Harrisburg City Planning Commission - 08/06/25
like to call the Harrisburg planning
commission to meeting to order at
approximately 6:33.
Um, commissioners, uh, you received the,
uh, oh, before I get, uh, into the
agenda, I'd like to welcome our new
board member and make sure I said your
first name right, Bur
Ber. Okay. Vincent, right?
Welcome aboard. Um, I noticed you're
sort of was interested in comprehensive
plan and all that. U, you came to the
right place.
And uh we're very objective in our
meetings. We have experienced
commissioners here and u we only very
objective with our decisions
based on zoning compre you know
comprehensive plans and everything else.
So welcome good to have you on the bill.
Okay
with that commissioner um received the
July 2nd meeting minutes. Um, are there
any changes, additions, deletions?
>> If not, could I get a motion?
>> Motion to approve.
>> Is there second?
>> It's been moved and second for approval
of the minutes as they are. All those in
favor state by saying I.
>> I. I.
>> Opposed. Abstensions.
One extension.
two extensions.
Um, with that, a motion carried. With
that, under old business, item number
one, this is a variance application for
508 and 510 North Second Street. It's a
zone commercial neighborhood. It's filed
by David Butcher with WCI Partners LP.
is to convert the existing office
building to multif family dwellings with
a total of 11 units. St.
>> Uh yes, the applicant is proposing to
convert the existing office buildings
into an 11 unit multif family dwelling
which requires zoning hearing board
approval of a variance from the density
requirements outlined in section
7-307.3A
of the zoning code. Buildings on site
will be converted into one-bedroom units
ranging in size from 435 ft to 588 ft.
There will be 5 units in 508 North
Second Street and six units in 510 North
Second Street. Properties at 508 and 510
North Second Street comprise a project
site totaling 09 acres and featuring two
three-story buildings. Former is a 3519
foot structure which was constructed
1920 and the latter is a 3822t
structure which was constructed circa
1900 although they were most likely
although they're almost certainly they
were constructed at the same time. The
properties are bounded by the property
at 512 North Second Street to the north,
North Second Street to the east,
properties at 124 to 132 State Street to
the south, and the property at 507 Adams
Alley to the west. These attached
masonry structures mirror each other and
feature elements of the Second Empire
architectural style. Character defining
features include the brick facade, the
brownstone water table featuring
decorative metal grates over the
basement windows, large ornate
entryways, decorative window headers,
large ornate cornises with brackets and
medilians, two-story porches at the rear
of the side elevations, large dormers
with pediments, and a slate maner roof.
The main entryways are topped with
simple transoms displaying the property
addresses and feature tall panled wooden
doors set within substantial frames
featuring fluted pillers and brackets
and wide pediments with decorative
woodwork. They're accessed by brownstone
stoops with metal railings. The property
at 508 North Second Street includes a
secondary entrance featuring a panled
wooden door with a half view pane in
place of one of the first floor windows.
It is accessed by a brownstone stoop
with metal railings. Administration
includes at least six 20 over two wooden
windows on the front elevation of each
property. 510 North Second Street
features a seventh window where the pair
features a door. Those on the first and
second floors feature decorative wooden
headers with scroll work. The third
floor dormer windows feature arch top
sashes, fluted pillisters, brackets, and
substantial pediments with keystones.
Penetration on the side and rear
elevations features windows in a variety
of sizes, pane configurations, and
settings. There's a first floor oral
window with one over one wooden windows
at top panels on the side elevation of
508 North Second Street. Structures
feature manered roofs with real slate
shingles and otherwise appear to be
topped with flat rubber roofs. Aside
from minor modifications, primarily on
the side rear elevations, the buildings
retain a significant amount of their
architectural and historic integrity and
reflect many of the same architectural
features as other buildings in the
neighborhood and particularly along the
500 block of North Second Street. As
such, theru structures contribute
significantly to the eclectic and
diverse architectural and historic
character of the streetscape and
neighborhood. The planning bureau staff
recommends the request be approved with
the following conditions. If the
applicant receives approval of the
requisite zoning relief requests, uh
they must secure city council approval
of the associated land development plan
for the proposed conversion. any
exterior alterations to the building
will receive approval from the historic
preservation specialist or if necessary
receive harp approval of a certificate
of appropriateness application and the
applicant will coordinate with the
department of public works to ensure the
account billing reflects the
establishment of the pro proposed uses
on site. Plane bureau staff recommends
the request be approved for the
following reasons. The adaptive reuse of
vacant and undesired office spaces
compels significant investment that
requires commensurate relief from the
density regulations of the zoning code
as noted in the financial evaluation
provided by the applicants the applicant
in their supplemental narrative and the
unique interior configuration of split
level floors and thick masonry party
walls precludes combining proposed
units. Other conversions of former
office buildings in the surrounding
neighborhood have demonstrated the
proposed use will not impact will not
adversely impact the character of the
neighborhood and the project will help
retain existing architecturally and
historically significant buildings
endangered not only by the threat of
extended vacancy but by the by the
deteriorating buildings to the north.
And finally, the proposed reuse will add
residents to the neighborhood to
activate the street on nights and
weekends and grow a customer base to
support local businesses and will
provide additional units to the downtown
housing inventory. Uh and it should just
be noted that um this uh review and the
following one are for the same uh
project. It's just the zoning relief and
land development components of those.
>> Okay.
>> Thank you, staff. Uh could you state
your names, address, and relationship to
the project?
>> Sure. Uh Dave Butcher with WCI Partners.
Her address is 1900 North Second Street.
Um we are the developer for the project.
Lori, 1900 North Street, WCI.
>> Okay. You you both heard the uh uh
conditions by the staff. Are you
acceptable of those conditions?
>> Yes.
>> Okay. Thank you. Did you want to add
anything to advice?
>> No, I think staff covered everything.
>> Okay.
Um, I don't have any questions at this
time, so I'll come to my commissioners
and see if they have questions or
concerns. Commissioner McKenzie.
>> Yeah, I don't have any specific uh
questions on the project. I mean, I
think it's a a good plan. It is, you
know, needed. Uh, and I understand the
finances. The struggle I have is
utilizing a variance as the route to get
here.
U and I guess I would ask Josh, can you
do you have available the definition an
MPC of what a variance is relative to
financial difficulties not being an
applicable
uh issue? I don't have anything with
respect to
>> Does our attorney have it maybe with her
>> okay
>> I don't have it memorized the exact
language and I'm not trying to deep fix
the project I'm just wondering whether
there's another route rather than create
creating an open avenue for others
>> to claim I bought a building I paid too
much for it now I need a variance and I
just see a slippery slope and not again
nothing about your project but is there
another route
>> to get you to where you want to So, I
would note that um and I'm certainly not
a a lawyer and don't know the specifics,
but I know that other um applicants in
the past um especially those that have
legal counsel have referenced uh state
um Supreme Court decisions that do
establish some threshold of financial
hardship, especially for dimensional
variances, I think, over as opposed to
like use variances. Um so, I know that
that's out there, but I don't know the
specific language or what that threshold
is, and it's probably a case- by case
basis um for that matter. So, I know
that that's out there. Um, but that's
just from my experience being in these
meetings and hearing legal counsel
reference those and seeing them
referenced in supplemental narratives
for that accomp projects.
>> Yeah, I mean the dimensional absolutely
the fact that the building was built
before there was zoning and the zoning
never would allow our city to be built
no matter how you write it. Um, and if
those were the issues that were coming
to us relative to variance,
I think that would be clean and clear.
But the fact that the arguments has been
private is on finance.
I struggle I have a tough time with I
respond to that. Yeah, thank you. I just
to clarify there so the there are unique
physical circumstances in the building
and that is our primary. I concluded the
financial but um in our narrative that
we submitted with the project most of
the points especially the initial points
are relative to the physical
circumstance property which does meet
>> explain them to me if you would yeah so
there are elevation differences on the
second floor between the front and the
back so these units cannot be combined
same condition exists on the third floor
there's an elev that's similar
>> it's typical Harrisburg typical Harris
switches where they have the different
elevations and then there's a thick
party wall in between both of the
buildings that impedes the ability to
combine those with a logical circulation
plan.
>> So, and then that condition also exists
on the first floor. So, that is our I
understand your concern. Um, and I agree
with Jeff. I I just I don't have the
legal um cases at hand, but I think
there have been some cases that have
been um approved. Uh a precedent has
been established based on financial
circumstances, but we leaving that
aside. There are unique physical
circumstances
>> and I think the few financial ones that
I have seen you know in in looking at
the histories typically have been a
building was owned by the applicant
zoning was adopted
and created the financial but not
through no action of theirs. uh in this
case the building's been bought
um with the known restrictions and and
now trying to uh I guess I'm just
struggling whether variance is the right
tool to get here or there's another
avenue but again not against the project
I think it needs be done but it's a
bigger long-term issue I think and we're
recrafting what variances will be in the
city going forward
>> what about with respect to the physical
circumstances I think under that
criteria
>> well it ties back It works in my mind it
works back to we're trying to get to a
certain number of units because the
dollars follow the bathroom in in our
bathrooms and kitchens.
You know, if we were talking about a
building where by right it could have
six and you're trying to go to seven
units or eight and you're trying to go
to 11, you know, I mean, but the the the
starting point in that particular zoning
area for right or for wrong is, as I
understand from your right up pretty
low, you know? for the conversion. So
that's that's all I have to say here.
Thank you.
>> Uh Commissioner Tool.
>> Uh yeah. Uh Officer Jeffrey, you have no
problem with the uh with the density on
this.
>> Um yeah, you know, uh I think in my
initial uh discussions with the
applicants, I did reference and from
looking at their uh initial submissions,
um uh I did make a comment to them that
I think their front and uh rearu uh
units proposed could be um combined and
to create like seven units for example.
