Harrisburg City Council Legislative Session 5/14/2024

1:22:25EnglishTranscribed Jun 15, 2026
0:16

good evening again everyone the time is

0:18

6: p.m. I would like to officially call

0:21

our legislative session to

0:25

order Mr Parker could you please call

0:28

the role yes

0:30

Miss

0:33

Daniels misss Davis

0:36

present Miss green

0:40

present Mr Jones

0:43

here M rolls

0:46

present Mr Rodriguez present Miss

0:50

Bowers present thank you the invocation

0:54

this evening will be led by vice

0:56

president green

1:00

thank you president Bowers if we could

1:02

all take a moment of silence to keep the

1:03

family of Miss Taisha Miller and her

1:06

unborn child in your thoughts and

1:08

prayers as they tragically lost their

1:10

lives this Monday here in the city of

1:16

Harrisburg thank

1:18

you thank you vice president green the

1:21

Pledge of Allegiance will be led by

1:22

councilman Jones

1:30

Al to of the United States of America to

1:34

The Republic stand Nation God

1:39

indivisible liy justice for

1:45

all thank you councilman Jones for

1:48

communications this evening we are

1:50

joined uh by Miss Charlotte Katen moer

1:54

CEO of Capitol region water who will

1:57

share a presentation

2:10

I believe this is

2:12

on thank

2:15

you good evening thank you counselors

2:19

for the opportunity to address you and

2:21

community members this evening my name

2:24

is Charlotte katsen Moyer and I am the

2:25

CEO of capital region water I am here

2:28

this evening to talk about a problem

2:30

that we have in the in the city of

2:33

Harrisburg that problem is the raw

2:35

sewage that we contribute to the Paxton

2:37

Creek and the sesana river when our

2:40

combined sewer system is

2:42

overwhelmed a combined sewer system is

2:44

one that is designed to allow both

2:46

sewage from buildings and the Plumbing

2:49

Systems and rainwater from rooftops

2:51

parking lots and streets to enter the

2:54

same sewer Network that cap region water

2:56

maintains the combined sewer system

2:58

covers about 60% % of the city the other

3:01

40% of the city is served by a separate

3:04

storm sewer system meaning the rainwater

3:07

is conveyed to Paxton Creek and sesana

3:10

River without being polluted by raw

3:12

sewage now back to the problem with our

3:14

combined sewer system on a day with

3:17

little to no precipitation our

3:19

underground pipes and pump stations can

3:21

safely convey the combined sewage to our

3:23

treatment plant on Cameron Street and

3:25

safely treat all Wastewater and storm

3:27

water before it is released to the SES

3:29

River so this concoction of rain water

3:32

and storm water gets full treatment at

3:34

the advanced Wastewater Plant however on

3:37

wet or soggy days like we had last week

3:40

when too much storm water from rain

3:42

Andor snow melt overwhelms our combined

3:45

sewer Wastewater and storm water system

3:48

this polluted mixture

3:50

overflows untreated into the Paxton

3:53

Creek and Squan River but on a day like

3:55

today there was not enough rain at one

3:58

time to overwhelm the system

4:00

and the combined sewage was completely

4:02

treated at the plant with no overflow

4:04

events today I will discuss Capital

4:07

Region Waters plan to fix this 100-year

4:09

old problem the raw sewage releases or

4:13

combined sewer overflows are not an

4:15

operational choice in fact like 800

4:18

other communities around the around the

4:20

country it is a permitted activity our

4:23

infrastructure is undersized and

4:25

overwhelmed by the added storm water

4:27

that runs off of buildings and streets

4:29

as the city has been built out over the

4:32

over the decades since the sewer was

4:34

first designed in the early

4:36

1900s on average capital region water

4:39

captures and treats 90% of all combined

4:41

sewage and storm water the 10% that goes

4:44

untreated is primarily due to the result

4:46

of heavy rains overwhelming harrisburg's

4:49

aging and undersized

4:50

infrastructure this is the problem

4:52

capital region water is committed to

4:55

solving since Capital Region Waters

4:57

Inception in 2013 we have been been

4:59

investing in our infrastructure to

5:01

reduce these combined sewer overflows

5:04

and improve water quality public health

5:06

and the fabric of our community in fact

5:09

over $200 million has been invested we

5:12

are approaching yet another milestone in

5:14

our path to clean water Capitol region

5:17

water is now updating its long-term

5:19

control plan to manage storm water in

5:22

the city of Harrisburg better known as

5:24

the city beautiful H2O program

5:27

plan the development of this plan is is

5:29

required under a federal consent agree

5:31

or negotiated agreement that cap region

5:34

water has entered into with the US

5:36

Department of Justice us Environmental

5:39

Protection a protection agency and the

5:41

Pennsylvania Department of envir

5:43

Environmental Protection under this

5:45

agreement capital region water has

5:47

specific deliverables and timelines that

5:50

must be met to remedy this decades long

5:53

issue an updated long-term control plan

5:55

is required by the end of this year most

5:59

recently kler region water submitted its

6:01

analysis of various approaches or

6:03

Alternatives that would control combined

6:05

sewer

6:06

overflows this Alternatives analysis

6:09

report is a critical component of the

6:11

larger City beautiful H2O program plan

6:14

an Associated financial report was also

6:17

recently submitted this report known as

6:19

a financial capability assessment

6:22

identifies the economic harm or risk

6:24

that would result if Capital Rion water

6:27

were required to implement our

6:28

recommended plan over a 20-year period

6:31

to meet the Clean Water Act

6:34

compliance it considers a variety of

6:36

poverty in indicators in the city of

6:39

Harrisburg together these two documents

6:41

the Alternatives analysis and the

6:43

financial capability assessment provide

6:45

the technical and economic foundation

6:48

for an updated recommended

6:51

plan with that background in mind I'd

6:53

like to mention a few details of the

6:54

recommended plan and share opportunities

6:56

for public

6:58

input the recommended plan's objectives

7:00

are to control combined sewer overflow

7:02

discharges to the Susana River and

7:04

Paxton Creek reduce backups onto streets

7:07

and into basements improve the health of

7:09

local waterways protect public health

7:12

and safety and comply with the Clean

7:14

Water

7:15

Act combined sewer overflows known as

7:17

csos are a significant pollution problem

7:20

for the cesana river and Paxton Creek

7:23

during Heavy Rain events CSO discharge

7:25

csos discharge untreated sewage and

7:28

storm water into the Waterway

7:30

leading to the contamination of the

7:32

water and degradation for aquatic

7:35

habitats this pollution not only harms

7:37

the health of wildlife but also

7:39

threatens the health of people who use

7:41

the rivers for drinking swimming and

7:44

Recreation Capital Region Waters work

7:46

over the last 10 years and this

7:48

recommended plan aims to reduce those

7:50

harmful overflows prevent localized

7:52

flooding events and improve water

7:54

quality creating a safer and healthy

7:56

environment for

7:58

all to analyze a range of Alternatives

8:01

and demonstrate how water quality

8:02

requirements will be met capital region

8:04

water developed models of our sewer

8:06

system and receiving Waters again the

8:09

cesen river and Paxton Creek these

8:12

models help us helped us to understand

8:14

how various projects or Solutions can

8:16

better manage storm water and reduce

8:18

water quality impacts we are already

8:21

observing how Investments made to date

8:23

including some of our projects completed

8:25

over the last decade are resulting in

8:27

measurable improvements

8:30

recent capital projects such as the

8:32

upgrade to the Front Street Pump Station

8:34

in the shipoke neighborhood green

8:36

infrastructure projects throughout the

8:38

city and modifications to the Overflow

8:41

locations or structures at at the at the

8:44

streams have resulted in a decrease of

8:47

overflow volume of nearly 10 million

8:49

gallons

8:50

annually the recommended plan consists

8:53

of a combination of proposed Solutions

8:55

including a retention treatment Basin

8:57

similar to a many treatment facility

9:00

enhanced convey conveyance capacity

9:02

imagine bigger pipes where possible

9:05

brainstorm water infrastructure or

9:07

natural elements to capture and store

9:10

rainwater where it falls and before is

9:12

contaminated by domestic sewage and

9:15

Sewer separation taking the one pipe

9:17

that carries both storm water and

9:18

domestic sewage and separating it into

9:21

two pipes like 40% of the city already

9:24

has the recommended plan is estimated to

9:27

cost $450 million

9:29

our analysis indicates that we need as

9:31

much as 40 years to make these

9:33

Investments compared to the standard 20

9:35

years that most other cities get and

9:38

aims to minimize Financial strain on our

9:40

community especially low-income

9:42

households the plan prioritizes both

9:45

environmental stewardship and fiscal

9:46

responsibility making it the ideal

9:49

choice to advance Capital Region Waters

9:50

objectives effectively and

9:53

efficiently the timeline of how long the

9:55

usepa will allow us to implement the

9:57

recommended plan will be negoti over the

10:00

next several

10:01

months public engagement is a CR crucial

10:04

component of the plan and stakeholders

10:06

will have the opportunity to influence

10:07

revisions and updates to the plan the

10:11

plan was developed using a multifaceted

10:13

strategy and several alter Alternatives

10:15

were evaluated based on their ability to

10:17

meet current water quality standards

10:20

feasibility ease of operation and

10:22

maintenance and cost

10:24

Effectiveness after a thorough

10:25

evaluation of all Alternatives Capital

10:28

Region Waters preferred Solutions

10:30

include a retention treatment Basin that

10:32

I mentioned before near our plant on

10:34

Cameron Street adding storage facilities

10:37

where open space allows to capture and

10:39

hold combined sewage until after the

