Harrisburg City Zoning Hearing Board Meeting 4/20/2026
I was gonna say
I tell you what people say all the time,
I wish it was more like Scotland's
>> world.
You get a chance to wear wool.
>> A lot of
layers.
>> Oh gosh.
Oh man, I love it.
Good evening everyone.
This is the monthly meeting of the
Harrisburg zoning hearing board. Okay.
I will introduce all players. To my
right is Mr. Hobs. Okay.
Myself
to my left. Okay. Michael
and Michael.
There are solicitors
front of me. Go to your go to Jeff
first. Okay. Jeff Knight. He's director
of planning
Harrisburg
to his right. Okay.
See, I've got
Cameronish Cameron and
>> she's the assistant director deputy
director playing director.
>> Okay.
>> Okay. All right. So, uh right we're here
for the April 20 uh meeting. Um and uh
as this is a uh hearing,
all testimony will be taken under oath.
We have a court report here to my left.
Um and we'll go through actually we're
going to start off with uh two
continuances.
Um the first one is 2628
was already continued once
um from the March uh hearing that was uh
B1 and then it'll now we have B2 where
um it is uh applicants uh email
requesting that it be continued to the U
May um zoning hearing board meeting. So
we have B1 and B2 for exhibit 2628
and that will be then uh listed for the
uh May hearing.
Then we have 2638
that is part of new business um for
tonight
that applicant Arthur Jefferson uh
Jefferson um he has requested that the
matter be continued from tonight uh to
the May uh hearing. So that is uh B1 and
that'll be marked
Okay.
So, um we have those two uh two
requests. Um do we have a motion to
accept that? 2628 2638.
>> I make motion to move 2628 and 268.
>> Second.
>> Okay. We have a motion and a second. All
those in favor? I
>> I
>> Okay. So, those uh those uh continuences
are approved and those two uh 2628 2638
will be um then for the May uh zoning
hearing board meeting.
Um then we will start with uh the old
business 2626.
Um
that was uh filed uh by Family Tree
Holdings LLC. Is anybody here for that
applicant?
Okay. I don't uh see anybody for that.
Um so that was initially um listed for
the March uh meeting.
Um March meeting had to be cancelled due
to due to weather. Um so then it was uh
also then advertised um for the April 13
uh meeting and um nobody appeared for
that and it is also on the agenda for
tonight. So um still nobody has appeared
um for that. So I am at least going to
mark though the uh notices that we do
have because it was uh properly
advertised.
Um we do have B1 the proof of
publication in the Patriot news made uh
March 1, 2026 and March 8, 2026.
And then uh we do have the uh proof of
publication for uh the one from March 29
and April 5.
And those two now
the other exhibits um we do have or
Yeah.
So we do have
the B2 is the application packet with
the attached narrative and the photos uh
of the property and the plans for the
proposal. B3 is the building permit for
the property. B4 is the deed
establishing the applicant standing to
pursue the requested zoning relief. And
B5 is the planning bureau case report.
Um now
as I said it's applicant's burden to
though uh to be here and present her
case. Um she is not here.
So I think that u
>> uh we have not um and uh I would note
the applicant was not in appearance at
uh either the uh March or April uh
planning commission meetings.
Yeah. So, so to the board, um it's the
applicant's uh burden to move forward in
this case. So, our recommendation since
they're here, we can't continue it
because we don't have somebody here that
one of the owners to continue the
meeting. So um traditionally what our
action has been is a motion to deny the
request um with regards to this
application.
>> Certainly we have a motion motion that
page 26 26
den.
>> Okay. Do we have a second? So obtain.
We have a motion and a second to deny uh
application 2626. All in favor?
>> I
move to 2627.
So, application 262740
North 17th Street
applicant called Horizon's Group. And
I'll read in the exhibits. Then we'll
have the planning director sworn in and
u he can provide U testimony with regard
to that applicant and then we'll have
the applicant sworn in as well. Okay. Uh
the exhibits uh B1 is a continuence
request of applicant from the March
meeting to uh tonight's meeting. Uh B2
is the proof of publication and Patriot
News March 1, 2026, March 8, 2026. B3 is
the proof of publication Patriot News
March 29, 2026 and April 5, 2026. B4 a
letter uh sent from the planning
director uh to applicant notifying of
the hearing. B5 is the hearing notice
posting on the property. B6 application
packet with the attached narrative,
photos of the interior and exterior of
the property, site plan and floor plans.
B7, notification letters sent to
neighbors with certificate of mailing.
B8, the deed to the property
establishing applicant standing. B9,
planning bureau case report. and B10
city of Harrisburg Planning Commission
resolution.
Okay, with that, could we have the uh
planning director sworn in?
>> I do.
>> Okay. Why don't we have applicant
identify himself and then we'll have him
sworn in as well and counsel too.
>> Jared Neil with Holden Horizon's Group.
>> I do. and council just to introduce
yourself.
>> Ash Mccomi with Mcnes Wallace and Neric
100 Pine Street, Harrisburg,
Pennsylvania.
>> All right, with that then uh Mr. Knight,
can you provide some background on the
application?
>> Uh sure. Uh so the case for number 2627
uh involves uh the conversion of the
property at 40 North 17th Street uh from
an existing single family configuration
into a two-unit multif family dwelling
which requires zoning hearing board
approval of special exceptions for the
proposed use and relief from the off-
streetet parking requirements per
section 7-305.7
and 7327.6 and six of the zoning code
respectively and variances for relief
from the density regulations and
specific criteria in sections 7-307.3
and 7-309.2V
of the zoning code respectively. Uh this
case is uh similar to many of the others
that we get for um these conversions uh
of the of single family dwellings to
multif family dwellings here in the
city. Um, in this case, uh, the property
itself, uh, has been vacant, uh, for a
fairly extended period of time as
evidenced and as evidenced by the, uh,
photos that, uh, accompany the
application, both those taken by the
city and provided by the applicant, uh,
demonstrate the, um, interior and
exterior condition of the property. uh
with the interior being uh significantly
um uh deteriorated uh andor partially
demolished at this point where it lacks
a lot of interior walls um and uh the
exterior with windows boarded up uh and
the condition of the overall condition
of the building itself uh where there's
you know kind of holes and cornes and
things of that nature. Um so uh the
justification behind that behind the
request uh is really you know very
similar to those uh other cases ref
previously mentioned um in that uh the
extended periods of period of vacancy uh
does provide some justification as does
uh the significant amount of investment
that's going to need to be made uh into
the property by the applicant um and uh
will therefore need uh some return uh on
that investment uh if required to have
the property as a single family
dwelling. Um it's likely that the
investment would necessitate the either
sales price or the rent to be so high as
to be uh infeasible and the alternatives
uh if uh required to have uh one
property or one unit on site uh would be
maybe to have the structure continue to
deteriorate and uh to potentially impact
the adjacent property to the south at 38
North 17th Street. Um, so with all of
that being said, uh, the planning
commission, uh, is recommending the
zoning hearing board approve the request
for the following conditions. If granted
zoning appeal to move forward with the
project as proposed, the applicant shall
allow the codes bureau to perform a
comprehensive inspection to identify any
outstanding code violations and will
receive approval for all for all
necessary city permits prior to
receiving a certificate of occupancy. Uh
the planning bureau recommends the
applicant retain historic and
architectural features of the property
such as the oral windows, real slate
shingles and metal finineal at top the
front turret to ensure the property
enhances its contribution to the
aesthetics of the block. And finally,
because the rear yard cannot accommodate
legal parking spaces, uh the property
itself is only, I believe, 16 ft wide
and a and a legal parking space is 18 ft
long by 9 ft wide. Um, the planning
bureau recommends the applicant enclose
this space with a six- foot high fence
to enhance security for tenants and
prevent unauthorized access to the site.
The planning commission recommends the
zoning hearing board approved the
request for the following reasons. The
property has experienced extended
vacancy over the past decade, resulting
in significant deterioration and a
general lack of basic elements such as
walls and utilities that threatens the
long-term viability of the structure and
potentially the stability of the
attached row home. As such, there is
justification for the allowance of more
units than would be permitted by Wright.
The project will reconstruct a a blading
influence and attractive nuisance into
new units that will contribute to the
housing inventory in the city generally
in the neighborhood specifically and
rehabilitate an historically and
architecturally significant building and
represents a significant improvement
over expected future conditions should
the property continue to remain vacant.
And finally, the project advances the
purpose of the RM zoning district
provided in chapter 7-305.4C
4C of the zoning code as it provides
development at medium densities that
will not adversely impact the stability
of the area and advances chapter 7301.27
of the zoning code by protecting the
residential neighborhood and providing
diverse housing opportunities.
>> Okay.