Um and then uh in further discussions
and doing a site visit that's when I um
observe the switchback staircase that
they had referenced. I had pictures of
that in the in the case report and it
was evident that like yeah you it's not
just so easy as like punching through um
you know
little dividing wall or something like
that to add these. Um so I do think
there are um issues beyond the finances
uh of this uh as far as combining units
and how this building functions uh as a
multi family dwelling. Again, this was
originally a single family dwelling, so
it wasn't as big a deal. Gets converted
to office. And now, you know, the
office, you know, these are trends that
cities go through at different um you
know, uses of these downtown properties.
And so when you look at what's the use
after the commercial, um I think you
know what they're lay what they've laid
out uh makes sense from the way the
floor plan lays out.
>> Yeah. I you been on this commission too
long wanted to see trends change like
this. I mean, there was a time when we'd
roll up our sleeves and and combat this,
you know, but I think density is one of
the issues that we have to in light of
the housing crisis that we have to
lighten up on. So, uh, the other thing,
unless the solicitor disagrees with me,
I think we allow the applicant to
verbally amend its proposal so that we
could factor in the physicality of it
whenever we
u we make our decision.
Okay.
>> All right.
>> And to be Yeah. And to be clear, uh, if
if that explicitly noted as a condition
as a reason for approval. I that was an
oversight on my part to not include
that. I had hoped to at least make
reference to that throughout the uh case
report.
>> Okay. Yeah, I understand Vern's concern
just you don't want to set a bad
precedence here. So,
>> um yeah, I'm in favor of it. So,
>> okay. Uh Commissioner Nor.
>> Um No, I don't have any questions or
concerns. I I actually do feel that the
applicant
outlined the physical constraints, you
know, as being one of the the hardships
created here in this situation,
you know, over the financial. So, I I
don't have concerns with this.
>> Commissioner Jordan.
>> Yes. Um, so first of all, I wanted to
start off by saying thank you for the
well written application narrative is
very helpful.
>> Um beyond that um I noticed that you
referenced laundry facilities. Will
those be in unit or is there like a
shared facility among
>> Okay. Um as far as the pricing goes I
assume it'll be market rate. Um do you
have any general idea what your range
might be?
>> Probably 1100 to 1200 range.
And then um my last question was for
Jeffrey. Um based off of um what you
have on the case report in the first
page, uh I assume that these square
footages are allowable for um onebedroom
apartments.
>> Yeah, I don't I mean the zoning code
doesn't have anything with respect to
what the minimum size of a unit is.
There there are codes uh bureau
requirements, but uh these do exceed
them. I don't know what they are. I
think they might be 350 ft um off the
top of my head, but
>> but not as far as the zone.
>> Not
thank you.
>> And just um one common response to the
size of um our one of our most popular
properties
is 922 North Street called Union. It's
right. It's the kind of a boss kind of
facade. Um those units are 490 square
feet and they're one bedrooms. Um
they're really efficiently laid out with
probably doors in them that kind of
combine the bedroom and living or space,
but it just makes it feel larger. Um
anyway, that's our most popular
property. There's a lot of demand for
that size. Um this is just me
speculating. I got my first apartment,
all kinds of stuff, DVDs and CDs and
books and stuff. Today, it's all on one
device. So, just it seems that the level
of square footage just doesn't isn't
needed for a lot of things.
That's
it's not total, but there's a segment of
the market that likes
Thank you,
>> Commissioner Benson.
Okay, with that, I'll go to the public.
Um, if anyone has uh for against this
project, please stand and state your
address. I'll start at the middle
and to my right. I guess that's it. Um,
commissioners, um,
I'm going to probably vote in favor of
it. I I know my vice chair is concerned.
Um, but I'm with everyone else as far as
the hardship being the physical layout
of the building. The hardship there,
that's what I can see over you know,
making it
over the fiscal at this time.
>> If I may again, I just think we're using
the wrong tool to get to the right
place. This even though I think we
probably should be having discussions
about some reasonzoning. I hate to talk
spot reszoning, but it may be
appropriate in the downtown given the
variety of buildings that we have,
densities and capabilities. Uh I just
struggle with any language in here that
talks about the fan financial. I think
that makes this a very dangerous
document to have in our archive and
perhap carrying in the next meeting the
meeting after that and meeting after
that. We go back 20 or 30 years we used
to hear a lot of that. Will you let so
and so do this? And I think we kind of
shut that down a lot with parking and
rest again. It's a great project. You've
got a good architect. I'm sure it'll be
a stellar solution. They always are.
It's just are we using the right tool
that doesn't create a bigger problem to
get to a short-term gain on just this
one project. So that's all I have to say
on that basis. I I can't vote for it at
this point as written.
>> Okay.
>> Uh with that, uh
>> I will say and I apologize. I will um
going forward I will look into what the
case law says so that I can inform you
what the courts are saying or if they've
changed in any way what the test should
be if there's a percentage you know if
it's up to the discretion of what the
commission would like but I will avail
myself of the case law and make you guys
available um to have it as well and then
you know going forward you can make a
more informed decision based on whether
or not it's the way you want to do
But can I get a motion?
>> Motion to approve conditions.
>> Is there a second?
>> Second.
>> It's been moved and a second for
approval with the conditions. All those
in favor state by saying I.
>> I.
>> I. Oppose.
>> No
>> abstensions.
Motion carried.
>> And uh I think you can probably uh take
a motion on the land development plan.
Um I don't have any other additional um
conditions on that recommendation other
than tying it to the to the zoning
relief and you know having it be pred
predicated on the zoning relief being
granted. Um so the testimony would be
the same.
>> Okay.
Number two, of course, I'll read it for
the minutes. It's a land development
plan application for 508 and 510 North
Second Street zone commercial
neighborhood followed by David Butcher
with WCI Partners LP to establish 11
total units between the two buildings.
Did you want to I guess add anything to
that?
>> No, nothing further unless there's any
questions on application.
>> Okay.
With that, I have no questions on it.
Commissioner McKenz,
Commissioner,
Commissioner Merrick,
>> none.
>> Commissioner Jordan,
>> no questions.
>> Commissioner Vincent.
>> Um, my only question, I've read over the
the the parking piece, how how did that
determination about ample parking like
if you can just give me a brief synopsis
of that.
>> Uh yeah, so um that was uh based on my
uh experience visiting the property,
being able to park out in front. Um
there's at least from my experience
driving down Second Street, which I do
every day. Um there is generally parking
available in front of these properties.
Uh the properties just to the north, 512
and 514 North Second Street, those are
not occupied. Um they're actually in a
fairly deteriorated state. Uh, and then
you have the, uh, AFL CIO parking lot
just to the north. And I think there's
like four about four parking spaces uh,
along that on street parking spaces
along that uh, section of Second Street.
Um, and then there is, you know, parking
um, along State Street as well. Uh,
especially at night, um, less so during
the day, I'd say, but uh, you know,
that's kind of the complimentary use of
people coming in to work there and then
leaving um, in the evening. and then the
residents being able to park there. So,
and those are, you know, I think
ticketed or metered until um five I want
to say um six um and so there would be
parking available for the residents at
night to park on street.
>> Yeah. And and
yeah, I mean usually in the zoning code
there is a uh component whereby um and
this is more for the zoning relief which
is not required because in the sand
district but they talk about the
complimentary uses and being able to
share parking spaces and those are
relative to on a property and shared but
the same principle would apply to
publicly
U my understanding is that the owner is
getting bids right now.
>> Yeah, we we um I think there's alignment
with our interest and your interests and
getting those down as possible. We would
like them not to come down during or
after we construction.
So we are encouraging the owner.
>> Any other concerns? commissions.
>> If I might, I think what you're
referring to uh has been an issue that
we've had in other locations in the
downtown and I'm speaking from the
parking authority side here and that is
the want and printing of permit parking
for residences. And if you look at the
number of permits that are out there and
the one mark amount of spaces that are
available, I know that's been many a
concerns and phones calls I've had over
the years and that has been used on some
of the larger developments downtown as
the excuse for why, oh, we can make this
work. We'll we'll tell the out of town
folks that they can spend $60 a month to
get a parking permit and then take a
resident who's been in the area for 10,
20, 30 years. they have no space and and
so that is a problem that we've had
we've not been able to resolve and it
all and that's comes back to the parking
deal and all the issues there but you've
probably heard us talk about it this and
I agree with Joffrey's uh assessment
this particular location has a higher
density of available parking after hours
but again you're in that district you
may still be competing um a little bit
but you know that's you know it's not a
huge development and but he is correct
in the CN district we do not require
parking and that's the thing so it
becomes a functional thing but it's part
of a bigger problem that we we've got to
deal with in the downtown for those
places that aren't CN
>> okay if anyone were against this project
I'll start the middle again to the right
that commissioners um could I get a
motion
Motion to approve with conditions.
>> Is there a second?
>> Second. It's
>> been moved and a second for approval of
this project with conditions. All those
in favor state by saying I.
>> I.
>> I.
>> Oppos.
>> No.
>> Motion carry.
>> Thank you.
Okay. Um on old business under land
devel uh number three land development
plan application at 1081 Elliot Street
which is zone industrials followed by
Charlotte Kim Warrior the Cult region
border to construct an industrial
building and associated site and access
improvements. The applicant has
requested a continuence to the September
3rd HPC meeting. Commissioners, could I
get a vote on
>> I actually have a revision to suggest.
Um, in the email submitted by Capitol
Region Water, they are requesting a
continuence until October's meeting, not
September's.
>> So, I think we should amend that
request.
>> Thank you.
>> And vote on
They actually have not submitted
anything.
>> They haven't submitted,
>> right? So they and and I can I can
coordinate with them and see if they
want to like withdraw and then resubmit
to to be within the time frame. They
actually did submit something, but as I
was going through the their drawings, I
noted their building was going to be in
the floodway, which they're not
permitted to to have per our zoning
code. Um, and so they first requested
the first continuence because they're
still working with uh PA because our
zoning code does note that PA D can
issue
uh approvals for development of the
floodway. I don't know if they will. I
don't know if they're going to redesign
this or just scuttle the project with uh
altogether. But uh if timeline becomes
an issue um I can uh work with them to
just have them formally withdraw and
then resubmit.
