Harrisburg City Planning Commission Meeting -11/5/2025
the U Harrisburg Planning Commission
meeting to order at approximately 6:34.
Uh commissioners, um
you received your September 3rd and
October 1st meeting minutes. Are there
any changes, deletions, additions?
I'll make a motion to approve both the
September and October minutes.
>> Is there a second?
>> Second.
>> It's been moved a second for approval.
All those in favor state by saying I.
>> I.
>> I.
>> Opposed. Abstension. Motion carried.
Under old business, there's none.
Under new business, item number one is a
special exception application for 1414
North Cameron Street, which is zone
industrial.
It's filed by Joshua Gray and GNRLP.
Is to request relief from four of the
required All Street parking spaces
associated with the expansion of the
school public and private and primary or
secondary use of site.
>> Uh yes. So uh the applicant is
requesting relief from four of the
required off street parking spaces
associated with the expansion of the
school public or private primary or
secondary use on site. The capital
academy student population is increasing
from 115 students to 147 students and
the staffing will increase from 40 staff
to 52 staff which incre which which
increases the required off street
parking from 69 spaces to 89 spaces
because there will only be 72 spaces on
site after the installation of modular
classrooms in the parking lot and
reconfiguration of the parking lot. ZHB
approval of a special exception is
required for relief from 17 off-
streetet parking spaces. So that was the
way that I had calculated it based on
the numbers that we had um in compared
to what was submitted. Uh the property
at 1414 North Cameron Street is a 2.33
acre lot featuring a three-story 24,312T
structure which was constructed in 1942.
Property is bounded by an unadressed
parcel to the north, North Cameron
Street to the east, and the property at
1400 North Cameron Street to the south
and west. This detached structure
features elements of a vernacular
institutional architectural style.
Character defining features include the
brick facade, the monumental concrete
entryway, the horizontal brick and
concrete bands, the regular fenestration
pattern, a modern building addition in
the northwestern corner, and the fenced
in playground on the southern elevation
of the building. The main entrance
features full view metal door double
doors flanked by divided light
sidelights and topped with a large
transom and concrete header with the
property address. It is accessed by a
short flight of concrete stairs with
metal railings. Other entrances
primarily feature full view metal doors.
Penetration primarily features evenly
spaced plate glass windows around the
building, although there are some
locations featuring glass block infill.
The main structure is topped with a flat
rubber roof with a newer addition
featuring a metal roof. The building is
fronted by a large accessory parking lot
and both building and parking are
buffered by landscaping with larger
trees along the northern and southern
property boundaries. There is little
there's a large billboard at the
northern edge of the parking lot. The
Cameron Street corridor features little
in the way of architectural character
and the building design and sighting
differ from many of the surrounding arch
industrial properties. Although the
brick facade and some of the
architectural embellishments are
reflected in older industrial properties
and the housing development nearby. As
such, the property does contribute to
the architectural and historic character
of the streetscape.
The planning bureau staff recommends the
request be approved with the following
conditions. Uh the applicant must
coordinate with Capital Region Water
regarding the site disturbance and
proposed configuration of the parking
lot to ascertain what storm water
management or storm water mitigation
effect efforts may be necessary. And as
the proposed parking configuration will
have vehicles facing the residential
properties across Cameron Street. The
applicant should relocate the parking
lot several feet to the west and install
landscape screening along at least the
eastern frontage of the uh proposed lot.
The plane bureau would recommend that be
extended along the entire Cameron Street
frontage of the property. Planning
Bureau staff recommends the request be
approved for the following reasons. The
applicant has met the criteria necessary
for special exception and the proposal
should have a negligible impact on the
surrounding neighborhood. Because the
use is already operating on site,
approval of the proposal will not alter
the essential character of the
neighborhood and will provide benefits
such as the ability to enroll new
students. And finally, if the conditions
of approval are adopted, the project
will result in the property overall
being brought into better conformance
with the zoning code.
>> Okay. Thank you, Jeff. Um, could you
name could you state your name, address,
and relationship to the project?
>> Sure.
