Any
questions?
>> Um, always a pleasure to see you,
gentlemen. I have no questions. Thank
you.
>> Thank you.
>> Thank you very much. And Councilwoman
Davis, any questions?
>> Thank you, Councilwoman Green. Uh, good
evening, officers. No questions for me.
>> Thank you.
>> Thank you very much. As far as
resolution one, I'm going to recommend
this is moved to our next legislative
session agenda. But while we still have
you guys here, um I know I did speak
with Commissioner Carter about some
concerns the residents had uh as far as
ICE agents in the city and if the city
has any formalized agreement with uh the
department. So if you could just speak
to that, I'd appreciate it.
>> Back in uh
back in the early 2000s, u we did have
one.
Uh we have not
I can't say we have not worked with ICE
because if we come across a traffic stop
and if somebody is warned by any federal
entity then we're obligated to contact
that agency.
Uh I believe that we have done a couple
traffic stops and um there was a
detainer by ICE so we had to contact ICE
to come and pick up that person. As far
as going on any raids or anything with
ICE. We have not done that. And the
responsibility that we have is to stand
by. We're not going on raids with them.
But uh we can't let anything happen to a
nice agent because they're federal
agents and they're police officers
officers too. But as far as going on
raids, no, we don't do that.
I did hear that they were at the farm
show, but we had nothing to do with that
and they were middle somewhere like
that, you know, according to Facebook
and and things like that, but we had
nothing to do with that.
>> So, just just so we're clear, I mean,
they're not calling us and telling us
where they're at within the city when
they get here. So, a lot of times how
we're coming across that is that uh
either we're running across them when
we're out handling calls and and
patrolling districts or they call to
say, you know, something's wrong um that
we get there. has that happened? I don't
know of any incidents where that's
happened, but I'd have to check that
out. But yeah, we're not we're not going
like we're not teaming up with them.
There's no information exchange. There's
none of that going on.
>> Thank you very much. I just uh thought
that that was a conversation we should
have because it was brought up last
meeting and I know several residents
have wretched out about it. Uh anybody
else have any questions or comments
regarding it?
>> I'll start with Councilman Lawson. just
just the question just because I I I I'm
trying to wrap my head around how these
things work. So if we're not working
with them, how do we protect our our
citizens? And I'm not saying to protect
from any lawful activity happening
through ICE, but if situations become to
the point where we do need uh police
protection for for residents, whether it
be through bystanders or just as we saw
what happened with Min Minnesota,
someone getting in a situation to where
it becomes a a a dangerous situation.
How how do we walk that line there? And
it's it and there may not be an answer,
but I'm just I'm sure everyone wonders
how do we how do we work in a situation
like this where we can keep our
residents safe while,
you know, we have
forces coming from the federal a side
that we may not have control over.
>> The Minnesota situation is an
unfortunate
incident. There are many incidents right
now that are going on nationwide that
law enforcement, local law for
enforcement has no no control over and
no power over. I would advise our
citizens that if they are stopped by
ICE, just cooperate
because if we don't cooperate then
matters will just get worse. We are not
going to stand by and let ice beat on
anybody or anything like that, you know,
but you know, we don't want to get into
a confrontation with them either
because, you know, if that happens, no
one wins,
you know. So, I would just advise them
to give the ID to cooperate and usually
when ICE when they're in a area,
they know who they are after. They have
pictures of them and everything like
that. it doesn't go rolling into a
neighborhood and don't know who they're
looking for. So, um, if ice rolls up on
the hill or up town or the southside, I
would advise our citizens to cooperate.
Don't start anything. Just do what they
asked them to do because the Minnesota
situation, you know, there's been a
couple other situations like that, too.
And, um, it's just sad. It's just sad.
anything.
>> Thank you, uh, Vice President Jones.
>> Yeah. Uh, thank you guys and thank you,
uh, Councilwoman Green for, um, bringing
that up. Uh, one of the things that we
are looking at, and again, for thatou,
it wasn't it really wasn't a resolution.
Um, and I think there is a huge
difference between the two. I think, um,
we are looking at legislation right now
to to to, uh, put in place a resolution
versus aou. Um, hopefully we can get
this through legal. I think uh myself,
Councilwoman Ross and Mr. Lawson and
also Councilwoman Green um are looking
at this um to adopt this legislation to
bring it into effect. And I do
understand that you guys have a a duty
um to not interfere with with the
federal uh government. And one thing
that I would appreciate that you said is
that you won't stand around and watch
them beat on our residents. So that was
a good thing that that we have that. But
I think this piece of legislation is um
important to give that um that feel of
protection for our residents um
documented, undocumented, however that
may be. But uh and to your point, they
did go around um on Liberty Street. They
were going around just knocking on doors
and asking people, "Hey, who lives next
door?" So um you guys may not be aware
of that, but that did actually take
place um within the last week. So, they
are I don't know how they're getting
this information. That's one of the
things that um I think the people are
very concerned about, but it's good to
hear that you guys aren't sharing that
information. And um when they got to do
certain things, I do understand and I
hope that our public understands that
you guys have to comply or deal with
those consequences on a federal level.
So, um that's just my input on this.
Thank you.
>> Thank you.
>> Thank you very much, Councilwoman Ross.