10:42

storm has passed when capacity is freed

10:44

up at the treatment plant on Cameron

10:45

Street adding 200 Acres of impervious

10:48

area being managed by storm water green

10:50

storm water infrastructure sewer

10:53

separation projects and enhancements to

10:55

our major trunk sewers and upgraded pump

10:58

stations

10:59

the recommended plan is is projected to

11:02

reduce CSO discharges along the sesan

11:04

River from appr approximately 90

11:07

overflow events each year to 10 and

11:10

reduce Paxton Creek overflow events from

11:12

95 to 16 and these meet water quality

11:15

standards and make considerable

11:17

improvements to local

11:19

waterways furthermore systemwide

11:22

combined sewer overflow volume is

11:23

reduced from an average of 794 million

11:26

gallons to 131 million gallons annually

11:29

under the recommended

11:31

plan the recommended plan is technically

11:33

feasible cost effective resilient and

11:36

sustainable all of Capital Region Waters

11:38

core values in one plan we invite any

11:42

questions or comments and our report is

11:44

available on our website we are

11:46

committed to keeping this information

11:48

accessible over the next few months

11:50

capital region water will hold several

11:52

educa education sessions to discuss our

11:54

recommended plan and allow for public

11:57

dialogue and comment I know that $450

12:00

million sounds like a lot of money um

12:03

but we are committed to ensuring that

12:06

our customer assistance program is

12:08

expanded to help those uh that can leas

12:11

afford the rate increases that we will

12:14

in that we will definitely need to

12:17

implement thank you for your time this

12:19

evening and we look forward to continued

12:21

collaboration as we build a better safer

12:23

cleaner Harrisburg together thank

12:26

you thank you very much just one

12:29

question before we move on um can you

12:32

please share how residents and members

12:34

of the public can learn exactly when the

12:37

education sessions will occur sure we we

12:40

have on our website um those

12:43

opportunities uh we also um we'll we'll

12:46

post those we're also doing Outreach on

12:49

social media um as those events come up

12:52

uh to be able to provide um those

12:54

opportunities to the

12:56

public thank you very much

13:03

there any other questions councilman

13:05

Jones yes thank you madam president um

13:09

when you say that

13:12

uh you know this will help especially

13:14

lwi income families but then you also

13:16

said that there will be an increase can

13:18

you explain how that's going to help

13:20

some of the low income people so our

13:22

customer assistance program currently um

13:25

is

13:26

$300 looking at $300 a year um for

13:31

low-income

13:32

residents they don't need to provide

13:35

income eligibility they don't need to

13:37

provide any kind of income eligibility

13:39

except for if they're already on an

13:41

assistance program like Snap or lihe

13:45

that automatically makes them eligible

13:47

for our customers customer assistance

13:49

program all they need to provide is

13:51

documentation that they're part of one

13:53

of those other programs um that $300 we

13:57

realize as rate increases happen that

13:59

$300 is not going to be enough um so

14:02

we're committed to increasing that $300

14:05

amount um for those low-income residents

14:09

okay so when um you again when you look

14:11

at the increases with what what would

14:14

that entail would it be the ready to

14:15

serve or the actual water bill itself it

14:18

would be the total bill okay um and um I

14:22

I think uh Madame President and I are

14:24

scheduled to tour the facilities um I

14:28

can't wait to do that but one of the

14:29

questions I will ask about you know even

14:32

with the meter changing all of that um

14:34

is this a part of what you guys are

14:37

intending to do here so that's on the

14:39

drinking water side of our business this

14:41

is on on the waste water side okay so

14:44

now in the drinking water just one

14:46

question is is there any fluoride in her

14:48

water and if so how

14:50

much I don't know the current I don't

14:53

have that expert behind me um

14:59

yeah our our consumer confidence report

15:02

will be out shortly okay you'll receive

15:04

that in the mail it has that information

15:06

in there but yes we do add for it okay

15:09

and it and it's at the minimum it's at

15:11

the recommended minimum level that's the

15:13

EPA requires okay suggest all right

15:17

thank

15:18

you councilman Rodriguez any questions

15:22

no questions for me thank you thank you

15:24

councilwoman RS any questions thank you

15:27

and uh good evening thank you for being

15:29

here this evening I just had two quick

15:31

questions one was and I'm so mad I can't

15:33

find the email but there was an email

15:35

sent out for um an invitation to visit a

15:39

water basin I believe I'm getting I

15:41

don't want the reservoir thank you is

15:43

that part of the education of the

15:47

pollution um I'm not sure that we will

15:49

specifically address the recommended

15:51

plan during the deart day yes deart day

15:54

thank you but that that is to tour our

15:56

drinking water reservoir okay um so I

16:00

mean if you have any questions there

16:01

will be um staff there that could that

16:04

could answer questions on this as well

16:06

okay it's mostly on the drinking water

16:07

side of okay thank you and would you be

16:10

able to say how much do you think the

16:12

bills may increase within the next 5 to

16:14

10 years if you're able to possibly

16:16

answer that I don't have that

16:18

information but we'll certainly provide

16:20

that during the public education

16:22

sessions okay thank you that's it for

16:25

me thank you vice president green any

16:27

questions thank you president Bowers and

16:29

thank you for being here tonight and for

16:31

your presentation I don't have any

16:32

questions for

16:33

you thank you councilwoman Davis any

16:37

questions thank you president Bowers and

16:39

thank you for being here I don't have

16:41

any questions at this time thank you

16:44

thank you councilwoman Daniels any

16:46

questions okay thank you very much for

16:48

being here this evening thank you we

16:51

will now move forward with our meeting

16:53

agenda we will open the floor for

16:55

Courtesy of the floor just a few

16:57

housekeeping notes before we begin uh

17:00

please state your name and your address

17:02

for the meeting record if you don't feel

17:04

comfortable sharing your address please

17:06

share the vicinity in which you live

17:08

within the city uh you will have four

17:11

minutes to share your comments Mr Parker

17:14

will serve as our timekeeper and I will

17:17

begin to my right is there anyone that

17:20

would like to offer public comment okay

17:22

please come to the microphone

17:31

this one right here

17:34

oh oh well good evening um city council

17:37

members and city council family and

17:39

friends I should say um my name is

17:41

Shannon green and I uh reside in the

17:45

Governor's Square which is located here

17:47

in Harrisburg I'm very concerned about

17:50

our neighborhood from it being uh trashy

17:54

looking also the crime as well as um

17:59

you know the

18:01

children that I see in my neighborhood

18:03

riding their bicycles and stop signs you

18:06

know cars are flying through certain

18:09

areas that need stop signs and it is a

18:12

real thing I said it on a porch and um

18:15

just a lot of you know hanging around

18:18

and areas where the children are located

18:21

and the abandoned areas it's really a

18:23

concern for me because it's easy access

18:26

for uh the children to be AB it or you

18:30

know a lot of fighting in the area and

18:32

we do know I lost a good friend

18:34

yesterday and her mother you know I'm

18:36

aware of the people and their violence

18:38

and I'm just coming to the council to

18:40

see if if we can come up with an action

18:43

plan for the community to make it look

18:45

better maybe if it looks better people

18:48

act better that's all I have to

18:50

say thank

18:53

you sure councilman Jones um Miss green

18:57

uh no you good you're good I mean if you

19:01

yeah you could come on come on

19:04

welcome I don't know how this go sorry

19:07

that's all right so um as you seen this

19:10

week we were up there uh we will be back

19:13

up um Sunday and Monday and one of the

19:16

things that I uh plan to do just coming

19:19

together with some of the other

19:20

nonprofit organizations um and from the

19:25

city side of it you know that's F

19:26

federally regulated so there are some

19:29

restrictions far as what we're able to

19:31

do at this moment however um just being

19:35

a part of this community I'm taking an

19:36

initiative to come out there and uh try

19:40

to clean up some of that area but so I

19:41

just was thinking yesterday that I

19:43

absolutely I seen you too and I was I

19:45

was so I was so grateful you know I got

19:48

tears in my eyes and like there is some

19:49

kind of Hope because if we don't do

19:51

something soon it's going to be a rough

19:53

summer in our area where I live and I

19:56

have children so you know not only

19:58

concerned about my own children other

20:00

children around us it takes a village

20:02

you know so I'm one that is willing

20:07

to yeah be yeah so try to change just

20:10

stay in contact with me um one of the

20:12

things I want to be want to do is again

20:15

get some of those other local

20:16

organizations and um I was as I was

20:19

working yesterday I was like you know

20:21

we're cutting this now and cleaning this

20:23

now um but this is going to grow

20:26

back right so uh the idea is to um try

20:30

to bring some of the youth in that area

20:33

try to um teach them how to earn an

20:34

honest living yes um and and keep that

20:37

area as clean as possible as much as we

20:39

can so um stay in touch with me and U

20:41

I'm willing to work with you sure thank

20:42

you I appreciate it coun thank you thank

20:45

you is there anyone else to my right

20:48

that would like to offer public

20:50

comment seeing and hearing no one anyone

20:53

in the middle

20:55

section okay

20:57

[Music]