>> Good evening, commissioners. My name is
Ash Mcome. I'm an attorney with MC Wall,
100 Street, Harrisburg, Pennsylvania.
And with me is Josh Gray, principal with
GNR LP.
I live in 1937,
Pennsylvania.
>> And your relationship to the project?
>> Um, I'm actually the owner of the
property. I'm 90% owner of the property
and owned it since about 2007.
>> Okay.
>> We operated some businesses there and
the business
were sold and building was vacant for
several years. We were able to find
for special
was empty for several years.
>> You both heard the staff report. Are you
acceptable in the conditions?
>> Yeah, c certainly the first condition
as the second one. We'll look into what
what we can do from a landscaping
standpoint whether it goes the whole
length of Cameron. It's not there right
now uh landscaping, but we'll we'll look
into it and work with Sure.
>> Okay.
Um, commissioners, I have no questions
at this time, so I'll um call on you to
any concerns you have may have. And I'll
start with Commissioner Tul.
>> Yeah, the uh the trailers that are being
brought on site, is that additional
classroom?
>> Yeah, it's additional classroom space.
They're modular, but they're going to be
permanent. Uh so they'll be there, you
know, on a foundation kind of like
Yeah, I've never heard the questions.
Pretty straightforward.
>> Commissioner R,
>> will the the new the new modular
structures you're bringing in, will that
make the property become come to
capacity or will you have room to grow
further?
>> I mean, the further we grow,
we're going to need
>> exactly
>> right. We did a traffic stop and
fortunately for us um these students are
on bus for reasons administratively.
So most of them there's not a lot of
high individuals that could drive but
all these children in the school and a
lot of as well basically uses the bus
system. So we did a parking study like a
traffic study and had the cameras out
there that just to get a idea of who was
there was like
day.
So even though 76, you know, so it
really comes down to the question of
right now because we as
>> uh but at the moment even though
you know 39 is what the traffic study
estimated.
>> So the answer is probably no.
>> Pretty much
that.
>> Okay.
Okay. Thank you,
>> Commissioner Mard.
>> Thanks. Um, yeah. So, is the I mean, the
fact that you have to add two modular
units, is the building pretty well built
out then to like schoolwise capacity,
the classrooms.
>> Yeah.
>> Yeah. There is a there's a brand new
structure in the back uses like it's
like there's a space in the back that
they use, but they use it for like a gym
or bathroom.
And the problem with the building is the
blue line.
>> Is that the flood?
[clears throat]
>> Yeah, it should be the 100year flood
plane.
>> But the building as you can see is in
the flood way itself. And so we trying
to not do any additions.
>> Yeah.
>> Yeah.
the idea is trying to keep it out.
>> Yeah, that makes a lot of sense. I mean,
parking in a flood way, flood plane
isn't as concerning, right, as opposed
to having classrooms right in in there.
So,
>> um that makes a lot of sense. I I
appreciate that you took the effort to
put a parking study together. I think
that was really helpful. I would have
had a lot more questions had I not seen
those numbers and maybe even disbelief
that the numbers were that low. But
seeing the study and the fact that like
you said it's everyone's bus in even
faculty take the bus. Um you don't have
16 year olds typically driving even
their bus in as well. It sounds like so.
>> Yeah, I think the letter from the school
mentioned that there there are some 16
year olds. This year there are none that
drive and last year
>> and I think that the ratios over
>> right.
>> Okay. Yeah. Thank you. I have no other
questions. [clears throat]
>> Uh Commissioner Jordan.
>> Yes. I think this question is more for
Jeffrey. um with these modular permanent
structures, is that going to be another
set of approvals that are going to be
needed separate from this?
>> Uh yeah, so they've submitted the flood
plane development approvals that for
anything with a new installation with a
footprint in the flood plane. Um and
it's um I don't know if it's on that map
there gave you, but it's just outside of
the floodway. Um so it's um if it were
in the floodway, that'd be a different
issue, but it's um in the flood plane,
so it's just subject to chap the
regulations in 7315 of the zoning code.