Okay, this is with the um amendment from
our commissioner.
This would be continued to the September
I mean October meeting.
>> October 1st.
>> Okay, it's been moved and second for the
continuence to the October meeting. All
those in favor signify by saying I
>> opposed.
Under new business, this is a variance
and special accept application for 1932
on F Street which is own residential
medium that medium entity is followed by
you.
>> How can how pronounce the first name?
Martin.
>> Okay. Jennifer with the Y. Uh Martin
Martinus. Uh this is to convert the
existing single family dwelling to a
two-unit multifamily building.
>> Uh yes. So, the applicant is seeking to
formalize uh the conversion of existing
structure as a two-unit multif family
dwelling, which requires zoning hearing
but approval of special exceptions for
the proposed use and relief from the off
street parking requirements for sections
7-305.7
and 7-327.6
the zoning code respectively and
variances for relief from the density
regulations and spec and specific
criteria in sections 7-307.3
and 7-309.2b
of the zoning code respectively.
Property 1932 Forester Street is a 005
acre lot featuring a 2 and 1/2 story 22
foot structure which was constructed
circa 1900 per the Dolphin County tax
records. Property is bounded by York
Street to the north, the properties at
1934 Forester Street and 1933 York
Street to the east, Forester Street to
the south, and the property at 1938
Forester Street to the west. The semi-
detached structure features elements of
vernacular and Queen architectural
styles. Character defining features
include the brick facade with common
bond bands, the enclosed front porch
clad and vinyl siding, the rear edition
constructed of CMU block featuring a
wooden fire escape to the second floor,
and the third floor dormer with steeply
gabled roofs painted with uh with
painted wooden shingles. The main
entrance features a simple wooden door
flanked by divided light sidelights and
topped with a divided light transom.
There is a secondary entrance accessible
via concrete path and steps along the
building which features a circular pane
and sheltered by a small awning. There's
also a panled metal door on the rear
elevation. Fenestration also includes 16
windows which are primarily one over one
windows. There is a prominent oral
window on the second floor of the front
elevation. The structure is topped with
steep gable roofs claden asphalt
shingles. As a semi- detached structure,
the building mirrors architectural
features of its pair to the east,
although there are differentiations in
some aspects such as the enclosed porch
and the building addition on the rear
elevation and generally reflects the
massing of other properties in the
surrounding neighborhood. As such, the
building contributes minimally to the
architectural character of the
streetscape and neighborhood.
The planning bureau staff recommends the
request be approved with the following
conditions. Uh granted of zoning
approval to move forward with the
project as proposed. The applicant shall
allow the codes bureau to perform a
comprehensive inspection to identify any
outstanding code violations and will
receive approval for all necessary city
permits prior to receiving a certificate
of occupancy.
and the applicant must provide a
detailed site plan developed by a
professional demonstrating how the rear
yard will be developed and whether all
street parking will be provided on site.
If that is the intention, any new
development must be in conformance with
the applicable zoning regulations. Uh
and to kind of clarify that second part,
um the rear yard is currently kind of
dirt. Uh there's a shipping container
and there's some uh yard waste and
construction waste. It's clear that
there's space to be able to provide the
two Wall Street parking spaces required.
Um, so the special exception for that
aspect of the uh proposal uh could be
obiated, but I have no uh documentation
that indicates whether the applicant is
intending to do that. So that's why I
kept that uh zoning relief request in
there. Um, plan B staff recommends the
request be approved for the following
reasons. While the plan bureau does not
believe the existence of illegally
established units on site creates a
basis for the establishment of a
hardship or justification for zoning
relief requests as that may only
encourage such work. In this instance,
the subject property does exhibit
conditions that support the granting of
zoning relief, including the size of the
structure, the possibility to construct
all street parking on site and the
applicant's ownership of the adjacent
vacant lot, which if consolidated with
the subject property would obate the
need for variance for relief from the
density regulations.
The property and address the primary
concern of the public regarding the such
conversions, specifically the impact on
parking available to existing residents
through the provision of the required
parking in a new parking area at the
rear of the property and due to the
availability of Amplalon Street parking
along the frontage of the property with
Forester Street. Uh, and this is due to
um the uh adjacent property next door
which is vacant. Uh and then finally,
the existence of other of other property
conversions in the surrounding
neighborhood demonstrates the allowance
of a new such conversion would not
adversely impact the community.
>> Thank you, John. Um could you state your
names, address
um relationship to the project?
>> My name is Jennifer Martinos um 250
street in Harrisburg and I'm the owner.
>> Is this gentleman with you? Okay.
All right. Um, you heard the u the
conditions. Are you acceptable of those
conditions?
>> Um, I wanted to say the parking um the
reason the the yard is was in disarray I
guess when you went there. The
neighbor's tree fell. Uh, so you saw the
large tree and all of that. Um, that has
been cleared. It's been cleaned off. It
actually knocked off my fence. Uh so
that has already it's been handled has
been fixed and we did do the the
parking. Um in the back there's there's
spaces for I mean I have pictures for
the spaces for the
>> Yeah. Well, we would need to see like a
site plan to demonstrate that it was in
conformance with the applicable
regulations.
>> So the the back of it um the back of the
house
It does have like Jeff said does have a
lot of room for parking. So I did
already create uh two parking spaces
so that each unit can have its own off
street parking in the back of the house.
the tree that fell has been removed. So
the it does have a fenced in yard in the
back of that and it's
okay. As Jeff said, u you would have to
probably send him a plan on how that is
set up in the back. We don't have any
proof with us right now. So the parking.
So you're accepting the second condition
of developing a plan. That's correct.
>> The plan is for the for the the yard.
For the park
>> for the yard, how the yard will be laid
out. Yeah, that's what we would need a
plan.
>> The yard. Okay. Yes, of course.
>> Sorry. Also with the um as far as codes
on June 6 of 2025,
I included it in the package. They um
they already went offer
he went he did an inspection of the
entire property.
Uh the upstairs already passed
inspection. It's everything was good. Um
there weren't any issues. He saw the the
downstairs him and um officer Wilson
they saw the downstairs
because I had um items stored there. I
had the floors that have been installed,
the leftover floors and all of that. Uh
pretty much he said just bring us back
once this has been concluded. Uh because
I was already in the process of the
zoning process, the varian um so it's
just a matter of kind of having them
walk back through the property
and then there were no issues already.
So that as a condition
you have not you don't have official
reports do you or
>> um I do note they they were out there um
but uh I don't have like an official
inspection report from the code.
>> They said they cannot
say anything about downstairs because
it's a one unit. So they said we can't
say this
first floor pass inspection. We can't
say one pass inspection. So, we can't
say anything because it's just one
family. So, if um this is a condition, I
guess I would have to let them know,
hey, it's a condition, just going to put
something in writing that says this area
inspection, whatever, however they want
to word it, but they couldn't because of
that.
>> Okay. Yeah. Whatever documentation you
get, you send it to Jeff so we can see
that it's been done and that's part of
the conditions here. Okay.
Um,
of course that was one one of my
concerns with the parking, but you
covered that. So, um, I'll go that's all
I have right now. So, I'll go to my
commissioners. Commissioner.
>> Yeah, I don't have any problems with the
project. Nice. The photos look like
you've done a very nice job. The key
question I have, you took you took
ownership of this building fairly
recently.
>> 2024.
>> Okay.
>> April.
>> Did you use a realtor for that?
>> Uh, no I did not.
>> Okay. Okay. Sometimes we have issues
with realtors that don't disclose proper
aspects of zoning. And I just wanted to
find out if you were a victim of that.
>> No.
>> In this case,
>> the previous owner um he was a older he
is an older man. He that it was a two
family and I did as it states on the
county website said multif family. So I
>> did it's I saw in here there's a 2017
addition done to the building. Do you
know if they pulled a building permit
for that? Um I do believe they did. I
looked back through the um through the
decent records which is our code records
um for that and it looked like it's
always tough to tell because sometimes
what a owner will write is just like
>> is not what they
>> overall improve or they'll say something
very general like home improvement and
you know and what it is is it's I think
in this case it was enclosing that front
porch area and so that's um I think that
also created some discrepancy in the saw
some note in here about non-conformance
reports and amelioration in 2020.
>> Yeah. And so that and that's another
reason we want um you know the codes
bureau to do a thorough inspection to
make sure that was all done up to speed
that they have insulation if that's
necessary, any wiring that's going
through there.
>> Um because it's a little unclear as as
to whether the former owner or a former
owner um was very clear with the city
when they were doing that.
>> Okay. Thank you.
>> Um I'm sorry. Just wanted to say I
believe I included it in the package but
In 2017 is when that edition was done.
Um they were codes went and in 2018
uh it says there that um they gave them
I think it was 60 days or so. Then there
is the the paperwork where it says it
was brought into compliance. They did go
they inspected it.
>> They saw that it was all done.
>> Yeah. And I'm I'm just I was just trying
to establish whether those issues were
brought on by the current owner or was
something that was there. And that's not
you're not guilty for the past.
>> Yeah. Again, this is a application that
probably would have been dead on arrival
a couple years ago, but I I both
apartments seem to be good size and
you've addressed the parking issue, so
I'm in favor of
>> Okay, Commissioner,
>> I don't have any uh questions or
concerns. I actually echo what
Commissioner Oul said in regards to the
project. I think what's interesting is
Dolphin County property records list
this at or categorize this as a
multi-dwelling unit, which is a
discrepancy with what the city's records
are. So, it is fair that a purchaser of
this property would be under the
impression that this would already be a
multi-unit dwelling, you know, approved
as such.
>> Um, so I don't know what the city can do
to coordinate with the county records
that they're more you know, in
alignment.
>> I have brought this up with the county
in person on the phone in email asking
them to change that because it's and I
think they did it used to be property
use and they changed the property class
which doesn't really help at all. But as
I can as far as I can gather from my
discussions with them, it's a taxation
classification for the county's taxes.