21:03

good evening uh president Bowers vice

21:05

president green members of council my

21:06

name is Eric Hagerty I live at 605

21:09

shower Street here in Harrisburg uh I am

21:13

the new chair of the Broad Street Market

21:15

Alliance and wanted to uh share a couple

21:17

updates um first I'm thrilled to report

21:21

that next week the tent will open um and

21:24

we're just so excited for folks to have

21:27

the chance to get products from vendors

21:29

that it's been almost a year that they

21:31

haven't been able to get their produce

21:33

and dog treats and so much more so we're

21:35

really excited about that next week um

21:38

I'm also thrilled the share that I

21:40

Believe by the end of next month uh the

21:42

market will have finished paying off

21:44

nearly $50,000 in past du bills that it

21:48

had accured since the fire uh and we are

21:51

very close to being on a a uh Financial

21:55

uh trajectory that is much healthier

21:57

than it had been uh and we're of course

21:59

fortunate to have President Bowers on

22:01

our board as well so thank you for all

22:03

of your support um I understand uh later

22:06

this evening uh there's an opportunity

22:09

uh for Council to approve the next step

22:11

in this lasting recovery for the market

22:14

and select a construction manager um and

22:17

so I I just wanted to encourage the

22:19

support for um moving forward in that

22:22

process um my my understanding is that

22:25

once a construction manager is selected

22:27

the brick building uh will be complete

22:29

and open for business within two years

22:32

so I'm thrilled that we have the chance

22:33

now to take this next step um and really

22:37

appreciate everyone's consideration

22:39

thanks so

22:41

much thank you is there anyone else in

22:43

the middle section that would like to

22:45

offer public

22:47

comment okay seeing and hearing no one

22:49

anyone to my

22:51

left okay seeing and hearing no one we

22:54

will move forward with our meeting

22:56

agenda

22:58

we do not have any reports of committees

23:01

this evening we do not have any

23:03

ordinances for first reading nor do we

23:06

have any ordinances for Amendment and we

23:10

do not have any ordinances for final

23:12

passage we will move to resolutions the

23:15

first resolution for consideration this

23:17

evening is resolution 25 of

23:22

2024 Mr Parker could you please read it

23:24

into the

23:25

record

23:27

yes resolution 25 of

23:31

2024 a resolution approving the

23:34

preliminary slf final land development

23:37

plan for 1610 North 4th Street submitted

23:41

by Midtown Redevelopment LLC to

23:45

consolidate 19 vacant parcels and

23:48

construct a four story 36 unit senior

23:53

apartment building with first floor

23:55

commercial space along with associated

23:58

impr

23:59

improvements thank you council members

24:02

are there any questions comments or

24:04

concerns related to resolution 25 of

24:12

2024 is anybody here representing that

24:15

no not for that one no why I wait

24:19

for okay

24:22

any further questions comments

24:25

clarification okay seeing and hearing

24:27

them Mr Parker could you please call the

24:28

vote

24:31

Yes Miss Daniels

24:36

yes M Davis yes Miss green yes Mr Jones

24:44

yay Ms rolls yes Mr Rodriguez yes Ms

24:50

Bowers yes resolution 25 of

24:55

2024 passes unanimously with a vote of

24:58

seven y to zero

25:01

Nays thank you next we have

25:04

resolution 26 of 2024 Mr Parker could

25:09

you please read it into the record yes

25:12

resolution 26 of

25:15

2024 a resolution authorizing the city

25:18

of Harrisburg to negotiate and enter

25:21

into a Professional Services agreement

25:24

with Alexander building construction

25:26

company to serve as construction manager

25:29

for the restoration Rehabilitation and

25:32

reconstruction of the Broad Street

25:35

Markets red brick

25:38

building thank you council members I

25:41

will entertain a motion to suspend the

25:43

rules for discussion so move is there a

25:47

second second thank

25:50

you I will defer to our parks recreation

25:55

and enrichment committee

25:57

chair councilwoman RW to lead discussion

26:00

thank you president Bowers um I see

26:03

there is someone from Administration

26:05

here to um answer a few more questions I

26:08

think Council had on resolution 26 of

26:11

2024 can you both introduce yourselves

26:13

and um say your positions here at the

26:17

city good evening Council my name is

26:19

David Baker I the facilities director

26:21

for the city of harisburg

26:23

good evening my name is Debbie reart I'm

26:26

project manager thank you both for being

26:28

here this evening and coming again I

26:30

know this our second time on this so we

26:32

really appreciate you coming to clarify

26:34

any questions we may have um because we

26:37

all know how important um the brick

26:39

building the Broad Street Market is and

26:41

how important is that we want it to um

26:43

be completed and um so do you all want

26:47

to start off by saying

26:50

anything

26:53

or um I mean we're here to clarify any

26:56

questions you may have about the the

26:58

process or about the the Consultants

27:00

that we're proposing to move forward

27:02

with so it's you know we're here for you

27:04

guys okay thank you well um since I have

27:08

the mic I'll start off I just

27:11

um I just have really one quick question

27:14

and I want to P pass it to my council

27:15

members I don't want

27:17

to hog the time um when I was looking

27:20

through the scoring rubric um the one

27:23

question I had for you miss Reinhardt is

27:25

that I had noticed that um for company

27:29

you said they didn't have a budget um

27:33

and you scored them as such however when

27:35

you got to the gym group you said they

27:36

didn't have a budget but you gave them

27:38

10 points so I was just wondering um did

27:44

they have a budget or did they not I

27:46

just needed some clarification on

27:48

that but I'll give you a moment to look

27:51

don't rush look and see and let me know

28:13

oh no so the um

28:15

sorry they got a zero as well they did

28:18

not provide a budget the 10 was for the

28:21

number of allotted points for that

28:22

particular

28:25

Criterion

28:26

uh okay but it says a lotted points 10

28:30

and then it says score

28:32

10 where I'm looking it says um and it

28:35

does say no budget provided but it then

28:36

it says a lotted points 10 score points

28:40

10 so wouldn't that mean you gave them a

28:42

score of a 10 yes but what I'm looking

28:45

at I have a zero there do you want to

28:49

pass this to her so she can see

28:52

mine I I thought I think it is it went

28:56

it was with her sheet that they printed

28:57

off for

28:59

me I know I I agree it could have been

29:03

mixed up but I did see that's how it was

29:06

given to me and printed to me in the

29:07

administration

29:13

office can you please speak into the

29:15

microphone you noted that she's right it

29:17

does say 10 and 10 um but there was no

29:21

budget provided okay so um my second

29:25

question would be um

29:29

real quick could we possibly get a copy

29:31

or we can scan over real quick to make

29:33

sure you want get a copy of this whole

29:35

thing I have here yes okay I'll pass

29:38

this why get it

29:40

back that back

29:43

okay thank you save legs

29:47

okay um my final question was I I saw in

29:53

the RFP they asked for a fee schedule

29:57

but then we were grading on a

30:00

budget so that kind of confused me

30:02

because when I was looking through the

30:03

the rubrics I was looking for or I was

30:05

looking through the company's um

30:08

proposals they sent in I was looking for

30:11

a budget CU I was like well it's on the

30:12

rubric where are their budgets and I

30:15

also didn't see any budgets except from

30:17

two companies it looked like they had a

30:19

very they looked like they had a budget

30:21

um and then other companies had a fee

30:23

schedule so then were we looking for a

30:26

fee schedule or a budget or they the

30:28

same cuz then I got confused myself

30:30

right so no they are not the same okay

30:33

um and the initial statement of work in

30:36

the um initial RFP included a budget and

30:42

so a budget would be what they think the

30:44

project is going to cost right and a fee

30:46

is how much they're going to charge to

30:48

do the work like per month or some per

30:50

se it's much smaller right okay but the

30:52

budget's much larger more scope and

30:54

sequence to it okay so when uh so just

31:00

to clarify when when we were looking

31:02

through um the bids put in were we

31:05

looking for a budget or fee schedule so

31:08

we were looking for both okay so

31:11

companies had to have both right okay

31:14

thank you that clarifies it because I

31:16

did see some companies only had a fee

31:18

schedule right um and some companies

31:22

actually had a budget but they got zero

31:24

points for their budget you said they

31:26

didn't have a budget but from what I

31:28

what it looked like they looked like

31:30

they had a

31:31

budget can you give me a specific so uh

31:35

it could have been Alexandra Perry cuz I

31:38

know there was two

31:39

alexandras they look like they had a a

31:43

budget let me find it

31:50

here that's not

31:54

them I I apologize here oh there this is

32:00

and sorry there's a lot of paper so

32:06

I'mma okay here we go well there's it's

32:09

called a fee schedule but it looks much

32:11

more chunkier than or has more details

32:14

than the other companies did

32:20

so sorry I'm still trying to get my no

32:23

that's okay would you like me to send

32:24

this one down

32:30

and I'm guessing they put fee schedule

32:31

at the top because they asked for a fee

32:33

schedule but I don't it looks like a

32:34

budget to

32:37

me so you're specifically talking about

32:40

Alexander Perry yes all right

32:59

um I don't think I have a copy of that

33:02

I'm not sure why I pr them all out I do

33:06

have

33:16

mine no it's all

33:19

right I appreciate you giving me

33:25

clarification yeah sorry I don't have