Okay. That's all. Thank you,
>> Commissioner Vincent.
[clears throat]
>> No, everything looks good. The study is
showing that you guys never had any
types of complaints for parking at all.
No, no types of assemblies or anything.
So,
looks good.
>> Um, I'll go to the public right now. If
there anyone's for against this project,
stand and state state your name and
address. I'll start to my left.
Thank you, Commissioner. This is pretty
straightforward. Um, could I get a
motion?
>> Motion to approve conditions.
>> Second.
>> I'll second.
>> Second to approve project with the
conditions. All those in favor say
>> thank you. Appreciate your time.
>> Thank you very much. Thanks.
Okay.
Item number two is a land development
plan for 1332 North Second Street, which
is zon residential medium density. It's
followed by Adam Bredman and with
Damman's Properties LLC.
Uh it's to expand the existing
non-conforming conforming multif family
dwelling use on site by adding eight new
units to the existing five units on site
by converting space occupied by the
former funeral home. Okay.
>> Um yeah, so the applicant is proposing
to expand the existing non-conforming um
use on site by adding eight new units to
the existing five units um by converting
space occupied by the former funeral
home. The project proposes units in a
variety of configurations and sizes from
studios to two-bedroom apartments and
from 290 ft to 850 ft. uh proper and
this is the um second aspect of the
zoning relief that the applicant came
through I believe last month for um or
two months ago. Uh the property at 1332
North Second Street is a 48 acre lot
featuring a three-story structure
resulting from a combination of three
separate buildings into a mixeduse
building, a funeral home and apartments
with a total area of 8,428 ft which were
constructed circa 1900 and a separate
storage garage of 220 ft which was
constructed 1957. Property is bounded by
Calder Street to the north, North Second
Street to the east, Safford Street to
the south, and the property at 124
Safford Street, and a small grosser
alley to the west. The semi- detached
structure features elements of an
indeterminate architectural style.
Character defining features include the
formstone facade and water table, the
multiple access points sheltered by
awnings around the building, the regular
fenestration pattern, the upper floor
decks on the rear elevation roof, and
the freestanding signs near the parking
lot and building entrances. There are
multiple entrances throughout the
building, although the main entrance on
the eastern elevation features panel
double doors and a full view door set in
simple frames which are sheltered by a
large awning with square posts. Other
entrances on the front and side
elevations feature the same types of
doors and awnings. Penistration on the
front elevation features two over two
windows set in simple formstone
surrounds with soldier course headers
and sills wrapped in aluminum.
Tenistration on the side elevation is
more regular and features two over two,
one over one and plate glass windows.
The structure is primarily topped with
flat rubber roofs. The other major
feature of the site is a sizable surface
parking lot occupying the southern half
of the property which is bordered by
planting beds with trees along the
eastern frontage with Second Street and
a 4ft high chain link fence along the
southern frontage with Safford Street.
Although the architectural style differs
somewhat from nearby buildings,
specifically with respect to the
formstone and awnings and large parking
lot distinguishes the properties from
others in the historic district, the
building height, massing, and location
along lot lines does generally reflect
the built environment of the surrounding
community. As such, the subject property
minimally contributes to the
architectural character of the
neighborhood. The planning bureau staff
recommends the request be approved with
the following conditions. Any exterior
alterations to the property must be
submitted for review by the city's
historic preservation specialist and may
require harb approval of a certificate
of appropriateness application. The
applicant must coordinate with the
department of public works regarding the
size, location, and screening of any
required refuge containers. The planning
bureau recommends the applicant consider
eventually consolidating all refuge
storage and access in the existing
carport along the CER street frontage of
the building. The planning bureau staff
recommends the request be approved for
the following reasons. The adaptive
reuse of a vacant and underutilized
funeral home into apartments represents
a sensible expansion of the existing
multif family dwelling use on site and
the project can adequately address the
primary concern regarding such
proposals, specifically the provision of
off- streetet parking for tenants and
their guests. Other conversions of
former commercial spaces elsewhere in
the neighborhood have demonstrated such
projects do not adversely impact the
neighborhoods in which they are located
and often help catalyze other
improvements in those communities. And
finally, the proposed redevelopment will
add new residents to the neighborhood to
activate the street on nights and
weekends and grow customer base to
support local businesses while providing
a new neighborhood focused space and
will provide additional units to the
Midtown housing inventory.