Um, I just wanted to say, you know, um,
thank you for giving us some insight on,
um, what the process is with ICE, that
you're not working with them, that of
course you wouldn't let them hurt any of
our residents, but um, how you do
sometimes have if you had to answer a
call um, because traffic stops or
whatnot that um, that would be something
or reason you would notify them, but
you're not willingly give them giving
them information. And I think that's
what a lot of our residents were worried
about. And as you stated, Chief Carter,
there may have been something on the
books in the early 2000s, but of now, we
don't have anything set. And I think
that's important for our city, just for
our residents to feel safe. Not taking
any positions on if we agree or
disagree, but making sure our residents
are safe because I think um what we do
see on TV right now are um citizens are
getting hurt. residents of those
communities are getting hurt, not um
people who we want to um put in boxes of
being legal or illegal, but it is
residents of those communities, United
States residents are being hurt or um
unfortunately losing their lives. So,
just having something set and I know we
have all been trying to look at some
type of um resolution um that would
could come down that could put just some
things in place to help us all out. So,
I thank you both for speaking on that
and I thank you um Councilwoman Green
for bringing that up tonight and looking
into that for not just us but for our
residents. So, that was it for me and
thank you again.
>> Thank you.
>> Thank you all for being here and thank
you for taking the time to answer that
question. Um as I said, I'm going to ask
that resolution 1226 be moved to our
legislative session agenda and thank you
all for everything that you do for um
all of us because we're residents as
well. I think sometimes people forget
that that we live here. Um, so thank you
for, you know, being there for our
residents in every way possible. Uh,
look forward to working with you guys to
continue to work. Thank you.
>> Thank you.
>> Thank you.
Our final committee business this
evening lies with the parks, recreation,
and enrichment committee. I will defer
to our parks, recreation, and enrichment
committee chair, Councilwoman Woman RWS,
to lead discussion.
>> Thank you, President Hill. Um, Mr. Mr.
Humphre, can you please read resolution
2 of 2026? And
>> resolution 2 of 2026, a resolution
authorizing the city of Harrisburg to
negotiate and enter into a professional
services agreement with Flora Teter
Landscape Architects Incorporated to
provide landscape architectural services
for Vernon Street Park and Playground
located at 15th Street and Vernon
Street.
>> Thank you very much, Mr. Humphrey. And I
see we have two members from the
administration here to speak with us.
Um, please give us your name and your
title. Thank you.
>> I'm Sasha Rose, deputy director for
parks.
>> Kevin Sanders, parks and rec manager.
>> Thank you very much. And can you all
please give us some information on uh
this resolution?
>> Yes,
I sent over some slides uh more
recently.
>> Can you please move the microphone
closer to you?
>> Pulled over some I sent over some
slides. Thank you,
>> Mr. Cedric.
>> And you can it can like go right next to
you. I think it's it's very movable.
>> Okay.
>> Did you just send them recently?
>> Like
>> down here?
>> I don't have them, but we can hook your
laptop up.
Yep.
And while we're waiting, when you get a
chance, can you email me those slides as
well, too? Thank you.
Oh, and anybody else from council?
I Okay, you can send them to everybody,
please, when you get a chance. Can you
let them know, please? Thank you.
>> It's not going to allow your computer to
run the the program.
Okay.
You see it?
The slides will make it easier. I'll
make it quick. All right. So for 15th in
Vernon um we're looking to um basically
do a um
project there but the first step is to
apply for a grant. So we are requesting
uh council approval to do that. We did
do a RFQ for this process. We had a few
different uh consultants. We met with
them via Zoom. Um myself, other members
of the team. Um, so where we discovered
um, Floral Teeter, it's a little bit
more twofold. We have had other projects
where we've had different consultants
submit proposals. So that's where Foral
Teter came from initially. Uh, we did
like their proposal for the current
projects that we are working on, but
they weren't selected. Um, so we just
put like a poll together also from the
trade shows um, parks and recreation.
So, we try to give people opportunities
from different places. Um, some are
local, some are um in more urban areas.
So, foral ter while they're we like
that. Um, two of the other vendors also
had experience in there, but we are
leaning our group decided to go with
furl ter.
Um so basically at Fural Teter over the
probably last five years the community
and parks and wreck we have discussed
doing a project there at various times.
Um it just hasn't come to life for a
variety of reasons. Finances probably
are the most
important part of that aspect. Um and
just uh some shifting in priorities and
opportunities that obviously have come
through sort of put 15th Vern in more of
a stand still excuse me if you will. Uh
some of the goals are to improve park
functionality, enhance the recreation
space, maximize the use. It is a small
spot uh but also ensuring inclusivity
and sustainable design. Uh currently at
the park there are some issues there
with inclusivity which we are aware of.
Um but also the play equipment is um
aging out. It's over shelf life. Um it's
not the only park that is like this but
is one that is probably at the highest
priority in the next group outside of
shop. Shop's more of a replacement of
equipment but 15 needs a little bit more
actual work um to the site.
Um so just kind of brainstormed around
like I said that the RFQ
um where we got we had multiple
proposals. Um we did evaluate based on
ability to optimize uh small urban
spaces experience with urban parks or
likewise. Um so some of our examples are
schools as well as not just an urban
park but who impacting is still the same
uh young children. Um design innovation
and storm water. Uh we've been able to
actually firsthand inspect some of this
with rural ter and a separate u set of
uh projects by sort of just asking lots
of questions of the consultant group and
studying their website.
So during more intrusive discovery which
isn't in this um to get the storm water
we did see some other work that they did
which is on a separate project that we
were eyeing up which is something that
you guys want to talk about which we'll
talk about second. Um so notable on
their website uh they have did some work
at the Frank elementary school and
Baltimore the Shelby uh community park
and there's elementary school. So, some
are Maryland and then some Philadelphia
um or one Philadelphia. They have a lot
of experience in different areas. They
also have a um team in Pittsburgh. They
have a team in Philly and team in
Baltimore.