And I believe a lot of them are based on
the last time we did a countywide tax
assessment, which is in like 2004. Um,
and so you've got this like old kind of
like zombie information just continuing
through. And I've asked them to remove
it or call it tax class or something and
they just don't. And so a lot of this
and we and we're correcting it either in
talking to members of the public or
realtors. Um, and that's one of the
reasons we've updated our um, uh, flood
plane zoning certification. It used to
just be give you zoning and give you
flood plane and and now we have it uh,
give additional information and make
sure like it's coming before the uh,
instead of just going to the codes
administrator. Um, so we've tried to
make our property transfer review
process more robust so that we can catch
these things and we also, you know, are
always trying to clear this up with
anybody that calls in and asks.
>> Commissioner Jordan,
>> no questions.
>> Commissioner Benson,
>> no question questions. Great job being
proactive with the parking.
Thank you.
>> Okay. Is there anyone in the public or
against this project? Start with the
middle.
Commissioners, can I get a motion?
>> I'll make a motion to approve. And I
think we have uh
>> two conditions with the two conditions
noted.
>> Okay. Is there a second?
>> Second.
>> Been moved and second for approval of
this project with the two conditions.
All in favor state by saying I
>> opposed.
Motion carries. Good luck.
>> Thank you.
>> Item number five. This is a special
exception application for 2609 North
Trench Street. It's zone riverfront
followed by Noah Parsons with Triple P
Fitness. This is to replace the existing
front yard grass with Astro Turf.
>> Uh yes. So the applicant is proposing to
replace the existing front yard grass
with astroturf. Um and I guess it's not
technically astroturf. I think it's soft
lawn. uh comfort barefoot comfort uh
which requires zoning hearing board
approval of a special exception
application for section 7-321.4B
of the zoning code because the proposal
constitutes development as defined in
section 7-333.2
the zoning code which is not permitted
within a 50 foot front yard setback.
First section 7-307.3 of the zoning
code, a variance would be would
generally be required. However, given
the existence of the off street parking
area already encroaching into the front
yard setback, the proposal only requires
a special exception application for the
expansion of a non of an existing
non-conforming aspect of the property
per section 7-321.4B
of the zoning code. The property at 2609
North Front Street is a49 acre lot
featuring a one-story 3800 foot
structure which was constructed in 1950.
Property is bounded by the property at
2615 North Front Street to the north,
North Second Street to the east.
Properties at 2601 North Front Street,
102 Rner Street and 2604 North Second
Street to the south and North Front
Street to the west. This detached
structure features elements of the
international architectural style.
Character defining features include
brick facade with a painted mural on the
front and side elevations, the
asymmetrical front facade featuring a
row of fixed pane windows, a regular
penistration pattern along the side and
rear elevations, and the prominent brick
chimney in the rear. Main entrance
features a full view metal door topped
by a simple metal transom and a shallow
black awning set within a substantial
concrete surround. The rear entrance
reflects this design with a full view
metal door set beneath a shallow awning.
Administration also includes windows in
a variety of sizes and paint
configurations. The front elevation
features a row a of fixed pane metal
windows a top hopper windows set within
concrete lint headers and lintils.
Windows in the side rear elevations
feature the same windows design set
within simple brick frames and a
regularly spaced pattern. Structure is
topped with a flat rubber roof. The
property otherwise features minimal
landscaping it as bushes along the
building foundation have recently been
removed with two separate parking areas.
Although the building differs
marketkedly from many of the others
along Fun Street and the neighborhood
and in the neighborhood to the east, it
does contribute to the varied
architectural character of the corridor
and makes a minor contribution to the
architectural character of the
streetscape and neighborhood. The
planning bureau staff recommends the
request be approved with the following
conditions. Uh the proposed turf may be
installed no further into the setback
than the existing parking surface and
the applicant must reinstall the
landscape screening along the parking
area which was recently removed in
violation of the parking facility design
standards and install landscape
screening along the frontage with the
sidewalk. The applicant should relocate
the pedestrian connection to the public
sidewalk to the southern frontage of the
parking area to retain a direct
pedestrian connection to the building
and ensure that pedestrians are not
required to intermingle with vehicular
traffic to access the building. Uh the
applicant must remove the unpermitted
penetent signs along the front edge of
the property and given the location
within the AE flood plane and the and a
flood plane. The applicant must ensure
that any investments in the property are
submitted to the planning bureau for
consideration review against the flood
plane regulations and best practices
before work can commence. The turf and
ramp as well as an unrelated fence
project submitted separately from the
zoning relief request must be included
in the floodplane development
submission. The project will also
require review by Capital Region Water.
Planning Bureau staff recommends the
request be approved for the following
reasons. Although the planning bureau is
skeptical the proposed turf will
replicate the appearance or
functionality of natural grass and
concerned about the proposal
establishing a precedent for other front
street property owners. Project must
only receive approval of a special
accept exception application the
threshold for which is lower than for
variance. The project could function as
something of a test case to determine
how well the proposed project product
integrates both aesthetically and
functionally into the Front Street
corridor. And finally, if the conditions
of approval are adopted by the zoning
code, the project could result in an
overall benefit to the viability and
utility of the property while addressing
various zoning violations on site.
>> Okay. Thank you, Jeff. Could you state
your names, address, and relationship to
the project?
>> Uh Noah Parsons, 2609 North Front
Street. Uh building business owner.
>> I'm Chris Brun. I'm a synthetic turf
international dealer here in
Pennsylvania and registered with the
city and helping with this project. We
hope.
>> Okay. Uh you both heard the approval
with the conditions. Are you acceptable
of those conditions?
>> If possible, could we have him restate
the condition? I just feel like there
was a lot.
>> Yeah. Sorry. Uh so the proposed turf may
be installed no further into the setback
than the existing parking surface. So
that's about I think like three feet
from the sidewalk. Um uh and the
landscape screening must be installed on
the parking area there. So that's a
requirement of our zoning code to have
parking lot screened and that uh
vegetation was removed sometime in the
last three years. The most recent um
Google Street View images is from like
October 2022. Um so I'm not sure.
>> Yeah. Yeah. Like it's now like Tanark I
think. Uh just Tanark.
uh bushes, maybe like Chinese grass,
something like that. Um
and then uh having a landscape screening
along the frontage with the sidewalk. Uh
so there were two little bushes kind of
near where the um walkway connected to
the sidewalk. Um and while there's no
requirement for that, I noticed I noted
that in the um diagram of how the uh
turf is installed, there's like um
nailer boards, I guess, on the ends and
stuff. And we just want to make sure
that's not exposed to people just
walking on the sidewalk or just kind of
visually just right there up against uh
the sidewalk. So to have a little
screening and that could be something as
similar as like a flower planting bed or
something like that just to improve the
aesthetics of the uh property. So that
was the first one. Um and then they
relocating the pedestrian connection to
the public sidewalk uh to the southern
frontage of the parking area. So, I
noted that in the application it says
there's going to be no change to
pedestrian access, but in the proposal,
the um ADA ramp goes right into the
parking lot. So, anybody that's going to
be walking to the property would have to
walk into the driveway where, you know,
where the where there's people maybe
pulling in or pulling out. Um and so
having a direct pedestrian uh connection
from the end of the ramp out to the
sidewalk maintains that separate uh
pedestrian connection um that exists
there now. Uh and then uh removing those
penant signs uh that are out there. Um
and then finally uh just any work that
occurs on site requires um a flood plane
development permit and and CRW
coordination. Um, I know CRW has been
getting some of these uh synthetic turf
uh uh proposals um in more recent years
and they need to make sure that it to
ensure that it's still uh a pvious
surface that the subsurface the rock and
soil and whatever else is is done
correctly so that it doesn't light back
up or something. So that's something CRW
has been telling us that they need to
review.
>> How do we review that? Uh so assuming
this would get approval, I would put you
in contact directly with them and they
would work with you directly.
>> Okay. Um
one of my questions always with everyone
is uh did you contact the community? And
I noticed you do have a
um
couple sheets here filled out but they
don't have addresses. they mainly your
clients. So the community right there,
did you contact any of them?
>> Yep. So all our neighbors as well as
multiple of the people on that list are
neighbors along Second Street there um
as well as Front Street in addition to
our clients and then as well as an
online petition that's I believe over
300 people signed as well.
Okay, next time just well next time we
should have the address so we know just
by St. Harrisburg we don't know if
they're living it out on the hill
how they affect the community. Um
and the other um I guess you don't have
no problem with parking there. I don't
know.
>> No, but it's all by appointment based so
there's only one-on-one training
sessions maximum six trainers and six
clients. So that's never an issue.
Okay.
>> And I'd note they did uh in 2023 got
approval to set up the fitness center
use and as part of that they did get
relief from the off street parking
requirements based on the uh by
appointment only scheduling.
>> Okay.
>> I'm not too familiar but are you going
to do your training out on the astro
with this?
>> Yeah. So essentially what we'll be doing
is we'll be replacing the front grass um
with this specific permeable turf. This
is designed to look exactly like natural
grass to kind of maintain that maintain
that front street vibe. And then
additionally uh very permeable. I can
have Chris talk more about kind of the
specifics there.
And kind of the goal here is just to
have a riverfront training environment.
Something that this area or any area
really hasn't seen. Um so it'll be
solely for structured uh one-on-one
training sessions. Won't be any
equipment outside of equipment that's
brought in or brought out during the day
and then brought back in.
>> Okay.
Um those are the only questions I have
at this point. U Commissioner
McKisick.
>> Yeah, this is kind of an intriguing one.
I I can kind of view it out there and
I've watched what you guys have been
doing and it's kind of interesting. So,
it will be one-on-one training out there
and Okay. Yeah. And and again, the
permeability, we've done a lot of fields
over the years. And the uh flood plane,
I don't know where the flood plane lies
out there. Are you above it?
>> It's the whole property is entirely in
the flood.
>> It's the whole thing.
>> Pretty much all front street is there.
>> Yeah. And and we got involved in
cleaning one in North Carolina after
those floods last fall.
Um Yeah. But anyhow, um it's it's can be
a good product. Sand bed or is it rubber
based or how do you do the crumb?
