uh you received your July 10th meeting
minutes are there any changes additions
deletions
if not I'd like to get a motion for
approval I'll move to approve as
submitted is there a second second it's
been moved and second for approval of
the minutes as they are all those in
favor state by saying I I oppose
extensions motion
carried under old business there's
none under new business uh item number
one is a lot consolidation on land
development plan application for Capital
Heights phase
three this is Zone RM is followed by
Chris Bryce and David long with Midtown
Redevelopment
LLC is to consolidate Lots across six
separate sites to construct misuse and
multi family blowing structures along
with the seated site and excess in
will be provided in
property project
Isis Street to the South oh thanks uh
and Logan Street to the West
the applicants intend to vacate Jud
alley and consolidate the subject
Parcels into nine separate project sites
that will include seven mixed juice
multif family buildings with site and
access improvements and four Town Homes
two along Logan Street and two along
Clinton Street uh per the development
map in the case report the planning
Bureau staff recommends that the case
that the uh application be approved with
the following conditions uh the
applicants will redesign aspects of the
project which were changed subsequent to
the zoning hearing board approval
including the configuration location of
buildings 5 through 7 and the Logan
Street Town Homes uh or will submit uh
resubmit new zoning relief applications
for such changes and receive approval
from the zhp uh those were based on some
preliminary drawings that were received
by the planning Bureau um in the uh
interim uh the applicants have provided
updated documentation on um some of
those issues uh including the removal of
a floor at Building 7 uh such that um uh
much l zoning relief is necessary uh if
the applicants want to move forward with
the uh uh project as proposed uh the
applicants will redesign the Logan
Street town homes so that the property
at 1640 nor4 Street can be utilized as a
public amend amenity incorporating a
relocated community garden which the
applicants agreed to during the review
of phase one of the Capital Heights
project which included the removal of
the community garden on North Third
Street uh the applicants should design
all the proposed residential units
within the project to be at least
visitable if not fully a Ada access ible
including aspects such as zero step
entries for the proposed Town Homes to
ensure the units are accessible to as
much of the population as possible uh
the applicant should ensure that the new
vehicular access point on Clinton Street
uh features a driveway curb cut design
as opposed to the current Street curb
cut design uh the applicants will
coordinate with the city Engineers
office on new or reconstructed sidewalks
and pedestrian markings such as
crosswalks uh the plan Bureau recommends
that the applicants consider sidewalks
full width of the public right away
Along Hamilton Street and North Fourth
Street specifically and uh the
applicants will should should consider
the inclusion of secure ground floor
bike storage in the proposed apartment
and mixed use buildings and will include
bicycle racks near the entrance of the
commercial spaces and buildings uh 2 3
and four as required per section 7-
327.5 of the zoning code the plan bureo
would recommend that such parking be
located near the main entrance and
sheltered if possible uh the applicants
will provide formal landscaping and
photometric plans to inform discussions
with the City Arborist and to confirm
consistency with the applicable
regulations of the zoning code such as
the fence regulations and the
environmental performance standards the
applicants should consider using native
tree species and pollinator plants and
finally the applicants will coordinate
with the Department of Public Works to
confirm the appropriate size location
and design of refu collection
particularly for the multif family
dwellings and mixed use buildings plan
Bureau staff recommends the request be
approved for the following reasons the
applicants have received approval from
the zoning hearing board where the
various relief requests needed to
effectuate the project as previously
submitted and if the bureau's conditions
are adopted will have met the conditions
of those approvals in the subsequent lot
consolidation and Land Development
submission uh the project will enhance
the character of the neighborhood by
replacing vacant Lots with buildings
that reflect the height massing and
configuration of the surrounding
community and will enhance pedestrian
infrastructure throughout the project
area the proposed residential uses both
the town homes and the apartment
buildings will feature two bedroom units
which are inard which are in higher
demand than some of the studio or
one-bedroom developments that have been
more commonplace in recent proposals and
finally The Proposal will add new
residents to the neighborhood and
activate the street and surrounding
community on nights and weekends and
contribute to a growing customer base to
support local businesses okay thank you
Jeff U could you state your name address
and relationship to the
project Matt long with Midtown
Redevelopment uh Andy George with one
law representing Developers
okay um you gentlemen heard the staff
report um with the conditions are you
acceptable of those
conditions um so uh thank you Mr
chairman by the way um I I don't know if
if uh this board because you've seen
this project on many many occasions
would like a presentation on uh the
project discussion around uh the
buildings and uses and Cly Mr can do
that and then we can talk about the
conditions look we can make things easy
I
mean we'll accept the conditions except
one we'd like to talk about with the
Planning Commission and and I leared
Jeff to some concerns um and we like his