Some of the strong alignment with the
project goals uh for the urban space. Um
one thing that's not on there, it is a
womanowned company.
And then we really thought that these
two sites were very successful.
This is a picture of Hamilton Elementary
School.
And then there's there's more of a
breakdown on our website on how they
came to these projects just for more
insight as well.
This one's a pretty tight space. This is
actually a lot smaller than 15th of
Vernon, but this just gives a little bit
of mental insight of how the team was
sort of thinking about 15th of Vernon,
like how we can really max out all of
it. Not just the way we think of it, but
maybe how they might think of it mixed
in with how the community wants it.
Uh so for this scope essentially this is
to help us with the the grant
application. It's part of the DCMR
application process.
Um consultant gave different budgets. Uh
theirs was actually the lowest. Um it
also includes uh surveying which we
traditionally hadn't done at this phase
but we found that we kind of need to do
that up front um because this will
minimize some issues that we've had um
beyond the planning stage and
implementation. Sometimes we skip that
and then we do it later and then ends up
messing up some of the ideas and
concepts.
One thing we do know is what we for this
one we'd have to have community
involvement also as part of the DCMR
process which includes at least two
meetings for the community.
>> Okay. I was waiting for your I didn't
know I was going to ask. Okay. Thank
you. Um,
I don't have any questions right now on
this exact um, project. Um, the
slideshow did help with um, some of the
questions I may have had. I think more
so I'm just looking forward to seeing
what they do, making sure we stay on our
timeline. Um, because I know a lot of
residents have had questions and I've
contacted both of you with emails about
um, the parks that are currently being
updated. are we going to meet the
deadlines, what the extensions are
looking like. So, I think just making
sure we're staying in um which I know
we're saying compliance with those, but
um from the perception it was is we
weren't, which is why a lot of people
had questions with are we going to meet
that? Do we so we don't have to give
money back. So, I think just making sure
we stay with these timelines, keeping us
updated to make sure because we know it
can be hard work with updating
playgrounds and you can't really do it
in the winter time.
Um, I think my biggest, so it kind of
does go with this project. Um, but not
but it does because I think one of the
things I want to make sure is we have
benches under our pavilions. Um, as we
are going to update this playground and
the other ones that we are one thing
that I've noticed throughout the
playgrounds in the city and I think I've
at least I spoke to you, Mr. Saunders
about it is just I've been to many
playgrounds where there are no benches
under the pavilions or there's just one
bench but it's out in the sun and I mean
I don't want to be cooking while
watching my kids play. You know, I would
like some type of shade. Um and so I
think like just making sure that that is
there. Um I think thinking about what
the residents want um is important. Like
you said, you're going to be having the
two community meetings. So, um, like I
said, I don't particularly have any
questions. Just making sure as we're
going through this process. We're making
those playgrounds in a space where, um,
people can sit, participate, but most
importantly is what the residents are
asking for um, or trying to come to some
type of compromise. They can't get
everything, but like how can we meet
them in the middle? Um, and just one
last thing and then I do want I know my
colleagues have questions. Um, I don't
know what it looks like for I hope we do
get some spray park systems. That's
since I've been on council that's like a
big thing for me. Spray pad, spray park,
like another place where residents can
be near water, can play in water.
Everybody's not going to go to the pool.
Um, so I think as we update these
playgrounds and Vernon Street, just
thinking about that concept, which I did
see one of the pictures up there, I know
it wasn't our park, but showing how um
Teter does work with small areas and I
saw that that was one of the things that
they had there. Um, so, you know, just
just making sure that that is um a part
of a plan or at least thinking of it.
Um, so I'll start down to my far right
with um, Councilwoman Lawson. Do you
have any questions?
>> Thank you, Chair Ross. Um,
>> the I think the slide may have answered
it. I saw the the budget of of 19,000,
but then I see deliverables are the
plans basically. U, uh, we're we're
we're paying them for the, uh, the
concept at this point, and we'll get a a
larger budget, I I suppose, once we get
that plan straightened out. Um you did
note that they were the the lowest uh
cost. Was that the reason for the
selection or or was it for their overall
work?
>> Uh in this mode we what we kind of got
into was who we think can deliver us the
concept the best way for the grant
application. And that and then if
everything works out and we get the
grant, we would potentially go back with
them. You don't have to, but ideally you
want to go back to this. We're using
utilizing them for a service right now
to help us develop our grant and provide
concepts there. That way, they're not
looking like we just drew them, but
they're actual concepts that would go in
the park. I think there is getting
community feedback and things like that.
Actual designs. They're not the final
designs or anything like that at this
phase, even when they're done. That
would come after we got the grant
approved. We have money to change up
those things.
>> Okay. And then you you did get them
because you like their work product and
not just because they were the lowest
cost. That's correct.
>> Yeah. We actually really weren't focused
on their cost. Okay. At all. We really
focused on what we thought they could
what group could do the best.
>> Okay. Great. Thank you very much. That's
that's exactly what I wanted to know.
>> Thank you.
>> All right. Uh Councilwoman Green,
>> thank you very much. I don't have any
questions.
Vice President Jones.
>> Thank you. Thank you guys for your
presentation. Um I know Councilwoman
Ross uh pretty much touched on it, but I
would ask you to expound on um the
timelines. Um I'm talking about the
parks in general from 7th Reservoir. Um
I know when the one time you guys came
in front of us, um we were kind of
pushing it and again if there was an
extension just so the residents can
actually hear that process.