This one doesn't bend, does it? I don't
think it really bends. I think you just
kind of
>> Yeah. Okay.
>> Good evening. Thanks for for having us
uh this evening. Uh as Jeff mentioned,
uh we represent Holden Horizons. This is
our third project before you. Um you
approved the last two which were similar
but slightly larger larger projects here
over the last couple of months. Uh as
Jeff pointed out, this this request is
pretty simple. It's conversion of a
single family into two multif family
units uh because the property is is
generally unsafe and and very
dilapidated at at this point. Uh and the
relief will allow the rehabilitation of
the property. Property is in the RM
district and we are uh seeking uh three
or four uh forms of relief. Uh the first
is the normal special exception to
permit the use uh in the district. Uh
the second one is a variance from
section 7-3073A
to permit two units on the property
which is less than 3,000 square feet in
area. To clarify that is the area of the
property, not the area of the building.
Um, if necessary, we're seeking a
variance from section 7-3072V1
to permit uh the proposed use in
existing building less than 2500 square
ft. Uh, by way of further explanation,
the above grade portion of the property
is around 264 square ft, but there's
also a basement that's 862 square ft.
Uh, it's good for storage. It's, you
know, like any other building here, you
can't finish it uh for use. Um, but when
you put those two numbers together,
you're well over 2500 square feet. And
so, it was just not clear to us whether
we could include the the basement or not
in that calculation.
And then finally, we're requesting a
special exception from section 7-327.8
to reduce the off streetet parking uh
down to zero parking spaces. As Mr.
Knight pointed out, there's no room on
the property. it's too narrow uh to put
them out back. Uh and so we're
requesting relief from that under the
special exception provision. Um we are
accepting of of all the conditions
suggested by Jeff. Uh the lone exception
being the fence. We'll look into it. Uh
as I mentioned that the property is
pretty narrow. A six foot high fence is
going to be pretty overwhelming uh in in
that area. The property has a set of
stairs coming down the back side of it
that that Gerald will will show to you.
Um, so we'll we'll certainly look into
it. Um, but we would appreciate that if
that was a a recommendation and not a
requirement uh on the fencing.
So, I I think Jeff gave a pretty good
overview. I'm happy to walk you through
our our packets like like we normally
do. Um, I also don't want to waste
anyone's time knowing there's quite a
long agenda. So, um, if you'd like us to
do a quick run through of of the packet,
I'm happy to do that.
>> Yeah,
>> sure.
>> Yeah.
>> Hand these out.
Mr. Knight, what's the uh city's
position on the calculation with the
basement that
>> um so I would say that uh as a general
rule, basements are not uh considered um
in the square footage because it's
generally not habitable space. uh it can
be uh made habitable uh if it's you know
built to the required building code
requirements like having a uh secondary
means of egress uh and whatever other
building code conditions there may be
they may require a certain height for
example. Um but we would view it as we
would somebody saying well I could just
build an addition onto the back of this
and make this you know be compliant with
the zoning code. Um unless that happens
and unless that other you know stuff
happens with the redevelopment of the
basement we look at just um above ground
uh square footage within the for as it
relates to these specific criteria.
>> Okay. So that that additional variance
that Mr. McComy talked about would be
necessary
>> I believe. Yes.
>> Okay. Thank you.
>> Please state your name and business
address for the record. Uh Jared Neil,
uh business Halton Horizons Group,
address 227 State Street, Harrisburg,
Pennsylvania.
>> And what's your role with Halden
Horizons?
>> Uh director of development and
acquisitions.
>> Do you currently have other projects in
the city?
>> I do currently have uh three or four
other ones.
>> And how many of them have come before
the zoning hearing board here?
>> I believe three.
>> When did Halden Horizons acquire this
property?
>> Uh I believe it was in October of last
year. October of 25.
>> All right. And before you right now is
exhibit A1. What is it?
>> Uh it's an aerial view of the uh of the
property. Uh the subject property is
outlined uh in the red box. Can
>> you or use it to orient the board,
please?
>> Sure. Um looking at the the graphic, the
top of the page will be north. Um North
17th Street running north and south. Uh
the alley that is just uh to the north
of our property is Helen Street, which
is where we have the the rear of the
property. And what's the if you could
describe the neighborhood? Is it single
family, multif family, commercial?
>> Yeah, a lot of row homes. So, a mix of
single family and multif family.
>> And if you go to the next exhibit,
exhibit A2.
How many pages is exhibit A2?
>> A2 is two pages.
>> Two pages.
>> Yes.
>> And what is exhibit A2?
>> Uh, so page one of exhibit A2 shows the
exterior of the building. Broken out
windows, boarded up windows. uh
dilapidated porch, broken broken
concrete stairs and so on and so forth.
>> And the next page,
>> uh if we look at the inside, uh this is
the inside of the the top picture on
page two is the inside of the building.
Um boarded up doors. Um it looks like
some form of construction had started
here with demo. I think they started to
move it forward and then that's where it
stopped and we had purchased it. Um the
the lower picture is from the rear of
the building. Again, kind of showing um
really the garbage that's out back
there. Um and this is when we when we
just when we purchased it. Uh rotting
upper deck. Again, more broken windows,
boarded up windows.
>> And are those the stairs that go down
then into the backyard?
>> They are. Um we did not construct those,
so I'm not sure if they're going to need
to be reconstructed. We we'll have to
have that inspected.
I
>> think they might.
>> I feel like there's some things that
maybe it was like a tack on.
So,
>> um, was the property in this condition
when you acquired it?
>> Yes. Yes, it was.
>> Is there any on-site parking?
>> There's not. No.
>> And to your knowledge, how long has the
property been vacant?
>> Um, approximately.
>> Yeah. A few years. I'm not sure of the
duration. Um, I know it's been longer
than two or Yeah.
>> Okay. Go to the next exhibit. Exhibit
A3.
>> Yes.
>> What is this? Uh exhibit A3 is a
existing conditions um exhibit just
showing um where the building falls in
existing conditions um the alleyway
Helen Street as well as North 17th
Street and then identifying the two
adjacent property owners.
>> All right. And on this exhibit is the is
the north arrow pointing to the right?
>> Uh yes it is.
>> And is the property approximately 1,632
square feet?
>> Uh yes. Uh going back to
uh parking uh why aren't you adding
parking on the property?
>> Yeah, so we had evaluated this and
looking at the legal parking space um I
believe it has to be 18 ft by 9 ft and
the subject lot is only 16 feet. So just
by virtue of the size it wouldn't fit.
>> Would it also potentially create storm
water issues?
>> I I believe it might. Yeah, we'd have to
>> buffer and screening.
>> Correct.
>> Yep.
>> Just not enough room for enough room.
No.
>> Uh, are there bus stops nearby to the
property?
>> There are. There's actually two of them.
One to the north and one to the south of
the property
>> on North 17.
>> On North 17th Street.
>> And is there on street public parking
available?
>> Yes. Yes, there is. Along along North
17th Street.
>> Great. And to the last exhibit A4.
What's this?
>> Yeah. So, this is uh the layout that
we're proposing. So, it's a three-story
existing structure. Um, we're looking to
break this up. Um so the whole first
floor will be the first unit. Half of
the second floor um will be part of that
first unit. Um so it be two-bedroom uh
two bedroom two full baths, kitchen,
living room. Um really actually a nice
kind of layout with a kitchen in the
back, a bedroom, two bedrooms in the
front on the first and second floor. Um
this when you look at the second floor
there, it kind of shows the grade out
area. That's the second unit. If you
flip over um to the next page, it'll
show the two two separate um the two
floors which which make up the second
unit. Uh second floor, second unit. Uh
there's there will be living room, a
half bath, dining, kitchen, and then to
go upstairs, a full bath and then two
bedrooms to the third floor.
>> Uh is the basement usable at all for
storage or anything? We
>> Well, it'll be storage. Yeah, we'll have
access to it to potentially um it'll be
all cleaned up and if maybe we'll have
uh tenant storage down there if they
want to use it.
>> And why are you proposing two units as
opposed to leaving the building as a
single family?
>> Yeah, much like we've talked before um
just because of the condition it's in.
Um it's a full full gut and rena. I
mean, this cost of that um really
exceeds what what we could then take
turn into and then still have rent be
somewhat affordable. Um so we're just
asking that to uh for to increase the
the units here to two. Um and then we
felt that that that makes the perform
better. We probably given the size could
have done three but to us it wasn't
necessary to to be able to complete the
project.
>> Great. You mentioned affordable. Are
these going to be affordable as defined
by the city?
>> Not as defined by the city. Um but I
would say affordable um as driven by the
neighborhood. So affordable in terms of
residents in the area would be able to
afford them.
>> That's correct. Yes.