>> Um
can you hear me?
>> Yeah. Uh we use a stuff called Envirill
which is acrylic. Um it's not the
typical football field where they put
like you know this much sand and then
this much
>> up tires,
>> right?
>> Which some people say is not real
healthy. You could have mercury this is
has micro band in and it's very safe for
kids to play on and it's very pet
friendly too.
>> Okay. Yeah, that sounds the uh I have no
problem supporting this. The only thing
as I might suggest a condition that just
to note that this shall not be used for
parking at any time. No, because we have
designed them and parked on them. It's
not good but it happens. So, and I know
we've struggled with front front yard
parking down Front Street for a lot of
years. So,
>> yeah.
>> Yeah.
>> And that property that used to be a
fully just like impervious service and I
remember they came back and and because
they expanded it from to the one side of
the walkway. Um, so they did like the
pvious pavement.
>> Nothing else. Thanks. Commission to
Yeah, I agree with Vern. This is a this
is a new one on us. Uh
this doesn't require the like the
drainage infrastructure that you put on
a football field, doesn't you? You're
just putting it on
>> No, you know, I'll talk to the the folks
about that, but I usually put a clean
stone down first about 4 in.
>> Then I'll put a finer stone and compact
it all out. That gives natural drainage.
The turf actually has PF holes on the
bottom of it every four inches. So
there's holes like the size of a pencil
that help it drain.
>> And the test results, as he said, it
drains
600
gallons in per hour. So as he says, it
drains better than grass.
>> Yeah. Just curious. Yeah,
you got my vote.
>> You rais a question if I may. Um, do you
I assume you guys do a perk test to go
with this to ensure the um the
underlying soil is not a clay.
>> I can. I'm not accustomed to it.
>> Okay.
>> And I think that's something that
probably um
I'm just thinking about.
>> I noted in the cross-section of the of
the product in the brochure, it talks
about compacted uh subgrade and and then
it has the um stone on top of that. So
that's something that you know CRW will
tell them like yeah it needs to be this
spine of stone or whatever.
>> Yeah. I just I was just curious if you
had because I know we've dealt with that
that silty clay so along Front Street
and it can be kind of doesn't like to
give up the water.
>> Um yeah I uh
I think this is very innovative. I have
been going back and forth about whether
it should be a separate condition
um in respect to capital region waters
review and just any design coordination
in respect to storm water planning,
infiltration and the flood like drainage
into the flood plane. So, I mean, I know
you're saying it's coordinating
being like the flood plane review and
coordinating with CRW,
>> but there's also the drainage aspect of
this
turf of the water going directly
into,
you know, into the soil. There's
they also might have an issue of
actually seeing reverse
water filtrate happening if there's a
flood situation
where
I don't know. I mean the
I'm just wondering if there should be a
separate I'm I I'm leaning towards there
like you kind of just like made a one
statement like the project will require
review by CRW and I'm just I think there
should be it should be a condition that
CRW approves of the drainage and ration
design of this project.
>> Sure, I think that's sensible
>> and that is my only concern with this
otherwise think it's pretty cool.
>> Okay,
Commissioner Jordan.
>> Yes. Um, so there was made reference to
the concern for this setting a precedent
going forward, right?
Yeah, that was so I guess this is maybe
a hypothetical question is because you
talk about the fact that this could
function as a test case. Is there any
way from a language standpoint to make
this like revisionary for this
particular case?
>> Um, you know, I think I I don't know
that we've ever used that terminology in
the zoning relief uh process. Uh we use
it in HARB uh but that's a bit more uh
the scope is a little different of their
review authority. Um, so I I think it'd
be tough to say, well, we'll let this
happen, but
>> everything else is, you know, subject
one to one basis because that's the case
anyway, right? Um, about what's relative
to that property or whether it's a
variance versus a special exception. So,
um, I I didn't know really how to put
that down. I mean, like I said, my my
one concern was basically saying like a
lot of other people saying, "Well, I
don't want to mow my lawn every year."
So, why don't we just do this? And then
all of a sudden, you've got this carpet
of, you know, turf like laid out along
Front Street here. And I think
>> um you know that I think that's still a
a possible concern, but um like I like I
noted in the case report, I mean, this
is a special exception. It's not a
variance. And so the and so the
threshold is lower. I came into this
honestly expecting to recommend denial
and I I couldn't get there while I was
reviewing the case. So
>> yeah, because If I'm just being honest,
that's kind of where I'm at. I think for
your business, this makes sense. But
since there doesn't seem to be any
gradation, it's either all or nothing.
That's where my concern lies.
I think that's it for me.
>> Commissioner Vincent.
>> Yeah, that my big question would be, you
know, what happens after that CRW?
Do do we have to relook at the storm
water runoff plan? Like what does that
look like from our end and our
responsibility? Does it come back to us
after that?
>> I don't think so. I mean CRW would
basically tell them here's how you do it
or you don't get approval from us. Uh so
it would kind of be a you know binary
like once they get there,
>> right? One of the things here is it's
such a small parcel, it doesn't reach
the thresholds of the square footage
that typically pushes it in the county
conservation or NPDS or anything like
that. So all those guards are down. This
case is coming back to CRW to kind of
pick up that role.
>> Okay.
Is there anyone from the public for
against this project?
One in the middle, two on the side.
Um, commissioners, um,
could I get a motion with Ann, you want
to add your condition to
>> Yeah, we're adding
>> two
>> two additional condition.
>> If you're if you're good with the
parking, it's showing up. I've just seen
too many impervious areas get a, you
know, get an inch and a half of asphalt.
When I go back to the Civil War Museum,
we had almost an acre of impervious area
and they came back and asphalted it
three years later.
>> There's a bus parking below the hill
there. So,
just happens.
>> Nobody remembered. They didn't know it
was there.
Um, I mean, I guess there's a
possibility for um possibly doing like
hatching at the edge of the parking lot
so it doesn't have to be like repaved as
um as uh concrete or something like that
and then just with curb stops set apart
from that. So that creates that. I just
want to make sure that anybody who is
walking because you're right across the
street from River Park. Somebody may,
you know, take the green belt up there
that they're just don't have to walk
into the parking area and maybe
somebody's backing out and hits them
that they have their own, you know, uh,
separated area to walk up.
>> Um, yeah. Does that
making sure
I would make a motion to approve this
with the conditions uh stated and also
adding a condition that uh no parking of
vehicles would be allowed on uh this
area and um amending condition for uh to
separate out a uh review and approval by
Capitol Region Water for the design of
this uh drain. dage and infiltration of
the of the area.
>> I I would second that.
>> It's been moved to second for approval
with the added conditions. All those in
favor state by saying I.
>> I opposed.
Okay. Motion carries. Goodbye.
Anybody
want to see?
surprising.
>> Yeah, they converted ago.
>> Yes, this is fun.
So I have a question.
>> Is that like um I know like tennis in my
days they're grass courts.
[Laughter]
>> I get the city to fund it.
Okay. Uh let me see where are we?
Uh at the item number six, I believe. Um
this is a land development plan
application for 315 North Second. It's
zone commercial neighborhood. is
followed by Adam Gretman and with
Gretaman Properties LLC is to convert
the existing office building to a 10
unit multi- family dwelling.
>> Uh yeah, so the applicant is proposing
to convert the existing office building
into a 10-unit multif family dwelling.
Uh commissioners probably recall this
from last month uh when the applicants
received um variance approval uh to
establish the 10-unit uh multif family
dwelling. Uh the property at 315 North
Second Street is a 0.1 acre lot
featuring three attached buildings, a 2
and 1/2 story 232t
structure, a three-story 2700 foot
structure, and a three-story 4938t
structure, all of which were constructed
circa 1900. Property is bounded by
Barbara Street to the north, the
property at 210 Pine Street to the east
and south, and North Second Street to
the west. These attached masonry
structures which are or will be
internally connected uh feature elements
of varying architectural styles. The
southernmost of the three buildings
features elements of the federal
architectural style. Character defining
features include the painted brick
facade, the arched entryway, an awning
and access ramp at the rear entrance and
the regular fenistration pattern. The
main entrance is recessed behind an
arched entryway featuring wide pillers,
a keystone and a decorative sconce and
features a panel door flanked by divided
lace sidelights and topped with a
sunburst transom featuring the property
address. Administration on the front
elevation features five 12 over 12
windows with wooden sills and decorative
brick headers which all feature painted
wooden shutters. There are an additional
five divided light windows on the side
and rear elevations. Structure is topped
with a gable roof clad asphalt shingles.
The middle building features elements of
the Italian 8 architectural style.
Character defining features include
painted brick facade and water table,
the decorative metal grates over the
basement windows, the former entryway
converted into a Juliet balcony, the
consistent fenestration pattern, the
threestory bay window, and the
decorative stepped corn brick cornness.
The front main entrance is no longer
accessible from the street as the stairs
were removed prior to October 2008 and
replaced with a decorative metal railing
but features a wooden panel door set in
a simple frame and topped with a sconce
um top of the sconce. The entryway
previously featured an arch brick
surround which has since been infilled
with brick. Administration on the front
elevation includes 17 divided light
wooden windows set in simple wooden
frames. Those on the first and second
floors include storm windows. There are
an additional five divided light wooden
windows on the rear elevation which also
include storm windows. The structure is
topped with a flat rubber roof. The
northernmost of the three buildings
features elements of the classical
revival architectural style. Character
defining features include the painted
brick facade, the double-sided access
stairs, the regular fenistration
pattern, the substantial brick, the
substantial corners featuring brick
posters, decorative brick and wood
elements, and a central embattlement
with narrow windows and a large
three-story decorative brick chimney on
the side elevation. The main entrance
features a panled wooden door set in a
simple panel frame blank by sconces and
topped with a divided light transit. It
is accessed by birectional brick steps
with a simple metal railing.