33:27

copy it's all right but okay that

33:30

was a concern of mine I just didn't

33:33

understand what the difference was

33:35

between a i well in my mind I thought

33:37

maybe it was a fee schedule was much

33:39

smaller in a budget was much larger in

33:41

capacity had more details where a fee

33:43

schedule was just broken into months but

33:45

like you said that is what it is and

33:47

that you all were looking for both yes

33:50

okay so um that ends my questions I'll

33:53

move on and see if other council members

33:55

do have any questions but thank you so

33:57

much for answering those um Mr Jones do

34:00

you have any councilman Jones yes okay

34:03

thank you you're welcome councilwoman

34:05

Ross um I don't know if you guys can

34:07

answer my questions I'll let you

34:09

continue doing what you're

34:11

doing go ahead I'm sorry we're just

34:13

trying to clarify for councilman r

34:34

this one

35:11

right councilman Ral did you what

35:13

happened to uh is the fee structure paid

35:16

that you were talking about is that in

35:17

this uh pile of paper or is that oh no

35:20

you mean the one for Alexander and Perry

35:23

no I have it here

35:25

inside for Jim oh oh their Fe oh no it's

35:28

not I have it here if you want me to

35:30

find it yeah I just I want to clarify

35:32

that the copy that we gave you is the

35:33

identical copy of what we currently have

35:35

in our possession their their fee

35:37

schedule or their the the first question

35:41

you had about the rubric the rubric

35:43

grading I gave you the I gave you my

35:45

rubric yes that is um Miss reinhardt's

35:48

rubric

35:50

yes

35:53

think yeah they have it no that's my

36:16

we're missing missing her page that says

36:18

the Fe

36:33

Mr Parker do you have the uh paper that

36:35

has the fee schedule on it for the gem

36:39

group I do not

36:42

okay you mean the you mean the rubric

36:45

where you graded it I gave it to you all

36:48

I gave all the paper I gave her whole um

36:51

and it might be in this stack somewhere

36:52

I just didn't want to go through

36:53

everything because I'm seeing other

36:55

individuals yes there's other names but

36:57

hers was together with

37:00

it Madam president uh can I put a motion

37:03

in to have a recess for five minutes for

37:06

them to get it

37:11

together okay we'll give you five

37:14

minutes I guess to review any paperwork

37:16

and so you're prepared to continue to

37:18

answer any questions council members may

37:21

have um the time is 6:37 p.m. we will

37:27

recess for five minutes and then resume

37:30

thank you thank

37:56

you

38:26

e

38:56

e

39:26

e

39:56

e

40:26

e e

41:26

um we had one more minute but I

41:28

understand you're ready to resume

41:29

questioning okay chair

41:32

R all right thank you

41:35

um councilman Jan do you have a question

41:39

or uh yes did did you get yours answered

41:43

though yes my paper does say 10 but I I

41:48

don't know where the mixup came um okay

41:52

I think I have additional one but not

41:53

right now I have to my question will be

41:56

for Alexander company

41:58

so you

42:08

guys if you don't mind introduce you

42:18

yourself Steve Wilt with Alexander

42:20

building construction company project

42:23

executive Terrell Davis Alexander

42:25

building project manager

42:27

all right thank you guys for showing

42:29

back up um at first I didn't think you

42:31

guys were

42:32

here uh anyway I I just want to ask um a

42:36

couple questions like you know uh for

42:38

one I know that this project means a lot

42:41

to this community right um as expressed

42:44

before my job is to make sure that this

42:48

is a fair process um make sure there's

42:51

um some type of I mean there is some

42:54

inclusivity in um local participation

42:57

all of those things um this is what I am

42:59

here to do and I I believe this body is

43:01

here to do so one of the questions that

43:04

I have for you um not to try to hold

43:07

this project up but this is of

43:09

importance for

43:11

me you have FNB right now correct yes

43:16

all right so in that within that um

43:19

resolution you guys you guys said that

43:22

you will have 30% at least 30%

43:25

participation

43:27

correct yes so where are you at now with

43:30

with that um with that process how uh

43:33

any contracts have been given or I I

43:36

want to know

43:40

that we're actually still under the

43:43

design process here so there no

43:44

contracts have been awarded or even

43:46

negotiated at this particular time here

43:48

and that is a actual pin bid live

43:50

project so it's going to become a public

43:51

bid project but right now we're still in

43:53

the initial design phase okay cuz for me

43:56

I would you know if if if you guys had

43:58

that what what's the timeline for

44:01

that just the design process or yeah

44:04

well for you to get to the contractual

44:06

process like getting to through all of

44:08

that what what when would you say that

44:10

you would have a list of of vendors and

44:12

people that you have the contracts for

44:14

so right now we're still working on

44:15

actal design portion of it here we're

44:17

projecting somewhere the end of July

44:20

okay um because that's what for me

44:23

that's what I would like to see um and

44:25

then see if once you do have have that

44:27

list see what companies those were and

44:30

how much you have you know contracted

44:32

out to them that's of importance for me

44:34

to see um and again not to hold this

44:37

project up but this is the language that

44:38

you guys had and the resolution so it's

44:41

something that I don't want to just see

44:42

words on the paper I really want to see

44:45

the action of that so for me that's what

44:48

I I can't say that I I'm going to hold

44:50

it up but that's what I would like to

44:52

see um no further questions for me

44:57

hey thank you councilman Jones and um

44:59

welcome again Alexander and Co thank you

45:01

for being here to answer um clarifying

45:04

questions um councilman Rodriguez do you

45:07

have any question um thank you madam

45:09

chair no actual questions at this time

45:11

it's just more in the thought of just

45:15

ensuring the process is Equitable and

45:17

fair for everyone um just that everyone

45:19

gets a fair shot and when things arise

45:22

when there's already slight questions

45:24

not saying there was anything um funny

45:26

being done but then when numbers don't

45:27

match and it's like I hate how that get

45:29

on there it it's you know you got to

45:31

consider our role and what we were

45:32

elected to do as officials so um it just

45:35

you know I definitely respect what you

45:37

guys do and love the experience that you

45:40

guys bring to it it's just more of the

45:41

processes and how we go about coming to

45:43

the conclusion um thank you thank you

45:46

for that councilman Rodriguez president

45:48

Bowers do you have any

45:50

questions thank you yes I I have one

45:53

question related uh to the timeline of

45:56

events

45:57

so I'm not sure if Mr Baker or Miss

46:00

Reinhardt if you could please share the

46:03

timeline between uh the RFP when it went

46:07

out um to when the committee was

46:11

assembled for review and then when your

46:14

final selections were made

46:40

I would say you need the actual

46:42

dates I would like the dates I'm I'm

46:45

just I want to ensure that I have a

46:48

clear understanding of the

46:50

timeline so if you want actual dates we

46:53

can Abol Supply those to all of council

46:55

we can send them to Mr Parker the exact

46:57

days of each process that happened when

46:59

it was completed and who was completed

47:03

by is that satisfactory for you

47:06

president

47:07

Bowers uh not really but okay in in

47:12

the

47:14

RFP that we received under exhibiting

47:18

the scope of services there's a table

47:20

with activity and estimated dates so

47:23

maybe some of these will jog your memory

47:26

The Proposal due date was March 19th

47:29

2023 the RFP solicitation release

47:33

occurred on March 5th of

47:36

2024 contractor selection the estimated

47:39

dates are March and April of

47:42

2024 intent to award or notice the

47:46

estimated date was April of

47:48

2024 and then the contract commences in

47:52

May of

47:54

2024 Madam president just looking at an

47:57

email chain for procurement sent out the

48:01

results had come in on March the 27th in

48:04

the afternoon to Mr Baker Mr Hartman Mr

48:07

masel Mrs Robinson Miss Kelly and then

48:11

the recommendations came back on an

48:12

email on April the 10th after the

48:14

scoring was

48:17

done okay do you all remember when the

48:21

committee was

48:22

assembled for review

48:26

was during the sorry was during the

48:29

process when the RFP was out for

48:34

bid I don't remember the exact date but

48:36

it was during that

48:38

period after the RFP was released

48:43

okay and do you remember how long you

48:45

had to review the rfps that were

48:48

received the propos the proposals that

48:50

were received we had was about a week

48:54

okay thank you I don't have any other

48:56

questions you're welcome all right

49:00

thank oh sorry thank you president bars

49:03

vice president green do you have any

49:04

questions thank you councilwoman Ros um

49:07

thank you all for being here this

49:08

evening I have a couple of questions

49:11

I'll just start with the one that I I

49:12

kind of discussed with with you guys a

49:14

little bit last week um after the

49:15

meeting is can you just go over what

49:18

happens next like what was the purpose

49:20

what's the purpose of a construction

49:21

manager what do they do once the

49:24

construction manager is chosen what's

49:26

the next step like what are they going

49:28

to help the city with what's their role

49:30

because I think somehow it's not

49:32

explained the best so if you guys could

49:34

just go over what is the role of the

49:36

construction manager and what will be

49:38

the next steps once this is awarded to

49:41

whoever it's awarded

49:44

to I can go ahead and jump in it if You'