>> In your opinion, is the request relief
the minimum required to permit the
reasonable use of the property?
>> Yes.
>> Uh if the relief is denied, what what
would end up happening to the property?
What would you have to do?
>> Yeah. I mean, just based on our market
analysis, we probably wouldn't be able
to finish it and rent it. So, we'd
probably board it up and then hopefully
get a a sale on it. So, it was a little
at risk to purchase it.
>> Got it. Uh, in your opinion, does the
proposed use create any traffic hazards
or other nuisances?
>> Uh, no.
>> Is the use compatible with the
neighborhood?
>> Uh, very much so. Yes.
>> Is that because it's generally a
residential neighborhood?
>> Yes.
>> Do you propose to demolish any
buildings?
>> Uh, we do not.
>> Have you reviewed the application and
the narrative included with it?
>> I certainly have.
>> And to the extent applicable, do you
adopt the comments made therein as your
own?
>> Absolutely.
>> Those are all the questions I have for
for Jared. happy to answer any that that
the board might have.
>> Good evening. Uh so with no parking, uh
what is the thought on where tenants
will usually park?
>> Yeah, I mean with with the available on
street parking, we believe that that's
how it'll be accommodated on 17th
Street. That's kind of the the way that
a lot of those um lots are today. um as
as we go down. Um so we figure that we
would we would utilize those the same.
>> Have you happened to um maybe go by the
property at different times of the day
to see
>> parking capacity is?
>> Yeah, it it feels like um you know
there's certainly people are doing it.
Um people are parking along there, but
we've seen we've been able to we've been
able to park and pull up and then go
walk the building. So we haven't had
issue with that.
>> Thank you.
stole a lot of my
with the ordinances that were passed a
year or so ago about parking on 17th
Street because I think the police
department now people were parking
partially on the sidewalks. Um that
street gets a little interesting going
down. Okay.
started last year citing people for
parking on the sidewalks since there's
no parking.
How you know how to handle that?
>> I'm sorry. You said there is no parking.
>> Well, there's parking allowed.
>> Okay.
>> But but in order to accommodate the
people parking, they use the sidewalk
somewhere.
Okay. Which means the persons who would
basically move into this place, there's
a good chance that they may get a
citation.
>> Yeah. Yeah, parking on the sidewalk.
>> I I would say if they're parking on the
sidewalk, they probably deserve the
citation. Um, so we would we would
notify our tenants of how this will be
what what what's available to them, what
they can and cannot do is how we would
handle that.
>> The reason for that is that because a
lot of cars were losing their
rear mirrors,
their cars sideway.
>> So people, you know, basically say,
"Hey, I don't want my car hit." So they
start using the sidewalk. You damn if
you do, you're damn if you don't in this
situation.
>> So, it's something that I think that
needs to be taken in consideration.
>> Certainly.
>> Yeah.
>> I think that the hope is that, you know,
people will will utilize public
transportation. Um, you know, we
certainly can't can't control where
people park, but we can can certainly
ask that they park where where they're
allowed. Jeff, do you know offhand what
the parking is for a single family?
>> As in
>> like if this were if this were a single
family home?
>> Yeah. they would have to have one uh
parking space. I mean, if it were
reconstructed as a single family, that
would have been its use. I don't think
we if somebody came in and said, "We're
going to rehab this a single family," we
wouldn't require them to get a zoning
relief because it had been a single
family. Um
>> talking about like a one space
difference,
>> correct? Yeah.
>> Let's go back to
question. Okay. You say affordable for
the neighborhood. What's your idea? Do
you understand the
med income
of that neighborhood
>> generally. Yes. Of the neighborhood.
Yeah, we have other projects similar
right around this area. So, yes.
>> You're saying
leave it as a single family
to restore this prohibitive Correct.
>> Yeah. The the the rent that we would
need uh to to charge would would be out
of what would be I think affordable for
this area.
>> When this is converted to
what's your target?
>> Um I think I think for these it's it's
really going to depend on how we finish
it. Um so that's a conversation I want
to have with with my partners. Um, but
we see between for some of these and
around like the $1,500 mark. Now, this
one may be maybe maybe down to 13. We we
will have to see what kind of finishes
we put in it though to determine, but
they are a little bigger than what you
typically see. Um, and then obviously
with the two-bedroom and an additional
living room on top of that.
>> You answer this question
on other properties.
thought there was a limit on height.
>> Uh yeah, it's 6 foot for rear and sidey
yards. Uh it's 4 foot for the front
yard. Um and to the applicant's uh
request that it be considered a
recommendation, you know, we would be
fine with that. Uh it was, you know,
trying to uh envision what might happen
with that. Like a we would want to
prevent parking in the rear yard if it's
open and exposed to that alley. Somebody
may just be driving in and they're
sticking out. Uh and two, it's just uh
kind of in keeping with other row homes
in the area. Many of them have their
rear yards enclosed by fences primarily
for concern uh security issues. I think
you know the presence of the boarded up
windows and especially the window on the
second floor which is reachable by that
staircase uh indicate that at least to a
previous owner um the property was a you
know target for unauthorized access and
so they did that to prevent people from
breaking in. Uh so I would have just
just was trying to imagine extending
that security concern to a finished
product.
>> Maybe added benefit
mitigate the six foot fence security.
>> Yeah, we have security.
>> We have no problem with looking at it,
seeing how it would fit in there. Like I
said, if I have to tear down those
stairs, how does that how does the the
fence and then the stairs kind of work
together? So no no no problems with with
looking into it. Take it into
consideration. Certainly certainly not.
>> What would be a fire escape for the
second?
>> Well, so right now they're they're from
the top the second floor down. It's one
straight shot.
>> I think we would probably when we tear
those down and reconstruct them. It'll
come down half the flight, turn 90
degrees, and then go down. And then that
might put you right into the fence out
to the sidewalk. So, but we'll that's
kind of what I just don't want to lock
myself in here and having someone turn
turn the other way to go towards the
Yeah. So, that's just kind of where
we're at.
>> When I looked at the the blueprint here
for the first floor and the second
when you
first will have housing
attached to the second floor, the Other
part of that is going to be for the sec
but for the second unit third floor. How
is there going to be a solidition here
to stop somebody from going up from the
first floor second floor floor and going
into area that's not there.
>> Oh abs absolutely. Yeah. you will not be
able to. So to access to the second
unit, it'll be from the the rear and
you'll come up and that'll be blocked
off right where those so you can kind
>> certainly not from the street have to go
up the
fire escape or whatever.
>> Yep. Yeah. And then we're required to do
that per the building code as well just
the separation for for for fire of of
two separate units.
>> Thank you. Sure.
>> Um just one for clarification. So the uh
potential rental rates that you
mentioned that's for the entire building
or that's per unit
>> per unit
>> the 13500
>> in uh curious you mentioned that um if
you were to keep it as a single family
property that the rent the rate that you
would have to charge right for it to be
feasible would be higher than I guess
what would for that area. Do you have
like a roundabout number of what that
looks like?
>> So, you're you'd essentially be looking
at, you know, 3,000 or or 20 2,800,
which which I think is probably on the
higher side of outside of the what the
what you would consider for this area.
>> Thank you.
>> Yep.
>> Okay. Any other questions for applicant?
Okay. Anybody uh from the public here
that wants to speak on this uh
application? 262740
North 17th Street.
Seeing no one
to step out
step out or do you want to
>> Okay. And and by the way, if you're
going to Right. Except what the planning
bureau and planning commission with
regard to that third condition. It was
then the recommendation I think for the
fence. Is that also what you'd be
looking at?
>> No, they could do a six foot high fence
in the rear.
>> That's fine for the rear.
>> Correct. Yep.
>> Yeah.
I guess the city was saying
>> motion
motion for case 2627
approval
based off recommendations made by
>> all right. So uh right a motion to
approve application 2627 the uh special
exceptions and the variance requests
with the conditions set by the planning
commission. Right. Okay. That's a
motion. Is there a second?
>> So moved.
>> Okay. We have a a motion and a second.
>> Mr. Connor, was that with the with the
revised condition
>> where it was a recommendation?
>> It was a recommendation and that was and
that was a recommendation of also the
planning commission.
>> Thank you.
>> Yep.
>> So, uh, we have a motion and a second.
All in favor?
>> Okay.
>> Thank you very much.
>> Send out the decision within 45 days.
Okay.
>> Thank you.
Okay. 2631
923 North 18th Street.
Okay. And Mr. Knight, you were already
sworn in for that prior uh application.
Is that okay if that you're considered
sworn in for um application 2631 as
well?
>> Uh yes.
>> Okay. Um, and for the applicant for
2631,
um, if you could introduce yourself.