input as well too so would you like a
little presentation for us to talk about
the project do that or we can talk about
the conditions I say since even though
we have reviewed it many times but we
these specific uh project yes we would
like a quick review okay and we do have
amended plans if you'd like me to pass
those
out are those different
from there are some minor um uh changes
in the plans with respect to like I said
U building seven in the original plan
set was four stories and 16 units this
one shows 12 sto or 12 units and three
stories um and a few other changes here
and there um with respect to some of the
building Footprints but for the most
part they're pretty similar I don't
think there's any um substantive changes
between the
two oh and uh two more uh one more
change I should note is buildings three
and four on those new sets do show the
first floor commercial space which the
prior set did not
um they just showed it as being sixun
apartment buildings but they still do
have the first floor commercial
space a quick walk through on the
project is these are the vacant lots and
Capital Heights every one of these is
the vacant lot that's been vacant for
sometime um and part of developments
that were started failed started stopped
failed uh repeat over and over about
four more times these are all infill uh
three buildings are uh very much
infill uh spaces that hit Corner Lots um
that are approximately 30 to 50 ft wide
uh they feature first floor commercial
space with a few apartments above each
uh there's adjacent parking uh to each
building um and then there are three
larger 12 unit buildings uh that span
across bigger lots that are about 200
feet long and about 100 feet wide and
then there's one 8 unit apartment
building uh that sits on a about 100
about 100 foot wide and Watt by about 70
ft deep um
the ldps that you have in front of you
um reflect the zoning that was approved
previously in the layout that were
approved previously with one note on our
zoning plans the language that was
listed was to match existing prevailing
setback on
buildings 5 six and seven or de and
app when we received the paperwork from
the solicitor uh the zoning hearing
board solicitor with the order there was
a note after the order on page 22 that
said instead prevailing to match
existing prevailing setback it noted to
move them to the front yard line this is
the only condition we have an issue with
because if you're on these Lots Folton
Street is very so every one of these
would be pushing against fton street
it's very narrow it's only about 14 feet
the total right away is 20 feet so it
gives you 2 6 in sidewall which isn't
legal to begin with we'd have to have
minimum 3T so we'd already be
encroaching 6 in onto the land to make a
legal sidewalk which is the intent what
we'd like to do is move the buildings
back about four or five feet because
you're going to have 15 135t long
building 3 feet off the road on a 14t
wide Road that's our concern is you'd
have a very
narrow lock a road way with a large
building directly adjacent to it and
then our original plan should prevailing
the prevailing block the only uh
instance of this is the existing town
homes on fton street and they sit back
about 6 feet and that was our original
intent is to sit back about six feet so
you're not crowding this big building
right against the road and there's ample
room on the other side to still maintain
plenty of Green Space facing roads alley
and uh Meer alley
um well I mean as to the zoning hearing
board's decision it is as written and if
it was not challenged by the applicants
that's what the zoning hearing board
decision is and so that's kind of what
the applicants need to conform to now
their point about the narrow sidewalks I
think is accurate if you go out there
they're almost certainly not um you know
compliant with the city standards I'm
kind of confused as to why they were
built that way in the first place um but
if the applic intention is to you know
provide a wider uh sidewalk um for the
general public in front of their
buildings we think that's a reasonable
um uh justification for um some
deviation uh for that uh but if it's
just to put a six yard a six foot wide
yard in the front you know as we noted
during the zoning hearing board uh
reviews and the Planning Commission
review of the zoning relief requests um
you know a lot of times these little
interstitial spaces
become useless spaces they become they
get walked on they just become dirt
patches and they're really not
contributing either to the streetcape or
to the benefit of the tenants of these
buildings whereas if buildings are moved
to the front property line you create
more space behind where they can have I
know patios you know fire pit cornhole
whatever a place to go out and uh um you
know maybe walk your do dog or something
um so in the interest of you know having
a more useful uh property I think and
something that I think does better
conform to the overall uh neighborhood
and they're right that the one row of
buildings across the street uh from site
five uh with the town homes is set back
and frankly I think going out there kind
of proves my point is that some of them
are overgrown with lots and it's because
they those spaces have no utility um and
so I think it would give the overall
project more utility the overall project
sites more utility to have them as close
to the front property line as possible
again if it if the intention is to the
applicant's point to try and provide a
more ADA Compliant path along the front
edges of these buildings that that I
think is a good justification um but if
it's just to have a couple of bushes
that are going to die out in a year and
a half or something I I don't think that
um that's frankly good Urban Design or
would be would make the projects look
better just on we would be perfectly
accept making a majority of it sidewalk
but we' also like to still have some