49:48

like um a construction manager in a CM

49:51

agency type role is an extension of your

49:53

services so we're acting in your behalf

49:56

making decisions and recommendations to

49:58

you that uh is in the best interest of

50:02

of the city um our services would

50:04

include managing the process and in the

50:07

RFP it stated that we would help with

50:09

the selection process and write the RFP

50:11

for or assistant writing the RP for the

50:14

Professional Services the architect

50:16

engineers and that type of stuff and be

50:19

part of that process to help that move

50:21

along as well we'll also have on-site

50:24

supervision engineering and project

50:27

management to manage the contractors

50:29

once they're brought on board this is

50:31

still a public bid so when we get into

50:34

the public bid process we'll send the

50:36

notices out which there's three notices

50:38

that go out and then we'll go right into

50:41

um bidding the bidding process we'll

50:43

tabulate the bids and make

50:45

recommendations for for the uh

50:48

contractors to be reviewed by the city

50:51

to to select at that point in time all

50:53

right um that's what I that's what I

50:55

thought it was um but I kind of kept

50:58

getting different answers from different

50:59

people so I just want to um make for

51:02

sure I understand the process itself

51:04

better so essentially um you guys would

51:06

help with to build the bid packages

51:09

themselves the city would then review

51:10

over what was built correct it's not

51:12

just them making the decisions right

51:14

we're not just handing all the power

51:15

over this is more to the administration

51:17

make those decisions our our job is to

51:19

make recommendations and have approval

51:21

by the city understand no offense I was

51:24

asking the administration

51:27

so yes that that is the point of of what

51:30

they'll be doing for us that they

51:31

basically oversee or they will um give

51:35

us recommendations as far as each step

51:37

goes um and they do have the

51:38

Professionals in place as far as um

51:40

engineering side and and all that that

51:42

work in the industry uh to give us the

51:45

the best guidance possible just as like

51:47

a quick example um as Council stated we

51:50

are working with them currently on the

51:52

FNB field project and um we are still in

51:55

the design phase who are coming in over

51:57

budget already and part of what

51:59

Alexander is doing is helping us reduce

52:02

that that budgetary amount before we get

52:04

started

52:07

so right now yeah and in the design

52:10

phase um we it's been designed over

52:12

budget already so you know you go to an

52:15

architect and and they are going to make

52:18

it beautiful and they're going to make

52:19

it look as nice as possible their names

52:21

on so is there a change order attached

52:22

to that no because we're not there yet

52:24

we're we're still we're still drawing

52:25

you know getting thect pictures out and

52:27

working the the uh traffic flows and

52:30

egress plans and you know workability of

52:33

everything and the the

52:35

materials all of that and so Alexander

52:38

is helping us use commercial materials

52:41

that are still um appropriate to their

52:44

function but that are at a lesser cost

52:46

that are still going to Workforce in the

52:47

long run because their goal is to get us

52:51

what we need when we say we need this

52:53

but we need it at a lesser cost that's

52:55

their goal and their working with the

52:58

architect uh who is you know having to

53:01

reduce the scale or reduce the cost and

53:04

they know exactly what to do and what

53:06

not to do you know where can you cut and

53:07

where can you not cut uh to get us where

53:10

we need to be as far as the budget goes

53:11

for that project just as as an example

53:15

and hopefully that's helpful all right

53:17

um so back into this process moving

53:20

forward right so now they're helping to

53:22

build the bid packages um bids go out

53:25

how does the bid process work is it just

53:27

lowest bidder or is it lowest

53:28

responsible bidder is it still a scoring

53:30

rubric yes all right lowest responsible

53:32

bidder all right so we're back to lowest

53:34

response we better we're back to scoring

53:36

rubrics we're back to a panel um that

53:39

gets us back to this process that I

53:40

think we kind of have some some

53:42

questions about here um and one way that

53:44

I can suggest is that um no matter who

53:48

that gets this contract that we start

53:50

assembling that panel now um that we

53:52

make sure we have inclusion in that

53:54

panel obviously um I would recommend

53:56

commend that we have Mr Singleton as

53:57

part of that panel because we have that

53:59

office for a reason to make sure we have

54:02

diversity and inclusion um looked at as

54:05

we're creating these bid packages um as

54:08

well as as we're doing the scoring uh so

54:10

I think that's an important process that

54:12

I think we need to start looking at now

54:13

no matter who gets this contract um but

54:16

now back to scoring rubrics come in

54:18

right who's scoring them we've got the

54:20

panel is Alexander scoring are they part

54:22

of the scoring

54:23

process no I I so the business administ

54:26

rator would decide who would be on that

54:28

that scoring group um but I would assume

54:31

Alexander would give their two cents on

54:34

what they thought about each individual

54:36

but I don't believe and I could be wrong

54:37

because it's up to the ba um on who

54:40

exactly would be sitting on the panel

54:41

most likely be individuals who

54:43

understood the project and who knew the

54:45

guidelines or or knew what parameters we

54:48

need to stay within as far as the

54:50

individual bids that are coming in okay

54:53

so at the end of the day it's the city

54:54

that will be choosing who gets the

54:57

contracts for architect engineer

54:59

whatever other contracts come and play

55:01

when it comes to constructing this

55:03

that's correct it's not Alexander and

55:05

Company I I don't want to call it

55:06

Alexander and

55:08

Company there not Alexander building

55:10

construction that's making the choice

55:12

for the city the city is making the

55:13

choice right okay councilman green can

55:17

i' just like to add one thing you know

55:18

when when you're looking at the the

55:21

awarding of of contracts it's all

55:24

recommendations from us as I said before

55:26

before but the most important thing that

55:28

we're going to do is make sure that they

55:29

have the scope of work because that that

55:33

equates to if they don't have the scope

55:34

of work that equates to having a change

55:37

order and we don't want change order so

55:38

we want to make sure that the scope of

55:39

work is complete and that they're going

55:42

to do exactly what we want to be done in

55:44

that building so we're not asking for

55:45

more money to to do that so that's our

55:48

one of our main focuses to make sure

55:50

that the scope of work is 100% all right

55:53

thank you um and I will say a big part

55:55

of that is also part of building the the

55:57

B bid package itself to make sure

55:59

everything's explained properly so that

56:01

when they submit it it's really easy to

56:03

read sorry Mr Grover no I just wanted to

56:06

point out there's really two different

56:07

things that are going to happen here the

56:09

professional service contracts are

56:11

different than the construction

56:13

contracts they're they're scored

56:15

different they're they they're different

56:17

requirements and just so you know what

56:19

happens like in FNB field is influenced

56:22

by the source of funding which is an R

56:24

cap and wav certain requirements we

56:26

don't have those waivers for Broad

56:28

Street Market so we have to do what's

56:30

called separate the separations act

56:32

requires different bids for different

56:33

elements of the of it so the compliance

56:35

on both of them are just different and

56:38

so the lowest responsible bid is a term

56:40

of Art in bidding for construction

56:43

contracts where you know there just