>> My name is Robert Shooks Jr. I am the
sole member of Harrisburg or HBG Rent
LLC.
>> Okay. Why don't we have them sworn in?
>> Yes, I do.
>> Okay. Mr.
You're also then listed for applications
uh under new business 2634, 2635, 2636,
and 2637. Correct.
>> That is correct.
>> Okay. And due to uh some advertising um
issues and we discussed uh before this
hearing, are you agreeable then to have
uh those applications continue to the uh
May uh zoning hearing board meeting?
>> Yes, sir. That'll be fine. Thank you.
Okay. So, um we have then a request uh
to continue applications 2634, 2635,
2636, and 2637
due to a late advertisement of the of
the new business. Um do I have a motion
to accept that uh continuous request for
those applications?
>> Okay, I have a motion. Do I have a
second?
>> Second.
>> Okay, all in favor? I
>> Okay. So, they will be continued to the
May uh zoning hearing board meeting.
Okay. So, with regard to 2631,
it's 923 North 18th Street. Um it is
special exceptions to establish a
multifamily multif family dwelling use
and for relief from the off- streetet
parking requirements and then
dimensional variances
for zoning relief from the specific
criteria for the multif family dwelling
conversions and from the density
requirements
and I will read in um
the board exhibits. So we have exhibit
B1, the continuence request of applicant
uh from March uh to tonight's meeting.
B2 is the proof of publication, Patriot
News, March 1, 2026 and March 8, 2026.
B3, proof of publication, Patriot news,
March 29, 2026 and April 5, 2026. B4 is
a letter sent from the planning director
to applicant notifying of the hearing.
B5 is the hearing notice posting on the
property. B6, the notification letter
sent to the neighbors and certificate of
mailing. B7,
application packet with photos of the
interior and exterior of the property
and the floor plans. B8 is the
Pennsylvania Department of State uh
certificate of organization for the
applicants LLC with attached uh
operating agreement.
B9 is the deed uh to the property
establishing applicant standing. B10
planning bureau case report. B11, the
city of Harrisburg planning commission
resolution. So we have exhibits B1
through B1.
Um and then with that I'll turn it over
to Mr. Knight for background on this
application.
>> Uh yes. So, uh, so the case for, uh, the
application for 26, uh, 31, uh, for 923
North 18 Street, um, is similar, uh, to
two of the other cases that were heard,
uh, by the board at last Monday's
special meeting, uh, for 514 and I
believe 19, uh, Emerald Street and 1923
State Street in that this is an after
the fact application. Um and again this
was uh brought to the planning bureau's
attention um through the revised uh
flood plane zoning certificate uh
application process. So the re the
revised process and document was doing
what was supposed to be doing and
apprising us to kind of a zoning um
nonconformity issue. Uh and in um
discussing with the applicant and with
uh the codes bureau and looking back
through the records, it appears uh that
about uh a decade ago uh applicant
purchased this property um and uh
operating
in conjunction with uh the codes bureau
and uh with the uh submitt of building
permits to the code bureau uh moved
forward uh with redevelopment of the
property um in good faith uh in
coordination with the city. this was not
done, you know, nights and weekends type
of project. Uh, and uh, you know, this
came up to our attention 10 years later.
Um, and in this particular instance, uh,
this is a bit more um, intensive uh,
than what, uh, the previous cases were.
Uh, but the building also differs
significantly. Um so uh the overall
proposal is a conversion of the building
into a six-unit multif family dwelling
which requires zoning hearing board
approval of special exceptions for the
proposed use and relief from the off-
streetet parking requirements per
section 7-305.7
and 7-327.6
of the zoning code respectively and
variances for relief from the density
regulations and specific criteria in
sections 7-307.3
and 7-309.2V
of the zoning code respectively. Uh in
this particular case um the property was
in a significantly deteriorated pos uh
condition when uh the applicant uh
bought the property. Um as you can see
in uh the Google Streets View image I
believe from August 2014 that
accompanies uh the packet. Uh there most
of the windows were missing. Uh a lot of
the doors were missing. Uh there were
various other um you know issues that
are visible just from that uh
screenshot. But as the applicant
attested to uh both in their application
and in their planning commission
testimony uh the roof of the building
had actually fallen through all the way
to the basement of the building and
therefore uh the structure basically had
to be reconstructed from the ground up
uh into its current six-unit
configuration. Um looking at some of the
justification uh for uh the six units as
proposed by the applicant uh you know I
had actually come into the review
anticipating we'd be recommending maybe
a one or two units less or three units
less but the more we looked at the
project and the more we looked at the
property uh the more the applicants uh
approach to the redevelopment uh did
make sense. Um again there was a
significant amount of reconstruction
necessary all three floors uh we're
talking uh utilities um structural walls
uh dividing walls um etc. The building
itself is also um you know significantly
larger than what the threshold for
conversion for up to three units would
be which is 2500 ft. The building is
3639
uh square ft. Um, additionally, while
it's uh a bit difficult to tell from the
research we were able to do, uh we
couldn't tell how many units there used
to be in the property at one point, but
it looks like uh there used to be at
least multiple residential units uh if
not a complete mixeduse um use of the
property. Uh the infill the vinyl
infilled windows on the first floor kind
of attest to maybe what might have been
a commercial history on the first floor
of this building. Um again, our records
in the city's um in the city's system
only go back to like 2015 or so. So it's
very whatever was operating there had
been operating for a long time. There
was no like recent work done on it. It
was just a property that you know had
existed. Um and so given that history of
the property, the substantial amount of
investment that was required to, you
know, make the building structurally
sound, much less habitable. Um and then
the third issue uh was the central
location of the stairwell. Um if you
look at how the uh stairwell uh is laid
out, it basically divides each of the
floors into two spaces. And so when
you're looking at the uh building, you
can kind of say, well, we could either
make it so that each of the floor is one
whole unit or that this floor or that
the stairwell uh kind of naturally
divides each of the floor plates into
two different distinct spaces. And you
know, it really appears that's the case,
not just because the stairwell is there,
but as you see, uh within the floor
plans, there's still stairs that go up
from the landings. So like the floors
are on different levels. uh even um
relative to where the stairwell is. Uh
so uh it makes sense that uh the
property would either be you know three
units or six units uh given that
configuration and again given the
history of the property uh given the
amount of investment that was necessary
to go into it to make it a habitable
structure. We did feel that the
applicant's proposal for six units uh
was reasonable at the time. Um the only
issue really that uh we saw with uh the
overall development as completed uh was
the installation of the parking along
Boa Street. Uh there were head and
parking spaces uh established there and
it and it is a little unclear when you
look at the uh Google Streets view image
from August 2014. Uh whether there was
parking there occurring at the time.
There's no line spaces but uh it's
difficult to tell. Um but you know we
require that an ADA compliant uh path
and sidewalk basically be constructed um
along all building frontages. So there
the sidewalk cannot be replaced uh with
um with parking. uh and any parking that
encroaches into the public right ofway
is by definition a public parking space
and it is not a uh private off- streetet
space that can be reserved for use by uh
by tenants or their or their guests. Um
so in addition is the spaces you know
removing a sidewalk they also are not
could not really be counted as off-
streetet parking spaces meeting the
requirements. Um and so for that reason
uh that was our uh big recommendation uh
in the planning bureau's case report and
that was um really supported by the
planning commission and their resolution
uh which recommended the zoning hearing
board approved the request with the
following conditions. Uh the applicant
must remove the illegal parking
installed along the side of the building
which replaced a required sidewalk.
construct a new ADA compliant sidewalk
with tree pits and/or planning strip and
construct a new code compliant curb to
prevent a a sidewalk encroachment. Uh in
uh conversations with the applicant
subsequent to the April 1st planning
commission meeting, he did provide a
sketch site plan which I believe is was
provided with the packet uh whereby he'd
be using curb stops instead of an actual
curb uh to reestablish a curb along uh
the Bow Street front edge of the
property. And the reason this was done
is um as shown in that sketch and um as
provided by the applicant uh their
runoff from this property as well as two
of the properties directly to the east
at 1801 and 1803 Boa Street. Uh the
runoff kind of goes toward the front
corner of that building there, the
intersection. And if a curb was provided
there, there might be a backup of runoff
which could either infiltrate into the
building itself or create uh conditions
for pedestrians, especially when it's um
when it's cold and it like would freeze.