type of vegetation trees if you walk
around the block if you're walking up
Hamilton or you're walking up Harris you
have tree planters every 15 to 20 feet
that's the type aesthetic we'd like to
keep and we you know most of all we
would like to keep the building back so
it's not crowding the street and you're
not walking down you're not right
against someone's bedroom you're not
right up against the building um so we
definitely are not opposed to making it
a majority sidewalk with the ability to
have tree planers say every
15t
um quick
question Jeff yeah if if if that would
occur I believe that would be consistent
with the zoning code right we wouldn't
be in violation of The Zing code with
that six foot setback and with addition
I think the devil's in the details on
that we really have to see exactly what
that looks like I would not feel
comfortable giving a response without
seeing you know something written with
Dimensions well but if if the cach wrote
five foot or match existing prevailing
set back which that would do if we say
they're five foot then we're matching
the Z directly the point being the zon
hearing board rendered a decision with
their decision written out and so the
project needs to conform to that and
this was kind of the planning bureau's
intent from the get-go last year when we
were reviewing this project is not is
again not to have these small little you
know 3 foot x 3 foot front yards or
whatever it's to have a building that is
reflective of buildings literally
throughout the city um I don't
understand frankly the concern about
crowding the sidewalk when you
know blocks throughout Midtown Uptown
Allison Hill have buildings constructed
right to the sidewalk it is what kind of
defines Urban um streetscapes and urban
spaces is to have this um is to have
buildings fronting these uh uh the
sidewalk and directly accessible um to
the public right away yeah my
understanding of the concern though for
the developers Jeff really is the the
size of the sidewalk of area so um can
we reach a an agreement that expanding
the sidewalk would be good for Ada
purposes um to create some additional
space on the sidewalk for people to move
uh like I said I think then widening the
sidewalks to make them you know five
foot wide or whatever however large uh
wide they end up would be a reasonable
justification for that but um otherwise
I would probably say no okay so if if if
we if
we agree to expanding the sidewalk and
subject
to sta planning staff review prior to
the submission and following the plans
would that be an acceptable condition
that's up to the Planning
Commission if it's for the expansion of
the sidewalk that would be a
justification in my
opinion I'm going to um go to the
Commissioners I have no question at this
time and I'll start with commissioner
old yeah I know at this time right
commission
re these units are mixed income units
yes uh the whole overall project has U I
believe about 14% low income set
aside and the town homes those will be
those those four town homes in this
packet are low it doesn't too
low thank
you uh commission mark
uh thank you yep I'll start with an easy
question what's the uh project timeline
that we're looking
at within a year um and again I always
CAU saying this because as Chris and I
can tell you right now we are still
these are all H um we just got for the
project you heard almost two years ago
to the day uh our plans are sitting
with the codes Bureau and they're also
sitting with h waiting for some
revisions to the contract language and
after 17 months we receive new parcel
ideas So within a year is the ideal
time to break ground or complete ground
break okay all
right um so going back to the
conversation about you know the the
frontage of the buildings on Fulton
Street and setbacks or being right up
against
all do you know Matt what the WID is of
the proposed sidewalk presently is it
like a foot less than a foot the
addition I can't see a diens if you
follow what's there now uh they're two
feet 6 wide they're not even up to code
so if you look at our plans you see
about 6 in on there that's to get them
to Legal width right there I mean these
are they weren't built to code yeah and
they weren't built like anything else in
the city you don't have anywhere that
you have a two foot6 wide sidewalk and
the RightWay is 20 feet you got a 14
foot wide road so right so the side that
bit of sidewalks in the has to be in the
right of way of the road because it's so
yeah so that's not even ADA Compliant
correct at the current Dimension
no but
yet one of the conditions is asking for
Ada comp ADA compliance and visibility
at the highest extent possible so we're
sort
of sort of like double like like it's a
little bit hypocritic we're kind of
going double-edged sword here asking for
one condition but then not really
allowing for the other condition to be
fulfilled it's a little contradictory of
what we really want here yeah and and
like I said I agree that widening the
sidewalks is a is a reasonable
justification I would just like if if it
was just to have the setback with a yard
in front for example I would think that
that would not be you know a reasonable
justification right um yeah I mean I'm
thinking about the ADA compliance
accessibility the desire to allow for a
greater visitability of access of the
sites also the vision zero City plan of
pedestrian priority and
safety um so so that's sort of some
things I'm thinking about I going back
in then the planner thought
um would it be a possibility and a
consideration to sit down with Claire at
crw to
discuss um incorporating some of those
tree Wells and
uh the smaller storm like rain basing
you know rain capture areas you could
incorporate some of those if you went to
a six foot plus sidewalk with um it also
might help with some of your storm water
management
requirements on the
sites some food for thought
for is the condition
one all focused around this chain
that