56:44

there I'm just point there is a

56:46

difference of the two um and and that's

56:49

something everyone has to monitor along

56:50

the way okay and Alexander building and

56:54

construction would uh be the ones Who

56:57

oversee all of that the construction and

57:00

the Professional Services or is that

57:02

somebody else I'm just trying to figure

57:03

out like who all the players might be in

57:05

the end so we would still have a general

57:09

contractor that would oversee but

57:11

Alexander you can kind of look at as a

57:13

second set of eyes looking from a

57:15

different point of view uh so the

57:16

general contractor is going to be there

57:18

to get the job done and he's going to

57:21

make sure that individuals are doing

57:22

what they're supposed to but uh bottom

57:24

line they want to get it done you know

57:26

they they got to get this this job

57:28

finished so they get on to the next one

57:30

and Alexander really will be sitting

57:32

there um 100% from the city side it's

57:35

not their number one priority to make

57:36

sure we get done quick it's their number

57:38

one priority to make sure that what

57:39

we're paying for we're actually

57:44

receiving I I I'm just again

57:48

uh please help me understand this you

57:52

guys are there to make the selection

57:54

process um the kind of oversee how

57:57

everything is moving forward right yes

58:01

so why does that cost $914,000

58:05

you know we looked at the services that

58:07

we're providing and um the time frame

58:10

that's what it equated to there it is so

58:13

the services what are that what what are

58:15

those Services it's it's uh the

58:17

preparing to bid packages it's providing

58:19

supervision and uh schedu and

58:22

involvement it's reviewing our um

58:25

request for for proposals and and all

58:28

those things when people you know shop

58:30

drawing review the whole there's a whole

58:32

series of construction type tasks that

58:35

have to be done that we'll weigh in on

58:37

we don't want to um have a a a

58:41

contractor general contractor come out

58:43

and start uh doing something that

58:45

doesn't meet the quality of the job and

58:48

using wrong materials and that type of

58:51

stuff so we're involved in every step of

58:52

the process with our superintendent on

58:55

site with our with our folks there

58:57

making sure that it's in the best

58:58

interest of the city there's a there's a

59:01

lot there's a lot of activities that

59:02

happen and I can give you a complete

59:04

list if you'd like it I mean I can I can

59:06

put that together no I'm just listen I I

59:09

want to be clear too I'm not questioning

59:11

your ability to do work understand at

59:13

all um um like I said I think you guys

59:16

are qualified um I did look at the work

59:19

but again it's this process of how we

59:21

got here is a concern for me but uh when

59:25

we look at this the bidding part of that

59:28

um and the laws responsible bidder and

59:30

all of that so to do what they're doing

59:32

you saying that you can't find any

59:34

cheaper price to get that done what

59:36

they're doing this is for you

59:41

guys it's not necessarily the lowest

59:46

B that's what I said the the lowest

59:49

responsible B I'm saying for the

59:50

services that they're providing no one

59:53

else is can be qualified to do that at

59:56

at a cheaper price I'm

1:00:00

asking I'm sure there is are other

1:00:03

people who can do that okay that's all I

1:00:07

think the thing to remember is with the

1:00:09

individuals that supplied the

1:00:11

information that they did um from that

1:00:13

group this was the uh most I guess would

1:00:17

be the yeah it' be the best qualified

1:00:19

for the dollar so the problem is and

1:00:21

again this is

1:00:23

not to detriment of your expertise right

1:00:28

um this is uh again if you're nobody

1:00:31

will be a ever be able to compete with

1:00:33

them because of the years of experience

1:00:36

that they have no one will be able to to

1:00:40

be able to be on the same playing field

1:00:42

so if we're looking for

1:00:45

inclusion and other people are applying

1:00:47

for this and not to say that they you

1:00:50

shouldn't be allowed because you know

1:00:52

it's like no one will be able ever to

1:00:55

beat their expertise in in a lot of

1:00:57

these areas so we'll probably be seeing

1:00:59

them every time and I know we haven't

1:01:02

had large projects like this but I just

1:01:05

think that the it just seems like it's a

1:01:08

uneven playing field and that's just my

1:01:10

concern um again I think our our fear at

1:01:14

least my fear would be if we don't have

1:01:17

the best qualified group uh supporting

1:01:19

us you know we could have upwards of $20

1:01:21

million misappropriated or misused or we

1:01:25

have to go back and change a whole bunch

1:01:26

of things or we're liable for any sort

1:01:28

of issues that might happen and I think

1:01:29

that's really what we're we're shooting

1:01:32

for is not to have any of that happen so

1:01:34

we're trying to get the absolute best

1:01:35

that we can for what we can afford to do

1:01:37

or for the value of what we're getting

1:01:40

and that's where we ended up as as far

1:01:41

as a rubric goes um and and coming up

1:01:44

with this because I think when people

1:01:45

are doing the grading they they're not

1:01:46

like ah this is the winner before they

1:01:48

do it we have to sit in the room and

1:01:50

they're tabulating the numbers and no

1:01:52

one no one can know what the winner is

1:01:54

going to be because even if you get give

1:01:56

one company the best for you can

1:01:58

possibly give them you have other

1:01:59

individuals in in that room that have

1:02:02

graded a little bit differently than you

1:02:03

have and maybe they didn't do that so

1:02:05

when all those numbers are tabulated

1:02:07

that's when that that individual says

1:02:09

all right this is the the company that

1:02:10

we've chosen that has the most value for

1:02:12

the dollars that they're they're telling

1:02:14

us it's going to cost I got you so let

1:02:16

me be clear what what what so happens in

1:02:19

the city of

1:02:20

Harrisburg there's cronyism that happens

1:02:23

that take place in our city which leaves

1:02:26

out the little guys and the people that

1:02:28

are looking to um scale their businesses

1:02:31

and get on the level of a Alexander

1:02:33

company you know that happens so then

1:02:35

when they when you give them this

1:02:36

portion and then they get to influence

1:02:40

who's going on moving forward you may

1:02:42

not like this person you may not like

1:02:44

this person and and they get to decide

1:02:47

that that's an issue not just for them

1:02:50

I'm just saying how we do business in

1:02:51

the city of Harrisburg we are known to

1:02:53

be called a rooll all over City and I am

1:02:58

looking to change that uh uh the way

1:03:01

people look at the city of Harrisburg

1:03:02

someone needs to stand up and speak up

1:03:04

about a few things that are happening

1:03:07

and that's where I'm going with

1:03:09

that that's

1:03:10

it thank you councilman uh Jones uh

1:03:15

councilwoman uh Dan excuse me Davis do

1:03:17

you have anything thank you Council

1:03:20

woman Ross um thank you for being here

1:03:24

again I think that

1:03:27

um I am prepared to um make a decision

1:03:32

but also the um question of

1:03:37

how you know bias could possibly be you

1:03:41

know intoduced into the whole process is

1:03:45

is just a concern and um and a valid

1:03:49

concern on behalf of the residents of

1:03:52

the city of Harrisburg but um I don't

1:03:56

have any questions right

1:03:58

now okay thank you councilwoman Davis uh

1:04:02

councilwoman Daniels do you have any

1:04:04

questions no I don't okay thank you does

1:04:07

anybody else have any other

1:04:10

questions okay um so I know this is

1:04:13

coming up for a vote so I just uh before

1:04:16

it does I did want to um read something

1:04:21

um yes that's fine yep we'll go back in

1:04:25

like to entertain a motion to resume our

1:04:28

legislative session so moveed is there a

1:04:30

second a second thank you at 7:04 PM we

