Harrisburg City Planning Commission Meeting - 5/7/2026
The Harrisburg City Planning Commission approved multiple pivotal development initiatives, notably endorsing two significant affordable housing projects on Allison Hill, the historic adaptive reuse of an Art Deco publishing house, and a specialized adolescent therapeutic playground. A proposed zoning amendment for signage regulations was delayed due to commissioner absence.
This meeting highlights municipal strategy on Allison Hill, demonstrating how Harrisburg coordinates zoning variances, green infrastructure, and historical preservation to foster affordable housing and commercial reuse.
Section summaries
Call to Order & Signage Ordinance Postponement
skipThe commission approves the previous month's minutes. However, the anticipated zoning amendment on signage regulations is immediately postponed to the next session because Commissioner Vern McKisik is absent.
The main agenda item for old business was tabled without any substantive discussion.
1854-1860 Walnut Street Multifamily Conversion
watchThe commission reviews a request to consolidate four properties into a 5-unit multifamily building. Discussions focus on removing non-conforming gravel parking to comply with stormwater standards, and resolving unpermitted work with the Codes Bureau.
Offers an informative breakdown of how local stormwater policies and code enforcement impact multi-lot acquisitions.
1257-1259 Walnut Street Cooperative Housing
watchSouth Central PA Restoration presents plans for an environmentally-friendly 6-unit infill project. The developers discuss their partnership with a local trade nonprofit, green building components, and their intent to utilize an affordable housing cooperative ownership model.
Highly engaging review of modern co-op models, sustainable design, and neighborhood integration in Allison Hill.
Penn State Health Outdoor Therapeutic Playground
optionalPenn State Health petitions to construct a specialized, secure outdoor therapeutic playground for adolescent psychiatric patients. The commission debates the safety benefits of a proposed 10-foot tall mesh fence and defensive bollards along Boyd Street.
A niche, straightforward institutional use with minimal broad policy implications.
34-Unit Scattered-Site Affordable Housing (Phase 2)
watchThe commission evaluates a large-scale scattered-site infill project proposing 34 affordable housing units across nine vacant properties. Developers explain the success of Phase 1, and answer questions regarding sidewalk widening, street trees, and illegal dumping.
An essential segment mapping out major residential changes across multiple Allison Hill blocks.
112 North 13th Street Historic Book Publisher Restoration
watchReview of the land development plan to convert the historic 1922 Art Deco Central Publishing House into a 12-unit residential building. Engineers describe street tree placement, historic district facade preservation, and necessary driveway waivers.
Provides an excellent example of adaptive reuse balancing preservation criteria with modern housing demands.
New Deputy Planning Director Introduction & Adjournment
skipPlanning Director Jeffrey Knight introduces Stephanie Thompson, the newly hired Deputy Director of Planning and Harrisburg native. The commission welcomes her, previews the light June agenda, and adjourns the meeting.
This section consists of standard administrative introductions and informal meeting closeouts.
Key points
- Gravel Parking Lots Evaluated as Impervious Surfaces — Capital Regional Water (CRW) treats unpaved gravel lots as impervious surfaces unless specifically engineered to handle stormwater. Replacing unmanaged gravel with structured parking pads and turf actually reduces a property's total impervious surface footprint.
- Cooperative Housing Models Secure Long-Term Affordability — A proposed infill project at 1257-1259 Walnut Street will employ a cooperative housing (co-op) model. Residents hold partial equity ownership, creating a stepping stone to homeownership and legally locking in affordability over time.
- Adaptive Reuse of Historic Art Deco Assets — The vacant 1922 Church of God Central Publishing House is set for adaptive reuse—converting the blighted structure into a 12-unit apartment complex while retaining its classic architectural detailing like masonry buttresses and arched transoms.
- The Psychology of Illegal Sidewalk Parking — During debates on a 34-unit scattered-site project, officials noted that residents often park on vacant lots or sidewalks. This behavior stems from a fear that passing vehicles will clip their side-view mirrors on narrow neighborhood streets.
“The decadesl long vacancy of the subject properties demonstrates the challenges inherent in identifying appropriate and feasible redevelopment projects...” — Jeffrey Knight
“And finally, the proposed building design incorporates a number of novel features for projects in the city, including the incorporation of a rooftop deck, green roof, and solar panel array.” — Jeffrey Knight
AI-generated from the transcript. May contain errors.
like to call the Harshburg Planning
Commission to order at approximately
632.
Um commissioners, um you received your
April 1st, 20
26 meeting minutes. Are there any
changes, additions, deletions?
If not, could I get a motion for
approval?
Move to approve.
>> Is there a second?
>> Second.
>> It's been moved and second approval of
the minutes as they are. All those in
favor state by saying I.
>> I.
>> I.
>> Opposed. Abstention.
Motion carried.
Under old business. This is a zoning
code amendment
uh for signage regulations outlined in
chapter 7-325
of the zoning code. is filed by the
hashtra plane bureau and is to revise
and streamline the ordinance to support
city businesses and organizations
accommodate modern signage best
practices and ensure new signage designs
are compatible with surrounding
neighborhoods. Yes.
>> Uh yes,
>> sorry. Uh yeah. So, um I know we were
kind of hoping Vern was going to be able
to be here uh as I think he is the only
uh commissioner we hadn't heard from uh
yet regarding uh the uh signage
regulations. Uh but he is clearly not
here uh this afternoon. So, uh, I don't
know, um, whether the rest of the
commissioners feel comfortable moving
ahead and just, uh, uh, taking action,
uh, with maybe some additional
discussion or whether you would like to
wait to hear from, uh, Commissioner
McKisik.
Commissioners, it's your
>> Okay.
I mean, I I don't think so. I think um
you know, it's important to get it right
here as it leaves uh the planning
commission and and to hear from
everybody. Uh and I know we have heard
from the rest of the commissioners. So,
I don't I don't think I don't think
there's I don't think there's a harm in
postponing another month.
>> Okay.
>> Could I get a motion to continue this
until the next meeting?
>> Is there a second? Second.
>> It's been moved a second to continue
this until the next uh our next meeting.
All those in favor state by saying I
>> oppose.
Motion carries.
Uh item number two. This is a a variance
and special exception application for
1854 through 1860 W Street. This is the
zone RM is followed by area cosmos
and establish a multif family going use
through consolidation of multiple lots
with individual residencies into a
single lot and to construct required off
street parking and rear yard.
Y okay. So the applicant is proposing to
consolidate four subject properties into
a single parcel which will consolidate
three single family dwellings and a
mixeduse building proposed for
conversion to two units to create a
5-unit multif family dwelling which
requires zoning hearing board approval
of a special exception for the proposed
use per section 7-305.7 the zoning code
and a variance for encroachment of
parking space in the rear yard setback.
The properties at 1854 to 1860 Walnut
Street total 2 acres and feature a row
of connected 2 and 1/2 story structures
which were constructed circa 1900.
Properties abounded by Apricot Alley to
the north. The properties at 510 North
19th Street and 1862 Walnut Street to
the east, Walnut Street to the south,
and the property at 1852 Walnut Street
to the west. This row of attached
structures features elements of the
Italian 8 and vernacular architectural
styles. Character defining features
include the varied facade and treatments
including vinyl, vertical wood and wood
wooden shingle siding, the seconds story
porch on the front elevation connecting
three of the four buildings and the
prominent dormers. The main entrances
feature primarily feature paneled metal
doors set within simple frames. Although
the property at 1861 street features a
half view pane with simulated divide
light mountains, they are accessed by
small concrete patios. Penetration
features windows in a variety of sizes,
shape, shapes, sizes, pane
configurations, and settings. Although
most of the windows on the rear
elevations are one over one. Properties
at 1854 and 1856 W Street feature
prominent dormers on the on the third
floor with simple pediments. Structures
are topped with steep gable roofs clad
and asphalt shingles. The front yards of
all four properties are are enclosed by
4ft high chainlink fences and are
covered by pavers or astroturf. The rear
yards are relatively undeveloped and
feature a gravel parking lot that
extends across all four lots. Although
the properties are somewhat similar in
massing to other properties along Walnut
Street and and in the surrounding
neighborhood, they have been
significantly altered in a variety of
ways. As such, the buildings do not
contribute to the architectural
character of the streetscape and
neighborhood.