was there other the condition one was a
little vague to me and that might just
be because I don't remember right the
back and forth well like I said it was
uh related to like the Logan Street Town
Homes were set back um and those in the
initial design and Zoning review were
set against the front yard there was the
additional building on um additional
floor on building seven uh and some of
these have been corrected in the um
revised plans but uh additionally when
the zoning her board does render a
decision if a plan is designed to not be
in conformance with those um conditions
of approval they uh the applicants have
to go back before this actually happened
it doesn't happen often uh but it did
actually happen with the molder Square
project where they moved some of the
units from one of the sites into another
building and the applicants had to go
back to the zoning hearing board and get
relief from the condition the zoning
hearing board applied in that situation
so that's why we want to make sure that
the project is going forward in
conformance with the zoning hearing
board decision sure understood that
makes sense
um my last question is around condition
two what is the intent of the planning
Bureau about redesigning that so that
it's utilized as a public
amenity so that was as as noted in the
condition there that was brought up uh
during the discussion on uh phase one uh
which was um the block along between
Third Street and Logan Street and if the
Commissioners may remember there was a
bit of a consternation uh from some
members of the public about the loss of
the community garden there along Third
Street and uh I mean you might not
remember that it was a while ago and I
think the garden itself has fallen into
some disrepair since then probably due
to the kind of Uncertain nature of where
everything stood there but um as a um uh
as a offset uh the applicants um had
noted and I believe it actually ended up
in some sketch site plan uh that they
would be having the community garden on
the Block to the east in fact I looked
it up uh while doing this case report
and I believe commissioner Merck you had
asked about that and they had said you
know we will provide this Garden um to
the East and I believe it was meant to
be a continuation of a brick sidewalk
that went through the uh block of phase
one and then through this site through
this uh block here alongside the Logan
Street town homs
if I can real quick on that um the size
of the town homes have been increased a
little bit which page are you on so
chp-1
c-1 thank
you so the community garden is still
going to be there um and we will update
the plans to show access to it but it
will be at the the where you see site
Logan Clon yeah that's where that so
what we'll do uh before submission and
we'll make you know send to the planning
Bureau is we'll throw a hatch pattern on
there and show this area is dedicated to
community garden if you look directly
above that there's actually an existing
RightWay there uh and there's a pathway
you you'll see it even indicated uh to
your left there's an existing walkway
there that buts the property so still
have a RightWay access um and then we
will show the portion beyond the
townhouse lot as dedicated to communal
space community garden space so there'll
still be access um we might put a note
on there that the portion of
access
within our land will be updated and
upgraded for easier ease of
access what's that yeah if well if the
intention is to expand that over to
North Fourth Street so that it's
accessible to the public and visible to
the public I think maybe that'd be okay
but to just put a little island in the
center of the of the block that's really
only accessible via the parking lot and
bya a maybe 4 foot wide uh Grocers alley
that runs behind buildings like that to
me does not say welcome Community it
does not say this is a community space
it says you know this is a space that's
really off limits to people and um you
know I don't think that was the
intention uh of the planning Bureau to
accept what they're proposing now um
when we discussed this a year ago uh and
you
know the I'm not sure why the townhouse
is just had to be widened all of a
sudden the ones along um uh Clinton
Street seem to be about the same size as
the lots that are along Logan Street
they've just widened the houses uh and
again post discussion of this with the
Commissioners and with you know planning
Bureau staff and uh you
know I I just think the applicant should
be following through on the commitments
they've made in previous discussions of
this project and phase one of the
project um again maybe it doesn't have
to look quite the same as using the
whole block or the whole property at
1640 North 4th Street for public right
away but you know that was definitely
the
uh discussion point at the last meeting
and um to change that then after the
fact after getting approvals is you know
not something that I think is a good
look um when we're changing the design
to something that was previously agreed
upon the applicant has no issue
dedicating four four feet space to the
north to wider access
which would match the
original well I can't Jim in about that
commentary it's between those
two we no toic it was 4T back so it
would be an 8ft
wide um so you have 7 ft right now
between the two but given up the three
foot set
back think the constract ability on it
this one the house doesn't actually
encroach the whole way so we have room
to run on the side this one there
actually built right onto the property I
wouldn't want to give up to 3 ft there
for constru
giving
thist as a dedicated path or an
EAS which would match the original plan
of the wi walkway I mean I'd really have
to see a
um a site plan of what this is as
opposed to a conceptual discussion um
for me to say whether the planning
Bureau felt that this met the intent of
the discussion at previous
meetings can we the Practical question