>> Sure. So for that project um 7th and
Rner Gorgus Reservoir Park and um Wilson
Park we did have an another extension
till for 33 of 2026
and that's recent.
>> Okay.
>> Um we realized that we weren't going to
finish um for a variety of reasons. Um,
reservoir's still going to have some
issues finishing. Um, but we do think
we'll be able to get
>> no clawbacks. No clawbacks.
>> Yeah.
>> Outside of reservoir, I I can't really
speak to things. Okay.
>> Is very um difficult.
>> Yeah. Uh my other question is with the
Vernon Street project, um you know, that
that design looked pretty good. My
concern is the streets, Vernon Street
itself, the one coming out of
>> Mayflower. You talking about the alley?
>> The alleyway definitely for sure. That's
you know Axel Bendon Road there. Uh
>> coming out of Hamilton Health Center.
That that one too. That's 15th is it?
>> Yeah,
>> that would No, that'd be 15 17th. Yeah.
So just surrounding that area, are we
working with public works to to pave
those areas once this project again? I
mean it should have been done honestly
but um because people actually utilize
that space and I know this isn't your
question. I'm I mean for you for your
department but I'm asking are you guys
collaborating or looking at that along
with this project because I think that
would be an issue so people can safely
pull up drop kids off and you know
>> we can talk to John Watson about that
stuff. Okay.
>> It's it's twofold. Um, so on the road
where the alley is, the walkway has been
washed away for about 10 years. So the
wall that's at the park, we installed a
wall in 2017
and brown this actually late December of
that year and part of it starting to to
give. So if some of the storm water this
that would come into play here is taken
care of, they'll actually
should level the road off some, not but
also more of a consistent flow of water
so it's draining correctly. And if you
look at the um the grate that's out
there with the um the sewer, the
lateral, some of those things need fixed
and then the cross works need fixed. So
these are things that are could be fair
game. It's just they have to sort of
kind of come into the inclusivity part
and access going over to Hamilton.
um could play a role, but it's really
going to be road to road as opposed to
Hamilton Health. There's no walkway over
there.
>> No, I'm just saying just
>> but all it's all one thing. It's not
like they're you're trying to make the
road safe, but you're also trying to
storm water at the same time.
>> So, I understand that like the the
dynamics may not seem that way, but that
alley you need everything needs to be
tightened up.
>> Well, that's that's pretty much
>> but we have to make From a grant
standpoint, it has to make grant sense
for the park, too.
>> Right. But that's why I was asking is
there going to be You said you would
talk to Mr. Watson. Yes.
>> Right.
>> That's it.
>> We're going to try to make it into the
grant. So the covers
>> Well, I mean, we have our own equipment.
So, we can we can do some black topping
over there. So, you know,
>> a little more in black top.
>> I know. I mean, you you got Yeah, you
have deep holes over there.
>> Oh, yeah.
>> So, yeah. I don't know. I was just
asking a question. It didn't really fall
on you guys' department. And I was just
hoping we were thinking about this
because it's been a bad area for some
time.
>> Thank you.
>> I'll make sure it's on radar.
>> Thank you. I know.
>> You mean the old road? Not just by the
park.
>> N Yeah. Yeah. That whole square right
there is bad.
>> All the way up.
>> Yeah.
>> Yes.
>> All right. To 15th, 14th. Thank you.
>> Yeah. Gotcha.
>> And do you have any questions, President
Hill?
>> Um, yes. Thank you. So, in reference to
resolution two, I'm excited to see I I'm
hopeful that um the plan that will be
developed will be great. I like the
images that I saw from the other cities
and I like that there are at least two
community meetings built in um on behalf
of DCNR. So, I think that's exciting. Um
in reference to resolution three of
2026, I asked Mr. McCutchen earlier. Um,
can you speak to the pool improvements
funding or the limited amount that was
expended so far on phase one?
>> Yes. So, we're still waiting for the
consultant to finish a scientific study.
Okay.
>> At um Paul all manner.
>> Um there
after talking to Lamont, there did seem
to be some goofy things that he said
come correct. So, we've had some things
go down. So, we were waiting for the
scientific study to be a little bit more
expanded upon with um there's like some
brown water and um we don't necessarily
it's not like sinkhole, but we just got
to make sure that we can actually build
a pool there.
>> Okay.
>> So, those things sort of kind of went a
little stagnant after our last council
visit.
>> Oh, I see.
>> Waiting for the team to get back to us.
>> Okay.
>> Was delayed a little bit.
>> When do you anticipate
um So
>> hearing back from them maybe the during
the first quarter
>> it'll be in the first quarter.
>> Okay.
>> Um our every other weekend or Thursday
every other week or Thursday. So the
last Thursday they had to go out and do
a little bit more work.
>> Okay. Okay.
>> We are we are really probing them. It's
not just us as facilities. We're we're
all on the same call. We're really
probing.
>> Okay.
>> Can we or can we do it? So it slowed us
down. We had steam and we sort of lost a
little steam. So
>> Okay. Okay. Well, I hope we reboot and
get some more steam there. And then my
final question is around the other
programs, the extension that was granted
until March 3rd.
>> Um, do you believe that that is a
reasonable
deadline at this point? Do you
anticipate an additional request of an
extension or
>> We don't anticipate another request. We
we have went as far as we could at
things weather related. Um it's a kind
of a daily conversation. Um we are
meeting with one of the vendors
specifically each week to sort of go
faster. Um they did they're out there
working now. They they were a little bit
behind but they may have slowed down
some of the other groups from being able
to complete their work. So while we got
that extension that will help us get us
closer to 95% across the board. Um
there's one concern that we just might
not be able to do a playground on time
of March 3rd.