The planning bureau staff recommends the
request be approved with the following
conditions. Uh, the applicant should
remove the existing non-conforming and
unpermitted parking in the rear yard and
replace this parking with six head-end
parking spaces directly accessible from
Apricot Alley. And the applicant should
remove the gravel constituting the
current parking area and either plant
grass or install amenities for the
benefits of tenants. If granted zoning
approval to move forward with the
project as proposed, the applicant shall
allow the codes bureau to perform a
comprehensive inspection of 1860 Walnut
Street to identify any outstanding code
violations related to the unpermitted
establishment of the first floor
residential unit and will receive
approval for all necessary city permits
prior to receiving a certificate of
occupancy. Plan B staff recommends the
request be approved for the following
reasons. The proposal will not
appreciably change the existing
configuration of the properties on site
aside from the conversion of firstf
flooror commercial space at 1860 Walnut
Street into an additional residential
unit which will limit the impact on the
surrounding neighborhood. If the
condition of the planning bureau is
adopted, the configuration of the
consolidated property will be enhanced
to provide tenants with more outdoor
space to remove non-conforming parking
surfaces and imperous surface and to
create more recreational recreational
and relaxation space for tenants of the
properties. And finally, whatever
parking configuration is ultimately
approved, the applicant will need to
coordinate with Capitol Regional Water
on Storm Water Management for the
proposed parking areas.
>> Thank you, Jeff.
>> Yes.
>> State your name, address, and
relationship to the project.
>> My name is Arya Carmason. Address is 752
Willow Street, Lebanon, Pennsylvania. I
am uh the architect for the client uh
that just purchased the properties.
>> Okay. You heard the staff report
[clears throat] with the two conditions.
Are you acceptable of those conditions?
>> Uh yes. I didn't quite get all of it. I
believe it was uh no gravel and
uh yeah. So the two conditions uh were
that uh the gravel parking lot in the
rear yards of the properties uh will be
removed and replaced with um six spaces
directly accessible from Apricot Alley.
um so that the rear yards can be
returned to grass or you know space for
uh tenants. And then the second one is
ensuring that uh 1860 Walnut Street uh
have a thorough codes inspection. Um I
note in the application it sounded as
though there was a residential unit
established um in the former salon that
was located 1860. And um our records
don't show that ever having been
approved or inspected. So, we want to
make sure that's inspected to just
ensure that any electrical or plumbing
work was done correctly.
>> Okay.
>> Yes.
>> Uh, did you want to add anything to the
report?
>> Not at this time.
>> Okay. Um, Jeff, um, what's the
requirements for their parking?
>> Uh, so for the five total units that
will be on site, they would be required
to have six spaces.
And you said they do have seven
>> uh they have seven uh shown in the
drawing, but again that's just like in
the existing gravel parking area, which
you can't really um specify because you
can't like line gravel. Uh so uh what
we're saying is that they should have
parking directly accessible from Apricot
Alley, which is what most of the other
properties along uh this block of
Apricot Alley have, just a you know
concrete parking pad in their rear yard.
uh something like that and then have the
yard returned to grass or whatever for
uh the benefit of the tenants.
>> I'm sorry. Hold on just so I can
visualize what you're saying here.
>> Yeah. like you would just pull in right
from uh I cut alley into each of the
spaces. Yep.
>> How many spaces?
>> Uh so the rear the rear property line of
the consolidated lots will be about 67
ft. Um and uh at uh the required
dimensions of parking spaces 9 ft wide
by 18 ft long. You'd be able to fit um
seven well I guess you'd be able to fit
uh seven spaces in there
>> this way. Uh yes,
along the back if it's 66
>> unless it's7
>> uh it was I mean at 67 I I added the uh
property line width from the county
website.
>> So no clearance. Why I measured it?
Okay.
>> Yeah. So if you say there's seven
spaces,
>> they would only and again only six
spaces would be required uh to meet the
requirements of the zoning code.
>> [clears throat]
>> No, I think
>> Oh, the other question. Have you um
communicated with the um community at
all? I know they have a community
organization out there. I haven't uh
commu uh communicated with them in in
that sense, but I did send out some
letters and I did uh receive from phone
calls which I I talked to them and
explained what we were doing
>> and most of them were acceptable.
>> Yes.
>> Commissioners, I see any questions I
have so far. So if you have any
questions or concerns, we'll start with
Commissioner.
Yeah, I have no concerns. We're going
from a four units to five. It's not too
drastic and it's going to be a
significant improvement. So, yeah, I
have no concerns.
>> Commissioner,
>> um just a question on the size of the
units like how many bedrooms would they
be in?
>> Um
I don't recall because all these were
existing. Um let me see. I know cuz I
went into into the one it was or
actually I went to to two over here. So
one had three bedrooms, the other one
had both these had three bedrooms.
>> I'm not sure about these. They might be
two two or three bedrooms.
>> Commission.
>> Yeah. Uh I do have a couple questions.
Um uh well a clarification first. So
the structure, it's three separate
parcels. Three, three separate lots.
>> Four.
>> Four separate lots. Correct.
>> And there's like one dwelling per lot
except for the fourth one which has the
mixed use.
>> Yes.
>> So the owner is purchasing has purchased
>> all of them.
>> Yes, he owns all all of them.
>> So okay. Did they submit a lot
consolidation plan?
>> Uh yes.
Okay, missed that part. Um, and then
chef, you mentioned about coordinating
with CRW for storm water, but they would
need to submit a land development plan.
>> Uh, we wouldn't have a land development
plan, meaning for the establishment of
the parking.
>> Well, if they're making this a larger
lot and then putting like you're
essentially you're consolidating these
structures into one building and you're
adding which is impervious area onto the
lot. Wouldn't that
>> So for
>> be a land development plan.
>> So they're just I mean so they're doing
the lot consolidation which is kind of a
land development plan. It's like a minor
land development plan. They're not
building any new structures on. They've
got these four buildings on separate
parcels. And uh what this what this grew
out of was we got a this was brought to
our attention again by the floodplane
zoning process that uh brought some
other uh uh conversions to our
attention. Um and so in discussing it
with um the applicant, they were
proposing to convert 1860 Walnut Street
to two units. And uh through the through
our coordination where where I told them
well that requires a um special
exception to create a multi family
dwelling and there might be uh a
variance for a leaf from the density. Uh
he noted that the singular entity had
purchased all four of these properties.
And when you look at the four properties
in total they would provide they would
allow up to six units by right. So
they're creating five there's going to
be a five unit multi family dwelling but
they're only really creating one
dwelling unit as part of this process.
And so they'll have one lot with five
units on it. We would consider that a
multif family dwelling because you have
five units on one lot. Um even though
they're all already existing.
>> Yeah.
>> Um but then
>> you are increasing the impervious area
on that lot. Well, so they're going to I
think with the recommended uh changes
from the case report, they'll actually
reduce the overall impervious surface
because CRW considers gravel to be
impervious surface. It has to be
designed specially to handle storm water
for them to consider that uh pvious
surface. So, by removing the gravel
that's all over the kind of the backyard
right now, um, and just creating the
parking off the alley, uh, they would
actually, I think, reduce the overall,
uh, impervious surface area of the of
the property.