you're kind of negotiating sitting here
at the table for something that's not
confronted with the board so what are
you asking the board to do well we just
received these on Friday I'm asking what
are you asking the board to do because
how they something that's not in front
of the PID fuel should be
conditioned asking the bo to add
conditions you're proposing tonight I'm
just trying to get clarity what the
board is going to be es well I think I
think um
there are eight
conditions uh
that came along with the recommendation
from the city I think we're asking that
those conditions this board consider
amending those consistent with the
discussion tonight so so they're very
detailed what you're saying yeah and so
I just the clarity of everybody it has
to be very detailed how this what in
front of yeah and I think that along
with that I would say Neil um because I
think Jeff raises a good point that
certainly if the language isn't
perfected tonight but it comes with a
the plans have to be submitted to
planning stand for approval on on
meeting the conditions being discussed
tonight because I know for instance Jeff
ra a concern with look you're asking me
to say what's the sidewalk going to look
like when it's six foot and I don't have
a plan in front of me I want to see what
it looks like where the planners are you
know I think that's that's reason where
saying look I'll reverse the plans back
and you know provide some sort of easer
right away if that's subject to planning
staff review I think that' be an accept
condition I was just trying to get
clarification
trying I'll leave it to Mr
night at the end of the day I guess my
concern is why this plan does does not
look like what was reviewed and approved
at the zoning hearing board I don't
understand why certain changes are made
like that's the whole point is to say
here's what I'm going to do here's a
zoning relief I need to get to do that
and then here's Land Development plan to
effectuate what I said I was going to do
and now we're getting changes between
what that zoning relief is and now and
you know I there without seemingly
justification there seems to be just
well we decided to make the buildings
wider or we just decided to change this
community space we we told people where
it's going to be here and that is my
concern is that this is done kind of
really like I don't understand why these
things are being made when the whole
point of the process as we go through it
is to say this is what I'm doing here's
the
legal uh here's the legal uh permissions
that I need from the zoning hearing
board and then here is the land
development plan that again accomplishes
what we all talked about during the
zoning relief process and then there's
these changes between and if those if
that wasn't what they intended to build
they should not have brought that before
the board is my concern because now it's
just well we have to do it this way and
it's different than what we said
before Jeff you're saying
that we vote
on your report with the
conditions and they're acceptable of
those that's not changing the plans
right yeah and I and I think there is
some wiggle room here given the
conditions it says you know they'll use
1610 North 4th Street uh for um the for
the community space in the garden and
you can do that without having used that
whole property and still meet that but
if it's just hey we'll give you this 4
foot of space between these two fences
here that the community can walk down to
get to this Garden to me that's not a
community amenity that's not what uh the
intent of that discussion was at the
previous
meeting I just raise the issue then Jeff
is it is
it not consistent with the code and I I
think about both of these issues I
mean a plan may have been presented to
the zoning hearing board for the
purposes of relief but if a subsequent
plan is consistent with the code
regardless of what relief was granted by
the zoning hearing board
why does that matter so for example if
you have a
non-compliant not Ada accessible um
sidewalk you wanted to build back um off
of the street further which you're
permitted to do and these with
zoning and your proposal is to expand
the sidewalk and that's consistent with
the zoning code you don't need zoning
releas so even though zoning human board
may have conditioned something and we
may but that's the thing we may you're
you're bringing these things up now when
it's like okay we're what if we do
something different and I said I said
maybe that's something we can work
through but again I've asked for
drawings I don't have you're asking me
to say yes to things that I can't see
and that's that's why I said I think the
proposed The Proposal then from us would
be there's a list of conditions we'd
like to meet with those conditions in a
different way and we're fine if the
condition is that there have to be plans
submit to you planning staff for that's
part of the approval tonight we would
accept that as a
condition again I if if they want to if
the board wants to say we are fine with
adopting these with that condition that
the plan will meet planning Bureau
approval I guess it sounds like you're
asking then if I say well I don't like
this are you going to say you know well
we can do it anyway because what you
asked for is not in the is not
likei you have to approve it so again
you know may I real quick we're we're
going onto a long drawn out conversation
here and what I'd like to go back to is
we got two items we're talking of the
community garden and we're talking about
the
side the proposal that we're asking for
tonight is very clear and doesn't
deviate from the zoning plans it
deviates on language that was adopted in
the order that's open for interpretation
like
they're Illustrated in front of you is
the setback that we're requesting Jeff
is saying it would be acceptable if it
was presented as concrete as a sidewalk
that is our proposal it's that that's
where we're at it' be proposed as