>> Thank you. Could you state your name,
address, relationship [clears throat] to
the project?
>> Yes. Uh Michael White, 1419 North Third
in Harrisburg. I am the um operations
director for Brandon Group.
>> Okay. Uh you heard the staff report with
the conditions. Are you acceptable of
those conditions?
>> Uh yes. Um we you know for any exterior
um changes we would of course seek
approval um through the appropriate
body. Uh in terms of the consolidation
of refu that's something that we have
planned. In terms of the location we're
going to um try to determine the best
location. We we I think that that is a
nice uh covered location, but that what
what we want to do is consolidate, but
it might not be in that exact location
just because there could be some windows
potentially two apartments there that
could be access to an apartment. So,
we're just going to from a resident
quality standpoint, but I kind of am of
the mind to consolidate. So, that makes
a lot of sense to me.
Um I the only concern I was I had
initially was the parking but I would
got remember this um you had this
project here before and you had that
extra those extra parking spaces. So
>> yes
>> pretty much covers the parking. Um
commissioners if you have any questions
or concerns and I'll start with
commission.
Yeah, as it turns out, they have plenty
of parking. Joe,
>> no, I was at the zoning hearing board.
They they didn't they overturned the uh
relief provided to lease those
properties, those parcels out.
>> Yeah, I'm done. I'm finished.
Commissioner Commission Reed,
>> I have no questions.
>> Commissioner Mark, I
>> think this is pretty straightforward. I
just want to confirm there are no
external uh improvements to the site
being proposed.
>> Yeah.
>> Correct. Thanks.
>> No, Commissioner Jordan.
>> No questions.
>> Commissioner,
>> no questions.
>> Okay, we'll go to the public. Are there
any concerns or questions to my left?
Not at all.
On my right. Okay. Commissioners, as
everybody says, this is pretty
straightforward. Could I get a motion?
>> Motion to approve with conditions.
>> Is there a second?
>> Second.
>> It's been moved and second for approval
of the project with the conditions. All
those in favor by saying I.
>> I
Thank you.
>> Okay.
Item number three. This is a land
development plan for 2601 North Third
Street. Uh it's uh building number one
which is zone commercial neighborhood.
It's uh followed by Gregory Alquist with
Penmark Hburg Holdings LLC and is to
convert the vacant hospital building
into a mixeduse building featuring 130
residential units with one and two
bedroom configurations.
Uh, the applicant proposes to convert
the vacant hospital building into a
mixeduse building featuring 130
residential units, associated amenity
space for tenants, and both space
reserved for retail uses and space set
aside for future development proposals.
The project proposes units in a variety
of configurations and sizes from studios
to three-bedroom apartments. That should
be three and not two in the uh summary
there. Um, and from 544 ft to 1143 ft.
The property at 2601 North Third Street
is a 6.36 acre lot featuring a sprawling
medical campus including a 216,440t
facility which was constructed 1926 and
an 83,870 square 76T facility which was
constructed 1957. Property is bounded by
Wikiniscoco Street and the property at
2645 North Thirdrd Street to the north,
North Fourth Street to the east,
Polyclink Avenue to the south and 2645
North Thirdrd Street to the west. This
property features a sprawling industrial
campus with three to six story buildings
that previously accommodated the poly
clinic hospital. However, the current
proposal only involves the southernmost
building. Character defining features
include the X building shape, the brick
facade, the decorative entrance, the
prominent concrete and masonry bands
around the building, the consistent
fenestration pattern, and the former
utility room with accompanying large
smoke stack. There are entrances in a
variety of designs and sizes around the
building, many of which are solid metal
utilitarian doors. Although the main
entrance on the western elevation
features full view double doors, metal
double doors topped with a large metal
transom featuring the property address
all set within a prominent masonry
surround featuring sconces, a decorative
cartouge
um of a former awning and a Juliet
balcony pediment with dentals. It is
accessed by masonry steps and a concrete
ADA ramp with metal railings.