Administration on the front elevation
includes five 9 over9 windows with brick
sills and headers which all feature
painted wooden shutters. There are an
additional 11 divided light windows on
the side elevation and two dormers
topped with substantial pediments on the
side roof flank flanking the large
chimney. Structures topped with a gable
roof clad and real slate shingles. The
buildings retain a significant amount of
their architectural and historic
integrity and exhibit a unique
configuration of three conjoined
structures of differing architectural
styles. And although they differ
significantly from other properties on
the block, particularly those to the
north and south, they reflect many of
the same architectural features as other
historic properties throughout the
downtown historic district. As such, the
structures contribute significantly to
the eclectic and diverse architectural
and historic character of the
streetscape and neighborhood. The
planning bureau staff recommends the
request be approved uh for the following
reasons. The project has received the
requisite zoning relief approvals to
convert the property into a 10-unit
multif family dwelling. The adaptive
reuse of vacant and underutilized office
spaces into apartment buildings is a
long-term trend for the neighborhood.
Other conversions of former office
buildings in the surrounding
neighborhood have demonstrated the
proposed use will not adversely impact
the character of the neighborhood and
the project will help retain existing
architecturally and historically
significant buildings endangered not
only by the threat of extended vacancy.
Um oops, sorry.
Um and the proposed reuse will add new
residents to the neighborhood to
activate the street on nights and
weekends and grow a customer base to
support local businesses and will
provide additional units to the downtown
housing inventory.
>> Thank you, Jeff. Could you state your
names, address, and relationship to the
project?
>> Richard, architect by design.
>> Uh, Michael White, owners rep, project
manager, 232 Jackson.
>> You bothard the staff conditions. Are
you acceptable of those conditions?
>> There were no conditions. Sorry, I I
said I said approval with conditions,
but uh there were no conditions.
I'm so used to those conditions. Boy,
it's automatic. Okay, no conditions.
Um, I have no questions at this time.
I'll start with my commissioners
commissioner.
>> I'd like to say I don't like the
project, but many many many moons ago
about 35 years ago, we did the com
combination of those and so it's good to
see it being carried into the future. At
that point it was Bell Telephone or
Bellip PA and that was their first
growth out into that area and it was
there was a lot of discussion about tear
down and build new at that point and
they
converted them the way they did and now
it's great to see that all the work was
done made it easy. you don't you don't
have any property lines to move and and
so it's good you know I've been watching
it sit there empty so
good luck
>> yeah the only question just out of
curiosity would you figure out whether
you or whether Belle owns the parking
lot or if it's part of the applicants
>> is um a permanent easement to the
benefit of the
Okay. I know that was up in the air last
time we were together.
>> Yes.
It's not it's not a lease
commission.
>> Okay. That that was going to be my
question. Um because then on the site
plan like on the plans. So it it's shown
in the existing
um overall site plan but then it's not
shown on the proposed plans that
adjacent like the permanent easement
being there.
the permanent there. I'm not sure which
plan you're looking at just the overall
site plan. I mean the plan set
you know you've got your ex you have
existing site plan where it does show
the entire building footprint plus the
parking area and an easement but then in
your proposed
plans
>> I think
the floor plan
>> there's no site plan
>> site work
there's no proposed site work there's no
Okay. All right. Well, okay. I
understand that then. That's how it's
reflected. Okay.
>> Commissioner Jordan,
>> no questions.
>> Uh, Commissioner Benson,
>> no questions.
>> Uh, is there one one person in the
middle?
>> Down to one person. Nobody on my right.
Um, said you're in favor of it. Didn't
help you.
>> Commissioner is going to get a motion.
>> A motion to approve.
>> There's no condition.
>> I'll still try to get a
>> I'll second.
>> Okay. It's been moved to second for
approval with no conditions. All those
in favor state by saying I
>> I oppose.
Motion carries. Good luck.
>> Thank you.
Item number seven, this is a lot
consolidation and land development plan
for the SRTA
and M facility in the block generally
bound by her street. The Harrisburg
Cemetery, State Street and Cameron
Street industrial followed by Richard
Par. The Suscoana Regional
Transportation Authority is to demolish
existing structures vacant rights away
and construct a new operation and
maintenance facility with a temporarily
transfer center.
>> Um yes. So the applicant is proposing to
vacate various rights away in the block
generally bounded by her street, the
Harrisburg Cemetery, State Street and
Cameron Street, consolidate the subject
properties, demolish the existing
structures on site, and construct a new
Sesuana Regional Transportation
Authority operations and maintenance
facility with a temporary transfer
center on site. Project A is comprised
of 14 parcels. Uh 901 North Cameron
Street, 650 North 12th Street, 603, 611,
and 627 North Cameron Street, 700 Monroe
Street, 901 North 12th Street, 527 North
Cameron Street, 1100 State Street, and
three parcels collectively addressed as
1151 North Street, totaling
approximately 15 acres, which features
eight distinct buildings and several
other structures across the site.
Project site is bounded by 107 North
Cameron Street and 102 North Pearl
Street to the north, North 12th Street
and the Harrisburg Cemetery to the east,
State Street to the south, and Cameron
Street to the west. The northernmost
property currently accommodates the
existing Serta O andM facility comprised
of a two-story office building and
maintenance garages with two separate
maintenance garage buildings to the
north. These structures total 1,247
ft with the maintenance garages being
constructed in 1910 and office building
component being constructed 1950. The
property has function functioned as the
maintenance facility for the region's
mass transit operator operator going
back to the earliest days of the city's
trolleys. The garages are primarily
one-story masonry structures featuring
elements of utilitarian industrial style
with the office building in the
southwestern corner featuring a more
modern mid-century architectural style.
Character defining features of the
garages include the large roll down
garage doors and the tall blue metal
cornises overhead. Character defining
features of the office building include
the varied masonry facads with
differentiated vans, the large wings
extending from the main entrance, the
prominent stair and elevator towers and
the irregular fistration pattern. The
entire site is paved as parking or
access drives and is enclosed by an 8ft
high green chain link fence topped with
barbed wire. Central block features an
institutional campus previously owned by
Goodwill Industries and is comprised of
four separate buildings totaling 100,956
square feet. The campus buildings were
constructed at various points between
1950 and 1987. Buildings are primarily
one-story masonry structures featuring
elements of utilitarian commercial and
industrial style with a more modern
office building along North 12th Street
being two stories and featuring a more
modern architectural style. The
industrial buildings along the western
and northern um
uh facades have little architectural
character. While the character defining
features of the office building include
the prominent entryway with a two-story
glass curtain wall, the regularly spaced
brick columns on the northern and
southern facades and the regular
fenistration pattern. Block features
parking lots and access drives
interspersed amongst campus buildings
with a vegetated buffer of varying
depths and states of maintenance around
the periphery. Block to the south
features two use surface parking lots
enclosed by chainlink fences, some of
which are topped with barb wire.
Properties were formerly the site of the
state testing laboratory. Currently, the
sites only accommodate impervious
services and overgrown vegetation. The
eastern block features the city-owned
parks and recreation facility comprised
of four separate buildings totaling
16,740
ft. The campus buildings were
constructed at various points between
1960 and 1992. The buildings are
primarily one-story masonry structures
featuring elements of utilitarian
industrial style with no defining
architectural characteristics. Property
features parking areas and access drives
fronting garages and maintenance or
storage buildings. Overall, while the
project site does feature elements of
other industrial properties along
Cameron along the Cameron Street
corridor in respect to both existing
site conditions and building design, the
properties do not contribute to the
architectural character of the community
and in fact largely detract from it. As
such, the project represents a welcome
improvement to the corridor.
The planning bureau staff recommends the
request be approved with the following
conditions. Uh the project must receive
approval of the street vacations for
portions of Foster Street, Goodwill
Drive and North 12 Street as well as
various other public rights of way
running through the project site prior
to filing the lock consolidation at LDP
LDP final plan set with the Dolphin
County Reporter of Deeds. And I know
this is a little bit um a weird
condition here that it's not being filed
um uh concurrent with this uh land
development plan. I think because it's
involving um both city land as far as
the park and recreation facility uh and
like state land. Um the applicant has
been in coordination with like the law
bureau about how best to handle this,
whether this is just through a um city
council resolution or whether it
actually requires this. So I think
they're still working that out. Um but
they do eventually had to be vacated in
some. Uh the applicant must secure
approval of a letter of map provision
from FEMA so that the development can
proceed as proposed and must eventually
receive approval from the flood plane
administrator for both the structural
demolitions on site uh which I've just
recently reviewed and approved. Um as
well as the as well as the new all new
proposed construction including
buildings, fences and signs. Uh and the
applicants are uh have been working
since I think December uh with uh FEMA
on the documentation for that letter of
map revision. Um and so they're
currently in the midst of that uh
process. Uh the applicant should
coordinate with the city arborist to
increase the ecological impact and tree
canopy on site by incorporating native
tree species and pollinator plants
particularly on the western edge of the
site around the storm water detention
infrastructure which can also address
localized air pollution created by uh
Cameron Street and Hurst Street
infrastructure. I should say State
Street. Um they do have a much more uh
vegetated proposal as proposed as
compared to the last parks and recck
facility. Uh but the city art is
currently reviewing that. We just want
to make sure it's following our
standards uh and best practices um from
that perspective. Uh and finally, uh the
proposed transfer center component of
the project should be considered a
temporary accommodation and the
applicant must continue long-range
coordination with the city on an
alternative location that enhances
coordination with the Harrisburg
Transportation Center. better
accommodates rider origin destination
trips and more closely conforms to the
city's comprehensive plan as well as
previous studies developed by Pendot
including the Harrisburg Transportation
Center TOD master plan from December uh
2017.
Uh the plan bureau staff recommends the
request be approved for the following
reasons. The project will expand and
modernize operations and maintenance
facilities, consolidate agency staffing,
increase efficiency, and improve their
ability to provide services to the
region's residents, businesses, and
visitors. The project site is a
conspicuous location located at the
intersection of two state routes. And
the removal of deteriorated and
underutilized buildings and replacement
of large expanses of impervious surface
with vegetation and a modern transit
facility building will bring aesthetic
improvements not only for passers by
local residents and workers as well. And
through coordination with FEMA, the
project will result in a site that is
flood plane compliant and more resistant
to future flood events in the Paxton
Creek.
