Harrisburg City Planning Commission - 2/5/2025
e
e e
at approximately 6:30
p.m. uh commissioners receiv received
your January 8th
20255 many meeting minutes um are there
any changes deletions
additions if not could I get a motion
for
approval so moved is there a second
second been moved and second for
approval of the minutes as they are all
those in favor state by stay and I I I
opposed
exstension motion Carri
under old business there is
none under new business this is a
preliminary Land Development plan
application for 1103 South Front Street
Zone RF all by Harry Lane with Eden
Village of Harrisburg for the
construction of a transitional housing
development featuring a 2400 square foot
Community Center including services for
residents and 32 individual tiny homes
uh yes so the applicant proposes to
construct transitional uh housing
actually think it's permanent yep sorry
permanent uh housing uh development for
homeless individuals featuring 32
individual tiny homes a 2400 foot
Community Center offering services for
residents and Associate site and access
improvements project received zoning
hearing board approvals for the required
zoning relief requests at their October
21st 2024 meeting property at 1103 South
Front Street is a 15 acre lot which is
largely vacant although it's still
obtain some of the building foundations
and site infrastructure from when the
property accommodated a steel mill
currently it accommodates a critical
connection of the capital area greenb
but little else in the way of bment
interactive uses there's currently a
subdivision application in the review
process which will result in the
partitioning of the existing property
into two tracks an 8 and 1 half acre lot
and a 6 and 1 half acre lot this project
will be located on the lad lot to the
South the property is bounded by the
property 1101 South Front Street to the
north railroad tracks to the east
property at 1105 South Front Street to
the South and ssan Street ssan River to
the
West the planning Bureau staff
recommends the request be approved with
the following conditions uh the
applicant should ensure that the tiny
homes will be ADA Compliant via zero
step entries and the community center
will likewise have Ada access to ensure
that they're able to accommodate as much
as the population as possible uh the
applicant must install landscape
screening along the western side of the
proposed parking areas to prevent
headlight spillover into residential
units uh the plane bu recommends that
the app can continue coordination with
the City Arborist regarding required
landscape screening and trees retention
of existing mature trees and the
installation of native plants and
pollinator plants in landscaped areas
throughout the site and more
specifically around the proposed storm
water detention basins uh the alant rec
the plan be recommends that the
applicant install the required bike
parking near the main entrance of the
community center and that it be
sheltered for the benefit of staff and
volunteers residents in the tiny homes
can store their bikes and their units
and finally the applicant should
coordinate with with the owner of the
property to the north of the site to
ensure to secure easement agreements for
Access through their site and provide
such documentation to the planning
Bureau planning Bureau staff recommends
the request be approved for the
following reasons the applicants have
received approval from the zoning
hearing board for the various relief
requests needed to effectuate the
project as proposed uh the proposed
project will meet a critical need
housing for homeless individuals will
provide units with full bathroom and
kitchen facilities that have improved
their that improv their standard of
living and will further development a
housing typology that has been proposed
and completed for other sites in the
immediate area uh the project represents
a continuation of recent development
projects in in this area intended to
provide accommodations and services for
those experiencing homelessness and
finally if the recommended conditions of
approval are adopted the proposed
project will provide improvements that
benefit residents including better
bicycle infrastructure and increased
vegetation and ecological
biodiversity thank you Jeff gentlemen
could you state your name uh address and
relationship to the project we start
with Josh widler I'm the civil engineer
for BL companies at Marketplace
Harrisburg PA okay thank you um
Commissioners at this point I have no
questions um and I'll start with my
commission who have any questions or
concerns commissioner
mic there's a
here there's a letter here uh from what
was it January 3D I think asking for a
lot of specific exceptions and waivers
to a number of
items
yeah um so I you know generally speaking
uh these waivers are um requested are
actually pretty standard uh for what we
get um in developments and frankly the
applicants have probably gone you know
above and beyond uh with like the space
between buildings uh things of that
nature that you know normally we don't
even kind of do a review of on our case
um so from the you know planning
bureau's perspective uh for the most
part um the traffic impact study that's
not required because it's not going to
be 40 Peak uh trips per hour uh STM
Water Management facilities I mean
that's something that actually the um
capital region water would have to sign
off on anyway so that's kind of more
within within their purview um and so
you know we find uh the proposed waivers
to be acceptable on our end and
otherwise would have to be addressed
through um you know capital region
water okay I guess the the one question
back in back in the day we we had a city
engineer who
reviewed those requests on that we don't
have I I didn't we don't have anything
like that anymore right uh no we do um
so I had I believe in the uh at the back
uh the city engineer did review uh the
request and did not uh the did review
the project and did not make any
recommendations noted in here I just
missed it uh I think it's like right
before um
the right before after the comprehensive
plan uh portion of the case report
it's under page seven of the case report
yeah uh recommending approval without
additional conditions without additional
comments sorry okay I missed that thank