concrete there there's nothing more and
then on the community garden I will note
that the community garden was never in
the Zoning for this phase it was in the
Zoning for a prior phase it was not in
the zoning for what is approved and what
is in front of you what is depicted in
front of you in these drawings matches
the two six of 23 drawings that were
submitted and approved by the zoning
hearing board and this Planning
Commission last year it would still
allow for the community garden and we
are willing to take the additional space
that is not required for the homes and
dedicate that we have two things change
to concrete
and add the additional space to make it
more welcoming as you walk down to the
community
garden I I would argue that the plans
here do not match what was shown to the
zoning hearing board if they did it
would have been brought up at the former
meeting they and the applicants admitted
they they changed the configuration of
the of the roow of the Logan Street row
homes I'm just I'm just asking people to
be consistent when they come before the
boards and say Here's what I'm going to
do if then if they then follow up and do
not do that then you know that is that
creates a problem for me that creates a
problem for me because they've sat in
front of the board and in front of the
public and said we're willing to do this
and especially in regards to the
Public's concerns about the loss of the
community guard say we hear you we're
going to do this for you and now later
they come back and say we're not going
to do it that way and to me that's a
that's a concern that is a concern to me
and I I don't know if it's a question
per se but in the spirit of yeah
continuing to try to refocus and narrow
down I just wanted to share that it did
sound to me earlier having to do with
the setbacks and the sidewalks that a
wider sidewalk which I think everyone
agrees is a good idea could be a
justification for that I guess slight
change to condition number two does that
and I'm not saying and when I said that
I'm not saying I would prove it because
again I have to do this in conformance
with the zoning hearing
board so I was not if if it came across
as that as I was saying like yeah i'
sign off if you change this because I
like the thing you're doing like that
was not my implic it's not my intention
I I appreciate that and I'm not trying
to pass the buff on that I guess I would
share my view that I think I would
Elevate the concern about getting those
sidewalk width up to the legal standard
and hopefully a little bit you know to
be
the elevating the elevated concern in my
mind so I would view that as a
justification for the the piece of that
that we were talking about first I I
know that we were talking about a second
thing as well but I guess I would share
that with the commission at this point
and maybe defer to others who were
around for the first
uh on the community garden piece of
it I know it's not a question but I
wanted to put it in the room
um I'll go around with the Commissioners
after we heard more
discussion commission
have okay I'm still trying to clarify
with you Jeff if
you're I'm that if we
approve the uh project with your
conditions then you're
saying they are in compliance with what
was the zoning hearing board that would
be correct I mean that's basically what
the condition says is you will be in
compliance with the zoning hearing board
decision
I'll go to the public first and then
come back to Mission is there anyone in
the middle war against this
project one to my right
hi I just I'm sorry I I'm sorry my
concern is that
um are we deciding that the changes made
here are minor in nature or adjustments
or correction because if not and if not
if it's not going to match exactly with
the zoning hearing board said then
changes to approv plans need to go back
to the zoning hearing board so I'm
trying to figure out if if Jeff you're
making decision
that if it's not required it's because
it's from minor technical adjustments or
Corrections of information that do not
affect the significant features of the
site plan and the intensity of use as
determined by the zoning officer so are
you telling them that if you accept the
conditions that you're saying or leeway
that you're saying are they sticking to
the Z zoning hearing board's decision or
are they making changes that should be
sent back to the zoning hearing board if
the conditions as outlined in the case
report are adopted it would be in
conformance with the zoning hearing
board decision I mean even with I hear
you saying like well there could be some
leeway like I'm not sure no I'm saying
that might be a justification for moving
the building back but that's not saying
like I'm authorizing you to do that and
there could even be could moving the
building back a minor technical issue or
is
that how I think there needs to be legal
interpretation of you know what I'm
saying like if you're saying if he could
move the building back are you saying
that that would be a minor technical
adjustment or correction from what
zoning hearing said I don't know what
minor technical adjust I mean those are
I I don't even think that's the issue I
I I think that I'm saying I think the
issue is that if you're not approving
what the zoning hearing board already
approved
then it's problematic and I I disagree
because the zoning hearing board didn't
approve Land Development plans that's
not their job what their job is to Grant
relief and the issue that we're
discussing um doesn't go to us asking
our client asking for Relief out of the
zoning hearing code what I'm saying is
that and I I indicated this earlier the
plans that we're submitting which have
the additional sidewalk are consistent
with the Z we don't need relief
in order to submit those plans to Jeff
and say to
Jeff we'd like to have a bigger sidewalk
and build a bigger sideb this is
consistent with the
code we staff approve the plans it's not