1:04:34

are resuming our legislative session

1:04:36

chair RS you have the floor thank you um

1:04:39

before we vote on uh resolution 26 of

1:04:42

2024 I just wanted to say that um

1:04:46

tonight council members as committee

1:04:48

chair of the parks and wreck and

1:04:50

enrichment committee I urge you to vote

1:04:53

against resolution 26 of 2024 this is

1:04:57

not a reflection of Alexandra's

1:04:59

capabilities please understand that not

1:05:02

at all but rather due to the concerns

1:05:05

regarding the selection process and how

1:05:07

it was done my concerns are as follows

1:05:11

the team lacked diversity and

1:05:14

perspective companies were scored on

1:05:17

criteria that were not requested or did

1:05:19

not receive points for fulfilling

1:05:21

requirements the city's equity and

1:05:23

compliance director was not involved in

1:05:25

the process but most importantly

1:05:28

consideration of company's willingness

1:05:31

to work with local vendors or DB

1:05:34

participants was not taken into account

1:05:37

the restoration of the brick building of

1:05:39

the Broad Street Market is crucial to

1:05:42

counsel to the administration and to our

1:05:45

community it must be carried out with

1:05:48

the community residents and local

1:05:49

vendors in mind the city of Harrisburg

1:05:52

and impact Harrisburg commissioned a

1:05:54

disparity report that revealed that

1:05:56

local Harrisburg vendors have been

1:05:58

excluded in the past projects let us not

1:06:01

repeat history thank

1:06:05

you thank you um Mr Parker could you

1:06:08

please read resolution 26 of

1:06:11

20124 back into the record again yes

1:06:15

resolution 26 of

1:06:18

2024 a resolution authorizing the city

1:06:21

of Harrisburg to negotiate and enter

1:06:23

into a Professional Services agreement

1:06:26

with Alexander building construction

1:06:28

company to serve as construction manager

1:06:31

for the restoration Rehabilitation and

1:06:35

reconstruction of the Broad Street

1:06:37

Markets red brick

1:06:39

building thank you council members are

1:06:42

there any further comments questions or

1:06:46

clarification needed prior to voting on

1:06:50

resolution 26 of

1:06:53

2024 is does anyone any Clarity on what

1:06:56

the CM firm actually does as far as they

1:06:59

they don't hire construction workers

1:07:00

they don't like it's more engineers and

1:07:03

design and point of order Madam

1:07:05

president I believe we would need to

1:07:07

suspend the rules to go back into

1:07:09

discussion we can ask questions during

1:07:12

this time so if there are any other

1:07:16

questions yeah what what were you saying

1:07:19

Mr Baker I I just wanted to make it

1:07:20

clear just so Council understood that

1:07:23

this portion is they don't hire like

1:07:25

like the as far as local participation

1:07:28

it's much harder for a um construction

1:07:30

management firm to hire local

1:07:32

participation just because of what they

1:07:34

actually do it's more uh we have

1:07:36

industry experts that have been doing

1:07:38

this for years that are overseeing the

1:07:40

actual um labor force like they they

1:07:42

don't oversee as far as they don't hire

1:07:44

them they don't have anything to do with

1:07:46

them other than they give us

1:07:47

recommendations on who would be you know

1:07:49

proper general contractor who then will

1:07:51

hire additional subs or we have other

1:07:54

Generals in different trades of the

1:07:55

separations act would apply for this so

1:07:57

they would be the ones that would be

1:07:59

hiring lots of our local participation

1:08:01

um to do the work in here this this

1:08:03

particular and and any um right any

1:08:06

contractor of this caliber uh wouldn't

1:08:09

be Outsourcing their work they would do

1:08:12

we would hope they do the majority of

1:08:13

all the work inous with their existing

1:08:15

staff yes and I know you guys are

1:08:17

Harrisburg locally based as well um

1:08:20

that's a plus as well but again this

1:08:22

isn't about their ability of how to work

1:08:25

where looking at the process and that's

1:08:28

it just like the the grading process

1:08:31

that's yes okay and how the team was

1:08:33

selected it it wasn't diverse our equity

1:08:36

and compliance director we have a

1:08:38

department here he was not a part of the

1:08:40

process and I think I asked probably

1:08:42

every meeting and there were different

1:08:45

answers uh so it's not about the company

1:08:49

that you chose it was the process in

1:08:51

which you got to that

1:08:52

decision are there any further comments

1:08:56

questions I do have a comment um I will

1:09:00

be voting no on this resolution um I

1:09:04

Echo the sentiments of chair RS I find

1:09:07

discrepancy within the process it was

1:09:10

not Equitable at all um all of the

1:09:16

committee assembled to review the

1:09:18

proposals received um is viewing them

1:09:22

from the same lens and perspective

1:09:27

and

1:09:29

it's it's an issue right um it seems

1:09:34

there was question whether the expertise

1:09:38

of the individuals that participated

1:09:40

within the committee their expertise and

1:09:43

um in various areas um however I don't

1:09:47

believe one of them um shared the same

1:09:51

expertise I think it was just a

1:09:53

directive of the mayor

1:09:55

um there seems to be some gaps in the

1:09:58

timeline um between March 27th of 2024

1:10:02

and April 10th of

1:10:04

2024 Easter weekend occurred and it's

1:10:08

our understanding that some of the

1:10:11

review in an expedited manner occurred

1:10:15

during the Easter weekend

1:10:18

holiday so there are just a number of

1:10:20

things that literally and quite

1:10:22

figuratively are not adding up such that

1:10:25

the information you shared um had

1:10:28

different scoring numbers than what you

1:10:31

were presenting this evening so I'm not

1:10:34

really sure I mean our information has

1:10:36

all the same numbers I I think

1:10:38

councilwoman RS might have gotten

1:10:40

outdated copy from someone I but we

1:10:42

received it from you that's my point

1:10:44

yeah I got it from the meeting I was at

1:10:46

when I came right I so do we have any

1:10:49

other members of council that have did

1:10:51

they get we all received the same

1:10:54

information

1:10:57

again miscommunication so there are just

1:10:59

a number of issues here and it's um I as

1:11:05

a result I just cannot support this

1:11:07

resolution I'm hopeful that in the

1:11:09

future uh when review committees are

1:11:13

assembled that there will be much more

1:11:16

thought and concern considered uh for

1:11:19

the diversity within our city whether

1:11:23

that's our residents whether that's the

1:11:25

Workforce of the city government um

1:11:28

there is a director of equity and

1:11:30

compliance why isn't he participating

1:11:33

and councilwoman RW chair RW is correct

1:11:36

she's asked

1:11:37

repeatedly since March or before where

1:11:41

is Mr Singleton in these

1:11:43

conversations um and even if he can only

1:11:47

participate from an advisory perspective

1:11:49

perhaps he cannot participate um in his

1:11:52

role under his compliance umbrella but

1:11:56

perhaps he could participate in an

1:11:58

advisory capacity in reviewing the

1:12:01

proposals that are received and provide

1:12:03

recommendation to the committee

1:12:06

members his voice is

1:12:09

needed and it was just absent from from

1:12:12

this

1:12:13

conversation so I don't have any further

1:12:15

commentary Mr Parker could you please

1:12:17

call the

1:12:21

vote Miss

1:12:23

Daniels yes

1:12:26

Miss

1:12:28

Davis no and it's because of the scoring

1:12:34

discrepancies only just concerned about

1:12:38

that so I'm going to say no thank you

1:12:42

Miss green

1:12:45

yes Mr Jones nay M rolls no Mr Rodriguez

1:12:53

no Ms Bower

1:12:56

no resolution 26 of

1:13:01

2024 fails with a vote of five Nays to

1:13:07

two

1:13:10

Ys thank you thank you next we have

1:13:14

resolution 28 of 2024 Mr Parker could

1:13:18

you please read it into the record

1:13:20

resolution 28 of

1:13:24

2024 a resolution appointing Gloria

1:13:26