>> Okay.
>> Not saying it won't get up in March.
This won't be open up on March 3rd.
>> Okay.
>> Yeah, I do think we'll get done with
just the dates.
>> Okay. Well, thank you for the updates. I
don't have any other questions.
>> Thank you, President Hill. Uh,
Councilman Rodriguez.
>> Uh, thank you both for joining us this
evening. Um, I have no questions. just I
get very happy when any work is uh being
looked to do on Allison Hill. Sometimes
it's overlooked and um not saying it's
due to anyone intentionally doing that.
It's just the way the grant processes
work. Sometimes they identify more
pertinent areas what they deem more
pertinent. So anytime work um is being
done for the families of Allison Hill,
South Allison Hill, it's just, you know,
a joyous occasion. So I look forward to
seeing the park, you know, um fulfilled
and completed. I grew up on 16th in
Chestnut, so you know, I got a lot of
bumps and bruises right there on that
street. So, um, I look forward to seeing
it and thank you both for your work.
>> Uh, do you have any questions,
Councilwoman Davis?
>> Thank you, Councilwoman Ross. Thank you
both for being here this evening and
thank you for everything that you're
doing to upgrade our parks and make them
safe. Um, I'm thinking about
this particular playground and I believe
if my memory serves me correctly,
the
perimeter around the playground,
especially right there where that alley
is, there's nothing there right now. Am
I correct?
>> H,
>> there's um homes there.
>> No, the alley. the alley behind I mean
right there alongside of the playground
like there's not a fence or a wall or
anything there. I don't think
>> there's a wall.
>> So you said the wall is
>> the wall. Okay. Is there
>> and then there's a wall and then there's
like steps.
>> Okay. And but you mentioned the wall is
falling down.
>> Yeah. It's gonna it's was it wasn't
temporary but we got about 10 years out
of it.
>> Okay. Yeah. I was just trying to
remember. I do remember going through
that area and saying to myself, "Oh,
someone could easily go on that
playground while the children are
playing or the children could easily
drift away from the playground just
because that area right there by the
alley wasn't secure."
Um, so again, I'm just I haven't been
over that way in that alley in a while,
but I do remember thinking that and
wondering if the kids were safe. That's
all. Just from So, will this grant cover
a new wall or a new fence?
>> Yeah. So, the the grant for the grant
application here is to start building
towards a bigger project.
>> We're not going to be able to go get one
grant. We're going to need multiple
grants.
>> Um it's not a project that we anticipate
being done in in um like 24 months or
anything like that. We do expect it to
probably take about three years
>> to get the funding for this project.
>> Yeah. So just because of the traffic
that goes through that alley there and
all the cars that drive through there,
I'd like to see that whole side secured
so no one can go up on in that
playground and the children can't branch
out into the street into the alley while
they're chasing their ball or
>> so that's my only concern with that
playground. But thank you very much for
all that you do and that's it for me,
Councilwoman Ross. Thank you. And there
was one more question.
>> Oh, you do you have
>> It's not a question. It's just kind of a
clarification. Um as far as what
Councilwoman Davis was talking about
>> on the street that is Mayflower Alley,
there are not houses directly across.
It's where it runs right behind um
Hamilton Health Center.
>> So you're not crazy. There is a section
without houses. Um right and there's
like shrubbery there. And then the other
portion does have houses and then it's
the other street.
There is a section with the wall that I
believe is crumbling along Mayflower
Street that doesn't have houses that I
think you were speaking to. Yes, it's
Mayflower Street,
>> right? Thank you.
>> Like part of the park has fencing and
then the other part other part does not.
>> I I thought so. And um again, I'm just
concerned that the kids could just, you
know, be chasing their ball. It run the
ball goes out in the alley. It's just
not secure on the alley. There's a lot
of foot traffic that goes through there
and also cars speeding through there.
So, I was just thinking of safety and
hopefully that this grant could cover a
a wall, a fence or something that could
make sure that the kids are safe within
the playground.
>> So, thank you again for all you that you
do.
>> Thank you. Thank you both. Um, and Vice
President Jones, you had a question.
>> Yeah. Um, I've been meaning to get get
with you guys about this because I keep
getting um inquiries about uh the flat
top of Reservoir Park. Have there been a
study up there? People have been worried
about this thing crumbling down up there
by the Civil War Museum.
>> You have to talk to Joe about that. That
city engineer. Okay. I I did do not to
cut you off anybody off but about not
this budget but the last budget um I had
went out in the summertime with Joel. We
went up to the flat top. We even had a
company come out and I asked them to get
um a quote done to see how much would it
cost because it is tilting. It is
falling. It's scary to stand there and
look down. It's going right behind
McDevit. So I understood the concern.
Um,
I believe they had said that the Civil
War Museum may have had a grant, but
then I even spoke to uh, Solicitor
Grover and um, they didn't know if they
had a grant. It was a whole thing, but
then it was not even put in the budget
as a project because they said it was
said that it's not crumbling yet. So, I
know Councilman Jones left, but whoever
else needed that. So, it's not important
at the moment. So that's that's what I
got on it. So um I don't know.
So any other questions, concerns? Okay.
No, you're welcome. I would um please
add resolution two of 2026
um to our next legislative agenda. And
that's it for Parks, Recreation, and
Enrichment Committee. Thank you both for
coming tonight and giving us
information. Enjoy your evening. Oh,
wait, one more thing. I am so sorry. Can
you please send all of us the slides?