you yeah and and and usually if if the U
City engineers's response is more robust
I'll include that as a separate
attachment to the to the plan but uh
there was really nothing to provide
right okay no other
question Commission
M read I have no questions on the
application but I forgot how you said
you were going to uh get your homeless
individuals how are you selecting
them process and we'll be partnering
with other organizations throughout here
okay which ones uh we we're working with
Bethesda mission right now I could also
see as working with Opa we have
relationships with them also okay okay
thank you
uh commissioner
Nork
um I don't think I have no questions on
the
actual layout you know the develop the
development plans as presented um I
think one related question would
be the South Front Street Extension is
that a public road is that becoming a
public road at this point uh it is as
far as through this site or through the
p that site well you now have this
extension which is a roadway now going
through three different properties pass
pen dot yeah um it is not it is a uh
private drive from basically the
intersection with Sycamore Street uh
through the pendot so it's not even a um
uh public right of way through the pend
do property see okay so okay is that the
one you I wasn't sure if you were when
you mentioned the easan agreement I
wasn't sure if you were referring to the
Front Street Extension or that um
emergency the gravel road on the the I
guess that would be the western side of
the properties yeah um that was for
basically any easements whether they're
utility easements or access easements um
and it's more of a I would say formality
uh we had we've had people inquire um
about uh any easements once the VOA
facility was um approved uh and
constructed and so I just wanted to make
sure in the future if we got you know
requests for these or if the property
changed hands either this property or
the one to the north and we had uh you
know those parties asking us for those
for their own legal purposes that we had
that on file yeah yeah yeah I would
agree because I at this point if that's
technically a private driveway that
belongs to VOA then what's preventing
them you know at some point either in
the middle of it yeah saying you guys
can't drive up here if let's say there
starts to become an issue with um folks
that are occupying spaces on either
property yeah Anda says I don't like
this anymore I don't want your people
coming up here what so so vpa when the
original subdivision for vopa was done
and and Jeff you can correct me wrong
here but they they did provide with that
subdivision the public access for South
Front Street so it's so it
is recorded in an easement as public
access the South Front Street extension
and then okay the southern portion of
that or Western portion I guess on the
on the bottom of the site that's record
also recorded as emergency access okay
and access for utilities okay so both
the top and the bottom have already like
been recorded as they're not roads right
they're not public roads so that the
city doesn't take care of them right
it's the responsibility of the owners
but that recording will will follow
through with this with this plan and
with the T to job as well okay has that
and on the western
side
right yeah all right that's uh that's
good to know glad that's been been
addressed and uh at this
point I know we had conversations back
during the sketch plan and the variance
phases of this project along with the
other projects that has the green belt
um bike PA the pathway has there been
any movement one way or the other is it
possible to utilize this extension as
access for biking Where Do We Stand um
to my understanding uh based on the um
review during the tonsil Towers project
tonso Towers intends on having Gates and
fences across these which will
effectively prevent Public Access and I
think um the capillaria green belt
Association is moving forward as though
that will be the final configuration of
the site and so they have been uh
looking at alternative alignments I
don't know that there's anything formal
as far as um a study underway uh they've
definitely they definitely know where
they want to go I think but they don't
um have the the formal uh engineering
study complete certainly I don't know if
they're in discussions I haven't had any
conversations with them in a little
while so um I I do believe they're in
the process of fundraising for that uh
study um and again I think they've had
conversations with the owners of the
property through which the the
alternative alignment would run um which
seemed to be going well I guess as well
as as well as they could um and uh you
know it's their they seem optimistic uh
the green B Association seems optimistic
that they will be able to find this
alignment and at this point it's a
matter of engineering and money okay
understood nothing that would pertain
then to this this subject of property I
can say is an engineer looking at it
they did share that with us and uh there
is a request for the city to assist in
an application for funding um so all
that's ongoing um so they I think I saw
the numbers between two and a half and
three million that's one set of numbers
you know I think without an engineer's
actual thing you know and uh there's I
think a question about whether things
will be donated or not in terms of
Rights uh so there's there's just
they'll be moving Parts but it looks
like they are on track to solve their
problem relocating got it okay that's
all the questions I have
thanks uh commissioner Jordan um with
with that bit of information I don't
think I have any further questions
then is there anyone from the public for
against this
project as I look
around I scolded before for not asking
any question I think it wasion now was
there anyway so Commissioners this is
pretty straightforward
U I got a
motion before before you make a motion
can I can I speak a little to the plan
so the one there's one item in the uh
conditions of approval actually there's
a couple here in the conditions of
approval just wanted to go over have a
little exhibit
um so this is really regarding the
uh approval with conditions item one
that Jeffrey had stated uh which is I'll
just read it again so we can read it
record the applicant should ensure that
the tiny homes will be ADA Compliant via