his only hearing Court issue at that
point I'm I'm saying changes to an
approved
plan dimenions match exact the
dimensions match exactly what was
submitted for the zoning hearing board
to the team I just looked up 44 feet
rear yard setback we have 44 feet and
and it showed a 5 foot but it said to
match prevailing which would be if you
go by matching
prevailing would be the six foot setback
already
established I think there may be with
respect to the sidewalks maybe some to
your point about being a minor technical
issue uh if the space there in the
setback was used for a sidewalk that
would be considered development still if
somebody does a parking lot and they
build it to to the property lines we
consider that a development that
encroaches into a setback so that would
still be considered development would it
be the Building Development you know no
but it would be a development footprint
of a building like there I think you
could make an argument that that's a
technical issue in that case you know if
if we're trying if we're trying to look
for like whether this conforms to like
the zoning code Andor conforms to the
zoning hearing board decision and saying
like well if you're moving that back
then you're not conforming to the zoning
hearing board decision that's still a
development encroachment into the foot
pack into the setback it's still
development up to the property line it's
just used for a sidewalk instead of the
building so I think in that Spirit of uh
what miss Cameron is saying that could
be considered a minor technical
alteration
um Commissioners there's any other
comments but uh at this time I like to
get a motion to
approve the project with the conditions
[Music]
if not I need a
[Music]
motion another motion
trying to
think um
I would make a motion to
approve with the conditions amending
condition
one to I'm trying to think how to word
this to State how uh to state
that buildings 5 through 7 in the Logan
Street Town Homes will be in zoning code
conformance
I think that would address what we're
discussing about
this is there a second
one yeah a
second with with with the well I don't
need to make a notation but with the
understanding that that result to be
approved by the reviewed by the the
planning bu Bureau I should add that um
statement as well to condition one
seconded the moov and second for
approval with the
amended one yeah all those in favor
state by St
I I opposed
okay we're go to item number two
then item number two is uh by
consolidation and land development plan
application for Marketplace Midtown
which is Zone RM it's followed by Chris
Rice and David long with Midtown
Redevelopment
LLC and it's to consolidate lot to cross
seven separate sites to construct initia
commercial and multi family dwelling
structures along with ass s
excise uh yes so the applicants are
proposing to consolidate Lots across
seven separate sites to construct mixed
use commercial and multif family
dwelling structures along with
Associated site and access improvements
three of the project sites will be
developed as row homes three will be
developed as multif family dwellings one
of the sites will be a mixed juice
building one of the sites will be a food
Hall and three will be developed as
accessory parking for the proposed
residential and commercial buildings uh
the six space 8 space and 43 space
parking lots in total there will be 62
units across 23 individual buildings and
approximately 5,500 Square ft of
commercial space uh similar to the last
one I'll just read the general property
description um as opposed to the
description of each individual site uh
the project is comprised of uh
51 separate vacant Parcels the applicant
the applicants intend to both
consolidate and subdivide the subject
Parcels into 11 separate project sites
that will include mixed use multif
family buildings with site improvements
town homes and a food Hall per the uh
attached development
map the Claim Bureau staff recommends
the request be approved with the
following conditions uh the applicant
should design all of the proposed
residential units within the project to
be at least visitable if not fully Ada
Ada accessible including aspects such as
zero step entries for the proposed Town
Homes to ensure the units are accessible
to as much of the population as possible
uh the applicants should ensure that all
new vehicular access points feature a
driveway curb cut design as opposed to a
street as opposed to a street curb cut
design
uh the applicants will coordinate with
the city engineers's office on new or
reconstructed sidewalks and pedestrian
markings such as crosswalks planing
Bureau recommends that the applicants uh
specifically consider full width
sidewalks on the public RightWay along
cder Street and North Fourth Street uh
the applicant should consider the
inclusion of secure ground floor bike
storage in the proposed apartment and
mixed use buildings and will include
bicycle racks near the entrances of the
commercial components of the project is
required by section 7- 327.2 of the
zoning code plane Bure would recommend
that such parking be located near the
main entrance and sheltered if possible
the applicants will provide formal
landscaping and photometric plans to
inform discussions with the city rbur
and to inform consistency with the
applicable requirements of the zoning
code such as the fence regulations and
the environmental performance standards
and finally the applicants will
coordinate with the Department of Public
Works to confirm the appropriate size
location and design of refuse collection
particularly for the multif family
dwellings and mixed use buildings uh
plan Bureau staff recommends the request
be approved for the following reasons
the applicants have received approval
from the zoning hearing board for the
various relief requests needed to
effectuate the project as proposed and
has met the conditions of those
approvals in the subsequent lock