>> Are you okay? So, you in your condition
talking about changing it to six head
spaces. Are you okay then? Like, are you
basically saying granting any sort of
waiver if the parking spaces go into the
setbacks? Well, yeah, and that was the
that's the variance that's noted in um
uh in the request there. It says and to
construct required off- streetet parking
in a rear yard setback. So, that's what
the variance is requesting there
>> for the way they have it current the way
they're proposing to configure it.
>> Well, the proposal is I mean there's
varying uh non-conforming aspects there
of like having the gravel, not having
like line parking. um
you know, encroachment into setbacks
because they're all again different lot
lines until the lots are formerly
consolidated. Um but the proposal to
just move that parking directly
accessible from Apricot Alley just
requires that one zoning relief uh for
encroachment into the setback. They
could in theory build like a 10-ft deep
um driveway and then have an additional
18 ft for the parking spaces and that
would not be in the setback because
driveways are permitted to across a um
setback area. Uh but that would also
waste a lot of the land to do something
like that. So we're just basically
saying remove the that driveway um that
you would you know create to get around
the variance requirement and just put
those parking spaces in the rear yard.
or sorry the rear yard setback.
>> Can I add a note about that? Uh there
there is a a utility pole in that area
too. So that might interfere with one of
the parking spaces
>> and if that interferes with one I think
yeah I did I did see that during the
site visit. I I think you'd be able to
still put like five on one side and and
one on the other or four on one side and
two on the other. So I think you'd still
be able to work
>> with that.
Um, re realistically we can get five
parking spaces there. So,
>> I have no other questions.
>> Commissioner Jordan.
>> Yes. Um, so in the picture here, you
have like I guess it's like a overhead
structure for parking spaces.
>> Yes. Is that going to be removed or
altered?
>> Yes, that's going to be removed. Um, I
was told that it wasn't permitted
originally, so we're gonna have it taken
down.
>> Commission Vincent.
>> No. Um, thanks for making the changes to
be in better conformance with the zoning
code.
>> Simple.
>> Okay. Uh, with that, we'll go to the
public. If anyone is for against this
project, please stand, state your name
and address. And I'll start to my left.
Senator
on the right. Okay. Commissioners,
can I get a motion?
>> Motion to approve conditions.
>> Is there a second?
>> Second.
>> It's been moved and second for the
approval of this project with
conditions. All those in favor state by
saying I
>> opposed.
Motion carry.
>> Thank you. do the work.
>> The item number three is a variance and
special application for 1257 and 1259.
Uh this is zone RM and is followed by
Arthur Jefferson with South Central
Pennsylvania Restoration LLC.
It's to consolidate the subject
properties and request the zoning relief
necessary to construct a six unit multif
family dwelling and to request relief
from the all street parking
requirements. Jeff.
>> Uh yep. So, the applicant is proposing
to consolidate the subject parcels and
construct a three-story six-unit multif
family dwelling with a rooftop patio
common area. This project requires
zoning hearing board approval of two
special exceptions for the proposed use
and relief from the off street parking
requirements per section 7-305.7
and 7-327.6
of the zoning code respectively and two
variances for relief from the density
and allowable building width regulations
in section 7-307.3
of the zoning code. Project will include
three one-bedroom units and three
two-bedroom units. The project site is
comprised of two vacant parcels totaling
06 acres which feature overgrown
vegetation at the rear of the lot.
Project site is bounded by Walnut Street
to the north, the property at 1261
Walnut Street to the east, the property
at 46 Lynden Street to the south, and a
narrow public right ofway to the west.
The planning bureau staff recommends the
request be approved with the following
conditions. Uh, the applicant must
submit a lot consolidation and land
development plan application and receive
approval from the planning commission
and city council. And the applicant must
receive approval from the Harrisburg
Architecture Review Board, which I
believe they did receive on Monday. Uh,
the planning bureau staff recommends the
request be approved for the following
reasons. The decadesl long vacancy of
the subject properties demonstrates the
challenges inherent in identifying
appropriate and feasible redevelopment
projects and thus supports the requested
relief for the development of a six-unit
multif family dwelling. The
configuration of the property with
limited frontage along public rights
ofway and surrounded on three sides with
developed lots presents challenges
regarding access to the property and
supports the requested relief from off-
streetet parking. The project will
improve currently vacant and
unmaintained lots with affordable units
that are pressing need in the city
generally and the neighborhood
specifically. The applicant also
responded to a solicitation from the
city for redevelopment of the site as
affordable housing which necessitates
additional relief from the zoning
regulations. And finally, the proposed
building design incorporates a number of
novel features for projects in the city,
including the incorporation of a rooftop
deck, green roof, and solar panel array.
The pro the property will also be
operated as a cooperative housing model
that will retain affordability over
time.
>> Thank you, John. Could you state your
names, address, and relationship to the
project?
>> Can you speak?
>> Uh, press the button on there. Yeah.
Thank you. I'm Duran Sawyers, uh,
co-owner of South Central PA
Restoration.
I'm sorry. Address 1400 Karen Drive,
Harrisburg, PA.
My name is Arthur Jefferson. My address
is 1952 Manitor Street. And I again the
co-owner of South Central PA
Restoration, which will serve as the
general contractor and the developer of
the project.
>> Okay. You both heard the staff report.
Are you acceptable of the three
conditions?
>> Yes. Yes.
>> Do you want to add anything to the
report?
>> Um, please approve.
[laughter]
>> I
Okay, with that at this time, I have no
questions yet. So, I'll start with
Commissioner. Any questions, concerns?
Yeah. Yeah. Jeffrey, real quick, can you
outline the the relief being sought here
again?
>> What's that? Sorry.
>> Can you uh explain the relief being
sought real quick for me?
>> Yeah, sure. So, um because the
properties are in the RM zoning
district, multif family dwelling
requires a special exception. Um,
additionally, uh, because they cannot
provide, uh, off- streetet parking on
the property, they will require relief
from, um, the three units that would be
require that would be required if it's
submitted under the city's um,
affordable housing program. And if not,
it would be six uh, off- streetet
parking spaces that would be uh, require
relief. Um, and then as far as the
variances are concerned, uh, the project
is more dense uh, than would be
permitted by Wright in the RM district
um, even with uh, the affordable units.
Um and uh the building is also wider
than the 20 is more than 20% uh of the
prevailing width of structures on the
block.
>> All right. And what's the density? What
numbers we dealing with there?
>> Uh I believe they would have been able
to provide uh or they could have um
constructed two units by right and
they're proposing six units.
>> All right. Yeah. Yeah. In spite of that,
it looks like a great project. You have
to attracted voting. Hope that's what
ends up there. So yeah, I'm in favor.
I'm just curious about the nonprofit
that's mentioned in the application.
>> Big US or US Big Us?
>> Big US workbased training. Yes.
>> Okay. Can you tell me a little bit about
the nonprofit and the relationship to
the project here?
>> Um so,
uh we are from the city of Harrisburg um
and South Central PA Restoration. how we
started that myself and Arthur um we it
was us and some guys from our community
and uh we so what we did over time we
kind of trained them and showed them a
trade and so we seen families uh the
improvement of them especially the
fathers in the house and they be able to
support. So we like, man, we we're doing
all of this from the muscle. So why not
try to get some assistance from funding
and start a nonprofit to do the same
thing and which we already know is
successful because we're actually doing
it. So we do a lot of work for the city
of Harrisburg and uh other counties as
well. So that's how we started the
nonprofit and with that idea in mind.
>> Okay.
>> Yes, ma'am.
>> Uh Commissioner M.
I appreciate seeing an infill uh
development project. So that's really
really good to see. And I don't have any
questions about the plans that
presented. So uh I'm curious if um you
were able to reach out to your neighbors
uh surrounding community and get any
feedback.