Um and so the proposed curb stops would
allow um water to leave the property and
kind of go into the p uh the street. Uh
I did reach out to CRW uh and put uh CRW
in touch with the applicant in case
there are other uh solutions to doing
that um that uh would maybe improve the
streetscape of the property, perhaps
tree pits or something like that. Uh the
second condition of the planning
commission's resolution was that the
applicant should consider the provision
or subsidizing of SERTA passes to
residents given the size and
configuration of the units. It is likely
that not all residents would own
vehicles and ensuring their access to
the bus network will reduce the need for
personal vehicles and provide tenants
with affordable mobility options. Um and
this was added which is not um a
condition that we usually include in
these uh because we did realize that in
um making a condition that the parking
these six parking spaces be removed uh
which would create um three publicly
accessible on street spaces along the
bow street frontage of the property.
that that would be a significant step
down from the parking that's there now,
legal or not. Uh and be and given the um
proximity of a bus routes along her
street just a block to the north, uh we
felt that this may be a uh way to uh
offset um the again loss of that
parking.
The zoning the planning commission uh
recommends the zoning hearing board
approved the request for the following
reasons. The property experienced
extended vacancy over approximately 20
years from 1997 to 2016, resulting in
significant deterioration that made the
structure an uninhabitable and dangerous
nuisance and threatened the physical
stability of attached buildings along
North 18th Street and Boa Street and
necessitated significant investment to
address the structural and livability
concerns of the property. As such, there
is justification for the allowance of
more units than would be permitted by
Wright. Uh the project reconstructed a
blighting influence at a conspicuous
corner property and two new units that
contributed to the housing inventory in
the city and neighborhood and represents
a significant improvement over the
potential alternatives of demolition or
collapse.
>> Okay, Mr. Schol.
Um yes, I'd like to um maybe expand on
what Mr. Knight said there. um
during um during the time frame or at
least I can only speak from the time
frame in which I was doing this which
would be somewhere between 2011 to 201 I
think 18 was when they stopped actually
renovating new properties.
We did quite a few um I think at one
point in time we were up to 138 units
out of 100 buildings and we paired that
down to 90. Uh, in this particular case,
um,
let me let me step back just for a
second. In in the earliest days when I
first started this, we would simply
apply for a permit to either either keep
a single family residence, a single
family residence, or if it looked like
it was suitable or somebody had been
using it as a two two unit before, uh,
we would apply for that as well. Now,
sometimes that was approved and
sometimes it was not. I wasn't really
sure as to why it was or wasn't. So, at
some point in time, we had a
conversation. I had a conversation
with u
was now director and Montgomery. At the
time, she was not director. And uh she
showed me how that they typically went
to the the county's website to look at
specific data and what the class section
and that was her first mode of of
research at the time. Now, that that has
since changed, but that was pretty
common at the time. Uh, if you go on the
county's website, even today, moments
ago, I went and it's still classified as
R12 apartments, 5 to nine units. That's
what it says there. So, you can see
where it could be easily misleading to
anyone to look at that and think to
themselves, well, do I really need to go
bother planning commission with with
this when it clearly says right here
that that's what what it's been used for
in the past or or that kind of thing. So
in coordinating with U now director Ann
Montgomery um I just want to say that uh
we did full set of architectural plans.
These were engineered stamp plans. There
were structural engineered inspections
as well as the city inspections,
engineered electrical inspections,
plumbing inspections with uh still on
staff um the plumbing inspector Daryl
Wagno. A full fire suppression system
was designed and engineered and
inspected by Triangle Fire Engineering.
The primary inspector on the job was
Rick Janakovich who held a a training
session there on site. Asked me if I
could take some time to show everybody
how it is that we did, how why it is we
planned it the way we did in order to
make this function as a six-unit
apartment building and not just a house
that had been cut up and turned into a
multi-unit. The whole structure interior
was a redesigned and reframed for this
purpose. So it flows well, the water
flows well, the everything is stacked
and that kind of thing. Plumbing works
out really well. Uh at some point in
time we did also have um inspections
there by the assistant fire chief and
the fire chief. So, we went through a
lot of processes here and a lot of
people and when the fire chief and the
assistant fire chief and everyone else
were there for the uh certificate of
occupancy, I'm going to call it ribbon
cutting on this thing because it was
really an eyesore in the neighborhood
for a long long time. Uh we were
standing in the middle of this parking
lot this parking area as as we did the
final air test and and pressure checks
checks on the uh on the fire suppression
system. Um, so I I would just just say
that this is just an example of how
thing it just I don't know how this
process went arry, but this wasn't the
only one in in in the process of
divesting from rental properties here
and the city and in postcoid woes, I'm
going to call it. Um,
um, Mr. night noticed that we had some
issues at least in one. And so I said,
"Well, here's a list of all of them. Can
you when you get a chance, can you check
these and let us know what which of
these you think might run into problems
so that we don't keep doing this?" Well,
there were seven and so all seven of
those are now before us here. We had a
couple last week and now this one and
then I think four more that we've just
uh uh kicked down to the to the May
meeting.
So, um I think um in addressing the
concerns over the parking,
my thought was that well there was there
wasn't really a curb or there wasn't a
sidewalk there at at the street and and
what we would now want one. There's a
the sidewalk is still existing. It's
just right up next to the building and
so it's useless. you're you're
literally, you know, elbow shoulder to
the wall up against the building where
the sidewalk was originally put at. Uh
and and so that's that's not going to be
useful. So, um my suggestion was we
don't change the water. We don't change
the water flow because we might create
more problems than than we than we
solve. And that was in in conjunction
with a telephone call down to
engineering. Uh, and then the already
established
blacktop asphalt
driveway there can become the de facto
12 14t wide. I'm not sure exactly what
it is. I went out to 16 foot wide
sidewalk that goes across the front of
the building that anybody as a
pedestrian might might be able to use.
Um, and but of course we do need some
kind of curb because we don't want
people parking out there and we don't
want people saying, "Well, okay, but
it's a flat surface. I can park all the
motorcycles I want to over here or my RV
or whatever it is that may not be a car
but might slide up in there. So, I need
to leave a, you know, a foot in here for
people to be able to walk between these
things and for water to go through. And
I'll probably even drill some holes
through these these parking curbs um in
order to allow sufficient water to go
through there. But that seemed like the
the path of least resistance that got
everybody to where they needed to be uh
and and solved the problem. And there's
no doubt in my mind that in 6 months
nobody will even remember that there was
parking up there because initially the
tenants that are living there right now
are not going to be happy.
But it is what it is and then that'll
have to be what it is. And I have looked
in or I have spoken with uh my partner
about looking into I can't say that we
have any results yet uh into the bus
pass option here because that that seems
like something that
while let's be honest it would be
incorporated into the rent. would be
something that that makes sense for us
to go ahead and do. And that way we're
coordinating it with for someone on
their behalf and then that they you
know, you're just handing them a package
and said this is how it is and here's
your your your card or however it is.
They they they work that out and that
seems like a simple solution for at
least at least half the the folks that
would would be there uh as tenants in
the in the long run. I'm not sure that I
can offer anything else in in terms of
hindsight as to how it is we got
into this mess, you know, uh but but
there it is. Most the vast majority of
the properties that we renovated were
not were not converted to multi-units.
Um and I would say probably within the
first because we were buying primarily
from
um the tax sales initially. I mean, I'd
buy 10 or 12 at a time. Um and then
others that were if you may recall with
the depression and after the uh bank
collapse in 2008 that there was a lot of
REO bankowned properties there. So we
that was our primary sources there. Um
and so we went after the worst of the
worst fired properties, properties that
were were falling down and and blighted
and of course we got them for $500 at
that time. You could do that. Um I my
just my personal background so you know
is I have degrees in structural
engineering, physics, meteorology,
former science officer for United States
Air Force during first Gulf War. Um I
don't I didn't go into this without
planning it out or understanding what it
is I was doing or what my mission
statement was and and I mean that in
every sense of the word. Uh so we
we did what we did purposefully and with
planning and with direct coordination
with the folks at the at the uh at the
permanent office and had they simply
just said well we can we don't have the
authority to do this you got to go to
this see this guy down here then that's
what we would have done it's too easy uh
but you know we we did what we did
because that's what we thought we were
doing that was proper at the time
>> right I'll just Mr. tonight. Anything go
I mean going back to that time
>> you know that he was mentioned you know
2014 15 16 around that time any
>> comment with regard to you know to that
or relying on the county records or or
anything like that any comment with
>> yeah I mean uh it precedes that a little
so my tenure with the city started in
December of 2012 um and from what I
heard uh for about eight months before I
got there there was nobody in the
planning bureau there was somebody who
was kind of working between two bureaus
to basically hold down the fort and have
these monthly meetings, but there wasn't
somebody there who was, I think, uh, had
like a degree in planning or was
answering things on a daily basis. And
so, I think other departments learned
how to work around that. And I think
probably one of those instead of, you
know, being like, well, we don't know
what a zoning code is or how to read
this or whatever. Let's rely on what the
county's records are. I think the other
departments began to utilize that. And
it wasn't until you know I had been
there a little while and uh been you
know able to establish myself as like
hey I am the authority on this like
these types of things need to come
before my department till I think it
wasn't until then that uh other
departments you know really realized
like oh there are other considerations
you know when we're looking at something
like this. So, I don't think, you know,
I I think it was just people learned to
work around what the situation was and
it just took a little while for that to
change and that just happened to be at
around the time um the applicant was
purchasing and rehabilitating these
properties.