Administration also includes a multitude
of windows in sizes and configurations.
Although most are plate glass windows
with concrete sills and simple brick
surrounds. The ground floor windows on
the eastern elevation are metal divided
light windows with those at the northern
end being older. There is a large
multi-story wall of metal awning windows
at top louvers in the utility room. The
structure is primarily topped with flat
rubber roofs. Building features a
well-maintained landscaped buffer along
the southern and western frontages with
bushes, shrubs, and some larger, more
mature trees in the western yard.
Property differs marketkedly from the
surrounding residential community and
even from other institutional buildings
such as the steel school, the Scottish
Wright Temple, the Zebo and the Zebo
shrine, which feature more innate
architectural elements. However, it does
have a significant architectural and
historic character in its own right and
is individually listed on the National
Register of Historic Properties and
thereby contributes to the character of
the neighborhood.
The planning bureau staff recommends the
request be approved with the following
conditions. [clears throat] Uh, the
applicant must reconstruct portions of
the Fourth Street sidewalk to be ADA
compliant and specifically the loading
dock in the middle of the block. The
bureau recommends that other points with
vehicular crossings use driveway designs
with consistent raised crosswalks across
them for safer vehicular conflict
points. The applicant must coordinate
with the Department of Public Works
regarding the size, location, and
screening of any required refuge
containers. The planning bureau
recommends the applicant consider
eventually consolidating all refuge
storage and access in the existing
vehicular access areas along the fourth
street frontage of building one. The
applicant must ensure that
[clears throat] any proposed signage for
the businesses on site is in conformance
with the applicable regulations or they
must secure the necessary zoning relief.
And finally, the planning bureau
recommends that sheltered bike parking
be provided at the main entrances to
both the residential and commercial
components of the property with secured
bike storage potentially located in one
of the proposed amenity areas on the
first floor. Planning Bureau staff
recommends a request be approved for the
following reasons. The adaptive reuse of
a large vacant and underutilized
institutional building into a mixeduse
building with lower level retail store
spaces and apartments above represents a
unique and challenging project in the
city and will support redevelopment of
the remaining buildings that comprise
the former hospital complex.
Additionally, the applicant is retaining
flexibility in the project by reserving
portions of the building for future
development proposals which will help
the project grow more organically to
support the needs of existing res
residents of the neighborhood and future
residents of the development. Successful
redevelopment of the institutional site
may help catalyze redevelopment and
reactivation of other institutional
sites in the north to the north
including the former William Penn school
and the ZBO shrine. Other conversions of
former commercial or institutional
buildings elsewhere in the city have
generally demonstrated such projects do
not adversely impact the neighborhoods
in which they are located and often help
generate other improvements in these
communities. And finally, the proposed
redevelopment will add new residents to
the neighborhood to activate the street
on nights and weekends and grow customer
base to support local businesses
while providing a new neighborhood
focused space and will provide
additional [clears throat] units to the
uptown housing inventory.
>> Thank you, Jeff. Uh gentlemen heard the
staff report with the conditions. Are
you acceptable of those conditions?
>> Yes, we are.
and I skipped over. Could you state your
name and address our relationship to?
>> Sure. Uh my name is Gregory Hogquist.
I'm with Penmark Harrisburg Holdings.
We're at 1000 Germantown Pike in
Plymouth Meeting PA and I'm the owner.
>> I name is David Johnson
>> located at the same address. Uh John
Anderson with Cornstone Consulting, 213
West Main Street, Landdale, PA1 19446,
uh civil engineer for the project.
>> Um
you did say you're accepting acceptable
acceptable.
>> Um my my only concern again usually is
parking, but I since I have been in the
building and my offices before I
retired, so I know There's lots of
parking in that place. So that's not a
concern with me, Mr. Commission to
um
>> yeah,
>> any concerns?