consolidation and Land Development
submission the project will enhance the
character of the neighborhood by
replacing vacant Lots with buildings
that reflect the height massing and
configuration of the surrounding
community and with commercial space
tailored to small businesses similar to
those along nor Third Street and will
enhance pedestrian infrastructure
throughout the project area the proposed
residential uses both the town homes and
apartment buildings will feature two
bedroom units which are in higher demand
than some of the studio one-bedroom
developments that have been more
commonplace in recent proposals and
finally The Proposal will add new
residents to the neighborhood and
activate the street and surrounding
community on nights and weekends and
contribute to a growing customer base to
support local
businesses thank you Jeff uh gentlemen
you heard the staff report are you
acceptable of those comms yes
Commissioners I have no questions um if
you have any concerns or questions and
let's start with commissioner I have
none commissioner re none commissioner
mer uh just one similar question to
before what is the project timeline on
this proposal uh the same the goal on
this one actually is uh very aggressive
we
hope if approved and reported uh to
break ground on parking the main parking
lot the market building in the towns
soon as possible ideally we've been
talking March or
April hope to get the marketpl building
done before the
market think that may be
likely at this at the rate the city's
going uh I have no other questions
Joe no questions thank you okay is there
anyone from the public for against this
project start the
middle to my right would you state your
name and
address uh my name is Dylan Ziggler my
address is 1422 fton Street I think this
project is
surrounding area um is there green left
in any of these
areas um is that proposed in the project
because I live in this area um most of
the lots that I think because I couldn't
get any information as to exactly which
lots are in this area um those lots are
used by families in this area um it's
not quite the
same those lots don't look the same as
the ones that are up farther north on
Four Street that your other project that
you're doing um these lots are kept
really nice there are family that play
in those yards um in those empty lots
specifically the ones that have grass um
specifically the one that's next to the
church on Maran Street um so I just want
to know if there is any green space left
because now we're turning all this green
space into parking
lots um so these are all inil Lots uh
have you had a chance to look at the pl
directly I have not had any
okay yep and I will absolutely give you
a set here um so a lot of these Lots so
like what we're proposing right now U so
you said 1422 so that that's right at
the corner before the green lot that
sets on Ral correct okay so that lot's
not in the proposal right now just
saying that that's
a yep um so the uh most of these town
homes so there're say I believe we're
consolidating one two 3 four five so in
an area we looking to build seven town
homes or six town homes there was seven
lot previous uh part the planning Bureau
recommendation we're holding them as
close to the road as possible now these
houses are all going to have little
yards in the back um the apartment
buildings will have on one of them will
have green space out back so if you're
going
up fer the one on Maring there'll be
probably
give you an idea of 20 foot that opens
up to about 26 feet by 100 plus feet
will still be
green correct yeah yeah this is all in
fill I mean they're
smaller best we
can trying not to take it
every there is you there is no Act
[Music]
next
that also thaty Street was very
dangerous that not people down that
street as someone with a small
child
child so use specifically C Street
because that is way less traffic got
nice shade trees
actually one second I just want
we like to talk you afterwards because
there is a lot right on the corner of
Maran that it's really nothing to be
built
there
and Y and kind of meeting with you and
some residents in the HOA there even too
uh to discuss plan
for that's
okay thanks for your question
um and I was going to recommend you two
getting together but seems like you s
came to
AG okay
Commissioners any
other questions or
concerns if not could I get a motion
conditions is there a
second I'll second it's been moved and
second for approval of this project uh
with the conditions all those in favor
state by saying I I I
oppos
extensions thank you thank you
uh
Jeff you
have you have any other any other
business uh there is no other business
no
Commissioners could you guys
sorry gentlemen meeting is not over
um is there anything good for the good
of the
W not could I get a motion for
adjournment so moved is there a
second
second
stand give that to
More transcripts
Explore other videos transcribed with YouTLDR.

為什麼投資比特幣
Terry Chen 泰瑞 · English

Historia de Colombia: La Hegemonía conservadora
Historia sin Esquemas · Spanish

LEILÃO VIRTUAL GENÉTICA MARCA LC - REPRODUTORES (PARTE 1) | 12/07/2026 – 10H
Canal Terraviva · English

Learn HTML In Arabic 2021 - #16 - Span And Break And Horizontal Rule
Elzero Web School · English

POSISI STRATEGIS INDONESIA DAN POTENSI SUMBER DAYA ALAM #geography #education #kurikulummerdeka
Fahmi Astathi · English

Machine Learning Explicado: Cómo Aprenden Realmente Las Máquinas
Objetivo IA · English

Video Edukasi HIV AIDS dalam rangka MPLS kota Denpasar 2026
KPA Kota Denpasar (kpakotadenpasar) · English

中國迎來新牛市?還是一波新災難?
Terry Chen 泰瑞 · English

CEREBRO SIN FILTRO - Capítulo 6: TOMA DE DECISIONES
CerebroSinFiltro · Spanish

Quantiferon TB Gold Training Video
SATVIUCT · Spanish

VELASCO: Retrato de un Monarca Andino Cap 1/2
OdyseaProducciones · Spanish

Persamaan Kuadrat [Part 1] - Bentuk Umum Persamaan Kuadrat
Benni al azhri · English
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.