>> And Mr. Schopes, just going back to that
time when it was I mean, we're talking
about he had to basically just renovate
the whole inside. How did he come up
with the six units?
>> That's a really good question. And I
don't know that I have a good answer for
you. Um, in truth, the building there,
the first time I went to that building,
I was working as a consultant for
another wholesaler here in town by the
name of PA Deals. Maybe you remember
them. Used to the yellow trucks and with
the black lettering say we buy houses
1800 cash or whatever that whatever the
number was. Um, I went into that
building and and climbed my way through
what was the debris that was had fallen
and walked back out and said, "No, you
don't want to have anything to do with
this. This is not structurally sound.
This is going to be a lot more money
than you want to take on and then try to
wholesale that off to somebody else.
You're going to have to ballface lie to
somebody across the country to get them
to to buy into this. So, don't do it."
um we wound up having um differing
opinions as to what constituted good
business and so I moved on to uh to do
things on my own. Um and that and that's
how I got into it really. They they
introduced me to the uh to the
Harrisburg area. I first got in here and
decided that we were going to start
hiring from every everybody that's that
that has ever worked for me or with me
around me lives in Harrisburg. I've
trained I don't know how many people in
electrical, plumbing, and and various
trade craft. Um, some of them now
licensed, not all. Some of them are out
there doing whatever it is that they can
do to make a living. Um, and um, so I
don't I don't know that anything other
than once we made the commitment that
this was the the building that
represented that whole area up there on
the hill. You couldn't go anywhere
without passing by this eyes sore that
and so all of the other work that we
were trying to do up there was affected
by this building. So I decided that we
were going to do our best to try to do
something. And somewhere in the process
we managed to shore up the outsides. And
I just looked at it and went, "Okay,
well it's this. It's it's a rectangle.
An apartment building would just have a
stairwell going up the middle." And so
what what do we have left when we put an
adequate stairwell up the middle? what
do we have left and whatever that is
that's what we did three three floors
worth
members any questions that you may have
>> Michelle
thanks thanks for coming back
I'm looking at the map
case
and
property too. There's going to be a
certain amount of development going on
in that area. I know it is it
>> 18th and her there's a large building
directly north of this property. Y
storm water
capital water.
>> No.
>> You plan
that question and the reason for it is
that this more storm water mitigation
coming down the hill that decentiz
it absolutely it absolutely could.
However, I would say that nothing that
we're proposing doing changes that from
the from the existing. We're still going
to have the same amount of water, which
is why I don't really want to do
anything to to mess with that cuz it's
it's working now is about as good as
it's going to. As you say, sometimes
it's pretty it's pretty stiff there. Uh
wouldn't want to do anything that then
made that worse. Um because at at some
point in time when you start redirecting
water and affecting other people's
properties, they get upset about it
because now I've made our problem their
problem.
Um, and as of right now, it goes out
into the street, which I think it has
for quite some time because if if I
recall
in front of the building where we
currently have the parking, there was
some people were just parking off off
the off the street right there in order
to go inside and use this business.
There was uh there was leftover deli
equipment, things like that that we drug
out of there and and stuff from
upstairs. It was then now down in the
basement. So, it was kind of hard to
tell what was where in that building. I
have no idea how many units were
actually functioning in there. Um, but I
I think if if we do what we're talking
about here, we haven't changed anything
other than discouraging people from
parking on it and leaving that space
available for folks to be able to walk
past there. It does create a burden for
the ownership to clear the snow
across that whole area. So, it's much
more snow, you know, removal than you
might otherwise have, but that's that's
just um it's one of the things we're
going to have to tolerate.
>> Since it's you said asphalt covering,
>> yes,
>> maybe some type of
surface so the water running into the
ground, per
>> some of it could run into ground if it
was more pvious. Yes. And and just to
note, that's one of one of the reasons I
um introduced uh the applicant to CRW is
because I know sometimes they do uh work
with property owners on um you know,
introducing new storm water management,
green storm water infrastructure. I I
know they've like they used to at least
have like pilot program funding for
stuff like this. Um and maybe they would
have something similar
>> and we would certainly I would certainly
welcome coordinating with them and if
they have any great ideas you know why
not
answer you question
right now based off the square footage
you can have three apartments there
correct
>> uh yeah up to three apartment well I
mean that would
So that would be uh per the specific
criteria. Um and that's for a conversion
of a single family. And the reason I
have that in there is just because when
a um non-conforming aspect of a property
uh when a property is uh uh vacant or
abandoned, uh that non-conforming um
aspect goes away and reverts to the
allowances of the underlying zoning
district. So that's kind of why I
treated it like that. And I again I
wasn't able to really tell what the
history was, but I wanted to kind of
look at it as similarly across these
seven different projects as possible.
You have to keep it as three units.
Okay. Is this still is this project
viable to you?
>> No.
>> You need the six units to cover the cost
of
>> Well, there there are six onebedroom,
one bath with kitchenet kind of units.
These are studio apartment type things
with a separate bedroom. Um, and they
are separated by hallway and floor.
There's three on each side. There's one
A, one B, two A2 B. There's no way to
combine them without eliminating the
stairwell.
You don't you don't go to three. You
simply cut the building in half and then
say, "Okay, now I have two three-unit
buildings standing next to each other."
with the same address.
>> Well, yeah, it wouldn't have the same
address obviously, but
>> in fact, in fact, I I think there's some
indication that there used to be three
lots or three there was three paral
numbers that was that was associated
with this building.
>> Um,
you also one recommendation from the PL
is that they do something about
insurance side
walking
lot
or
>> Well, that is that is my proposal to the
solution of that is to eliminate that
parking lot and use that area as the
sidewalk as exists. I'll simply
eliminate any signs that says don't that
says you can't park here, whatever. And
and
remove all that. Remove any evidence
that there was ever any lined parking
there. Put the curb stops out so no one
can park on it. And then it becomes just
a big walkway. It's a wide walkway at
that point. I even talked to uh Mr.
Knight about putting a sign up there
that simply says there's no off-
streetet parking just so people say
understand we really mean it here. It's
it's a posted sign.
that you're constructed will be comp.
>> Oh yes, it's 18 ft wide
open water.
>> Well, that's all I have. Thank you.
>> Thank you.
>> Yes. My only thing was with the park. I
want to make sure I'm understanding. So
the spaces that are there now will no
longer be spaces and the sidewalk will
be built. Um and now so now there's just
going to be the three spaces on her
street but they're
>> uh Boas
>> I'm sorry Bo Street. Um but they're not
necessarily private spaces and those
would just be public street
>> correct spaces.
>> I mean they essentially be three new
spaces. They don't exist now. Um, and
the presumption would be that the
applicant's tenants would uh be the ones
that park there. I'm guessing the rest
of the neighbors have gotten used to the
current condition and park where they
do, you know, to serve their own needs.
They're not relying on those park on
that on street parking
currently.
>> Okay.
>> All right. Thank you.
One of my concerns is construction
building that goes up. There was extreme
parking constraints there
with the people who were going to occupy
that apartment complex starting over to
this because again
>> well I would say in that case so in that
case that was a 48 unit um senior living
affordable housing project. So they
actually have 48 spaces on site which is
twice as much as that what they were
required for affordable houses,
affordable units. It's half half a space
per unit. So one space every two and
they have 48. So they have one per unit.
So they have enough there. Uh there's
also um parking along the North 18th
Street frontage and the Hurst Street
frontage of that property. So I'd say
between the two of those sides, you're
probably looking at an additional 12
spaces in addition to the 48 spaces
they'll have on the site.
Okay, no more for applicant.
Okay, anybody here from the uh public to
speak on 2631 923 North 18th Street?
Okay.
Okay. Want to deliberate?
>> Yes.
>> And uh and Mr. Knight, right? the two
conditions. Did you add anything to
those two or is that just No, right.
Those are Okay.
>> All right.
>> Okay. So, is there a motion then to uh
um approve application 2631 special
exceptions and the variances with the
conditions
um provided by the planning commission?
>> Yes.
>> Motion.
>> Okay. A motion. Is there a second?
>> Okay. All in favor? I
>> Okay, approved. And uh so Mr. Sh, we'll
get a decision out to you and thank you
for the continuences and we'll see you
next month.
>> Thank you, sir.
>> Yeah.
Okay.