Thank you so much.
>> Thank you. We will move forward with our
meeting agenda. Next, we have public
comment. Just a few housekeeping notes
before we begin. Uh, please state your
name and your address for the meeting
record. If you don't feel comfortable
sharing your address, please share the
vicinity in which you live within the
city. You will have four minutes to
share your comments. Mr. Humphrey has
added a timer to the screen for your
reference. I will begin to my right. Is
there anyone that would like to offer
public comment?
Okay, seeing and hearing no one. Anyone
in the middle section?
>> Good evening, council members. My name
is Ca Rain, resident of Steel Barrow.
Um, as you all know, I was here last
week on the topic of ICE. Um,
today I'm coming again about the
subject, but not of my own view, but
that of my partner's experience in all
of this. I would like to take a moment
to thank Councilwoman Green for bringing
this up when the police department was
here. I do appreciate that. Um, but I do
have a letter from my partner who is
currently at home terrified to even
answer the front door because of what's
going on in the country right now.
So, my name is Aaron Rain. I have not
left my house since January 10th when
ICE first arrived in Harrisburg. I was
born in this country at Franklin Square
Hospital in Baltimore, Maryland. That
does not stop people from asking me
where are you from and assuming I'm a
Hispanic immigrant. During the Baltimore
ice raids in 2018, I hid in my house
with other members of the community who
looked like me because an American
citizen named Richard Garza, sorry,
Ricardo Garza, had already been detained
by ICE and had been detained for 38 days
even though he was a legal citizen. It
also does not matter that I am a mixed
race black man, as Germaine Thomas, who
was born on US soil on a United States
military base, was deported to Jamaica
on May 28th of last year.
I fled to this state after the literal
KKK chased me out of West Virginia after
protesting and writing a petition for
police reform during the Black Lives
Matter protests. I came to the city
because Harrisburg is so diverse and
welcoming to all. Now, I'm asking the
city that I've lived in for several
years to keep constituents like me and
others safe from ICE agents who
repeatedly break the law and detain
legal citizens. I would like to go I
would like to leave my house to go
grocery shopping, go to doctor's
appointments, and take my family out for
fun. I cannot do that under the threat
of wrongful detainment. I urge the city
to stop allowing ICE to go into
government buildings without a warrant
signed by a judge. I want local laws
preventing ICE from going into
businesses, hospitals, and places of
worship without a warrant signed by a
judge. I want local police to pledge to
stop working with ICE when they are
under no obligation to. Thank you for
your time and I hope to see you soon.
Following that, I would like to speak
more on recent experiences of American
citizens around the country as things
have been happening.
The terror that ICE has been bringing
doesn't just affect the unlawful or the
undocumented as they've gone into
communities arresting peaceful
protesters who are simply exercising
their first amendment rights. Pulling a
disabled woman from a car is seen on
January 13th in Minneapolis. They've
detained legal citizens like uh I'm
going to butcher this name and I do
apologize. Uh Doulsece Consuelum Diaz
Morales in Maryland, a US citizen who
was held for 25 days unlawfully because
of her name and skin color despite the
evidence presented of her citizenship.
There was also a New York City Council
employee who is as of this moment
unnamed to protect the privacy um that
is in the article as well. um but is in
the United States on a visa to live and
work here through October of 2026
and
was detained and sent to a ICE facility
in New York. The New York City Council
has not been able to get a hold of them
for any information as well.
And as recently as this morning when a
man named Chong Lelay Thao was pulled
out of his home in Minnesota in subzero
temperatures in just his underwear in
front of his daughter-in-law and his
four-year-old grandson and detained by
ICE who refused to see his ID because
they alleged that he matched the
description of two known sex offenders
that they also alleged live there
despite publicly available registries
documenting otherwise. This man was
driven out to the middle of nowhere,
photographed, and then asked for his ID,
which he didn't have because they had
declined seeing it while he they were
detaining him. In this instance, at the
very least, he was released after a few
hours of wrongful custody and drove back
to his home, still in only his underwear
and the blanket.
So, I do know I'm just about over my
time, but I do ask you, honorable city
council members, to pass a resolution to
prevent ICE operations in the area
without a judicial warrant signed by a
judge in businesses, residencies, places
of worship, or medical facilities so the
people of this beautiful city can
breathe just a little easier. Thank you.
And that's my time.
>> Thank you. Is there anyone else in the
middle section that would like to offer
public comment?
Good evening to the council. My name is
Kia Fowler. I am a new homeowner on
North Fifth Street as of Wednesday. So,
I'm very excited to be here. Thank you
very much. Um, I grew up here in York
County. Well, not Dolphin County, but
grew up in York County. Um, I've been
very privileged my whole life. Grew up
middle-ass family. Never had any
concerns. Obviously white, so I've never
actually had to worry about a lot of the
things that um, majority minority people
worry about. I have had the privilege of
being an immigrant. So even though I was
born here in the US, I immigrated to
Australia for a couple of years um and
was there during a lot of t turmoil. So
I am familiar with a lot of the fears
that a lot of immigrants have when it
comes to interacting with not only
hostile civilians but when it comes to
law enforcement as well. Um many many
immigrants are just here whether they're
documented or not are just here trying
to make a better life for themselves. Um
and are so afraid to step even a toe out
of line because the repercussions that
could happen. Uh it's been really
dismaying to see the actions of ICE in
our communities and I think the c thank
the council members uh for their
comments when the police officers were
here about their focus on keeping
Harrisburg residents safe. Um I really
really really want to make sure that if
something like Minneapolis comes to
Harrisburg that the residents documented
or undocumented are all being protected.