>> We we sent the letters out and um I
received one phone call and the lady
just was inquiring about what what's
going to happen, who are we going to
have in the property. Uh she was more
concerned that we were bringing in um
like like homeless homeless people on
the property, turning into a project,
let's let's say, but um we assured her
that that's not the direction that we
looking to go and um she said, "Okay."
>> Okay. Thank you,
>> Commissioner George.
>> Yes. Um, so to confirm this has been
submitted to the affordable housing
program,
>> um, I don't, uh, well, they didn't have
anything in, um, the actual application
that said like we intend on doing this,
but they're also, uh, talking about
ensuring the long-term affordability of
the property and also using a co-op
model. And so I'm not sure if maybe that
model uh maybe complicates it a little
bit because it won't necessarily be like
a rental uh unit, you know, like I think
as part of the co-op you like own part
of the building too. Um and so that
might complicate it and I'm not sure
frankly how our affordable housing
program would view something like that.
Maybe it's a bit different. Um, so, uh,
I didn't want to presume it would be
filed through that, but, um, if they do
file through that, that could be
certainly something that's addressed
through the land de development
application.
>> The only other question I had is um,
what is the average square footage of
each size unit?
>> About a thousand square feet
>> for for both the one and two bedrooms.
>> Yes.
>> Thank you.
Commissioner Vincent.
>> Um, no questions on a technical aspect
on the application. Um, on a personal
note, you know, great great job with
this project. This this is a really good
uh a good way to get, you know, housing
in, get that development, and I love
co-op models. You know, I've read about
them before. It is a good way to get
people to transition into home
ownership, um, and having something in
between. So, it's a really good project.
Hope you guys
a chance to come back. Thank you.
>> With that, I'll go to the public again.
>> Yes. Sorry.
>> Just because it's not clear to me. So,
is the is the off street parking relief
we're not requiring any?
>> That that'd be correct. It'd be a full
relief for off parking. Yeah.
>> I wasn't sure if you're saying they're
going to provide three
affordable housing or
>> is what they would be required to have.
But this plan, the relief is asking to
complete relief.
>> Yep.
>> No, that's it. I just wanted to
>> I thought about that after you said
that.
>> So glad you asked. Uh we'll go to the
public and uh if you have any concerns
or about this project or questions, Dan
and state your name and address. I'll
start to
senator one person there.
Commissioners
get a motion. I think this this other
commission said I think it's a great
project and the co-op is really great.
We need more of that in the city and the
building looks very will definitely
brighten up the neighborhood
which is very good.
So with that commissioners, could I get
a motion here?
>> Approve with conditions.
>> Is there a second?
>> Second.
>> Second for approval of this project with
three conditions. All those in favor
state. I
>> opposed
carried.
Good luck.
>> Thank you. Thank you guys.
Under new business, this is uh item
number four. This is a variance and
special uh special exception application
for 1531 and 1533 North 63 zone
IMS institutional
as followed by Penn State Health. This
is to construct an accessory use on-site
development to setback areas and
construct a fence taller than permitted
by right?
>> Yep. Uh so the applicant is proposing to
create an outdoor therapeutic playground
facility on the subject properties for
exclusive use by patients of the
adjacent medical offices at 1524 Wallace
Street which is an accessory use
function as the principal use of the
property and involves the construction
of a basketball court and playground
equipment that will encroach into the
side and rear yard setbacks which both
require zoning hearing board approval of
a variance application. The project will
also involve installation of a 10-ft
high fence which requires zoning hearing
board approval of a special exception
application for fence exceeding the
maximum 6 ft in height in the INS
district. Uh the proper the project site
is comprised of two vacant parcels
totaling 04 acres which feature unckempt
vegetation, a row of low shrubbery along
the side and rear property lines and
small and a small fenced enclosure in
the southeastern corner. The project
site is bounded by the property at 1535
North 6th Street to the north.
Properties at 1521 North 6th Street to
the south and east and north 6th Street
to the west.
The planning bureau staff recommends the
request be approved for the following
reasons. The existing configuration of
the development site, particularly the
narrow width and shallow depth, would
require relief for any type of
development on site. and the proposed
development represents a sensible use of
the lot given the low inensity use and
proximity to the principal use which it
will support. The lots have been vacant
for at at least 30 years and given the
location between a an accessory parking
lot and long-standing restaurant
establishment. The proposed development
represents the most feasible and
reasonable proposal to activate the lots
and improve their contribution to the
streetscape. And finally, the project
will complement a medical outpatient
clinic that provides services to adults
and adolescence receiving treatment for
emotional, psychological, and cognitive
issues. And we'll provide an interactive
outdoor setting that facilitates their
physical and mental health.
>> Thank you, Jeff. Could you state your
name, address, and relationship to the
project?
>> Yes. Good evening. Uh James Strong with
Mcnes Wallace and Nurk 100 Pine Street
in the city of Harrisburg. and uh we are
the attorneys for the applicant. Um and
then also with me tonight uh are Kevin
Kufa and David Deloo with Penn State
Health and Jeffrey Shik with K&W
Engineers.
>> Okay. Um
give me just a little more background on
your connection with Penn State and
>> Sure. I'll give you a little bit of uh
background and uh then if there are any
questions uh the folks on the team will
be uh happy to answer those questions
for you. Um but Penn State Health
operating as the Pennsylvania
Psychiatric Institute will be operating
an outpatient clinic on land uh located
on North Sixth Street and Wallace
Street. So that would just be to the
north of the federal courthouse
building, the new federal courthouse
building. Um that clinic includes
adolescent support uh as part of its
child uh partial program. And so
children will come to the clinic um for
uh varying parts of the day and as part
of that uh therapeutic uh programming
for the children. Um the clinic wants to
have a playground area uh for those
children uh to go out and uh have
outdoor uh therapeutic time. Um, the
playground would be for the exclusive
use of the clinic's uh patients. They
would always be accompanied by staff
escorted from the clinic building to the
uh playground building. Um, and so the
relief is is tied to sort of the unique
nature of these two very narrow parcels
uh that would be combined, but even at
their uh combined width, it would be a
maximum width of 31 ft. Um, so the
zoning relief relates to the unique
nature of those parcels. First is that
the parcels are separated from the
clinic parcel. So even though this is an
accessory use to the outpatient clinic,
um, it's not on the same parcel as that
principal outpatient clinic use. So
that's the reason for that request for
relief is to allow the accessory use to
be located on a nearby property as
opposed to being on the same property as
the principal use, which here is the uh,
clinic. The uh second request uh relates
to the side and rear setbacks. So those
side setbacks are 20 feet on each side
and the rear is 20 feet. As I mentioned,
even when we consolidate these two
parcels, at its widest, the parcel is
only 31 ft in width. So we can't meet
those uh requirements. So uh we are
requesting relief uh to allow the
proposed playground equipment as
depicted on the plan. And then the last
request for relief relates to the height
of the fence that would be proposed to
surround uh the playground. Um that
maximum permitted height is six feet,
but the zoning ordinance does allow by
special exception for that fence height
to be increased. And so the proposed
fence height is 10 ft and then there
would be a netting over the top uh of
that um uh fenced area. So, the idea is
prevent any unauthorized access into the
playground area and then also keep any
balls and other equipment inside uh the
playground area. So, that's the the
relief that's requested by the
application. Um, and so we're here to
answer any questions that folks on the
planning commission or members of the
public might have.
>> Jeff, as far as the fencing, that's a
special exception. Yeah, they actually
uh pointed out uh a section in the
zoning code which I had previously been
treating as a variance and and they
noted that it allowed for um extended
height via special exception instead of
the variance. So um you know I don't
always bet a thousand. So uh they uh
they corrected me on that and that's uh
where the um special exception request
is coming from. Okay,
>> before I have any questions, the
gentleman just joined you. State your
name, address, and relation to the
project.