>> Thank you, Jeff. Could you state your
name, address, and relationship to the
project?
>> Yes. Uh, good evening. My name is Bill
Schnore with Stantech Consulting.
We're the representative for Susana
Regional Transportation Authority for
this project.
>> Are you acceptable of the conditions?
>> Yes, we have reviewed the uh case report
and working with Mr. Knight and we are
agreeable to the conditions of the
recommended approval.
>> Commissioners um have no questions. This
is pretty straightforward. I'll start
with
>> Commissioner.
>> I'm sorry. We um I would just like to
say in addition to this, as both um
gentlemen alluded to, there is currently
a memorandum of agreement that the law
bureau has and is drawing down on. It's
technical. Um, and while the MPC does
provide for us to do things like this
for ease, like to do it through
agreement and contract, there still are
things that can't be passed over and
have to be councilmatic. So, I am I do
have the agreement and we are in favor
of the project. It's just a matter of
basically doing what you're saying is
that there are certain steps that cannot
be skipped. Like we cannot do a street
vacation by contract. you know what I
mean? So the bulk of this um is in the
agreement and it basically has a lot of
input of what Jeff has said. Um we are
just um commenting now and drilling down
into the technical aspects of it so that
we have an agreement that both makes it
easy and still provides for city council
to have their input.
As I said, it's it's pretty
straightforward and I'll start with
Commissioner McKenzie.
>> No, the only thing I can say is I think
we need more drawings for the land
development plan. It's not well enough
engineers. You're just kind of making
>> get paid by sheet
>> by the pound probably. No, but no, you
guys have it's a heck of a set of
drawings as I was going through there.
Seems pretty tight, but
Commission,
>> I'm really happy to see this kind of
investment on Cameron Street. Uh I think
the last time it was investment like
this, Vern was the architect and hope
this goes a little bit smoother than
that project through no fault of yours.
>> Only took 16 years.
>> Yeah.
No, I'm all favored.
>> Commissioner Murray,
>> I don't have any uh questions or
concerns here. I think it's a extremely
thorough and well-designed uh land
development plan.
>> Thank you,
>> Mr. Jordan.
>> Yes. Um I have two two major concerns. I
guess the the smaller of them from
looking at the site plans is it and
correct me if I'm wrong, as far as the
sidewalk goes along Cameron, it is
directly against the lane of traffic. Is
that correct?
>> Yeah, there is. straight up against the
curb
>> uh which is on the edge of traffic.
>> Right. Okay. Um my my concern with that
is anybody who's driven along Cameron
Street despite the 35 mile per hour
limit, people go 45 and then some. So to
be a pedestrian walking directly against
that type of traffic is unnerving to say
the least, yet alone there's a safety
aspect to it. Um just looking over some
of the specifications
to um there was let's see here basically
of course saying that there's a minimum
of six feet but then when the sidewalk
is directly adjacent to moving traffic
the desired minimum is 8 feet providing
a two-ft buffer for street furniture or
utilities maybe in this case a grass
meeting or something you know that's
something that I would suggest um
just simply you know just for pedestrian
access and safety because it's
essentially a highway still at that
point. Um, and you know, it's kind of
it's kind of a safety issue with people
walking directly across from the the
traffic. So, I don't know if that's
something you'd be amenable to looking
into.
>> We are amenable to do whatever the
commission uh and and the codes
recommends.
>> Okay. So, I I guess I'm going to volley
it over to you, Jeffrey, because that
that would be one of my I guess a
recommendation maybe to install it um as
opposed to two foot buffer for street
furniture perhaps for like a grass
median along the frontage of Cameron
Street.
>> Yeah. And uh the commissioners may
remember that's something we included in
the parks and wreck facility with like
the wider uh sidewalks along her street.
Um I think there's maybe a little bit
more uh maybe constraints on this side.
Uh you're right. The as when I was
walking along taking pictures and
posting the properties, like it is not
fun when you're right next to a truck
barreling down at 45 miles an hour.
>> Um I don't know exactly where the
property lines are relative to um where
the curb is and so what that width is.
It's also a state route. Um so I think
you know a lot of this falls within
Pendot's perview whether they're willing
to do something like this and and for
the most part I think they have been so
far. So, it's certainly something we
would support. We always support wider
sidewalks, especially if this is going
to be a transfer center and people are
going to be walking to the food school,
to the, you know, Sunshine Park, MW
Smith homes, uh, which are just to the
north here. Um, so yeah, we will
definitely in our continued coordination
with uh, the applicant and PennDOT, uh,
advocate for wider sidewalk.
>> Yeah, I I would really appreciate that
because, um, as you can tell, they've
already rebuilt that. um when they took
out the the curb cut where the garage
is, they rebuilt it and that concern was
brought up and as you can see was not
addressed.
>> So that's something that could be
coordinated going forward once this is
rebuilt once again.
>> Yeah.
>> Um and then the second concern which I
think um Jeffrey pointed out is just the
simple fact of where this is located as
far as the transfer center goes. Um the
rest of the project totally on board
with but the transfer center is on
camera It's not close to downtown and
pretty much I can't imagine
who's walking to it. Pretty much it
seems like you would have to catch a bus
to it, transfer there and then catch
another bus out of there. It might work
well for the regional systems coming off
the highway from like York and Lebanon.
But the capital region system that is
based in Harrisburg, it kind of seems
like you're doing a double back,
especially with now the state workers
coming back to work. You know, I can't
imagine we're going to ask them to leave
the
come over here to catch the bus to then
go to the westore for example. So I
guess my biggest concern is the way that
this is constructed. It doesn't look
temporary. It looks like this is once
it's built, it's built. And I understand
that the city and the partners downtown
would like to reclaim the transfer
center. understand that you know there
are private owners in some of the lands
in question closer to downtown and again
like you said that's not necessarily on
this time frame. I guess just my concern
is once this is built where where is the
incentive to look elsewhere because this
this is not designed to be temporary.
>> Yeah. And and that would and that's and
uh the applicant can confirm that that's
been a stated um concern of the planning
bureaus throughout our entire
coordination with them. Uh but in you
know in the applicant's defense we have
worked with the most um obvious
potential property owners around the
Harrisburg Transportation Center, the uh
old post office owner, the owner of the
um former uh Patriot News property
across the street from there. Um and uh
the um I forget the the organization
that owns it directly across um south of
the train station across uh Market
Street there um which owns the now
vacated vacant um and kind of properties
there south of Market Street. And um
we've we've had meetings with them. You
know, there's been some discussion about
what the federal highway uh will fund.
Um, so if you wanted to integrate a
transfer center into a new development,
that has to be just owned, I think, by
Pat or at least have like a permanent,
you know, master lease or something like
that. So, it's not quite as easy as
saying like, well, let's put it there or
let's get a somebody to build a building
that was on there.
>> That's my understanding as well. So, but
it it is it's it's something I've been
pretty firm on is that, you know, we in
coordination with our comprehensive
plan, in coordination with that TOD
study that Pendot themselves did in
2017,
um the transfer center really needs to
be near the train station to get the
benefits of the connectivity of, you
know, having people take the train
downtown and then hop on the or sorry,
take the bus downtown, hop on the train,
go to Philly, whatever, New York. Um,
and also because this is that would be
closer to where the city's major
employers are, the state, UPMC. Um, and
if it's all the way out where it is now,
it's just people aren't going to walk to
that. So, everybody's taking a taking a
bus to transfer there. It Yeah, I
measure I think I measured it on the
county's maps and it was about a half
mile to get to the train station. Again,
that's an unpleasant walk. Um, there's
you're right next to traffic, there's no
trees, so you're in the summer, you're
out in the sun. um you know no great
places to you know we just I think we
haven't found a viable final solution um
so and this project needs to go forward
the cat sort of uh needs to have a new
operations and maintenance facility the
money's there right now and I mean as as
you guys all know like when the money
comes in like that's the time to strike
here because it might not come back
again for a while and so um you know
we've just been you know kind of
stressing that throughout our whole that
like we understand this needs to go here
now because of the time frame and we
don't have a better option, but our
long-term goal needs to be that this
needs to be closer to the transportation
center. It needs to be closer to
downtown or the Yeah, the train station
and it needs to be closer to downtown.
Uh but in the meantime, we have to have
a transfer center somewhere. And so, um
this is going to go here. I don't know
what materials can be temporary like
i.e. five 10 year versus four year time
horizon. Um, but I've said the same
thing to them too is just like I hope
this is not all paved in, you know,
concrete marble and stuff like that.
That it is uh, you know, something that
is not overly expensive to put up and
therefore overly expensive to take down,
>> right? And and I guess that was my
concern that there might be an issue of
some cost that once it's it's built,
it's just kind of like, well, do we want
to spend the money yet again to put it
elsewhere? Um, and you know, just
speaking for me personally, I wish that
maybe the transfer center was being
being offered separately because like I
said, I have no problem with the system
um with the buildings being rebuilt,
they need to be, but it's just I'm just
concerned that once it's there, it's not
going. So,
>> no, I mean, again, I think the
applicants have we've made them aware.
They've been willing to meet and have
discussions and talk about the options.
it's just it hasn't panned out and and
maybe somebody comes forward, maybe
money becomes available to purchase a
property, you know, and again, like I
said, the it's not even just as simple
as like building it. It's about
ownership and that comes can become a
little bit tricky and that's not going
to happen right away. So, but in the
meantime, we do need these new
facilities. So, um, we felt that putting
that in this case report, uh, you know,
will if somebody needs to come back
later and say, "Hey, this is the city
council resolution approving this and it
says that they're supposed to find
this." So, that gives us the,
>> you know, that gives us the uh uh access
to, you know, changing this in the
future. Like, we're hoping that that's
going to be that is would you say access
or would you say leverage?
>> Leverage. Yeah, that probably be a
better word uh to change that in the
future. Yeah.
Thank you.
>> At the transit center you see the
transfer center.