I would really urge the council to look
at passing um some kind of law
resolution um just to prevent 287G from
being enforced here in Harrisburg. Um I
would really like to see the focus on
local police protecting citizens and not
cooperating with ICE as much as
possible. Uh we've seen many many
instances of ICE in Minneapolis and
Minnesota at large violating people's
due process rights. Uh various other
constitutional rights. Um, we've seen
citizens being injured. Um, not to
mention that a lot of ICE were so much
when it comes to the Renee Good
situation. Some of these issues with
with ICE creating dangerous situations
in order to do what they want was so
bad. Then 2014, um, that law was passed
telling officers they could not step in
front of cars, in order to be allowed to
use lethal force. Um, we've seen a lot
of ICE officers u just acting with
impunity uh wearing face masks, hiding
and I would hate to see the residents
scared to come out of their own homes.
Um, this city is so amazing because of
its diversity. I am Jewish and so I love
being up here where I can see people of
various ethnicities, faiths, religions,
languages all interacting and bringing
such a vibrancy to this community. and I
just don't want to see any of that
impeded uh by this lawlessness that
keeps happening. I thank you very much
for your time and I would really hope
that you consider preventing the
enforcement of 287g. Thank you.
>> Thank you.
Is there anyone else in the middle
section that would like to offer public
comment? Okay, seeing and hearing no
one, anyone to my left.
Good evening, council prophet chestnut
between 20th and 21st. Um, I understand
this ICE issue, but we have to keep in
mind that the president did say
effective February if we do um become a
sanctuary city that we will lose funds.
So, um, consider that. You don't want to
what they say, bite off your nose to
please your finger, right?
Um, I'm an immigrant. I've been in
America since 1983. That's 40ome years.
I've been in Harrisburg. I left Germany
in 2007. So, I've been in in Harrisburg
since for 19 years. The point is it is
difficult.
But if our residents came into the
country illegally, then that is a crime.
ICE are federal agents.
Their jurisdictions
is federally not by the city. If the
individual have come into the country
via visa, whether it's a F visa, a B
visa, you know, they will have something
called a I94.
This is a entry document.
If they overstayed
their time,
then that is a civil, not a criminal,
and they won't get the same type of
penalties. Now, if you do want to help
your
visitors that are in here without um
justification,
if they have a I94,
then we can try to move them towards
agency that can help them,
you know, to become legal. But to become
a sanctuary city is not a good move.
You're going to lose your fundings.
You're actually acting against your
parent. And your parent being the
federal government is not a good move.
Um, and yes, the Megan the the goods and
and and there's a lot of things going
on, but you know, if you jump in front
of a car, an ICE agent, a armed officer,
and you go, I mean,
that they're they're justified. There
are a lot of things that they're doing
that is very justified. And if you go
ahead and you allow these criminals
to control the city and come and cry and
listen,
if you're a citizen, then you have no
problem. If you're not a citizen, yeah,
you have a problem. But ain't nobody
want nobody in their backyard
unless they're invited. So don't go, you
know, coming here crying.
We're not in the Holocaust. This is not
a slavery movement. Stop using other
terrible things to justify what is going
on right now. And this is just a simple
federal agents trying to conduct their
jobs. Thank you.
Thank you. Is there anyone else to my
left that would like to offer public
comment?
Good evening. My name is Melanie Cook. I
am a resident of the city of Harrisburg
and I have been for most of my life. I
live in the 3000 block of North Third
Street. This wasn't where I was going to
begin, but let me begin by saying that I
do not live in pre-Nelson Mandela, South
Africa, and will not be producing
identification unless it is warranted.
The second point is if we are talking
about if you are not invited here you
should leave most of us in this room
would be gone. I am of silige Cherokee
descent um and I can assure you we would
like North Carolina and the southern
states back. We have to be aware um that
there is a process under which that has
existed in this country for many years.
Not to age myself, but in 1980 I was an
intern at a select congressional
committee on immigration and refugee
policy. The document is out there. I
suggest you try to read it all of you.
Trash bill relief. Um while there was
discussion of the two approximately 292
properties that may have received uh
compensation, well not compensation, uh
a walk to date, um there was no
information as to how much money um has
been written off. Um I as a citizen
would like to know um how much money is
in the pot and how much money has been
excused to date. Uh, with respect to the
project at 1332 North Second Street, I
do want to commend the city council
members, particularly um, Miss Ross RS
uh, for her pointed questions and
looking out for the existing tenants.
When these new projects come in, we want
to applaud them, but there are five
people at least who have been living in
these buildings, no doubt, for many
years. and very easily it could be
flipped in a way that they would be out
and what they are required to pay would
be um increased greatly. I also commend
uh President Hill for her question with
respect to what is making you produce uh
28 affordable units and note that the
response was we have been educated by
others about the feasibility of
affordable units. All of you or most of
you who have been sitting here should be
commended for the work you've done. the
pressing pressing pressing about
affordable housing. It is not going to
happen overnight. They are not going to
do it unless there's something in it for
them. And you are all to be commended
for the work that has been done, the
demonstration that these projects can be
done in this city. They're aesthetically
pleasing and they provide much needed
housing. Um, a point I would like
clarification on is at the end of his
presentation he slipped in that they
will be pursuing tax abatement 100%. The
question that I have is this property is
owned and the units are going to be
rented. So the 100% residential
abatement would apply to whom? to the
property owner who would not be paying
the tax uh because the renters wouldn't
be assessed to tax. And the question I
would have is how much of the rent um
has been factored in for a tax that they
may not pay. Now, it's one thing to say
we're collecting 20,000 8,000 whatever
he said. Um but if they're getting 100%
tax abatement, then presumably they're
not paying anything. Um with respect to
the project at PA Clinic, I as many of
you know have worked in a number of
fields. Um one of which was a
governmental affairs for building and
developing industry. I can say
definitively that the developer for that
project, Pinark Holding, is one of the
most impressive people I have ever seen.