So, now we have application 20 uh 26331
Berry Hill Street. The applicant
is one of you Juan Tolantino.
Okay.
Um and Mr. Knight, uh you've been sworn
in already. Um and you'll be sworn
you'll consider yourself sworn in also
for application 2633.
>> Yep.
>> Okay.
um an applicant Mr. Tolantino and who
was here with Mr. Tolantino
just translate.
>> Yeah, I remember we had this in
planning. He doesn't really speak good
English.
>> Uh yeah, I think uh u Mr. Torres is here
uh to help um uh translate the questions
uh to Mr. Tolantino and to translate Mr.
Tolantino's answers.
>> Uh Christopher Torres.
>> Yes. Okay. Um,
why don't we have him sworn in first,
Mr. Torres, that what he will be
translating will be accurate.
>> Yes.
>> And then we'll swear in Mr. Tolantino.
Yes. Yes.
>> Okay. Um I'm going to read in the uh um
exhibits and then I'll turn it over to
Mr. Knight. Okay. Uh B1 is the
continuence request of the applicant
um from the March meeting to tonight's
meeting. B2 is the proof of publication
Patriot News March 1 and March 8, 2026.
B3 is proof of publication. News March
29, 2026 and April 5, 2026. B4, letter
sent from the planning director to
applicant notifying of the hearing. B5,
the hearing notice posting on the
property. B6, the notification letter
sent to neighbors and certificate of
mailing. B7, the application packet with
attached narrative and plans for the
proposal including floor plans. B8 deed
to the property establishing applicant
standing. B9 planning bureau case
report. B10 city of Harrisburg planning
commission resolution. So we have B1
through uh B10.
And with that I'll turn it over to Mr.
Knight and whenever you need it
go slower to make sure that obviously
can be translated for Mr. Tolantino.
>> Sure. Uh so uh the application for case
number 2633
uh is a proposal to construct a new
two-story mixeduse building on site uh
featuring a three-unit multif family
dwelling uh a top coffee shop cafe and
personal services spaces and to request
relief from the off- streetet parking
requirements which requires zoning
hearing board approval of special
exceptions per sections 7-305.7
and 7-323.
3 327.6 of the zoning code respectively
and a variance for relief from the
prohibition regarding parking and
setbacks per section 7-327.9
A4 of the zoning code. Um so with
respect to the uh project site uh as
noted um it's a.16
acre vacant lot. So, it's a sixth of an
acre. Um, as uh evidenced by the
existing development that's there,
including the low retaining walls and
the stairs from both uh South 13th
Street and Berry Hill Street. Uh, the
property did once feature a development.
Um I believe it was a large uh building
that probably was at one time uh three
uh one time um a single family dwelling
but uh prior to its demolition due to um
disrepair and dilapidation it had been
uh three units. Um and in the
intervening t periods since it was
demolished in 2007 uh the property has
remained vacant. Um, you know, at
various times there's different levels
of upkeep. Uh, although currently under
the applicant's ownership, uh, it's
been, uh, fairly wellmaintained. I don't
think there's been any, uh, violations
or placards of the property. Um, and,
uh, the proposal, uh, the location sits
at a, um, you know, kind of gateway into
the South Allison Hill community, uh,
both from South 13th Street, um, and
Interstate 83, uh, to the south. Uh and
then uh Cameron Street to the west. Um
and so as a you know gateway property,
it has a uh I think like different
prominence to it than uh what the center
of a block may have, for example. Um and
given that it's a vacant property, it's
kind of a bit of a blank slate for what
it could become. Um and uh the proposed
mixeduse development we feel fits pretty
well here at this location. again
because it is um almost a standalone uh
property. It's bound on three sides by
streets uh and one of these gateway
properties uh into the um Allison Hill
neighborhood. And so uh something that
you know can both accommodate uh passers
by as well as residents of the
neighborhood uh makes sense as a um
development plan. Um and so the uh
coffee shop cafe and personal services
uses whether that's um you know barber
shop or um a salon or uh even something
like maybe tax preparation uh makes
sense. Uh it does have like a customer
base in the surrounding neighborhood and
then having the three units uh a top
that uh those that commercial space um
makes sense as well. uh the 7,000 square
foot uh nature of the property would
actually you know allow up to uh I
believe uh four um uh residential units.
So the three is less than they would be
able to have per by right. Um and the
development footprint as shown in the
site plan uh provided by the applicant
uh does um conform to the various
setbacks uh impervious surface coverage
etc. Uh it's also um kind of a sensible
layout with the building oriented uh
towards the intersection there of South
13th and Berry Hill Street uh with uh
that patio area which is exempt from the
setback regulations uh providing outdoor
seating for um uh customers of the
coffee shop or cafe uh area. Uh with
regard to the um with I'll get to the
I'll do the variance first. With regard
to the variance, um,
parking for anything more than a single
family dwelling cannot be located in a
yard setback. And, uh, this proposal has
the parking the four parking spaces for
the project uh, being located directly
adjacent to Albert Alley uh, at the back
of the property. And, uh, you know, that
makes more sense than having a 10-ft
deep driveway that just pushes the
parking further into the site. you're
not going to get any more parking um
just given the layout of the site um and
the uh driveway aisle widths to access
parking. Um so the applicants have
basically provided as much parking as
they can uh on the property. And again,
having that be uh in the uh right
adjacent to the alley um reduces the
overall impervious surface coverage and
allows for uh more use of the property
for both landscaping and the building.
uh and the uh drivers can back out into
uh Albert Alley because it is an alley.
Um and then with regards to the uh
special exception for relief from the
off- streetet parking requirements, uh
there's um kind of several uh different
criteria uh from that section of the
zoning code that come into play here. Uh
the first being um of the 15 off
streetet parking spaces that would be
required, again, the applicant is
proposing four. Um but it should be
noted that because it's a mixeduse
building, they're allowed to double
count uh complimentary uses uh per the
zoning code. So uh you know when you
have uh residential units above like a
daytime commercial use like a salon or a
coffee shop, um the parking can be
shared because the people get up in the
morning, go to their job, leave the
parking, employees can come in, use the
parking spaces uh and then when they
leave uh the residents are coming back.
uh residents themselves may also be
employees or um customers of these
businesses whom uh that the off-
streetet parking requirements are meant
to accommodate. Um so they'd be there
anyway. Uh in addition uh to that uh the
frontage along Berry Hill Street uh
allows uh two or three spaces. Um you
know we usually look at vacant lots as
though they're not generating parking
for the you know adjacent uh on street
spaces. So, the fact that there's
nothing there currently um means you can
kind of assign some of uh the uh
frontage to um the to accommodate the
demand created by the new development.
Uh when I did a site visit to the
property, I was able to pull up right in
front of it. Uh there was nobody uh
parking there. Uh the nearest parker was
right in front of the building to the
east. Um, it should also be noted that a
lot of the buildings along the south
side of Berry Hill Street there do have
rear yard parking accessible from Albert
Alley. So, um, while there is parking
being utilized in front of them, that's
not the only, uh, parking that those
residents and the guests would have. Um,
additionally, while we did not really
include it in our analysis of the
project, uh, there is on street parking
on the west side of South 13th Street
across from the property and the north
side of Berry Hill Street, but because
there are existing residences there, we
didn't want to count that and presume
that the residents of those buildings
would not be using that. Um but in a
similar manner to the uh on street or
off- streetet parking uh when those
residents leave for uh their jobs or
whatever uh to go about their day uh
there may be on street spaces along
those frontages for uh customers or
employees of the businesses. And then
finally, the um uh property is located
along uh three bus routes uh that run
along South 13th Street and then you
know directly connect to Paxton Street
or Interstate 83 to the south um which
those routes go both to the um eastern
Dolphin County and the West Shore. So it
gives them uh access to a lot of
different amenities, shopping options,
and employment uh centers. Uh so uh with
all that being said, you know, we think
the uh proposal again represents a good
model of development for a vacant lot at
a gateway here. And uh you know,
considering the uh type of project and
the fact that it is in the RM zoning
district, the uh project has been
designed to kind of minimize the amount
of zoning relief that's necessary. Um
and so the planning commission has
recommended that the zoning hearing
board approved the request with the
following conditions.
If granted a zoning approval to move
forward with the project as proposed,
the applicant shall submit a land
development plan and receive approval
from the planning commission and city
council. The applicant will be limited
to the proposed non-residential uses
outlined in the application and cannot
establish or propose other per
unpermitted uses without receiving
zoning hearing board approval of the
requisite zoning relief related to both
the use and potentially from the off-
streetet parking requirements. Uh, and
the reason we put that in there is just
so they can't, you know, create this
commercial space and then say, I'm going
to be a nightclub or we're going to be a
restaurant or something that may have
more intensive uh impacts than um what
the space is being designed for. Uh, the
applicant must provide landscape
screening around the proposed parking
area and there is sufficient space uh on
the site uh to do so. Uh, the applicant
should retain the large tree in the
northeastern corner of the property
unless the city arborist deems it a
danger to existing or future development
or otherwise otherwise authorizes its
removal.