>> Uh good questions for the architects and
the site civil but I'm thinking like 70
is uh
>> at a time with transfer
>> talking about the temp the transfer
center. Yeah.
>> No. Uh transfer center there's space for
uh
We see
>> because the functions removing what is
kind of tried to do make work on the
square since they built that in what 90.
>> Yeah.
>> And I remember when it hit a lot of
buses you don't see too much there
anymore.
>> It looks like from here 16 salt tubes.
>> Okay.
>> Yeah. But I mean even now you have the
bus back up on the second street
sometime and everybody's got to drive
around.
Yeah, clearly the current uh facility is
not sufficient to safely handle
all the circulation.
>> Just a thought came to me. Um
talking about other places you might
push too late now, but I I was thinking
just for the transfer center and the
other operations tell you where it is,
but uh have you thought about
Maybe you're not aware of it, but the
since I'm a member of the ABC brewery,
that to say I'm a for person, but that
closed down
uh about a month ago. Now, I was
thinking that building, they had the
parking lot behind it and also the
building where the office building
across the street,
I didn't know that would be an area that
if they're, you know, purchased be a
transfer center. They have enough space
for parking back behind the bus and it
wouldn't be that you wouldn't have to
cross Cameron Street.
I never thought I just thought about
that.
>> Mr. probably knows more of the the
properties that have been looked into in
that regard because I know uh Rich Bar
and others at Serta have been working
closely with the city on potential
options that would be you know agreeable
to the city.
>> Yeah. No, I mean there there are a
couple different options for the
properties along that 800 900 block of
Market Street there. Um again it was
more conceptual stuff and never I don't
know how far talks about purchasing
those properties ever got or what level
design
>> part of it is it's already what 70%
owned
>> uh was that those properties
>> yeah that were on I mean it's already
own property too.
>> Yes. Yes. Exactly. And they got it from
Goodwill which was you know amendable to
selling and moving out of there too. I
mean it was yeah it's it's a large a
large part of it is just the ease of
doing this because all of the property
owners and stakeholders in that site
were amendable to changing the city
obviously was like yeah we'll give up
our parks facility you buy us a new you
build us a new one which and like for a
temporary structure that makes total
sense but for a permanent structure it
kind of feels like an easy way out.
>> No like I mean the applicant can tell
you I haven't been
I haven't been given them the easy way
out on on on working through that. But
um yeah, I mean it's it's a challenge
and I know the there have been multiple
designs not even on the east side of the
tracks. There were talks about rerouting
back onto the ground level of the train
station where I guess buses used to run
down there. Uh there's a parking lot
just to the south of it uh where they
looked at it and um for various reasons
that just never that just never
happened. But we're continually looking
at it and at least from my perspective
as the plane director, this is one of
those high level things that anytime
anybody asks me about any of those
properties around there, um I make sure
to mention this first and foremost like
if you're looking to do a development
here, let's talk about how we can bring
the transfer center into that.
>> Right. And and there's plenty of other
transit agencies in the state that we
can look at as examples of doing just
that.
>> Probably agreement with Commissioner
Jordan.
Um, historically with the city, whenever
they do something temporarily,
>> that's it.
It'll never become
>> But, uh, it just sort of, you know,
again, with the post office, I don't
know what that that could be an
excellent transfer center, but you know,
whatever that building sits there
>> for what, $600,000,
>> I can't remember my head
>> or something like that.
I didn't forget about you commissioner
commission.
>> No good discussion. I I have no further
questions other than other than happy
discuss
>> just to please since there's no one in
the public
I can't ask public respond
just for the record
I get motion suggestion maybe Jordan you
want to make a motion with
added conditions.
>> Right. I guess a motion to approve with
the stated conditions and including the
um reference to adding the twoft grass
medium
along um the furniture Cameron Street.
>> Is there a second?
>> Second.
>> It's been moved and second for approval
of the condition.
condition. All those in favor state by
saying I
>> I
>> I
>> oppose abstensions.
>> Any other business?
>> Uh well, I didn't have it down on the
agenda, but I have it here on my notes
uh to um have the introduction of the
new commissioner. You kind of stole my
thunder a little bit there of the
meeting.
>> Sound like a couple. Uh but uh just uh
wanted to give uh Mr. Vincent an
opportunity to introduce himself, maybe
give a little bit of his background uh
the board and the general public.
>> Thank you, Jeffrey. Uh yeah, my name is
Boser Vincent. Um
uh let's see, I want to introduce
myself. Um I've been actually came from
a manufacturing background, so
mechanical engineering. uh worked in pet
food for about uh 15 years and then uh
transitioned uh started owned my own
business. Um did a lot of research uh
you know got kind of hooked on the
comprehensive plan started really diving
into that uh did did a did a series of
videos on that and that kind of led me
to to you know trying to want to engage
in this space a little bit more.
actually just previously made a run for
city council. Um and then um president
of young professionals of color. So, you
know, there might be some opportunity
for me to abstain depending on how
things, you know, engage. And then um
yeah, just really really looking to to
learn a lot about this process and see
how the group functions.
>> Again, I said welcome.
>> Thank you.
>> And I think you'll enjoy this type of
relates to your background and
and this meeting tonight was a good way
to get your feet wet.
>> Yes.
>> But this is a mild meeting. We have been
meeting when this place is packed and
we've been here for hours.
>> And the other thing I'll I'll let you
know, there's no pay.
>> The water is our reward.
reviewing.
>> Yes.
>> Well, we usually get it ahead of time,
but Jeff is the only person working in
that department
>> and they have them doing like 20 things.
So,
>> yeah. No. Um, yeah, they've the last few
months have been a little um more
hectic, so they there's been delays
getting them out. Um you previously I
was getting them out the Friday before
usually and this is and this tended to
be a fairly um you know complex project
especially with like the transportation
center. So the reviews uh are a lot
longer at least from my perspective
developing case report are a lot longer
than the discussion was. Um but uh yeah
going forward um I'm going to really um
focus on getting these things done
sooner so that you're not
as far as
>> Oh, no. There's It's always the first
It's always the first Friday of the
month for the following month's
meetings. So, September was last Friday,
August 1st. Um, and depending upon
>> I mean it's Yeah, it's like four weeks
basically. Um, depending upon how long
an agenda is going to be or how complex
the cases are, I may take something a
little bit later or if I've been working
with an applicant on something and
they're just waiting to get in
paperwork.
>> I was just curious whether
>> No, it's it's usually the month before,
but you know, so I've gotten everything
for next month already, but working on
developing this, then I'll be working on
the meeting minutes for the zoning
hearing board meeting. And so by the
time I'm able to turn to the next
month's meeting, it's like two weeks
before And yeah, so
>> Jeffrey, do you know if the budget has
been in so far? Because I'm asking maybe
asking request for pay for it.
>> Uh I mean it we we did put in the uh uh
temporary budget or not temporary uh
draft budget. Um but haven't had those
discussions with the city council yet.
So
>> you did.
>> Yeah. So there's uh there's always the
possibility to change it for the end of
the year. I know there are planning
commissions that do pay them, but
>> yeah,
>> we're the
exception of this,
>> but we do this because we care.
>> Well, because like uh the NBC
planning commission,
>> like a monthly like Yeah, it's like $600
for the year or something like that.
>> Hey, I'll go for that.
>> Better than just this.
Then I can buy my own water.
>> Uh, anything to get order?
>> Yeah.
>> What have you heard?
>> Oh, that economic development group.
>> Yeah.
>> I haven't been in a meeting. I so there
was a um uli had something a couple
weeks ago um uh about uh the downtown
and they had various stakeholders some
developers I believe Mr. Vincent was
there. Um business owners uh were there.
So they've had their engagement
sessions. Um and they're working on
developing a document. I think they said
it would take a couple months. Um so I
did ask for like an early draft of the
feedback that was gathered and they were
like we don't do that. So um they are uh
I think they said they were planning on
having at least some draft document
developed within like two months or
something.
they implemented.
>> Right. Right.
in terms of
>> aside from like I said a perspective
um
document availability date of I guess
late September early October maybe. Um
I'm guessing I don't know if they're
going to do a presentation like city
council
>> the federal tap house. So that's the
capital city music hall uh that was
They're having a session or something.
>> I was not
>> being
journal.
>> Oh, Central Pen Business Journal.
>> I think that's a active construction
zone. So, I don't know.
>> I think there was an article in the B as
well because I think that's how I found
out.
I'm not I'm not aware of that one.
I'm not
with that. Could I get a motion for
adjournment?
>> Is there a second?
>> Second. We stand and adjourn.
More transcripts
Explore other videos transcribed with YouTLDR.

Saiba a verdadeira função do DIRETOR EXECUTIVO e suas CARACTERÍSTICAS!!
Empresariando · Portuguese (Portugal, Brazil)

كيف اكسب 50 دولار يوميًا من التفريغ الصوتي بسهولة
Saad Alshmrani · Arabic

ملالة تعزية رووووعة /فكري القدسي
محمد كريم /AlJoubani · Arabic

He Reveals the Fastest Way to Make 10K With AI
Sandy Lee AI · English

TheBurntPeanut's Funniest Moments | JUNE 2026
TheBurntPeanut · English

The No Contact Rule Won't Bring An Ex Back. This Will.
Chris Blundell · English

Peranan Ilmu Kimia dalam Kehidupan Sehari-hari || Kimia X_Kurikulum Merdeka
Elin_Haula27 · English

Test du Trek Allant+ 6 : laid et tout-terrain
Numerama · English

Как устроен наш мозг? Интервью с профессором Александром Капланом
Раскадровка · Russian

FIREFIGHTING INTRODUCTION
A.Shuhayb · English

BIKIN MERINDING! Al-Qur'an dan Etika Teknologi di Era Kecerdasan Buatan (AI) | MTQ XXXIV SULSEL 2026
MIEM NUN ALIEF TV · English

23/07 - Jornada Científica ABNG
Professor Murilo Pereira · Portuguese (Portugal, Brazil)
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.