And those of you who know me know I do
not blow smoke. um they have come in and
offered and done things that I have not
seen many developers do. I implore you
to use them as a model for how the city
wants to see these projects develop
going forward because they are showing
you they are including people. They are
genuinely listening to comments that the
public makes and I implore you implore
you to follow up.
>> Thank you, Miss Cook. Yeah.
And again, we need a whole separate
thing on this situation with ICE.
>> Thank you.
Is there anyone else that would like to
offer public comment? I don't want to
miss anyone. Okay. Seeing and hearing no
one, I did want to respond um regarding
the trash bill forgiveness program. So,
Antonio, as I mentioned when we were
talking, um, did share the updates as of
December 11th, 2025.
So, bear with me. Um, he shared a trash
bill forgiveness program tracker. So,
I'll share those numbers, but he noted
then that we have $913,967.97
remaining in the program. The phase
three list of residents includes 575
residents and is currently being
reviewed by the administration to ensure
there are no employees, elected
officials, landlords, and businesses on
the list. Our goal is to mail out
letters with applications to the
qualified residents by December 19th,
2025.
There will be a timeline stated in the
letter of 15 days of for applications to
be returned. However, due to the
holidays, he anticipated um the ongoing
of a minimum of 15 business days. Um he
noted that they are going to communicate
the exact date and the date that they're
mailed um to council and that would
begin the phase three. So he's going to
provide another update of this tracker
when phase three is complete. So we have
a program overview
and the phase one total forgiven was
$835,37530.
Phase two total forgiven was
$250,656.73.
For a phase 2 overview, the total number
of churches that received of this
forgiveness were 20. Um total accounts
26 total contacted 16%
contacted 80%.
Total attended 9156%
attended 91530%.
Amount forgiven again that was
$250,656.73.
The total potential forgiveness is
$265,126.81
for a percentage forgiven of 94 uh.54%.
For a phase 1 overview, there were 536
um total mailings. Uh the total received
was 268.
So the percent received was 50%. The
total forgiven 835,37530.
The total potential forgiveness
1,531,53689
percent forgiven 54.54%.
The largest forgiven was $8,534.
The smallest forgiven was $77125.
The largest possible forgiveness
uh is $9,5365
and the smallest possible is $3557.
The number that were not returned uh was
211.
The number of bad returns was 57. The
number of landlords 21.
And the number of demoed were four. So
I'll repeat all of these numbers again
um during our legislative session. That
way they are included uh with the
meeting record. And perhaps Antonio, am
I permitted? Are we permitted to share
this? So as I review it, everyone can
view it.
>> Okay.
>> Oh, okay. Didn't have that one, but the
as of December 11th. So we have another
update um as of January 9th. So I will
share that next week, but I did want to
note that you pre previously provided
that. So thank you.
>> If there's no further discussion, any
>> Yes, Councilwoman.
>> Thank you. I was going to ask if that
information could be put on the website.
>> Not sure.
>> I'm not sure. I know that we can share
it during our meeting.
>> We can place it on e-codes.
>> So, okay.
>> Under miscellaneous documents, so it can
be viewed there.
>> Great. Then everyone will have access to
it, but we will review it again. So,
thank you.
>> Thank you.
>> Um, the time is 8:37 p.m. I will
entertain a motion to adjurnn.
>> Is there a second?
>> Second.
>> Thank you. We stand adjourned.
More transcripts
Explore other videos transcribed with YouTLDR.

Ahmet Serttaş ile Sıla Yolu 2026
Ahmet Serttaş · Turkish

Beginnt jetzt der Run auf TD Funding? (P2P Kredite News)
Passives Einkommen mit P2P Krediten · French

Carta de un bebe desde el vientre de su mama
Luigi C · English

2024 Maruti Suzuki Swift review - Return to form for India’s favourite hatchback | @autocarindia1
Autocar India · English

Param Sundari BGM - Dhoti Scene BGM | Pardesiya Female Version BGM
BGM Tracks · English

Teknologi Ramah Lingkungan di Kehidupan Kita
Hujan Tanda Tanya · English

قصة أصحاب الرقيم الشيخ ياسين الجمري مجلس الدعيسي
Majlisaldaaysi مجلس الدعيسي · English

O melhor cardápio digital para delivery em 2026 | MenuDino da Consumer
Marcus Barbosa | Analista Consumer · Portuguese (Portugal, Brazil)

Live de definição de Chaves do Grupo 12
Cooperativa Habitacional Vida Nova · Portuguese (Portugal, Brazil)

Modi Govt Opens Talks With CJP| Sonam Wangchuk Ends Fast, Dipke Refuses to Back Down|Dr.Manish Kumar
CAPITAL TV · English

How the Novel Coronavirus Infects a Cell: Science, Simplified
Scripps Research · English

MÓDULO 3 - Video 2: Seguridad en infraestructura y gestión de riesgos
Academia INFOTEC · Spanish
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.