>> I'm Jeff Shik. I'm with K&W Engineers,
and we're the uh con you were the civil
engineer for the project.
>> Thanks, Kevin Kufa, Penn State Health,
100 Crystal A Drive, Hershey.
>> Dave Deloo, Penn State Health, 100
Crystal A Drive in Hershey as well.
Um, since there are no conditions here,
uh, I have no questions at this time
unless you don't want to add anything to
the report.
>> No, I think Jeff covered everything very
well in the case report. Uh, and as
noted, no conditions uh, were proposed.
So, nothing for us to discuss there
either. So,
>> okay. Commissioners, this is pretty
straightforward, but do you have any
questions, concerns?
>> Yeah. Uh, has Penn State been operating
there or are they just now starting the
operation?
>> They will be um I think in August is
>> Yeah, beginning of August.
>> So, they need
>> it's under construction right now. need
to finish construction, get their
certificate of occupancy, but the the uh
goaler plan is to be uh operating in
August of this year.
>> All right.
>> Yeah. Yeah, that's great. I'm glad to
see them relocate the six feet. I'm not
going to let four feet of fencing stand
in.
One other question, James, what's what's
up with Ash? He's he hasn't been here
over here. [laughter]
>> Well, believe me, I'm pulling double
duty. I have the next application as
well.
>> Is he so Braxton? I mean, seriously, he
hasn't been here.
>> No, he's triple booked tonight. I'll get
it. [laughter] Busy man. Nothing for
>> I have no questions.
>> Yeah, I think uh this is a innovative
way to use a very uh difficult space. Um
and it's it's nice to see it being put
to a beneficial use, you know, for folks
that would need it. Um I I don't think I
have any issues with the height of the
fence and it you mentioned that
additional top portion that would have
the screening on it. The rest would be
sort of that open chain link fence we're
typically seeing.
>> Actually, the um
>> the whole thing is mesh.
three quart threequarters of the of the
vertical fence will have the screening
um or you know it's going to be either
the fabric is shown on the plan or you
know the the chain link slats but that
will be from um from bottom to top to
the 10 foot level except for on the very
I think it's the eastern most side which
would allow visibility from the actual
building um that the users of of the
playground would become coming from that
way there's additional you know um sight
lines from the building to see you know
what's occurring on the playground.
>> Okay. Okay. Yeah, that makes sense. All
right. Um it looks like on
the let's see void street side that is
full in parking indicated on the
drawings there.
>> Uh
>> so are the ballards being installed sort
of as a safety measure?
My eyes aren't great, Jeff. So, I'm like
look squinting at this Jeff um this
plan.
>> Don't appreciate your
>> Sorry, Commissioner Merrick. Where are
you referring?
>> Yeah. So, on the Boyd Street side where
it's pulling parking.
>> Yes.
>> Are there I can't see super well. So,
the plan is it new ballards being
proposed along that side sort of as a
safety measure.
>> Right. They will be. Yes.
>> Yeah. Okay. All right. because it looks
like that chain link fence is going
right up against against there. Okay.
>> Well, and I would I would also um note
that I'm guessing there's going to be
like a low retaining wall because
there's some um topographical change
across that. So, you probably have to
infill the back of the lot there to
build the thing on top of it. So, they
want to prevent people from running into
that.
>> Yeah. Okay. All right. No other
questions. Thanks.
>> Uh Commissioner Jordan
covered everything.
Commissioner Vincent.
>> Okay.
>> Again, I'll go to the public. 314
against this project. Please stand. I'll
start to my left.
Okay. Commissioner, as I said before,
this is pretty straightforward. Can I
get a motion?
>> Motion to approve.
>> Is there a second?
>> Second.
>> It's been moved. Second for approval
with no conditions. All those in favor
state by saying I.
>> I oppose and abstensions. Merry.
>> Thank you very much.
>> This is item number five. Um
this is a special applications for nine
lots in and around the intersection of
North 16th Street and Crab Apple Street.
Uh this was done RMI
Gerard Miller J Miller with TLC. It's a
workbased training program to construct
multif family buildings on the subject
properties to request relief from the
off street parking requirements in
section 7-327.6
of the zoning code and to request relief
from various aspect of development
standards.
>> Uh yep. So, uh the uh request is the
applicant is proposing to um construct
34 units across uh
nine different scattered sites uh within
the uh area generally bounded by uh
North 16th Street, North 15th Street and
Regina Street. Um, and they are
requesting relief from uh for both the
to construct the multif family dwellings
on the subject properties and to request
relief from the off- streetet parking
requirements in section 7-327.6
of the zoning code. Uh, and to construct
buildings wider than 20% of the
prevailing width on the block. uh to
construct units which require uh relief
from the front yard setbacks and to
construct parking spaces in the rear
yard setbacks uh which will not have the
required parking lot screening. Um the
applicant is seeking to develop 34
affordable housing units in development
involving 17 buildings across nine
consolidated lots. Uh the development
will consist of four one-bedroom units,
10 two-bedroom units, and 19
three-bedroom units in town home,
duplex, and triplex uh configurations
constructed across the various sites. Um
the applicant is also proposing
construction of accessory parking and
storm water management at various
locations within the development
footprint.
So the uh applicant uh the is also
seeking approval of the following
variances. So relief from section
7-307.3A
of the zoning code to construct a
building wider than 20 ft than 20% of
the prevailing width in the block and
that's applicable to lot 5 uh to request
relief from section 7-307.3A
of the zoning code to permit full
encroachment into the 5-ft front yard
setback that is also applicable to lot
5. uh to request relief from section
7-307.3A
of the zoning code to permit full
encroachment into the 4foot sideyard
setbacks and that's applicable to lots
six 7 and 9. Uh to request relief from
section 7-327.9A
of the zoning code to permit parking
encroachment into the required rear yard
setbacks along Crab Apple Street and
that request is applicable to lots
number four and nine. Uh and finally to
the extent necessary to request relief
from section 7-307.13
of the zoning code to authorize the
removal of trees with trunk diameters of
12 in or more. Uh and that's applicable
to lots number four 6 and 9. Uh the uh
project site uh is form is comprised of
34 separate parcels uh spread across
nine blocks along North 16th Street
between Walnut Street in the north and
Crab Apple Street in the south along
Crab Apple Street between North 16th
Street and Chain Street and along North
15th Street between Crab Apple Street
and Ethel Street. Uh and to um obviate
saying the same thing over again,
essentially each of these lots uh is uh
largely vacant. Uh most have uh low
grass coverage. Some have um some mature
trees and uh undergrowth uh on them and
occasionally some of the lots are used
uh for uh illegal parking u by residents
of the neighborhood.
The planning bureau recommends the
request be repro approved with the
following conditions. Uh if granted
approval for the requested zoning
relief, the applicant will subsequently
file a lot consolidation and land
development plan and receive approval
from the planning commission and city
council. Uh because the project will be
restricted to residents earning 60% of
the median family income and is
therefore eligible for a certificate of
qualification pursuant to chapter 12-101
of title 12. The applicant should submit
the project through the affordable
housing certification prior to recording
the lot consolidation and land
development plan with the Dolphin County
Recorder of Deeds. Uh the applicant
should reconstruct all sidewalks along
North 16th Street, Regina Street, and
North 15th Street to the full width
between the curb and property lines as
the current configuration of those
streets and will provide safer and
improved pedestrian infrastructure for
new residents of the proposed
development and existing residents of
the neighborhood as well as curb
bumpouts at corner lots along North 16th
Street, Regina Street, and North 15th
Street. similar to what was installed
along the 15th street frontage of the
previous phase of the project. The
applicant should also consider measures
to prevent illegal sidewalk parking
parking such as street trees. And
finally, the applicant should install
fencing and closing undeveloped areas
around the proposed buildings to prevent
unauthorized access and unpermitted
activities such as illegal parking and
dumping to create more functional space
for project residents and to enhance the
aesthetic impact of the project. The
bureau also recommends coordinating with
the city arburstone plantings to improve
the appearance and ecological function
of the project sites. The bureau
recommends that for every tree removed
uh on lots 4, six, and 9, uh the
applicants plan a new one in a tree pit
located within the public right ofway as
space on each development site will be
limited. Plan B staff recommends the
request be approved for the following
reasons. The proposed project will
develop lots that are currently vacant,
unckempt, and or utilized for
unpermitted uses such as illegal parking
or dumping and create affordable housing
units for the city's residents in a
variety of configurations, including
multi-bedroom and ADA units.