Martin Roberts to serve on the board of

1:13:28

directors of the Harrisburg Housing

1:13:32

Authority thank you resolution 28 of

1:13:35

2024 will move to the administration

1:13:38

committee next we have resolution 29 of

1:13:42

2024 Mr Parker could you please read it

1:13:44

into the record resolution 29 of

1:13:49

2024 a resolution appointing Zachary D

1:13:52

Jackson Senior to serve on the board of

1:13:55

directors of the Harrisburg Housing

1:13:57

Authority thank you resolution 29 of

1:14:00

2024 will move to the administration

1:14:03

committee resolution 30 of 2024 Mr

1:14:07

Parker could you please read it into the

1:14:09

record resolution 30 of 2024 a

1:14:13

resolution approving the fourth proposed

1:14:15

2024 budget

1:14:18

reallocation thank you resolution 30 of

1:14:21

2024 will move to the budget and finance

1:14:24

committee

1:14:25

next resolution 31 of

1:14:28

2024 Mr Parker could you please read it

1:14:30

into the record resolution 31 of

1:14:34

2024 a resolution authorizing the city

1:14:37

of Harrisburg to enter into a

1:14:40

Professional Services agreement with

1:14:42

mayor duel PC for the purpose of

1:14:46

providing audit preparation services to

1:14:49

the city of Harrisburg thank you

1:14:51

resolution 31 of 2024 will move to the

1:14:55

the budget and finance committee next

1:14:57

resolution 32 of 2024 Mr Parker could

1:15:01

you please read it into the record

1:15:03

resolution 32 of

1:15:05

2024 a resolution authorizing the city

1:15:08

of Harrisburg to negotiate and enter

1:15:11

into a landowner grantee agreement with

1:15:14

the capitol area Green Belt Association

1:15:17

in furtherance of construction and

1:15:19

restoration of the Pax Tang Parkway

1:15:22

Creek and Trail thank thank you

1:15:25

resolution 32 of 20 2024 will move to

1:15:29

the parks recreation and enrichment

1:15:31

committee next resolution 33 of 2024 Mr

1:15:36

Parker could you please read it into the

1:15:38

record resolution 33 of 2024 a

1:15:42

resolution authorizing the city of

1:15:44

Harrisburg to participate in the 2024

1:15:47

cohort of the Pennsylvania blueprint

1:15:50

communities program thank you resolution

1:15:54

33 of 2024 will move to the

1:15:57

administration committee next we have

1:15:59

resolution 34 of 2024 Mr Parker could

1:16:03

you please read it into the record

1:16:05

resolution 34 of

1:16:07

2024 a resolution approving the

1:16:10

preliminary slf final land development

1:16:13

plan for

1:16:15

174 North 15th Street submitted by St

1:16:19

John's CME Church to consolidate two

1:16:23

parcels and construct a new new

1:16:25

2400 square foot Church 17 space

1:16:30

necessary parking lot and Associated

1:16:33

site and access

1:16:35

improvements thank you resolution 34 of

1:16:38

2024 will move to the community and

1:16:41

economic development committee next we

1:16:43

have resolution 35 of 2024 Mr Parker

1:16:47

could you please read it into the record

1:16:49

resolution 35 of

1:16:52

2024 a resolution approving the pr May

1:16:55

I'm sorry the preliminary slf final land

1:16:58

development plan for 1719 Market Street

1:17:03

submitted by Capitol City Church of the

1:17:06

Assemblies of God Incorporated to

1:17:09

consolidate two existing parcels and to

1:17:12

establish an accessory parking lot for

1:17:15

the church located at 1710 Chestnut

1:17:18

Street along with Associated

1:17:22

improvements thank you resolution 35 of

1:17:25

2024 will move to the community and

1:17:28

economic development committee our final

1:17:31

resolution for consideration this

1:17:33

evening is resolution 36 of 2024 Mr

1:17:37

Parker could you please read it into the

1:17:39

record resolution 36 of

1:17:43

2024 a resolution approving the

1:17:45

preliminary slf final land development

1:17:48

plan for

1:17:51

2701 Industrial Road submitted by nav

1:17:54

need law Zer to construct a 143 stall

1:18:00

commercial parking lot to serve as

1:18:02

overflow parking for the farm show

1:18:04

complex and adjacent properties along

1:18:08

with Associated

1:18:11

improvements thank you resolution 36 of

1:18:15

2024 will move to the community and

1:18:17

economic development committee is there

1:18:20

any old business for discussion council

1:18:22

members yes uh Mr Mr Grover can you give

1:18:26

us an update on the status of the cdbg

1:18:29

dispersement

1:18:31

which um there has not been dispersement

1:18:33

yet there is a issue with um the process

1:18:38

that occurred um when a final opinion is

1:18:42

available to you uh at that point there

1:18:45

will be a partial dispersement I can

1:18:47

tell you that much but there is a

1:18:49

process issue uh which we will have to

1:18:51

discuss in an executive session and how

1:18:54

soon will that opinion be it's it's it's

1:18:57

fairly close um it's just it's a

1:19:00

complicated one because of the issues in

1:19:03

the process okay because right now we're

1:19:04

about a year behind I'm painfully aware

1:19:08

yeah

1:19:11

and yeah okay frankly we had to find a

1:19:14

way to let any of it go through that

1:19:17

became the issue with the

1:19:21

process I just have one note of old

1:19:23

business before moving to new business

1:19:26

um before we conclude our meeting this

1:19:27

evening I would like to address one

1:19:29

matter that residents have called text

1:19:32

and sent me direct messages about the

1:19:35

American Rescue plan act or arpa funding

1:19:38

I wanted to take an opportunity to

1:19:40

remind residents and members of the

1:19:42

public that Harrisburg city council has

1:19:44

taken action to appropriate the American

1:19:48

Rescue plan act funding the first action

1:19:51

occurred on July 5th

1:19:53

2023 when Harrisburg city council voted

1:19:56

on an ordinance that was Bill five of

1:19:59

2023 which appropriated American Rescue

1:20:02

plan act funding from the United States

1:20:05

Department of Treasury for Revenue

1:20:07

replacement and authorizing and

1:20:09

directing certain expenditures of such

1:20:12

funds the second action occurred on

1:20:15

April 9th 2024 when Harrisburg city

1:20:18

council voted on a resolution resolution

1:20:20

24 of

1:20:22

2024 which approved the third proposed

1:20:26

2024 budget reallocation in order to

1:20:29

appropriate certain monies locally

1:20:32

designated as Revenue replacement

1:20:35

funding through an award under the

1:20:37

American Rescue plan act to provide for

1:20:40

specified Projects please note

1:20:42

Harrisburg city council has done our

1:20:44

legislative Duty in approving the

1:20:47

appropriation of funds we are not

1:20:50

responsible for the implementation of

1:20:52

the specified pro project

1:20:55

the implementation of the spe specified

1:20:58

projects and other programming is the

1:21:02

responsibility of the mayor and her

1:21:04

Administration I would recommend calling

1:21:06

the mayor's office with any further

1:21:08

inquiries thank you is there any new

1:21:12

business councilman Rodriguez thank you

1:21:14

madam president just want to send out a

1:21:16

reminder to anyone that is um calling or

1:21:19

inquiring about our hotspot Saturday's

1:21:21

cleanups the next one will be this

1:21:23

Saturday we take care of the Allison

1:21:25

Hill area we'll meet at the love the

1:21:27

Hill Mansion at 10:00 a.m. and we'll go

1:21:29

out into the community from 10: to 12:

1:21:31

so anyone interested feel free to

1:21:33

contact the clerk's office or email me

1:21:35

directly at R Rodriguez at Harrisburg

1:21:37

pa.gov thank you madam president thank

1:21:40

you any other new business council

1:21:42

members just one note in terms of

1:21:45

scheduling I wanted to note that on

1:21:47

Tuesday May 7th

1:21:49

2024 Harrisburg city council hosted an

1:21:51

executive session to discuss personnel

1:21:54

and legal matters um Harrisburg city

1:21:57

council will not meet next Tuesday May

1:22:00

21st

1:22:01

2024 the council will host a work

1:22:04

session on Tuesday May 28th

1:22:07

2024 followed by a legislative session

1:22:12

the time is

1:22:13

7:22 p.m. I will entertain a motion to

1:22:17

adjourn so move is there a second second

1:22:21

thank you we stand adjourn

More transcripts