zero step entries and that the community
center will likewise have Ada access
access to ensure that they are able to
accommodate as much as the population as
possible um so our initial submission
and submission that was reviewed did
include um the houses at grade basically
to allow not even a a rant isn't wasn't
really required right it was just a zero
step like you'd go into any grocery
store something like that um in the
process of getting some quotes there's a
significant almost double Savings in
price and correct me if I'm wrong KY
Wendell if we move to a like
pre-constructed preab building which
would require since they come in as one
item they need to be set on basically a
small crawl space that would require um
handicap rant to be installed which is
still which still provides at zero
access I think what we would like to do
is and just change the wording a little
bit U we'd like to recommend that the
Planning Commission change that
recommendation uh to
state will be ADA Compliant throughout
the interior and provide accessible zero
step alternates for those residents
requiring such access So the plan that I
showed you which would be the ramp
basically the ramp length that would be
required it's basically a 30 foot long
ramp and that kind of switch switches
back so we we are certainly going to be
provide all the houses with internal Ada
access and then where required where
there Ada accessibility necessary uh
provide this alternative access um that
way we're not installing them at every
single house that's a kind of a big ass
um for the for the site so just kind of
wanted to add that in there C can you
clarify that please because if it's new
construction the ADA requirements for
it's a residence though it's it's an
individual residence
so well I guess that's one way to look
at it but you you have a center you're
putting there are they going to own the
residences you know so are you going to
put them in
as residents switch over I mean I mean
I'm just asking the Practical side of it
you know it's
uh
uh I'm going to reserve the right to
look at that question between here and
City Council on on the
Ada without offering an opinion at this
point in time uh but the city is
generally trying to make sure that
everything becomes ADA Compliant because
we're 40 years behind so and I think
looking at um the new um sketch plan
that the applicants have provided um
whether that's yeah and and I think you
could even do it if if it's between
units like this like have another one
over on the other one so maybe it's
you're only doing one set of ramps
between every two buildings or even for
half the buildings I I um what and
whatever is required by Ada uh my main
concern was uh um and again looking at
the elevation plans of the tiny homes it
did look like they were but I just
wanted to make sure that was clarified
but looking at the um Community Center I
did didn't see ADA compliance I saw in
fact they each seem to have like a
little threshold or step up so that was
like more of my concern was that the
community center itself was Ada compli
yeah and if there are great changes
required for that uh reason or we'll add
that ramp there there is enough space at
the at the main entrance you can see
gets a little wider uh at the entrance
where toward the parking lot so we could
certainly provide the Ada accessibility
that ramp
there you kind of talking about
elevations there kind of sparked my
curiosity what is flood playing at this
site um so the FL I forget the elevation
exactly it's about four or five feet
below the kind of embankment where it
drops down the dark green kind of where
it drops down to the river it's about
four or five feet below
there and that's and that's which flood
plane for which event St 100 Year FL
that is it is that high there yeah um
and actually the 500e flood plane
for FEMA does does extend into the
property so while that's not really you
know why we're recommending this like
change to the ramp height it would
actually help in that manner as well it
would be outside the 500 plane yeah I
just know for other applicants in the
past we've um I think one 30 inches
above the certified flood elevation for
the lowest occupiable floor uh so a
flood constructed building yeah our free
board which is the kind of buffer you
provide above the Bas flood elevation is
18 in uh here in the city for new
construction is it 18 now yep okay and
we so we will be above that height for
the for the 100 for all the first floors
even if they're the lower even if
they're and and to and to clarify uh the
entire site is in the zone X the 500e
flood plane but the Zone AE flood plane
the 100e flood plane uh is west of the
western emergency route and uh east of
where their driveway and parking area is
so uh no part of it encroaches on their
proposed development footprint okay I
figured you had you've done such a
thorough job and everything else but
just curious yep it's always interesting
to watch what comes Downstream on Front
Street when the water High that's all
yeah thank you um so another another
item was uh item two which uh describes
the the request for landscaping kind of
between the parking lot and then those
houses that have the rear facing the
parking lot so um we're fine providing I
think it's actually a really good point
right we don't want head or yeah car
headlights going to the backyards um so
we'd
like it to State rather than just
Landscaping landscaping or opaque
fencing because we have the fencing
there we we might provide a fencing
instead like solid fencing there in that
section and then just a just a
clarification on your item number five I
think we talked about this already but
we we will the access to vpa is already
guaranteed through their easements on
the South Front Street and then the
emergency access out yeah and I think I
think it was more and I do recall seeing
um the E the easement documents for vopa
but there will soon be a different
property owner between um the penda
facility and your property so I don't
know whether vopa's easements override
all that or whether you have to have new
easements with a new property owner and
if nothing changes and the easements
that have been filed are you know in
perpetuity for all of the projects here
I think that's fine I just want to we
just want to make sure that that's clear