The subject properties comprising the
project site lack adequate pedestrian
infrastructure,
which creates unpleasant and unsafe
conditions that have an adverse impact
on the surrounding community. and the
project will enhance the streetscape for
existing and future residents by
providing wide shaded sidewalks if the
planning bureau's recommendations are
adopted. The zoning relief requested by
the applicant, such as relief to allow
rear yard parking or to encroach into
setbacks, which allows the construction
of units up to lot lines, will better
reflect the existing nature of the built
environment and the surrounding blocks.
Thus, these requests are necessary to
develop a project that integrates into
the building and infrastructure fabric
of the community. And finally, as
evidenced by the appearance and success
of the first phase of the applicant's
development along North 15th Street, the
project will bring significant social,
economic, and aesthetic benefits to the
neighborhood, providing affordable
housing and modern construction that
improves the streetscape and brings new
residents who will activate the street
on nights and weekends and will support
local businesses.
>> Thank you, Jeff. Could you gentlemen
state your name, address, relationship
to the project?
>> Sure. Uh again, Jamie Strong, Mcnes
Wallace, and Nurk, attorneys for the
applicant. Uh 100 Pine Street in
Harrisburg,
owner of the project
construction, TLC,
my address 2335 Dair Street, Harrisburg.
Matt Witters with Useless Engineering,
161 South 32nd Street in Campill, PA. We
are the civil engineering firm for the
uh applicant.
>> Eric Aring Ka Design Studio, 27 South
Main Street, Amler, PA 19002. We are the
architects for the project.
>> Okay. Uh gentlemen, you heard the u
staff report. Are you acceptable of the
four conditions?
>> Yeah, the uh case report is very
thorough. Um the uh conditions um there
are two that uh Matt will probably have
some additional conversations with Jeff
about. Um first the sidewalk and and the
curb um bumpouts and we can certainly do
those where we have the right to install
those improvements. Um and then the uh
the fencing. Um I don't believe there's
fencing in the first phase. Um, and so
we weren't sure if that would meant
fence in each of the properties, which
would be introducing something different
than what's there, but we can certainly
work with with Jeff on that and and have
those discussions before the zoning
hearing board.
>> Yeah. And, you know, I noticed there's a
lot of uh, you know, interstitial space
around uh, these units, especially for
some of the uh, lots that are more uh,
unusually configured like the triangular
lots on North 16th Street. Um, and as we
were walking around doing the site
visits and posting the property, you
know, we noticed that, for example, the
um, storm water catchment area for one
of the phase one sites is kind of wide
open and, you know, somebody could get
into it. I know in the discussion of
1605 to 1613 Market Street that was
reviewed earlier, they had talked about,
you know, putting a fence around that to
make sure that people couldn't get into
it. And so we're trying to look we're
trying to look to provide you know site
uh and access control which you know
helps to define the spaces a bit more
and again prevent somebody from just
driving up into the back of one of these
properties and just start parking there.
Um I mean if you go around the
neighborhood today even in the lots
around where they've finished the
buildings for lot one you still have
people just like parking on the vacant
lots there. So, so to provide that and
again to provide a bit more maybe
security uh and uh establish, you know,
the bounds of these different properties
and units, uh we recommend doing fences.
If they don't want to do fences, maybe a
bit more of a robust uh you know,
vegetated cover, planting tree screening
or something like that just to prevent,
you know, people just kind of using
these spaces behind the buildings or
beside the buildings uh for something
other than what they were intended for.
Did you hear?
>> Yeah. Again, it's not that we have
opposition to what what Jeff is
requesting in those conditions. So,
we'll we'll certainly work with him to
to address those concerns uh prior to
the zoning hearing board hearing. And if
it turns out that that fencing is what's
best, then that can be provided.
>> And and usually I don't and usually we
don't even include stuff about like the
sidewalks um and you know the fences in
like a zoning relief one.
put that in the land development plan
application, but kind of felt that uh
putting it up front at the beginning of
this process might help to ensure that
it goes a little bit smoothly as they
develop the lock consolidation and land
development plan. So that's not
something that like causes a snag in
that submission.
>> Um Jeff, just to understand the parking
again
>> since this is under the affordable act,
that's what I call it. Um
>> there's 34 minutes, but they only
required to have to have like 17 unit 17
parking spaces. Correct.
>> Correct. They'd have to have 17 overall
uh parking spaces and they have 10. Um
and so they would be required they're
requesting relief from seven off street
parking spaces. Uh and as we noted in
the case report, you know, there's all
of these lots are currently vacant. So,
um you know, there's a lot of frontage
on of on street parking. there's easy
availability to, you know, access on
street parking uh around uh 16th Street
and Regina Street especially. Um and uh
um there are bus routes that they don't
go adjacent to the project sites, but
there are bus routes nearby on 13th
Street, State Street, and Market Street.
Um as well as 17th. So they're kind of
kind of sitting in the middle of that
box. So they have access to both on
street parking um and uh mass transit
routes in the surrounding neighborhood.
>> Okay. Thanks. Um could you gentlemen uh
speak to the neighborhood neighbors at
all of that department?
>> Yes.
>> Yes, we did. We sent um letters out um
most of the stuff we already own. So,
uh, nobody gave us any feedback.
>> And you said the feedback was positive
or
>> I didn't get any feedback, but then the
residents loved what I did the phase
one, so they on board what I'm doing
again for phase two.
>> So, they loved it.
>> Okay. Uh, commissioners, I have no more
questions at this time and we'll go to
Commissioner with any concerns or
questions.
>> No, no concerns, no questions. a great
project. I like to see all this
construction going on in Allison Hill
>> and uh you know with the affordable
housing uh crisis that we're in that you
got to be a little more lax and
deviating seven parking spaces isn't a
problem I don't see. So yeah I support
it
commission
>> I concur
commission
>> yeah I would uh concur as well um a lot
of good development in here and you know
revitalizing vacant lots in field
development. It's It's good to see. So,
I was kind of in agreement like we
wouldn't typically be talking about
fencing in these places, but I think I
can understand why. Um given that so we
have these other are those vacant lots
also owned by the redevelopment
authority
>> kind of in the mix here.
>> I think some are, some aren't. Um, so
for example on the 16th Street uh lot
number two, you'll notice that's like
cut up into two separate triangles. And
I'm guessing they couldn't secure the
ownership of the one little parcel
between those otherwise they would have,
you know, consolidated them all into one
lot and built probably uh facing more
units facing 16th Street there. So yeah,
I think probably the other um, you know,
lots that are interspersed around here
are just under separate ownership.
>> Okay.
Um,
and then the the parking I don't have an
issue with the relief for seven spots. I
think my confusion or question was it
sounds like like on the one hand there
should be ample amount of parking given
this area has a lot of vacant lots. But
then the other hand in tonight I'm
hearing there's a lot of cars parking on
these lots. So do they not have enough
space to park? What is necessitating the
need to park on the street if there's
ample parking,
>> right? Um well, I mean that's a great
question. I think uh you know I think
especially I would say the parking was
more of an issue um along North 15th
Street than it was like along North 16th
Street. The North 16th Street uh and
Regina Street properties like really
didn't feature any of that. But if you
go um down to the lot eight, I believe
um which is just north of Market Street
there and uh lot 7, there is a lot of
parking there even though there's
parking available on the street. And I
think some of that comes down to, you
know, we hear a lot of times why people
are like parked up on the sidewalk.