>> In light of the fact he used to work, I
just curious why they aren't proposing
to put statue out there. [laughter]
>> Was that the package
>> to get approved that might have
need? No, no, it's no questions. I think
it's great. I mean that I think I may
have stated the last time you were here
that the most utilized underutilized
real estate in Harrisburg's between
there and the William Penn campus. So
glad to see it's see you moving in.
>> I'm done.
>> Commissioner,
>> I have no questions either.
>> Commissioner,
>> I agree with Commissioner Tool's
comments. Um
I think the
>> What's that? No, but not with not about
the statue.
>> Maybe a fountain would be more
>> statue [laughter] in the fountain.
>> Yeah, right. Yeah, let's get creative.
Um, [clears throat] I think the only
question I have,
um, I've been trying to visualize the
lower level, which is called the
basement, but it's the the elevation
varies. So, you have some parts of the
building where it's walk out onto grade,
not necessarily below grade,
>> right?
>> So, that's reserved for retail. Um,
and where's the loading dock?
>> It's on the back side. It's on the lower
level
>> of Fourth Street.
>> Yes.
>> Okay.
>> In a little courtyard.
>> Okay.
So, would that that would remain I'm
just thinking about future retail uses
being able to use the loading dock for
let's say if you have a restaurant,
right, that does end up in there, right?
And where those trucks are going to be
going in and out of the building and the
space. So, we're fortunate to have
uh separate courtyards around the back.
Um so, for example, that loading dock is
in a its own courtyard area. There's
actually parking spaces in there as
well.
>> Okay, that's okay.
>> It's in the back.
>> Yep.
>> Okay,
got it. So, that kind of does actually
separate this.
>> Yeah, it's pretty well laid out for
this.
>> There's also a couple of entrances. If
you look at this the campus where the uh
emergency drop off was along poly clinic
that's actually at the lower level and
then you come up around to the top and
that's the front entrance to the lobby.
>> Yeah.
>> So there's a lot of separate entrance uh
opportunity.
>> Yeah. The campus.
>> Yeah. So you would even be able to sort
of differentiate tenant entrances from
retail entrances too. That's kind of a
plan there. Okay. Actually lends itself
really well.
>> Yeah. Okay, I'm with you. Uh I think
that's the only questions I had.
>> Well, the other question you had was
bike rocks and we will have plenty of
>> Oh, that's right. I did ask that on the
last application, right? But then Jeff,
see Jeff already put the comment in
there. So, as a condition,
>> so I asked that we bring drawings of
building three with the bike rack shown
so I can show you to you. But, uh, no,
we we expect there will be a lot of, um,
you know, use of bicycles. So, we want
to make sure we have
>> I would think so.
>> That's what we're trying to promote,
too, is
>> um you know, bringing the streetscape
alive and work. So, we're going to have
plenty of bike racks in various
locations and building.
>> Nice. You have plenty of space
>> for the retail and for like the workers
in the in the commercial.
>> And we are segregating. Uh I don't know
that the drawings that you all have show
this, but
Jeffrey mentioned that we're And we went
over this with Jeffrey and shared the
drawings with him that we have to
segregate some future development here.
This building is 200,000 square feet
>> and for 130 apartments and retail.
There's still 60 70,000 square feet left
over. We're limited by zoning of what we
can do here. Um so, you know, we'll have
to see what happens down the road, but
we've got an easy way to segregate off
some area to allow for future
development. We'll see what what the um
the neighbors need and
>> what makes sense.
>> Yeah. Thank you. I don't have any other
question.
>> We're not relying on that. It's part of
the
like if it never gets developed, it's
not the end of the world. So, it's a
good thing.
>> Commissioner Jordan,
>> no questions. Commissioner Vincent.
>> Um, no questions. Exciting to see, you
know, always like to see new um new
residential and student commercial
space.
>> We kind of just keep we make up
questions for them.
I have more I can give you.
[clears throat]
>> That's okay. Uh I'll go to the public.
Uh 714 against this project
on my left.
My right. Again, this is pretty
straightforward. And
did I get a motion?