again for future uh planning Bureau
staff and if the requests come from
anybody
okay any
other um I guess no the only other thing
was and I think um ver you had mentioned
it that the waivers
while they're kind of brought up kind of
on the side they're not specifically
mentioned in the conditions and we would
like that especially because we had crw
looking at this we would like kind of
that confirmation the waivers you know
recommendation of approval with the
waivers as as request in and and we and
we would be fine with um we would be
fine with uh grany approval of the
waivers that we have the right
to um if it's crw and they say this
isn't Inc conformance uh we need you to
do X Y or z um I wouldn't want our
determination or the the planning
commission's determination to overrule
that great I think what yeah and what
I'm looking for then is just the the
board's kind of acknowledgement that
from our perspective you're you're
comfortable with the with the waivers
asking for but obviously it would be
determined by
crw still more and also the npds permit
so am I correct neither crw nor the
Dolphin County commission has weighed in
yet not yet I it and that was frankly my
fault I was a little uh that that's okay
but I'm saying we we do have to rely
upon both of them as we review a project
it's not really it's not really a our
discretion to push them aside you know
they're separate government agencies and
uh you know um I do not find crw as a
general rule to be willing to wave much
of anything so so they they they waved
they specifically did wave the um both
the vopa site and the tunnels to Tower
site for the two storm water related
items we were asking
for but I certainly agree like in
general people on standard for a reason
right um and and I would get and frankly
I would guess that um these are in
our uh Soo because it's from 1988 um and
that was when we still had a city water
department which would have handled all
this stuff and so there it might not
even be applicable as far as the soo is
concerned that we would have the
authority to ran waiver or even that
they would request that from us so um
you know I I I'm fine with uh the
waivers requested that the city has any
you know authority to approve um but you
know would want crw to weigh in on
their and when you referenced earlier I
thought I heard someone say this is the
sewers private did I hear that right are
the other two
private yeah okay so and what what that
means it's basically VOA who installed
that private line from their site to
connect with the public sewer so oh I
got you
okay homeowner that's responsible for
their private line gotcha but it's a
pretty pretty long private line pretty
long private Liney long private line
right so in our in US discussions with
crw we'll need separate permission from
vpa in order to be able to tie in as as
we have currently shown on utility plan
we could we could tie separately in um
if they wouldn't allow that but it seems
like their
favorable that's also why they need to
access
these gotcha so it's uh we have meetings
coming with with um RW which they are
under a 40-year consent degree to get
the system in place which we are under
as well and you know they want to have a
next steps kind of discussion so I don't
really know uh at least in my meetings
they didn't really feel like they
were willing to do anything that someone
could put and say you're not complying
with h the consent degree
so any other
changes no that's all that's all I have
thank you so much appreciate it
Commissioners with the uh additional
information
um could I get a
motion on this
project I'd be prepared to make a motion
and I believe that would need to State I
guess the two conditions that we're
going to
modify that the city had had in there
the fence and the um the zero Ada could
be accommodated through ramp okay Y and
then I would probably put that to get
back to the other Clarity I would
probably go back and suggest this would
also be conditioned upon crw and any
other uh applicable
ahj relative to the waivers that were
provided here
is there a second on the
motion I'll second just been moved a
second for approval with the
conditions um all those in favor state
by say
I
oppostion motion Carri good luck
gentlemen thank you appreciate
it
sorry I'll make sure I correct before go
counil
yep is there any other business um
nothing uh new on our end I don't think
um I don't we've only got one case for
next month so far so um the submission
deadlines is this Friday
though why are they coming in so
slowly um beginning of the year maybe
tariff impacts you know who who who
knows um
we got caught up in that one
to and was it a one-year extension is
that what I heard
yeah because once upon a time it was a
10year declining some balance I think
right back in the late
9s
okay uh Joff if I might uh any update
relative the Broad Street Market that
you'd be able to provide have you had a
chance to be included in anything yet
yeah so um did uh meet with um the
design team uh uh yesterday and um other
members of Staff our facilities manager
um and uh they discussed um some of
their process up to this point um which
they've developed they developed a few
different layouts for the internal um uh
layout of the building uh they are the
focus of phase one um is reconstruction
of the brick building um on the same
footprint um in a
historically um historic appropriate
manner um I forget whether it was like
preservation versus restoration I think
was a bit of a discussion um but uh so
that will be a part of it um there will
be modernization uh mechanical updates
things of that nature Ada uh updates um
they have a couple of different um floor
layouts I think they're planning on uh I
know they've solic visited uh they
circulated surveys amongst the the
vendors uh to get their input on you
know what the new layout will look like
I think they've got a couple designs
that they're going to you know share
with them and see what their feelings
are on um which they which they want and
uh otherwise I think a um public
engagement uh timeline and strategy is
still being finalized uh to um kind of
go out to the public
okay thank you
anything else with the good other
water if not can I got a motion
for
adjournment is there a second second
More transcripts
Explore other videos transcribed with YouTLDR.