They're worried about somebody clipping
their mirror as they go through. Um, and
so I think I think it's just a kind of
um, you know, mental thing where people
feel safer with their car off the street
even though there are spaces there. They
just feel better if it's on a lot there.
Um, and so that would be my guess as to
why that condition occurs when there's
available on street parking.
>> Yeah. Just want to make sure there
wasn't some a need that we needed to
address in that neighborhood, right? Not
separate from the project, but
>> All right. Thank you,
>> Commission.
No questions. Just happy to see a
project with so many larger size
departments. So, thank you.
>> Uh, Commissioner Vincent.
>> Yeah. Likewise. No questions. Great
project.
>> Okay. We'll go to the public. If you
have any concerns,
any objections to the project, please
stand.
We'll start to
people mostly now.
>> [clears throat]
>> Can I get a motion?
>> Motion to approve.
>> Is there a second?
>> It's been moved and second for approval
of this project with the four
conditions. All those in favor state by
saying I
>> opposed obsessions
and motion car.
>> Thank you.
Uh we're at uh item number six. This is
a lot consolidation and LDP application
for 112 North 13th Street.
and 105 through 121 Lynon Street. This
is zone RM is followed by
Dred Neil with Aton Horizon Group LLC
and it consolidate the 13 parcels
comprising the project site, convert the
former book publishing building into a
12 unit multi- family multifamily
dwelling and to construct additional
accessory parking and associated
improvements look like.
>> Uh yep. So this uh application is the
land development component of the zoning
relief uh application that was submitted
I believe back in January. Um so uh this
will be the final step in this project
uh moving forward. Um, the applicant is
proposing to consolidate the 13 parcels
comprising the project site uh along
North 13th Street and Lynen Street,
convert the former book publishing
building into a 12-unit multif family
dwelling, and to construct a 15 space
accessory parking lot and associated
improvements on site. The project
proposes one-bedroom units ranging from
537 ft to 680 ft and includes a small
office on the second floor. The project
site is comprised of 13 parcels totaling
42 acres. 12 of the lots are vacant and
the only property that features any
existing development is at 100 North
13th Street which is a.20 acre lot with
a two-story 11,580
ft brick structure which was constructed
in 1922.
The project site is generally bounded by
Calamus Street and 114 North 13th Street
to the north, North 13th Street to the
east, Walnut Street to the south, and
Lynen Street to the west. This detached
brick brick structure is an unusual
early example of the art deco
architectural style with Spanish mission
style and Gothic revival motifs and was
known as the central
printing press building formerly the
church of god central publishing house
which was designed by Frank fontock and
constructed by shoemaker and son. The
building is currently abandoned and has
been so for several decades. Character
defining features include the original
brick facade, a symmetric front facade
featuring decorative motifs, decorative
brick designs within the facade, a
prominent front entrance, a loading dock
on the Walnut Street elevation, and a
parapit wall topped with concrete coping
featuring ge geometrical design elements
which are typical of the art deco style.
The main arched entryway on North 13th
Street projects out from the facade, is
emphasized by buttresses and a
semic-ircular coping design, and
features simple wooden double doors
beneath a boarded up arch transom and a
sign identifying it as the central
publishing house. There's a secondary
pedestrian entrance and a vehicular
loading area accessed from Walnut
Street. Although many of the windows are
boarded up, fenistration primarily
consists of casement type windows that
are that originally had glass panes and
metal frames which were lost to rust.
The windows also feature decorative flat
arches and a belt course above the
seconds story windows. The structure is
topped with a flat rubber roof. The
project site also includes adjacent
vacant parcels to the north and west.
The industrial institutional structure
is unique in a neighborhood which
features primarily single family
attached row homes with scattered
commercial and instit and industrial
uses. Although determined to be not
eligible for listing on the National
Register of Historic Places, the
building is an important cultural
resource for the neighborhood and
contributes to the overall character of
the streetscape and neighborhood. The
project will allow the building to be a
contributing resource once again. The
planning bureau staff recommends the
request be approved with the following
conditions.
The applicant must conform to the
requirements outlined in the city
engineers review. Uh the applicant
should consider extending the fence
around the perimeter of the site in
including along the north 13th Street
and Walnut Street frontages with gates
at the location of proposed walkways to
enhance security and sight control for
residents and prevent public access to
the proposed rain garden. The planning
bureau recommends the applicant consider
creating an outdoor leisure area for
residents such as a patio or other type
of outdoor seating. And finally,
although the principal building is not
located within the AOD, it has historic
and architectural value to the
neighborhood and is located at a
conspicuous intersection. As such, the
applicant should endeavor to utilize
historically appropriate materials and
designs and exterior features such as
windows or doors. Plan B staff
recommends the request be approved for
the following reasons. The subject
property is a unique industrial
structure which has been vacant for
several decades, has experienced
significant deterioration over time, and
has imposed blight on the neighborhood
as well as small lots which have been
vacant for at least a decade. As such, a
project that can adapt adaptively reuse
the properties and allow them to
contribute to enhancement of the
community will provide a significant
aesthetic improvement for the
neighborhood. The 12 apartment units
will address the city's need for housing
by providing quality housing options in
a vacant building. While not certified
as affordable units per the city's
affordable housing policy definition,
the provision of more housing units will
help to combat rising housing costs. And
finally, the project will result in
improvements to the streetscape and
pedestri pedestrian infrastructure that
will benefit residents of the
surrounding neighborhood as it will
enhance a conspicuous corner lot along
one of the primary corridors in the
Allison Hill neighborhood, adding new
residents to the neighborhood,
activating the street and community on
nights and weekends, and contributing to
a growing customer base to support local
businesses. Could
you gentlemen state your name, address,
and relationship to this project?
>> Sure. Um, Sane Gist, project manager
with Integrated Consulting, the civil
engineer of record on this. We are
located at 4 Casey Court, Mechanicsburg,
>> and Jared Neil with Halden Horizons
Group at 227 State Street, Harrisburg,
and the owner of the property.
Uh both of you heard the staff report
with the four conditions. Are you
acceptable in those conditions?
>> Yeah, no issu uh yeah, no issues with
the conditions. Um we we want to go
ahead and just kind of look at the site
plan to see where we could fit in the
leisure area. Um and maybe just get an
understanding of how the fence fences
would wrap around um Walnut and and 13th
Street. But but no no reservations to to
to taking that. So, we will take that
into consideration certainly.
>> Uh, and the other questions, did you
speak to the neighbors or I know they
had and then they used to have a
neighborhood group back there. I don't
know they still do or not, but
>> um so so actually yes. Um is just last
week we met with um I believe it was a a
me a former member of that group or
former staff member of that group. So,
we spoke with him, but even that prior
to zoning, um, we had reached out to
some of the neighbors and just got some
feedback. Um, really the the feedback
was, you know, they love the building
and they're glad to see something be
finally done with it. Um, if you've been
by there recently, we started to clean
up the property. We boarded up the
windows, did a um, they really
winterized it um, just as we were
holding it over the winter months as
we're going through entitlement. So, um,
I think the feedback has been good from
what we've heard.