And the planning commission has
recommended the zoning hearing board
approve the request for the following
reasons. The property has been vacant
for 19 years since the demolition of the
former residential building on site in
2007 through various economic cycles,
demonstrating the need for financially
viable proposal that may require relief
from the current zoning regulations. The
proposed development minimizes the
amount of zoning relief by proposing
uses that only require special exception
approvals and a reason and a reasonable
variance request that provides off-
streetet parking while allowing
development of the site for more
beneficial uses. Uh, the property is a
conspicuous gateway into the Allison
Hill neighborhood, but has remained
vacant for almost two decades, severely
underutilizing a prominent location. The
proposed development will add new
housing to the neighborhood in one, two,
and threebedroom configurations while
creating spaces for small businesses
that will cater to the needs of existing
local residents. And finally, the
project will improve the pedestrian
experience for neighborhood residents by
replacing a vacant, unmaintained lot
with a mixeduse building that will be
activated 24 hours a day and customers
of the businesses who will populate the
building frontages along Barry Hill
Street and South 13th Street.
>> And Mr. Knight, so with regard to the
off street parking requirements, the
commercial uses on the first floor seems
to be calculated as requiring 11 spaces.
>> Correct. Is that about right? And then
because then the three units on a second
floor would require four.
>> Correct.
>> Okay. And this uh proposal would provide
four off streetet parking spaces.
>> Correct. Uh one of which would be um a
required ADA space.
>> Okay.
>> Okay. So with that then we'll have
applicant
provide
testimony.
I don't know about
about situation.
>> Mr. Torres, uh, can you press the button
on that?
So I explained to him a little bit about
the parking situation that they allowing
him because um the commercial spots are
being used uh as personal use for like
the tax preparation or coffee shop and
being that the apartments going to use
those parking after you know um they
close down you know like the commercial
spot or even the the people who lives on
top could even be workers or could use
these parkings. So I was explaining to
him a little bit about that and he said
he's he agreed with all you know what
what they have come through. So whatever
they require he he will follow.
>> Okay. Um could they ask he did provide
an application right that was um
completed and it has his name on it. Is
that
>> correct? Confirm that.
Yes.
>> And it also says here the project
architect and engineer A1
Silva is that person that also assisted
him with preparing that application.
>> Yeah, he was the one.
>> And did Mr. Silva also prepare the uh
different plans that were submitted with
the application including the floor
plans
and he was the one
>> and and I can confirm Mr. Silva
represented the applicant at the
planning commission meeting.
>> All right, board members questions for
uh Mr. Tolantino.
>> Hello.
>> I I had a few questions. Your hours of
operations for the coffee shop or your
personal services or
He would say he estimated time like 9 to
8 or 9 at at night. It depends.
>> What time do you start?
>> 9 9:00 a.m. to like 8 or 900 p.m.
>> Monday through Saturday.
Mhm.
And you have
the land usage plan. Is that
one requirements?
>> Yeah, they have not submitted the
application. I'm presuming they're
awaiting uh zoning hearing board
approval.
Hill
typical storm water questions for you.
Okay.
>> That's really all I have actually.
>> Thank you.
>> Good evening. Um just wanted to ask what
is the plan for like the three
residential units in terms of would
these be like affordable housing uh
market rate rentals? How is that going
to work? Okay.
He's um planning on renting it from what
the rent is going around the area. So to
wherever it fits, you know,
>> yeah, fair market value. Mhm.
>> for that area.
like 1,200 1300
apartments, right?
>> There's one two bedrooms.
>> There's two two bedrooms.
I'm sorry. He says two three bedrooms
and one two bedroomedroom.
But if if he he he doesn't understand
much because of the the developer
basically who designed it basically sit
down with him and explain a little bit.
So, he was the one that created like the
the layout and stuff. He don't
understand much, but he's a little bit
confused if it's two or three bedrooms.
>> Yeah. Based on the uh site plan, there's
a one onebedroom, one twobedroom, and
one threebedroom. There's one of each.
>> Oh, so
>> that's why Silva has helped him
throughout the whole process.
Sorry.
Take the price for the free bedroom.
Yeah, more or less.
So, yeah, he lives in the area. So, more
or less about the same.
with the size of that property and that
corner
be like a family dwelling family.
Will they be
>> Yeah. for family and because the size of
the area will be a play area for the
kids.
He said there's space it could be done.
There's nothing in the plan, but it
could be done.
>> But again, because the size of the area
and the elevation with there's going to
be families there, would there be some
type of
area in the back?
>> Yeah.
>> And I was they the site plan the site
plan does show there being a play area
on it. I don't know what the specifics
are, whether that's like a swing set or
what. Um but um there is u space
reserved on the side of the building for
some sort of play area
Albert alley.
Okay.
>> Yeah. in the back side.
>> Mhm.
>> I think I'm good. I saw the layout and
everything here.
>> So, Mr. Knight, the only um vehicular
access though is from the rear. Correct.
>> That's correct. Um there's really no way
to provide vehicular access otherwise
because of those like affformentioned
retaining walls the topographical
difference there between the roadway and
the site and then on the east side
there's a building.
>> All right. And I and I see here I mean
what applicant provided and then what it
says the planning bureau concurs with
this is the limited lot depth existing
alley width and required corner site
clearance restrict the available area
for on-site parking.
>> Yeah. Yeah, as as I noted, I mean, if
you look at the way the parking's laid
out, the only place you could maybe do
it, I don't really think you could, is
to have it go up the side uh of the
building where the play area is on the
site plan and then maybe like angled
parking, but then you just be backing
out. You you're asking for reliefs in
some way, whether it's to allow valet
parking arrangement or uh a different a
narrower drive aisle or something like
that. So there's really not a way to
provide more parking on there without
necessitating other zoning relief.
>> Right. Right. Okay.
>> It goes up.
>> Yeah. Yeah.
>> If you want to provide parking,
>> right? And if you provided like a new
driveway, you'd be removing on-site
street parking uh to do so. Right.
>> Right.
>> Okay. No. Any any more questions about
Okay. Anybody from the public here that
wants to speak on this application?
26331
Berry Hill Street.
Okay.
I just want to
deliberate or
>> All right. So, is there a uh motion to
approve
2633 the uh for special exceptions and
the dimensional variance with the
conditions uh provided by the planning
commission.
Motion.
>> Okay, there's a motion. Is there a
second?
>> Second.
>> Okay, there's a motion and a second. All
in favor? I
>> Okay, so a decision will be provided
within 45 days to the applicant. Okay.
Okay, congratulations.
>> Thank you.
>> Thank you. Thank you so much.
I was just wondering in that he didn't
have an interpreter would be required as
a board to have
>> something They showed up and we knew
they
was making sure
that he was saying what he was saying.
>> I just
Make a motion to adjourn.
I know.
More transcripts
Explore other videos transcribed with YouTLDR.

Tokyo diaries | ִֶ눈오는 날 여자놀이 🤍₊˚ ❆ grwm,짱 귀여운 타르트 가게🍰,소금빵🤤🤤
아린 wested_arin · English

الجملة التوضيحية المحدثة من آكسس كونشيسنس! (AR) @accessmultilingual
Multilingual Tools of Access Consciousness · English

為什麼投資比特幣
Terry Chen 泰瑞 · English

Historia de Colombia: La Hegemonía conservadora
Historia sin Esquemas · Spanish

LEILÃO VIRTUAL GENÉTICA MARCA LC - REPRODUTORES (PARTE 1) | 12/07/2026 – 10H
Canal Terraviva · English

Learn HTML In Arabic 2021 - #16 - Span And Break And Horizontal Rule
Elzero Web School · English

POSISI STRATEGIS INDONESIA DAN POTENSI SUMBER DAYA ALAM #geography #education #kurikulummerdeka
Fahmi Astathi · English

Machine Learning Explicado: Cómo Aprenden Realmente Las Máquinas
Objetivo IA · English

Video Edukasi HIV AIDS dalam rangka MPLS kota Denpasar 2026
KPA Kota Denpasar (kpakotadenpasar) · English

中國迎來新牛市?還是一波新災難?
Terry Chen 泰瑞 · English

CEREBRO SIN FILTRO - Capítulo 6: TOMA DE DECISIONES
CerebroSinFiltro · Spanish

Quantiferon TB Gold Training Video
SATVIUCT · Spanish
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.