>> Motion to approve with conditions.
>> Second.
>> Second.
I think Commissioner Jordan.
>> Yeah. [laughter]
>> Move second approval of the project with
the conditions. All those in I
>> oppos.
>> Thank you.
>> City.
>> Okay. We're under business.
Uh there's nothing on the um agenda for
other business. uh in I did want to uh
bring up one point in uh a discussion
from last month's meeting about the um
uh
open house that kind of city council had
with the different boards and there was
a discussion about having a um end of
the year report which I don't know that
I've done you know during my tenure here
really u and I am going to try and uh
have something uh to you all by
beginning uh middle maybe middle of
December and also have something you to
city council just as a synopsis of what
you guys have all tackled here and maybe
some of the things we're looking to do
next year. I think I've talked about
doing some packages of zoning map amend
or zoning code amendments uh with regard
to like signage and uh maybe um the use
table in chapter 73057 of the zoning
code uh to begin you know working on
those maybe for introduction in January,
maybe not till February depending on how
much I can get done. But, um, I I think
that was a it was a good, um, comment
that we should be doing a little
something even if it's just a single one
side of a piece of paper and we're just
kind of, you know, accounting for what's
what's gone on here. But, um, I do think
it's, uh, helpful to not only city
council, but members of the public and
yourselves to kind of, you know, uh,
summarize what the commission has done
over this year. Um because a lot of you
know what we do at the beginning of the
year can maybe be forgotten by this
point. Um and so u and even having an
update on maybe some of those projects
what what was approved in January. What
happened with that? Did they move
forward with that? So I'm going to look
to do a little something a little write
up for report for you guys for sometime
in December. And obviously you don't
meet so that'll just be something
transmitted via email.
>> Good.
I'm good. Is that something like Joe
needs to review and approve or do you
just send it on our behalf?
>> Yeah, I mean I can do that certainly is
send it to you all, make sure you're
happy with what with with what's in it.
I think it's largely going to be um you
know just academic really of just an
accounting of what's been what you guys
have been doing this year and um and
like I said hopefully some some goals
for next year. Uh and if you want to add
something to it, you know, certainly
feel free to do that.
>> Is there anything for the order
Christmas?
Uh if not, before I ask for German, I'd
like to wish everyone a happy holidays,
Thanksgiving, and Christmas, and
presents will be accepted by me.
[laughter]
Do
>> you want your statue in
>> bronze? Went to his head down.
[laughter]
>> And with that, can I get a motion for
adjournment?
What are
More transcripts
Explore other videos transcribed with YouTLDR.

CloComp 2526 Hashing 1
Bel V B · English

ANSYS FLUENT TUTORIAL : CFD Analysis of An Acoustics Louver | Turbulence and Acoustic Performance
Ansys-Tutor · Persian

5 Penyebab Tim Kamu Tidak Kompak | The Five Dysfunctions of a Team
Si Kutu Buku · Indonesian

They're Moving In!
Nick Nayersina · English

دبلومة مهندس مكتب فني كهربي - الباب الثاني - الدرس الخامس - الرسومات التنفيذية لنظام Queue 1/2
Mohamed Faramawy - محمد فرماوى · Arabic

شور - هيهات منا الذلة - كربلائي حسين طاهري 4K ©️
عشاق المجالس eishaq almajalis · Arabic

Obrolan Hangat Bersama Kepala BGTK Sumatera Selatan
kojakito · Indonesian

Praktikum Sifat Koligatif Larutan (Tekanan Osmosis Pada Kentang)
Agus Kamaludin · Indonesian

[ DARING ] XI RPL 2 - Kegiatan Minggu Pertama
ebadrus.com · Indonesian

Sesi 1 | Memahami Esai Secara Luas
Rita Primayuni · Indonesian

Why 99% of Power Bank Reviewers Are WRONG! (UGREEN Nexode 200W Test)
TechDayEveryDay · Polish

Milenial Anti Narkoba - BNN Short Movie
Lembaga Administrasi Negara RI · English
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.