Y
>> uh you want to add anything or you going
to show us pictures or
>> I can add a few things to what Jeffrey
provided. Um over here I have the site
plan which you should hopefully have a
smaller copy of the plans in front of
you, but I'm just going to talk about a
couple of the features. So um as part of
the zoning approvals, there was a few
conditions that were associated with
that at the time. Um, one of those was,
you know, being that, uh, there needed
to be a fence around the parking lot to
kind of shade head, you know, uh, screen
out headlights and provide a little more
privacy around there. So, um, that
combined with the fact that the parking
lot uh, area is subject to the summit
terrace historic district guidelines.
So, we will be go taking this through
the uh, architectural review board as
well. But what we're proposing is more
of a kind of decorative style of of
fencing that uh you know kind of
changing now that P the PVC fence that's
out there um that provides both that
privacy screening as well as a little
bit of more aesthetic feature to the
perimeter of the property. There also be
street trees surrounding that as well.
So aesthetically it's going to look a
lot better from a street streetscape uh
point of view. Um they are also
providing ADA access along uh Walnut
Street. The entrance there, there's an
existing entrance to the building. So in
interior to that building, it'll be a
ramp access to the uh within within the
the first floor there. Um and largely
speaking, and I the architect's not here
tonight, but I do have kind of a
full-size rendering that they provided
here.
>> [clears throat]
>> So the facade is to remain intact as um
you know Jeffrey was kind of describing
the features of it. It's obviously a um
a well you know it's a long-standing
architectural uh design that we want
that the applicant wants to maintain. Um
but as you noted the windows need some
assistance right there's so there's some
window treatments proposed over the
front entrance along 13th Street. there
would be an overhang kind of as you see
depicted there. Um and and some of the
uh typical light fixtures that would be
around the building. Um we we did submit
a lighting plan or for the parking lot
after the initial submission. We were a
little behind on that part of it, but um
we are meeting the code requirements uh
with that that plan um within the
parking lot. So trying to cut off any
spilled over from out, you know, going
outside the right of way of the the
property. Um outside of that, there was
just a couple waiver requirements we had
was or um waiver request was just the
preliminary plan as well as um the
minimum separation between a driveway
and intersection of right ofway streets.
The intersection that's along Calamus
back in here.
Oh, it's this one. Oh, yeah, that works.
That's easier. Um, the intersection, the
the entrance that's along Kalamus Street
there, uh, just given the where where
it's located and the proximity uh to the
Lynen Street intersection, we're not
able to achieve the 40 foot separation.
So, we're asking for a waiver of that
requirement. Um as well as
the curb radi requirement for
multifamily development I think is 20 ft
and it's just not achievable. We're
we're providing uh 5t I believe at all
the the entrance areas um from Lynen as
well as Kalamus. So it would be two-way
access coming off you know both both
streets there. um we are providing the
uh required amount of parking as well as
an 188 space with that um and an ADA
pathway to get into the building there.
Um so just a couple additional details
to add on to the narrative there, but
we're open for any questions.
Um
>> I think this is a a great project.
Again, I know a few years ago we had
another contractor
didn't work out with them, I guess.
[clears throat] And that building's
still standing there like
it's ugly, you know, that's all I can
say. So, anything to approve that corner
that that's great and seem like you guys
are doing a good job with that.
So, I have no questions at this time.
Especially the commissioners.
>> Yeah, it's a it's a great bud and glad
city will be utilized. So, nothing not
to like about the project. All in favor,
>> Commissioner Reed.
>> No questions or concerns.
>> Commissioner M.
>> I think uh it's a a great land
development project. Love the plan set.
Appreciate the thoroughess and um I'm
assuming uh Jeff the city engineers
review will be attached to all of this.
It wasn't an
>> Yeah, I don't think it was in the Harky
packets, but it's on the online one. I
think you know some of the statements
were basically 5 foot wide sidewalks
instead of 4 foot wide which is shown on
the plan. Um but it was generally minor
issues such as that.
>> Thank you
>> questionc.
>> Yeah no questions.
>> Okay. This is no one from the public on
the left. one person here for against
the project and one there. So as I said
before I guess it is again as said like
to see all this building and especially
properties that you can people can rent
or afford to live in. So with that uh
could I get a motion
>> motion to approve with conditions?
>> Is there a second?
>> Second. It's been moved and seconded for
approval of this project with the four
conditions. All those in favor say I.
>> I oppos.
>> Thank you so much. Thank you.
>> Uh just uh introducing the new deputy
director uh Stephanie Thompson.
>> [laughter]
>> has the nerve to sit next to you.
I can't wait.
>> Yeah, I don't know who this is. No. Um,
no. Stephanie started uh April 6th, so
she's been here a month now. Um, and uh
she uh graduated from the same college I
did. Uh, but I did not meet her through
an alumni network. Uh, actually my
barber introduced me to her. So, just
happened to be we both went to Virginia
Comwalth University. Um but uh uh you
know she'll be taking over the planning
commission and zoning hearing board
meetings moving forward probably
definitely by July uh and uh maybe have
her leading um the case reports from the
planning bureau's perspective in June.
Um so because we have a relatively light
agenda, just two cases there for June.
So I think it'll be a good good time for
her to uh get her feet wet on that. Uh,
and with that, I'll uh let Stephanie
provide a little bit more information
about herself.
>> I don't really have any more
information. [laughter]
>> I actually am from Harrisburg. Okay.
>> Born and raised.
>> That's good.
>> Only thing I request of you, since Jeff
does it, all I ask for water.
>> There you go.
>> I was warned about the water.
>> Yeah.
I was [snorts] best that's because
you're here. I think that's why.
[laughter]
But besides that, I think you'll enjoy
yourself working. We have a good mission
here dedicated and welcome aboard.
>> Thank you.
>> Um the only other thing is why is this
gentleman still here?
>> In the future developing projects as
well. I'm stay
Greg a lot.
>> Yeah. Yeah. Yeah.
>> Yes. So, I just want to This is my
second time coming here, so I love
everything that's going around. So, I'm
here.
So, I got to All right, man.
>> No, you don't have to leave.
[laughter]
>> You can.
>> I love this. I love this.
>> One day I'll be sitting there.
>> People don't get bored with our meeting.
>> See, we can see there's nobody here.
>> Sitting there one day [laughter]
with a big project.
Okay.
>> That's very good.
>> Yes, sir.
>> Okay. Is there any before German
anything was good at order?
>> Oh, city solicitor. Anything?
>> Okay. With that, can I get a motion for
a German?
So move.
>> Is there a second?
More transcripts
Explore other videos transcribed with YouTLDR.

How Export Controls Helped Not Hurt China & Power is the Bottleneck to AI | Perplexity CEO
20VC with Harry Stebbings · English

John 3:16 Was NEVER About How Much It Was About How
Deep Made Simple · Urdu

Google DeepMind Pre-Training Lead: How To Land a Job at a Frontier Lab | Vlad Feinberg
Ryan Peterman · English

Conductor CEO Charlie Holtz Walks Us Through His AI Coding Setup
Y Combinator · English

Harrisburg City Council - Legislative Session 6/9/2026
The City of Harrisburg - WHBG20 · English

Harrisburg City Planning Commission Meeting - 6/3/2026
The City of Harrisburg - WHBG20 · English

Harrisburg City Council Work Session 4-21-2026
The City of Harrisburg - WHBG20 · English

Harrisburg City Council - Work Session 06/02/2026
The City of Harrisburg - WHBG20 · English

Harrisburg City Council Meeting 5-26-2026
The City of Harrisburg - WHBG20 · English

Harrisburg Zoning Hearing Board Meeting 5/18/26
The City of Harrisburg - WHBG20 · English

Harrisburg City Council Legislative Session - 5/12/26
The City of Harrisburg - WHBG20 · English

Harrisburg City Council Work Session 5-5-2026
The City of Harrisburg - WHBG20 · English
Get the TLDR of any YouTube video
Transcribe, summarize, and repurpose videos in 125+ languages — free, no signup required.