Katabolisme dan Anabolisme - BIOLOGI XII SMA
Indah Rahmawati · Indonesian

Por que os homens DEVEM evitar mães solteiras (ninguém diz isso em voz alta)
Socratic Psyche · English

ORAÇÃO DA MANHÃ DE GRATIDÃO 🙏 Obrigado Senhor por Tudo que o Senhor Fez
Na Presença de Jesus · Portuguese (Portugal, Brazil)

كتاب الصلاة من بلوغ المرام لفضيلة الشيخ ابن عثيمين 32
قناة الشيخ محمد ابن عثيمين الرسمية · English

Donald Trump brutally humiliates CNN’s Kaitlan Collins during fiery address
Sky News Australia · English

Hakikat Ilmu Sains dan Metode Ilmiah (Kelas 7 SMP)
Heryanah Ana · Indonesian

Perubahan Sosial Zaman Dulu dan Zaman Sekarang
Im Mrwa · Indonesian

MATERI - SIMPLE PAST TENSE
VK's Project · Indonesian

Sejarah Awal Lahirnya Sosiologi
Spasi TV · Indonesian

Bahasa Arab Kelas XI Semester 1 | Bab 1 Qiro'ah Pusat Perbelanjaan
Farobiy · Indonesian

Asking Billionaires How They Got Rich! (Beverly Hills)
School of Hard Knocks · English

ruangbelajar - Sosiologi XII SMA - Perubahan Sosial
Ruangguru Bimbel Terbesar No. 1 di Indonesia! · English
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.